DE2309009A1 - STEP EXPANSION - Google Patents
STEP EXPANSIONInfo
- Publication number
- DE2309009A1 DE2309009A1 DE19732309009 DE2309009A DE2309009A1 DE 2309009 A1 DE2309009 A1 DE 2309009A1 DE 19732309009 DE19732309009 DE 19732309009 DE 2309009 A DE2309009 A DE 2309009A DE 2309009 A1 DE2309009 A1 DE 2309009A1
- Authority
- DE
- Germany
- Prior art keywords
- cap
- shield
- runner
- expansion
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000605 extraction Methods 0.000 claims description 3
- 239000003245 coal Substances 0.000 claims description 2
- 238000005065 mining Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000001627 detrimental effect Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
- E21D23/04—Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
- E21D23/0427—Shield operating devices; Hinges therefor
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Specific Sealing Or Ventilating Devices For Doors And Windows (AREA)
Description
Schreit-Ausbau als Stütz-Schild-Ausbau mit direkter Stempelunterstützung der Vorderkappe und der Schildkappe. Striding extension as a support shield extension with direct punch support the front cap and the peak cap.
Beschreibung: Der Langfront-Abbau von flözartigen Lagerstätten mit mechanischer Gewinnung wird in zunehmendem Maße unter Einsatz von Schreit-Ausbau geführt.Description: The long-front mining of seam-like deposits with Mechanical extraction is increasingly using walking expansion guided.
Die verwendeten Ausbaueinheiten sind dabei zum Vorwärtsbewegen entweder über Schreitwerke miteinander gekoppelt oder über Rückvorrichtungen mit dem Förderer verbunden.The expansion units used are either for moving forward Coupled with each other via walking mechanisms or with the conveyor via rear devices tied together.
Beim Schreit-Ausbau kommt es darauf an, die vom Gewinnungsmittel freigelegte Hangendfläche so schnell wie möglich zu unterstützen und dabei den entstehenden Spalt zwischen Kohlenfront und Vorderkappe so schmal wie möglich zu halten. Dazu muß die Ausbaueinheit in kurzen Schritten bewegt und bei jedem Schritt gelöst und wieder verspannt werden. Die von der Kappe erfaßten und getragenen Hangendschichten brechen schließlich hinter der Ausbaueinheit herein.In the case of walking expansion, it depends on the one exposed by the extraction means To support the hanging surface as quickly as possible and thereby reduce the resulting Keep the gap between the coal front and the toe cap as narrow as possible. In addition the expansion unit must be moved in short steps and released with each step be braced again. The hanging wall layers grasped and supported by the cap finally break in behind the expansion unit.
Bei kurzklüftigen Dachschichten bröckelt das Hangende bereits bei den einzelnen Schritten nach. Dadurch bilden sich Hohlräume über den Kappen, die sich umso nachteiliger auswirken, je länger der unterstützende Kappenzug ist.In the case of short-fissured roof layers, the hanging wall will already crumble following the individual steps. This creates cavities over the caps that The longer the supporting cap pull, the more detrimental the effect.
Aber auch das hinter der Ausbaufront hereinbrechende Hangende böscht sich in den Betriebsbereich ein und bildet, wie das von oben nachbrechende Gestein, eine Gefahr für den Bergmann und beeinträchtigt gleichzeitig die Fahrung und die Wetterführung.But also the sloping wall sloping in behind the extension front enters the operating area and forms, like the rock breaking down from above, a danger for the miner and at the same time affects the driving and the Weather management.
Es ist zur Vermeidung der aufgezeigten Mängel beim Schildausbau versucht worden, die Kappe zu verkürzen und die Hangendkräfte über einen hebelartig wirkenden Schild in den Stempel einzuleiten und den Spalt zwischen den Ausbaueinheiten durch Verbreiterung der Schilde durch federnde Stützbleche zu schließen, um den erforderlichen Betriebsraum gegen das Hangende und den Alten Mann besser abzuschirmen.Attempts have been made to avoid the deficiencies shown when extending the shield been to shorten the canopy and the hanging forces via a lever-like effect Insert the shield into the punch and clear the gap between the expansion units Widening of the shields by resilient support plates close to the required Better shield the operating room from the hanging wall and the old man.
Die Umleitung der Stützkräfte über Träger und Gelenke erfordert aber eine schwergewichtige und raumaufwendige Bauweise. Die Au'sbaueinheit wird durch die weit vorkragende Kappe standunsicher, und dem Bergmann fehlt die schützende vordere Stempeireihe, die ihn vor hereinbrechenden Wänden aus der Abbaufront abschirmt.However, the diversion of the supporting forces via supports and joints requires a heavy and space-consuming construction. The assembly unit is through the protruding cap is unsteady, and the miner lacks the protective one front row of pillars, which shields it from walls falling in from the mining front.
Der vorliegende Vorschlag verbindet die Vorteile des Stütz-Ausbaus mit seiner weit vorn liegenden ersten Stempelreihe mit denen des Schild-Ausbaus mit seiner kurzen Hangendunterstützung und der Abschirmung gegen nachbrechende Dachschichten unter gleichzeitiger Vermeidung der Nachteile, die diese Ausbauarten jede für sich aufweisen.The present proposal combines the advantages of the support structure with its first row of stamps far ahead with those of the shield extension with its short slope support and the shield against breaking roof layers while avoiding the disadvantages that these types of expansion each for themselves exhibit.
Der vorgeschlagene Stütz-Schild-Ausbau besteht aus einem durcngehenden Gelenkkappenzug, bei dem die Vorderkappe (1) wie beim Stützausbau durch einen Stempel (7) direkt unterstützt wird. Die Hangendkräfte werden so von der Vorderkappe direkt in den Stempel eingeleitet und auf die Kufe (5) übertragen. Die über ein Gelenk angeschlossene Schildkappe (2) wird ebenfalls durch einen Stempel (8) direkt unterstützt. Die Schildkappe ist gegenüber der Vorderkappe im Gelenk abgewinkelt, so daß nachbrechende Dachschichten wie beim Schild-Ausbau in das Bruchfeld abgeleitet werden. Die Schildkappe ist dabei mit der Bruchabschirmung (3) und einem Hebel (4) so geführt, daß an der Gelenkverbindung zur Vorderkappe beim Ein- und Ausfahren Kreisbewegungen vermieden werden.The proposed support shield expansion consists of a continuous one Articulated cap pull, in which the front cap (1) is fitted with a punch, as in the case of the support extension (7) is directly supported. The hanging forces are thus directly from the toe cap initiated in the stamp and transferred to the runner (5). The one over a joint connected shield cap (2) is also supported directly by a punch (8). The shield cap is angled in relation to the front cap in the joint, so that it breaks down Roof layers are diverted into the fracture field as in the case of shield expansion. The shield cap is guided with the breakage shield (3) and a lever (4) so that on the Articulated connection to the toe cap when retracting and extending circular movements avoided will.
Der Vorteil des vorgeschlagenen Stütz-Schild-Ausbaus liegt in der Verbindung einer direkten Unterstützung des Hangenden durch eine kurze Vorderkappe mit einer nahe an der Abbaufront stehenden Stempelreihe und einer vollständigen Abschirmung des Betriebsraumes gegen nachbrecbende Dachschichten und gegen das Bruchfeld bei größtmöglicbem Durchgang für Bohrung und Bewetterung und leichter Bauweise durch die direkte Kraftübertragung zwischen Kappen und Kufe.The advantage of the proposed support shield expansion lies in the Connection of a direct support of the hanging wall through a short toe cap with a row of stamps close to the mining front and a complete one Shielding of the operating room against roof layers that break down and against the fracture field with the largest possible passage for drilling and ventilation and light construction the direct power transmission between the canopy and the runner.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19732309009 DE2309009A1 (en) | 1973-02-23 | 1973-02-23 | STEP EXPANSION |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19732309009 DE2309009A1 (en) | 1973-02-23 | 1973-02-23 | STEP EXPANSION |
Publications (1)
Publication Number | Publication Date |
---|---|
DE2309009A1 true DE2309009A1 (en) | 1974-08-29 |
Family
ID=5872876
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19732309009 Pending DE2309009A1 (en) | 1973-02-23 | 1973-02-23 | STEP EXPANSION |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE2309009A1 (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2507263A1 (en) * | 1975-02-20 | 1976-09-09 | Johannes Winkler | Shield support for mines - has equipment for elastically stabilising cap to floor base |
DE2557255A1 (en) * | 1975-12-19 | 1977-07-07 | Gewerk Eisenhuette Westfalia | Self advancing roof support unit for thick seams - has figure eight steering system for angular stability of hydraulic props |
DE2600455A1 (en) * | 1976-01-08 | 1977-07-21 | Hemscheidt Maschf Hermann | Mine shield support unit - uses oppositely cranked rockers hinged to waste shield and floor bar with set axis spacing to adjust canopy |
FR2340445A1 (en) * | 1976-02-03 | 1977-09-02 | Bochumer Eisen Heintzmann | SHIELD SUPPORT EASEL |
DE2617141A1 (en) * | 1976-04-17 | 1977-10-20 | Thyssen Ind Agm 4300 Essen | CAP AND SIGN CONSTRUCTION FOR AN EXTENSION SIGN IN FLOE-LIKE STORAGE |
DE2622207A1 (en) * | 1976-05-19 | 1977-12-01 | Bochumer Eisen Heintzmann | Adjustable mine support behind face conveyor - has nearly horizontal piston and cylinder behind main cylinder between floor members |
DE2622208A1 (en) * | 1976-05-19 | 1977-12-01 | Bochumer Eisen Heintzmann | EXPANSION TRACK |
-
1973
- 1973-02-23 DE DE19732309009 patent/DE2309009A1/en active Pending
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2507263A1 (en) * | 1975-02-20 | 1976-09-09 | Johannes Winkler | Shield support for mines - has equipment for elastically stabilising cap to floor base |
DE2557255A1 (en) * | 1975-12-19 | 1977-07-07 | Gewerk Eisenhuette Westfalia | Self advancing roof support unit for thick seams - has figure eight steering system for angular stability of hydraulic props |
DE2600455A1 (en) * | 1976-01-08 | 1977-07-21 | Hemscheidt Maschf Hermann | Mine shield support unit - uses oppositely cranked rockers hinged to waste shield and floor bar with set axis spacing to adjust canopy |
FR2340445A1 (en) * | 1976-02-03 | 1977-09-02 | Bochumer Eisen Heintzmann | SHIELD SUPPORT EASEL |
DE2617141A1 (en) * | 1976-04-17 | 1977-10-20 | Thyssen Ind Agm 4300 Essen | CAP AND SIGN CONSTRUCTION FOR AN EXTENSION SIGN IN FLOE-LIKE STORAGE |
DE2622207A1 (en) * | 1976-05-19 | 1977-12-01 | Bochumer Eisen Heintzmann | Adjustable mine support behind face conveyor - has nearly horizontal piston and cylinder behind main cylinder between floor members |
DE2622208A1 (en) * | 1976-05-19 | 1977-12-01 | Bochumer Eisen Heintzmann | EXPANSION TRACK |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AT509059B1 (en) | BORING MACHINE | |
DE1219892B (en) | Control of a coal plow | |
DE2309009A1 (en) | STEP EXPANSION | |
DE2712869C2 (en) | Method of preventing water from entering underground cavities | |
DE2502109A1 (en) | PIT CEILING SUPPORT | |
DE2417223B2 (en) | STRUCTURAL STRUCTURE WITH SHIELD STRUCTURES | |
DE678589C (en) | Procedure for dismantling camps | |
DE3409002C2 (en) | ||
DE2519515B2 (en) | SELF-ADVANCING STRUCTURAL STRUCTURE FOR SUBSIDIARY PIT OPERATION | |
DE3528117C1 (en) | Apparatus for parting and loading seam-like outcrops of mineral raw materials | |
DE2047769C3 (en) | Pit construction for the striving | |
DE69019056T2 (en) | Mobile device for removal in the mining area. | |
DE2714533A1 (en) | Mine gallery support withdrawal appts. - has frame mounted on floor member with swinging member carrying withdrawal member | |
DE739141C (en) | Extraction chamber for underground operations | |
EP0245542B1 (en) | Driving shield for forcing prefabricated concrete pipes for driving galleries and tunnels in water-bearing or unconsolidated soil | |
DE1255069B (en) | Extraction system for underground operations, consisting of planer and conveyor | |
DE620994C (en) | Device for carrying out the method for lining underground construction lines | |
EP3486428B1 (en) | Device for extending a tunnel | |
DE19915939B4 (en) | Dammbaubock with adjustable shuttering walls | |
DD154352A5 (en) | BOESCHUNGSBRUECKE | |
DE4104726C1 (en) | Mined roadway support with spaced support arches - has reinforcement mats, in support stowing space, and underpinning lintel | |
DE3017416A1 (en) | Forwarding prefab. tunnel in loose ground under roads - involves injection of substances forming cohesive roof earth layer | |
DE1758697C (en) | Progressive hydraulic longwall mining | |
DE2137514A1 (en) | OUTPUT CONVEYORS, ESPECIALLY SCRAPER CONVEYORS, WITH MEANS FOR COLLECTING AND FORWARDING FINE COAL FROM THE CONVEYOR BASE | |
DE3218455C2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OHN | Withdrawal |