DE2426999A1 - GIRDER-BASED SUPPORT SYSTEM, IN PARTICULAR FOR FORMWORK PRISM-SHAPED STRUCTURES AND PROCEDURES FOR PRE-ASSEMBLING THEREOF - Google Patents
GIRDER-BASED SUPPORT SYSTEM, IN PARTICULAR FOR FORMWORK PRISM-SHAPED STRUCTURES AND PROCEDURES FOR PRE-ASSEMBLING THEREOFInfo
- Publication number
- DE2426999A1 DE2426999A1 DE19742426999 DE2426999A DE2426999A1 DE 2426999 A1 DE2426999 A1 DE 2426999A1 DE 19742426999 DE19742426999 DE 19742426999 DE 2426999 A DE2426999 A DE 2426999A DE 2426999 A1 DE2426999 A1 DE 2426999A1
- Authority
- DE
- Germany
- Prior art keywords
- formwork
- vertical
- profiles
- horizontal
- support system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000009415 formwork Methods 0.000 title claims description 97
- 238000000034 method Methods 0.000 title claims description 4
- 238000010276 construction Methods 0.000 claims description 9
- 239000000725 suspension Substances 0.000 claims 1
- 239000000463 material Substances 0.000 description 4
- 230000006641 stabilisation Effects 0.000 description 3
- 238000011105 stabilization Methods 0.000 description 3
- 230000006978 adaptation Effects 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/14—Bracing or strutting arrangements for formwalls; Devices for aligning forms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
Trägerro3tartiges Unterstützungssystem, insbesondere Sür Schalungen prismenförmiger Baukörper sowie Verfahren zu dessen Vormontage Die Erfindung~betrifft ein trägerrostartiges Unterstützangssystem, insbesondere für Schalungen prismenförmiger Baukörper, das aus der Unterstützungskonstruktion für Schalungen nach Patent 2 142 150 gebildet wird und ein Verfahren zur Vormontage dieses UnterstUtzungssystems.Girder-like support system, especially for formwork prism-shaped structure and method for its pre-assembly The invention relates a grid-like support system, especially for prism-shaped formwork Structure, which is derived from the support structure for formwork according to patent 2 142 150 is formed and a method for pre-assembling this support system.
Bekannt sind Schalungen für prismenförmige Baukörper, die durch horizontal angeordnete Trägerkränze unterstützt sind, wobei die Schalhaut direkt an den Trägerkränzen anliegt.Formworks for prismatic structures are known, which are horizontal arranged girder wreaths are supported, the formwork facing directly on the girder wreaths is present.
Diese sind über spezielle Rohrkupplungen mit vertikalen Gerüstrohren verbunden, die die Trägerkränze in ihrem Abstand halten.These are via special pipe couplings with vertical scaffold pipes connected, which keep the wreaths in their distance.
Die Anzahl der horizontalen Trägerkränze richtet sich nach der Tragfähigkeit der Schalhaut.The number of horizontal girder rings depends on the load-bearing capacity the formlining.
Sind in der Schalhaut horizontale Stoßfugen erforderlich, ist in Höhe dieser Fuge zusätzlich ein weiterer Trägerkranz erforderlich.If horizontal butt joints are required in the formlining, the height is this joint requires an additional support wreath.
Abweichungen von genormten Schaltafelmaßen sind in jedem Fall durch Paßtafeln auszugleichen.Deviations from standardized panel dimensions are definitely possible Compensate for pass panels.
Arbeits- und Stabilisìerungsgerüste sind selbständig stehend hinter der Schalung angeordnet und mit den vertikalen Gerüstrohren verbunden.Work and stabilization scaffolding are standing independently behind arranged on the formwork and connected to the vertical scaffolding tubes.
Im Montagezustand ist die Schalung durch Schrägstützen gehalten.In the assembled state, the formwork is held in place by inclined supports.
Bei der Herstellung von abgetreppten Fundamenten ist der kleinere Schalungsaufsatz durch Anordnung von Kanthölzern unterstützt, die auf dem Schalungsunterteil abgesetzt sind.When making stepped foundations, the smaller one Formwork attachment supported by the arrangement of square timbers on the lower part of the formwork are discontinued.
Bei sehr langen Seitenwänden des Schalungsaufsatzes wird dieser erst nach dem Betonieren des darunterliegenden Fundamentabsatzes auf den abgebundenen Beton gestellt.If the side walls of the formwork attachment are very long, this will only be after concreting the underlying foundation shoulder on the set Placed concrete.
Erfolgt das Umsetzen der prismenförmigen Schalung mittels eines Kranes, müssen die vertikalen Gerüstrohre in sehr engen Abständen angeordnet werden, um eine ausreichende Lastverteilung auf alle vertikalen Trägerkränze zu sichern.If the prism-shaped formwork is moved using a crane, the vertical scaffolding tubes must be arranged at very close intervals in order to to ensure adequate load distribution on all vertical girder rings.
Die Vormontage der Schalung erfolgt vorzugsweise unter Verwendung von Montagelehren.The formwork is preferably pre-assembled using of assembly jigs.
Infolge der relativ niedrigen Tragfähigkeit der Schalhaut müssen die horizontalen Trägerkränze in einem engen Abstand angeordnet werden, so daß deren Tragfähigkeit häufig ausgelastet werden kann.Due to the relatively low load-bearing capacity of the formlining, the horizontal support wreaths are arranged at a narrow distance so that their Load capacity can often be used to full capacity.
Der Materialaufwand wird bei erforderlichen horizontalen Stoßfugen der Schalhaut durch den zusätzlich erforderlichen Trägerkranz noch erhöht.The cost of materials is required when horizontal butt joints are required the formlining is increased by the additionally required support wreath.
Die Verbindung der Trägerkränze durch die vertikalen Gerüstrohre ist häufig nicht steif genug, so daß sich die Abstände der Trägerkränze bei mehrmaligen Umsetzen der vorgefertigten Schalung verschieben und die Verbindungen mit der Schalhaut sich lösen.The connection of the girder rings through the vertical scaffolding tubes is often not stiff enough, so that the distances between the support wreaths are repeated several times Relocate the prefabricated formwork and move the connections with the formlining loosen up.
Dadurch treten Verzögerungen und erhöhter Arbeitsaufwand beim Umsetzen auf.This results in delays and increased workload during implementation on.
Bei Abweichungen der Baukörper in der Länge und Breite von den genormten Schaltafelmaßen müssen in jedem Falle Paßtafeln angeordnet werden, da die Trägerkränze keinen Toleranzausgleich ermöglichen.If the building structure deviates from the standardized length and width Formwork panel dimensions must be arranged in any case, as the girder wreaths do not allow tolerance compensation.
Die selbständig stehenden Arbeits- und Stabilisierungsgerüste erfordern einen hohen Arbeits- und Materialaufwand.The independently standing work and stabilization scaffolding require a high amount of work and material.
Die Absteifung der einzelnen Schalwände bei der Montage durch Schrägstützen ist nicht in jedem Falle ausreichend0 Justierungen sind mit Schwierigkeiten verbunden.The bracing of the individual formwork walls during assembly by means of diagonal supports is not sufficient in every case0 Adjustments are associated with difficulties.
Bei der Herstellung großer abgetreppter Fundamente entstehen durch Wartezeiten bis zum Abbinden des Betons des unteren Fundamentabsatzes große technologische Pausen und zusätzlicher Arbeitsaufwand.When making large stepped foundations arise through Waiting times for the concrete of the lower foundation shoulder to set, great technological Breaks and additional work.
Der Einsatz eines Kranes beim Umsetzen der Schalung ist nur mit einem erhöhten Raterialaufwand für die Aussteifung der Schalung möglich.The use of a crane when moving the formwork is only possible with one increased material expenditure for stiffening the formwork possible.
Die Vormontage mit Montagelehren erfordert einen hohen Zeitaufwand für das Anfertigen der Lehren.The pre-assembly with assembly jigs takes a lot of time for making the gauges.
Zweck der Erfindung ist es, durch sinnvolle Anwendung der Unterstützungskonstraktion-für Schalungen nach Patent 2 142 150 die aufgezeigten ijängel zu beseitigen oder zu vermindern.The purpose of the invention is, by sensible application of the support contraction-for Formwork according to patent 2,142,150 to eliminate or to eliminate the indicated problems Reduce.
Der Erfindung liegt die Aufgabe zugrunde, ohne Erweiterung des Elementesortimentes der Unterstützungskonstruktion nach Patent 2 142 150 die Anwendung für Schalungen von insbesondere prismenförmigen Baukörpern mit horizontalen Trägerkränzen so zu verbessern, daß alle Belange der Arbeitssicherheit, der Anpaßbarkeit an die Bauteilmaße, der Vormontage und des Umsetzens berücksichtigt werden.The invention is based on the object without expanding the range of elements the support structure according to patent 2,142,150 is used for formwork of, in particular, prism-shaped structures with horizontal support wreaths improve that all concerns of occupational safety, adaptability to the component dimensions, pre-assembly and relocation must be taken into account.
Erfindungsgemäß besteht das trägerrostartige Unterstützungs systems insbesondere für prismenförmige Baukörper, aus vertikal angeordneten Schalungsträgern aus Doppel - U -Profilen, die bereits an den vorgefertigten Schaltafeln befestigt sein können und horizontalen Schalungsträgern aus Doppel - U -Profilen und Hohlkastenprofilen nach Patent 2 142 150, die die vorgefertigten Schaltafeln mit den vertikalen Schalungeträgern kranzartig umschließen.According to the invention, there is a grid-like support system especially for prism-shaped structures, made of vertically arranged formwork beams made of double U profiles, which are already attached to the prefabricated formwork panels can be and horizontal formwork girders made of double U profiles and hollow box profiles according to patent 2,142,150, which the prefabricated formwork panels with the vertical formwork beams Enclose like a wreath.
Insbesondere die horizontalen Schalungsträger können durch eine Unterspannkonstruktion verstärkt werden.In particular, the horizontal formwork beams can be supported by a soffit construction be reinforced.
Durch Einschieben von HohlkastenproSilen in die vertikalen Doppel - U - Profile ist eine beliebige Variabilität der Schalungehöhe möglich.By inserting hollow box profiles into the vertical double - U-profiles, any variability of the formwork height is possible.
Die vorgefertigten Schaltafeln können im Bereich der vertikalen Kante des Baukörpers bis zum Innenflansch der horizontalen Trägerkränze um ein beliebiges Baß überstehen.The prefabricated formwork panels can be used in the area of the vertical edge of the building up to the inner flange of the horizontal girder wreaths by any Survive the bass.
Dadurch ist die Notwendigkeit des Einsatzes von Paßschaltafeln weitgehend reduziert.As a result, the need to use passport formwork is largely reduced.
An den vertikalen Schalungsträgern können in beliebiger Höhe Konsole Sür Laufstege oder Arbeitsgerüste oder zur Abstützung der einzelnen Schalungswände im Montagezustand angebracht werden.Brackets can be attached to the vertical formwork beams at any height For walkways or work scaffolding or to support the individual formwork walls be attached in the assembled state.
Bei der Verwendung von Schalungsträgern mit Unterspannkonstruktion für die horizontalen Trägerkränze können diese gleichzeitig als Tragelemente für ein Lauf- und Arbeitsgerüst genutzt werden. Die Unterspannkonstruktion ist dann durch vertikal angeoranete Gerüstrohre unterstützt, die den Gerüstboden soweit überragen, daß durch das Anbringen von horizontalen Gerüstrohren ein Schutzgeländer gebildet werden kann.When using formwork girders with a sub-structure for the horizontal girder wreaths, these can also be used as supporting elements for a walking and working scaffold can be used. The soffit construction is then supported by vertically arranged scaffolding tubes that protrude beyond the scaffolding floor, that a protective railing is formed by attaching horizontal scaffolding tubes can be.
Bei abgetreppten Fundamenten kann der kleinere Schalungsaufsatz durch Konsolen auf das Schalungsunterteil abgestützt werden, die an den vertikalen Schalungsträgern des Schalung aufsatzes befestigt sind.With stepped foundations, the smaller formwork attachment can pass through Consoles are supported on the formwork base, which is attached to the vertical formwork girders of the formwork attachment are attached.
Beim Umsetzen der Schalung für prismenförmige Baukörper mittels eines Kranes können Seilschlingen in einfacher Weise durch einen Steckbolzen an den vertikalen Schalungsträgern befestigt werden.When moving the formwork for prismatic structures by means of a Cranes can easily attach rope slings to the vertical by means of a socket pin Formwork supports are attached.
Die Vormontage der trägerrostartigen Unterstützungskonstruktion, insbesondere für prismenförmige Baukörper erfolgt in folgenden Arbeitsschritten: - Auslegen der mit U-Profilen verbundenen vorgefertigten Schaltafeln auf einer ebenen Fläche - Verbinden der vertikalen Schalungsträger als Doppel -U -Profile durch Bolzen-Keil-Verbindungen und erforderliche Höhenanpassung durch Hohlkastenprofile - Vormontage der horizontalen Schalungsträger - Auslegen und Verbinden der horizontalen mit den vertikalen Schalungsträgern - Anbringen der erforderlichen KOnsole für Laufstege oder Arbeitsgerüste oder als Abstützungen bzw. der Gerüstrohre als Abstützungen für die Unterspannkonstruktion, die als Arbeitsgerüst genutzt werden soll - Aufrichten der einzelnen Schalungswände und Verbinden der horizontalen Schalungsträger zu Trägerkränzen Durch die Verwendung von vertikalen Schalungsträgern können die horizontalen Trägerkränze in größeren Abständen angeordnet werden, wobei an den vertikalen Stoßfugen der Schalhaut kein zusätzlicher Trägerkranz benötigt wird.The pre-assembly of the grid-like support structure, in particular for prism-shaped structures takes place in the following work steps: - Laying out the prefabricated formwork panels connected with U-profiles on a flat surface - Connect the vertical formwork beams as double-U profiles using bolt-wedge connections and required height adjustment through hollow box profiles - pre-assembly of the horizontal Formwork girders - laying out and connecting the horizontal and vertical formwork girders - Attachment of the necessary console for walkways or work scaffolding or as Supports or the scaffolding tubes as supports for the sub-span construction, which is to be used as work scaffolding - erecting the individual formwork walls and connecting the horizontal formwork girders to form girder rings By the use of vertical formwork girders can make the horizontal girder rings be arranged at larger intervals, with the vertical butt joints of the formlining no additional support ring is required.
Die Anpassung an beliebige Baukörpermaße in der Länge und Breite ist in einem großen Toleranzbereich ohne Paßschaltafeln möglich.The adaptation to any building dimensions in length and width is Possible within a large tolerance range without passport panels.
Der Arbeits- und Materialaufwand für Arbeits- und Stabilisierungsgerüste sowie Absteifungen kann durch die Einsatzmöglichkeit von Konsolen bzw. die Nutzung der Unterspannkonstruktion als Tragelemente für diese Gerüste wesentlich reduziert werden. Außerdem kann beim Einsatz von Konsolen als Abstützungen der einzelnen Montagewände im Montagezustand eine einwandfreie Justierung ermöglicht werden.The amount of work and material required for work and stabilization scaffolding as well as bracing can be achieved through the use of consoles or the use of significantly reduced the soffit construction as support elements for these scaffolding will. In addition, when using consoles as supports for the individual assembly walls perfect adjustment can be made possible in the assembled state.
Das Absetzen des kleineren Schalungsaufsatzes mittels Konsolen auf das Schalungsunterteil stellt eine völlig neue Lösungsvariante dar, die eine vereinfachte Montage des Schalungsaufsatzes ermöglicht. Bei großen abgetreppten Fundamenten können technologisch bedingte Wartezeiten vermieden werden.The lowering of the smaller formwork attachment using consoles the lower part of the formwork represents a completely new variant of the solution that simplifies one Allows assembly of the formwork attachment. With large stepped foundations you can technology-related waiting times can be avoided.
Das Umsetzen der Schalung für prismenförmige Baukörper mittels Kran wird vereinfacht, wobei eine gute Lastverteilung und Stabilität gewährleistet ist.Moving the formwork for prismatic structures using a crane is simplified while ensuring good load distribution and stability.
Die beschriebene Schalungskonstruktion ermöglicht die Verbesserung des Arbeitsschutzes und der technischen Sicherheit und die Erhöhung der Qualität. Die Vormontage erfordert keine besonderen Vormontagelehren.The formwork construction described enables the improvement occupational health and safety and technical safety and the increase in quality. The pre-assembly does not require any special pre-assembly jigs.
Die Erfindung soll nachstehend an einem Ausführungsbeispiel näher erläutert werden. In der zugehörigen Zeichnung zeigen: Fig. 1 die perspektivische Ansicht einer prismenförmigen Schalung für ein abgetrepptes Fundament Fig. 2 eine Schalungsecke als Draufsicht Das Schalungsunterteil und der kleinere Schalungsaufsatz nach Fig. 1 besteht aus einem trägerrostartigen Unterstützungssystem, das aus vertikalen Schalungsträgern 1 aus Doppel - U -Profilen 2, die bereits an den vorgefertigten Schaltafeln 3 befestigt sind, und horizontalen Trägerkränzen 4 aus Doppel - U -Profilen 2 und Hohlkastenprofilen 5 besteht.The invention is to be described in more detail below using an exemplary embodiment explained. The accompanying drawings show: FIG. 1 the perspective View of a prism-shaped formwork for a stepped foundation Fig. 2 a Formwork corner as a top view The lower part of the formwork and the smaller one Formwork attachment according to Fig. 1 consists of a grid-like support system, that from vertical formwork girders 1 from double U profiles 2, which are already on the prefabricated formwork panels 3 are attached, and horizontal support wreaths 4 consists of double U profiles 2 and hollow box profiles 5.
Die horizontaZen Trägerkränze 4 sind teilweise durch eine Unterspannkonstruktion 6 verstärkt. Durch das Einschieben von Hohlkastenprofilen 5 in die Doppel - U-Profile 2 der vertikalen Schalungsträger 1 ist die Schalungshöhe dem Baukörper 7 angepaßt.The horizontaZen girder rings 4 are partially through a sub-tensioning construction 6 reinforced. By inserting hollow box profiles 5 into the double U-profiles 2 of the vertical formwork supports 1, the formwork height is adapted to the structure 7.
Die Verbindung der vertikalen Schalungsträger 1 mit den horizontalen Trägerkränzen 4 erfolgt durch Bügel 8 und Holzkeile 9 jeweils an den Kreuzungspunkten.The connection of the vertical formwork support 1 with the horizontal Support wreaths 4 are carried out by brackets 8 and wooden wedges 9 at the intersection points.
Bei den horizontalen Trägerkränzen 4 sind jeweils Doppel- U -Profile 2 und Hohlkastenprofile 5 so angeordnet, daß sie in den Ecken kammartig ineinandergreifen und durch Bolzen-Keil-Verbindungen 10 befestigt sind.The horizontal girder wreaths 4 each have double U profiles 2 and hollow box profiles 5 arranged so that they mesh like a comb in the corners and fastened by bolt-wedge connections 10.
Die Bauteilmaße sind ohne Anwendung von Paßschaltafeln an jeder Seite der einzelnen Schalungswände in der Breite und Länge im Toleranzbereich 11 (siehe Fig. 2) variierbar, der durch die vertikale Kante des Baukörpers 7 und den Innenflansch der horizontalen Trägerkränze 4 begrenzt ist.The component dimensions are without the use of fitted panels on each side of the individual formwork walls in width and length within tolerance range 11 (see Fig. 2), which can be varied by the vertical edge of the structure 7 and the inner flange the horizontal support rings 4 is limited.
An den vertikalen Schalungsträgern 1 sind beliebig Konsolen 12 für Arbeitsgerüste, als Abstützung der Schalungswände im Montagezustand oder als Abstützung für den Schalungsaufsatz angebracht.On the vertical formwork beams 1 are any brackets 12 for Work scaffolding, as a support for the formwork walls in the assembled state or as a support attached for the formwork attachment.
An den Konsolen 12 zur Abstützung der Schalungswände sind höhenverstellbare StützenSüße 13 für die Justierung befestigt.On the consoles 12 for supporting the formwork walls are height-adjustable Support bracket 13 attached for adjustment.
Die Unterspannkonstruktion 6 der horizontalen Drägerkränze 4 ist gleichzeitig als Arbeitsgerüst genutzt, wobei die Unterspannkonstruktion 6 durch vertikale Gerüstrohre 14 unterstützt ist, die den Gerüstboden 15 soweit überragen, daß durch das Anbringen von horizontalen Gerüstrohren 16 ein Schutzgeländer gebildet wird.The supporting structure 6 of the horizontal Dräger wreaths 4 is at the same time used as a working scaffold, the sub-structure 6 by vertical scaffold tubes 14 is supported, which protrude beyond the scaffolding floor 15 that by attaching a guardrail is formed by horizontal scaffolding tubes 16.
Beim Umsetzen der Schalung für prismenförmige Baukörper mittels eines Kranes werden Seilschlingen in den obersten Löchern der Doppel - U -Profile 2 bzw.When moving the formwork for prismatic structures by means of a Rope loops are placed in the top holes of the double U-profiles 2 resp.
der Hohlkastenprofile 5 der vertikalen Schalungsträger 1 durch einen Steckbolzen befestigt.the hollow box profiles 5 of the vertical formwork support 1 by a Locking pin fastened.
Die Vormontage der Schalung für prismenförmige Baukörper wird wie folgt durchgeführt.The pre-assembly of the formwork for prism-shaped structures is like follows carried out.
Auf einer ebenen Pläche werden die mit den Doppel- U -Profilen 2 verbundenen vorgefertigten Schalungstafeln 3 ausgelegt. Die Doppel - U -Profile 2 der einzelnen Schaltafeln 3 werden mit Bolzen-Keil Verbindungen 10 zusammengespannt und die erforderliche Höhenanpassung durch Befestigung von Hohlkastenprofilen 5 hergestellt.The double-U profiles 2 are connected on a flat surface prefabricated formwork panels 3 designed. The double U profiles 2 of each Formwork panels 3 are clamped together with bolt-wedge connections 10 and the required Height adjustment made by fastening hollow box profiles 5.
Danach erfolgt die Vormontage der Schalungsträger für die horizontalen Trägerkränze 4 einschließlich das Anbringen der Unterspannkonstruktion 6. Diese horizontalen Schalungsträger werden auf die vormontierte Schalfläche aufgelegt und mit den vertikalen Schalungsträgern 1 durch Bügel 8 und Holzkeile 9 verbunden.This is followed by the pre-assembly of the formwork beams for the horizontal ones Support wreaths 4 including the attachment of the sub-structure 6. These horizontal formwork beams are placed on the pre-assembled formwork surface and connected to the vertical formwork girders 1 by brackets 8 and 9 wooden wedges.
Danach erfolgt das Anbringen der Konsolen 12 bzw. der vertikalen und horizontalen Gerüstrohre 14/16.Then the brackets 12 or the vertical and horizontal scaffolding tubes 14/16.
Die einzelnen Schalungswände werden aufgerichtet und zu der Schalung Sür priamenförmige Baukörper zusammengestellt, wobei über die Konsolen 12, die als Abstützungen Im Montage zustand dienen und die höhenverstellbaren Stützenfüße 13 eine Justierung erfolgt.The individual formwork walls are erected and attached to the formwork Assembled for priamen-shaped structures, with the consoles 12, which are called Supports are used in the assembly state and the height-adjustable support feet 13 an adjustment takes place.
Die horizontalen Schalungsträger werden durch Bolzen-Keil-Verbinduggen 10 zu Schalungskränzen 4 verbunden.The horizontal formwork beams are made using bolt and wedge connections 10 connected to formwork rings 4.
Claims (9)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DD17146473A DD107506A2 (en) | 1973-06-12 | 1973-06-12 |
Publications (1)
Publication Number | Publication Date |
---|---|
DE2426999A1 true DE2426999A1 (en) | 1975-01-09 |
Family
ID=5491599
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19742426999 Withdrawn DE2426999A1 (en) | 1973-06-12 | 1974-06-04 | GIRDER-BASED SUPPORT SYSTEM, IN PARTICULAR FOR FORMWORK PRISM-SHAPED STRUCTURES AND PROCEDURES FOR PRE-ASSEMBLING THEREOF |
Country Status (3)
Country | Link |
---|---|
CS (1) | CS211437B1 (en) |
DD (1) | DD107506A2 (en) |
DE (1) | DE2426999A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009043750A1 (en) * | 2007-10-04 | 2009-04-09 | Doka Industrie Gmbh | Formwork configuration for the cantilever construction of bridges |
WO2009043748A1 (en) * | 2007-10-04 | 2009-04-09 | Doka Industrie Gmbh | Framework arrangement for the cantilever construction of bridges |
IT201600131088A1 (en) * | 2016-12-27 | 2018-06-27 | Gran Building S R L | System for the construction of a walkable raised surface in formwork |
-
1973
- 1973-06-12 DD DD17146473A patent/DD107506A2/xx unknown
-
1974
- 1974-06-04 DE DE19742426999 patent/DE2426999A1/en not_active Withdrawn
- 1974-06-11 CS CS414274A patent/CS211437B1/en unknown
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009043750A1 (en) * | 2007-10-04 | 2009-04-09 | Doka Industrie Gmbh | Formwork configuration for the cantilever construction of bridges |
WO2009043748A1 (en) * | 2007-10-04 | 2009-04-09 | Doka Industrie Gmbh | Framework arrangement for the cantilever construction of bridges |
IT201600131088A1 (en) * | 2016-12-27 | 2018-06-27 | Gran Building S R L | System for the construction of a walkable raised surface in formwork |
Also Published As
Publication number | Publication date |
---|---|
DD107506A2 (en) | 1974-08-12 |
CS211437B1 (en) | 1982-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2914790A1 (en) | Method for producing a tower construction from reinforced concrete | |
WO2008148637A1 (en) | Self-climbing system and method for pouring concrete for a girder and/or mounting a prefabricated section using a self-climbing system | |
DE202015003841U1 (en) | Modular formwork system | |
DE102017114090B4 (en) | Method of constructing a building | |
EP0350525B1 (en) | Method for producing building-walls and a shuttering system | |
DE202021102448U1 (en) | Cantilever bracket and flange template for steel-concrete composite girders | |
DE29701162U1 (en) | Building construction | |
DE2426999A1 (en) | GIRDER-BASED SUPPORT SYSTEM, IN PARTICULAR FOR FORMWORK PRISM-SHAPED STRUCTURES AND PROCEDURES FOR PRE-ASSEMBLING THEREOF | |
EP0004251A1 (en) | Method of building a load-bearing structure, device for carrying out the method and set of parts for constructing the device | |
DE4215039A1 (en) | COMPOSITE COMPONENTS MADE OF WOOD AND STEEL CONCRETE | |
DE2309722A1 (en) | PROCESS FOR THE PRODUCTION OF CONCRETE BUILDING CEILINGS | |
DE19903310A1 (en) | Compound support as steel support for bridge structure | |
CH444453A (en) | Console frame | |
DE803435C (en) | Skeleton construction from prefabricated parts for multi-storey buildings and halls | |
WO2024223024A1 (en) | Climbing system for a rail-guided climbing frame | |
EP0598994A1 (en) | Method and prefabricated modules for the production of structures and buildings | |
DE102021102768A1 (en) | Method for producing a building with an element facade, facade module and building | |
DE8504548U1 (en) | Formwork for rotationally symmetrical, particularly cylindrical and conical, e.g. slightly tapering, structures | |
DE2212898C3 (en) | Large-scale bridge platform made of in-situ concrete and construction methods for its manufacture | |
DE202021100921U1 (en) | Facade module and structure | |
CH591605A5 (en) | Lifting rig for multistorey construction - has entire floors supported by movable lattice formwork skeleton | |
DE2550973A1 (en) | Tall bridge concreting formwork support structure - has lattice girders through loading towers, with detachable vertical supports | |
DE1866877U (en) | SUPPORT DEVICE FOR CREATING BUILDING CEILINGS OR OTHER STRUCTURAL STRUCTURES. | |
DE1188786B (en) | Method for creating wall fractures | |
DE2750773A1 (en) | PROCESS AND SUPPORTING FRAMEWORK FOR CREATING A STRUCTURE FROM PREFABRICATED PANEL WALL ELEMENTS |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OI | Miscellaneous see part 1 | ||
8141 | Disposal/no request for examination |