DE19851765A1 - Building material, useful for traffic surface layers, dam and-or embankment cores or building foundations, consists of ground recycled brick mixed with lime - Google Patents
Building material, useful for traffic surface layers, dam and-or embankment cores or building foundations, consists of ground recycled brick mixed with limeInfo
- Publication number
- DE19851765A1 DE19851765A1 DE1998151765 DE19851765A DE19851765A1 DE 19851765 A1 DE19851765 A1 DE 19851765A1 DE 1998151765 DE1998151765 DE 1998151765 DE 19851765 A DE19851765 A DE 19851765A DE 19851765 A1 DE19851765 A1 DE 19851765A1
- Authority
- DE
- Germany
- Prior art keywords
- building material
- building
- lime
- recycling
- brick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 239000004566 building material Substances 0.000 title claims abstract description 45
- 239000011449 brick Substances 0.000 title claims abstract description 34
- 239000004571 lime Substances 0.000 title claims abstract description 22
- 235000008733 Citrus aurantifolia Nutrition 0.000 title claims abstract description 20
- 235000011941 Tilia x europaea Nutrition 0.000 title claims abstract description 20
- 239000002344 surface layer Substances 0.000 title 1
- 238000010276 construction Methods 0.000 claims abstract description 10
- 238000004519 manufacturing process Methods 0.000 claims abstract description 4
- 239000002245 particle Substances 0.000 claims abstract 2
- 238000004064 recycling Methods 0.000 claims description 29
- 239000000463 material Substances 0.000 claims description 8
- 238000002156 mixing Methods 0.000 claims description 6
- 229920003023 plastic Polymers 0.000 claims description 6
- 241000283707 Capra Species 0.000 claims description 3
- 238000000227 grinding Methods 0.000 claims description 2
- 238000000034 method Methods 0.000 claims 1
- 229920006238 degradable plastic Polymers 0.000 abstract 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 8
- 239000000203 mixture Substances 0.000 description 5
- 230000003068 static effect Effects 0.000 description 5
- 239000000126 substance Substances 0.000 description 5
- 230000006835 compression Effects 0.000 description 4
- 238000007906 compression Methods 0.000 description 4
- 239000004570 mortar (masonry) Substances 0.000 description 4
- 238000000926 separation method Methods 0.000 description 4
- 229910052500 inorganic mineral Inorganic materials 0.000 description 3
- 239000011707 mineral Substances 0.000 description 3
- 238000007789 sealing Methods 0.000 description 3
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000005056 compaction Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000005012 migration Effects 0.000 description 2
- 238000013508 migration Methods 0.000 description 2
- 239000001301 oxygen Substances 0.000 description 2
- 229910052760 oxygen Inorganic materials 0.000 description 2
- 239000011148 porous material Substances 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 239000000758 substrate Substances 0.000 description 2
- 229920000704 biodegradable plastic Polymers 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000006227 byproduct Substances 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 210000003608 fece Anatomy 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000010169 landfilling Methods 0.000 description 1
- 244000005700 microbiome Species 0.000 description 1
- 238000010899 nucleation Methods 0.000 description 1
- 239000000843 powder Substances 0.000 description 1
- 239000000047 product Substances 0.000 description 1
- 238000012958 reprocessing Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B28/00—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
- C04B28/02—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
- C04B28/10—Lime cements or magnesium oxide cements
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B18/00—Use of agglomerated or waste materials or refuse as fillers for mortars, concrete or artificial stone; Treatment of agglomerated or waste materials or refuse, specially adapted to enhance their filling properties in mortars, concrete or artificial stone
- C04B18/04—Waste materials; Refuse
- C04B18/16—Waste materials; Refuse from building or ceramic industry
- C04B18/165—Ceramic waste
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C3/00—Foundations for pavings
- E01C3/003—Foundations for pavings characterised by material or composition used, e.g. waste or recycled material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/01—Flat foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0225—Retaining or protecting walls comprising retention means in the backfill
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B2111/00—Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
- C04B2111/00474—Uses not provided for elsewhere in C04B2111/00
- C04B2111/00612—Uses not provided for elsewhere in C04B2111/00 as one or more layers of a layered structure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W30/00—Technologies for solid waste management
- Y02W30/50—Reuse, recycling or recovery technologies
- Y02W30/91—Use of waste materials as fillers for mortars or concrete
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Ceramic Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Organic Chemistry (AREA)
- Materials Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Architecture (AREA)
- Inorganic Chemistry (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Processing Of Solid Wastes (AREA)
Abstract
Description
Die Erfindung betrifft Baustoffe aus Ziegelrecycling, Bauwerke, die aus diesem Baustoff hergestellt werden können sowie auf ein Verfahren zur Herstellung dieses Baustoffes.The invention relates to building materials from brick recycling, buildings made from this Building material can be produced as well as on a manufacturing process of this building material.
Ziegelrecycling ist im Bauwesen ein industrielles Nebenprodukt. Es entsteht insbesondere durch die Wiederaufarbeitung von Stoffen, die beim Abbruch von Ziegelbauwerken erhalten werden. Aufgrund des notwendigen Abbruchs einer Vielzahl von Ziegelbauwerken sind in den nächsten Jahren große Menge die ses Materials zu erwarten.Brick recycling is an industrial by-product in construction. It arises in particular through the reprocessing of substances that are involved in the demolition of Brick structures can be preserved. Due to the need to cancel one A large number of brick structures will be large quantities in the next few years expected of this material.
Allerdings entspricht das Ziegelrecycling hinsichtlich seiner Frostbeständigkeit, seiner Sieblinienzusammensetzung und seines Anteiles an organischen Be standteilen wie beispielsweise Bauholzresten in der Regel nicht den Anforde rungen des Deutschen Bauvorschriftenwerkes. Gleiches gilt für die Druckfestig keit und Beständigkeit der Einzelkörner des Ziegelrecyclings. Ein gewisser An teil von organischen Bestandteilen im Ziegelrecycling ist kaum vermeidbar. Ein Einsatz des Ziegelrecyclings ist deswegen im Verkehrsbau, Wasserbau sowie bei Gründungen und Baugrubenverfüllungen im Ingenieur-, Tief- und Hochbau zumeist nicht zulässig, obwohl der Baustoff gerade für dieses Einsatzgebiet grundsätzlich gut geeignet wäre.However, brick recycling corresponds to its frost resistance, its sieve line composition and its proportion of organic be components such as lumber remnants usually do not meet the requirements of the German Building Regulations. The same applies to the Druckfestig strength and durability of the individual grains of brick recycling. A certain kind Part of organic components in brick recycling can hardly be avoided. On Brick recycling is therefore used in traffic engineering, hydraulic engineering as well for foundations and construction pit fillings in engineering, civil engineering and building construction mostly not permitted, although the building material is just for this area of application would generally be well suited.
Es sind bisher wenige Fälle bekannt, bei denen Ziegelrecycling mit entspre chender Verdichtung (statisch/dynamisch) auf nichtöffentlichen oder unterge ordneten Verkehrsflächen, bei der Baugrubenverfüllung oder Bauwerkshinter füllung wie ein mineralisches Gemisch eingebaut wurde. Diesen Fällen steht die Fachwelt allerdings mit erheblichen Vorurteilen gegenüber. Few cases are known in which brick recycling corresponds to appropriate compression (static / dynamic) on non-public or under organized traffic areas, when backfilling construction pits or behind buildings filling like a mineral mixture was installed. These cases stand out the professional world, however, with considerable prejudices against.
Infolgedessen läßt sich Ziegelrecycling nicht oder nur schlecht verkaufen, so daß große Halden von Ziegelrecyclingmassen auf dem Gelände der Recy clinganlagen entstanden. Weitere Ziegelabbruchmassen werden von diesen Anlagen in vielen Fällen nicht mehr angenommen, so daß diese auf Deponien verkippt werden müssen. Eine Deponierung ist jedoch nur für Stoffe sinnvoll die sich nicht verwerten lassen. Zudem werden wertvolle Bodenschätze wie Gesteine, Kiese und Sande eingesetzt, obwohl auch Ziegelrecycling - bei Ver wendung in geeigneter Weise - deren Aufgaben erfüllen könnte.As a result, brick recycling cannot be sold, or can only be sold poorly that large piles of brick recycling materials on the site of the Recy Cling facilities were created. More brick demolition masses are from these Attachments in many cases no longer accepted, so these are in landfills have to be tilted. However, landfilling only makes sense for substances that cannot be used. In addition, valuable mineral resources such as Rocks, gravel and sands used, although brick recycling - at Ver application in a suitable manner - whose tasks could be performed.
Es ist daher Ziel der vorliegenden Erfindung, die Eignung von Ziegelrecycling als Baustoff zu erhöhen, in dem die oben beschriebenen Nachteile des Stan des der Technik überwunden werden. Dabei steht die Aufgabe, einen aus Zie gelrecycling bestehenden Baustoff zu finden, dessen Eigenschaften dem Deut schen Bauvorschriftenwerk entsprechen.It is therefore an object of the present invention to determine the suitability of brick recycling to increase as a building material in which the disadvantages of the Stan of technology can be overcome. The task is to get one from Zie gel recycling to find existing building material, the properties of which comply with the building regulations.
Erfindungsgemäß wird dies durch einen Baustoff gelöst, der aus zermahlenem Ziegelrecycling besteht, wobei das Mahlprodukt eine maximale Korngröße von 56 mm hat und dieses mit 1 bis 10% Kalk vermischt ist.According to the invention, this is solved by a building material made from ground Brick recycling exists, whereby the ground product has a maximum grain size of 56 mm and this is mixed with 1 to 10% lime.
Dieser Baustoff verfügt über verbesserte Frostbeständigkeit aufgrund der Zu gabe von Kalk, der die chemische Bindung der tonigen Feinbestandteile in Verbindung mit Strukturumwandlung und Mörtelbildung bewirkt, so daß die Ka pillarität herabgesetzt, die Wasserbeständigkeit erhöht und die Frostveränder lichkeit verringert werden.This building material has improved frost resistance due to the Zu addition of lime, which is the chemical bond of the fine clay components in Connection with structural transformation and mortar formation, so that the Ka reduced pillarity, increased water resistance and frost changes be reduced.
Weiterhin besitzt der erhaltene Baustoff eine erhöhte Trägfähigkeit, die durch Zugabe des Kalkes in Verbindung mit der eingebrachten Verdichtungsenergie (statisch, dynamisch) erzielt wird, und bindet ausschwemmbare Bestandteile durch Vermörtelung und chemische Bindung. Ausschwemmbare Bestandteile sind daher in dem erfindungsgemäßen Baustoff kaum enthalten. Furthermore, the building material obtained has an increased load-bearing capacity, due to Add the lime in connection with the compression energy introduced (static, dynamic) is achieved and binds washable components through mortar and chemical bonding. Flushable components are therefore hardly contained in the building material according to the invention.
Aufgrund des Verschlusses der Poren der Ziegelkörner durch die Kalkzugabe und die Einbettung in den Mörtel aus Ziegelmehl und Kalk, der die Ziegelkörner umgibt, werden mechanische Einwirkungen ebenso wie Wasser-Frost- Einwirkungen verhindert. Dazu ist eine ausreichende Verdichtung des Ziegelre cycling-Kalk-Gemisches notwendig.Due to the blockage of the pores of the brick grains by adding lime and embedding in the mortar made of brick powder and lime, which the brick grains surrounding mechanical influences as well as water frost Impacts prevented. This requires sufficient compaction of the brick cycling-lime mixture necessary.
Das Abwandern von nicht gebundenen Bestandteilen des Baustoffes der Erfin dung, die durch mechanische und andere Einwirkungen oder unzureichende Vermischung des Ziegelrecycling-Kalk-Gemisches entstehen, werden erfin dungsgemäß durch den Einbau von Trennlagen in Bauwerke aus dem Ziegel recycling-Mörtel-Gemisch verhindert. Damit werden zugleich Volumenverände rungen durch Abwanderung von Bestandteilen sowie die Vermischung des Baustoffes mit darunterliegenden, weicheren Schichten und das Aufsteigen von Feinanteilen verhindert, die die Tragfähigkeit des Bauwerkes beeinträchtigen könnten.The migration of unbound components of the Erfin building material dung caused by mechanical and other influences or insufficient Mixing of the brick recycling-lime mixture arise, are invented appropriately by installing separating layers in buildings made of brick Prevents recycling mortar mixture. This also changes the volume through migration of components and the mixing of the Building material with underlying, softer layers and the rise of Prevents fine fractions that affect the load-bearing capacity of the building could.
Die Fäulnis von organischen Bestandteilen, die im Ziegelrecycling enthalten sind, wird durch die Kalkzugabe verhindert. Bauholz ist zumeist chemisch vor behandelt, so daß es nur bei Kontakt mit Wasser, Sauerstoff und Mikroorga nismen fault. Der zugegebene Kalk verschließt die Poren und "ummantelt" der artige Bestandteile, so daß der Zutrift von Wasser, Sauerstoff und Mikroorga nismen verhindert wird. Zudem erschwert das kalkhaltige Milieu die Existenz und Wirkung der Mikroorganismen. Gleichzeitig werden die organischen Be standteile auf diese Weise verfestigt. Folglich führt der ohnehin geringe Anteil von Bauholz am Ziegelrecycling nicht zu Beeinträchtigungen der Tragfähigkeit oder der Frostbeständigkeit.The putrefaction of organic components contained in brick recycling are prevented by adding lime. Lumber is mostly chemical treated so that it is only in contact with water, oxygen and microorgan nisms rot. The added lime closes the pores and "covers" the like components, so that the access of water, oxygen and Mikroorga nisms is prevented. The calcareous environment also makes life difficult and effects of microorganisms. At the same time, the organic be components solidified in this way. As a result, the already small proportion leads of timber on brick recycling does not affect the load-bearing capacity or frost resistance.
Bei höheren Ansprüchen hinsichtlich der Beanspruchung des Baustoffes sollte das zermahlene Ziegelrecycling eine maximale Korngröße von 45 bzw. 32 mm haben. Vorteilhaft ist außerdem die Vermischung mit 1 bis 5% Kalk. With higher demands with regard to the stress on the building material should the ground brick recycling has a maximum grain size of 45 or 32 mm to have. Mixing with 1 to 5% lime is also advantageous.
Der erfindungsgemäße Baustoff kann in unterschiedlichen Bauwerken einge setzt werden. Dazu sollte er zwischen Trennlagen aus nichtverrottbarem Kunststoff in einer oder mehreren Konstruktionsschichten eingebracht werden. Diese Konstruktion kann vorteilhafterweise im Verkehrsbau und Wegebau an gewendet werden. Die Trennlagen bestehen vorzugsweise aus Geokunststoff oder Gebrauchtmaterialien wie Altfußbodenbelägen, aus denen Trennlagen hergestellt werden können. Die Trennlagen sollten mit einem Gefälle eingebaut werden, um Dränwasser aus dem Bauwerk abzuführen.The building material according to the invention can be used in different structures be set. To do this, it should be between separating layers made of non-rotten Plastic can be introduced in one or more construction layers. This construction can be advantageous in traffic and road construction be turned. The separating layers are preferably made of geosynthetic material or used materials such as old floor coverings, from which separating layers can be produced. The separating layers should be installed with a slope to drain water from the structure.
Ebenso ist ein Einsatz dieses Bauwerkes als Deckschicht für Park-, Abstell- und Verkehrsflächen möglich. Dabei kann die Deckschicht mit einer bituminö sen oder anderen Oberflächenversiegelung versehen werden. Überdies ist das erfindungsgemäße Bauwerk als Kernbereich von Dämmen und/oder Böschun gen sowie als Flächengründung zur Errichtung weiterer Bauwerke geeignet.This building is also used as a top layer for parking, parking and Traffic areas possible. The top layer can be covered with a bituminous sen or other surface sealing. Moreover, that is Building according to the invention as the core area of dams and / or embankments suitable as a foundation for the construction of other structures.
Die Herstellung des Baustoffes der Erfindung erfolgt durch Zermahlen des Zie gelrecyclings unter Begrenzung der maximalen Korngröße, anschließender Kalkzugabe, dem Vermischen und Transport des Mahlgutes und des Kalkes in einem Mischwerk, vorzugsweise in Fahrmischern. Zur Beschickung des Mi schers wird vorzugsweise ein Schütttrichter verwendet. Fahrmischer bieten den Vorteil, daß das Mischen, eine eventuelle Wasserzugabe und der Transport zur Einbaustelle gleichzeitig erfolgen können.The construction material of the invention is produced by grinding the goat gel recycling with limitation of the maximum grain size, subsequent Adding lime, mixing and transporting the ground material and lime in a mixer, preferably in truck mixers. For loading the Mi Schers preferably uses a hopper. Truck mixers offer that Advantage that the mixing, a possible addition of water and the transport to Installation site can be done simultaneously.
Vorteil des Einsatzes des Baustoffes der Erfindung sind geringe Herstellungs kosten bei gleichem bzw. verbessertem Gebrauchswert des Baustoffes gegen über herkömmlichen Materialien. Zudem werden Bodenschätze wie Gesteine Sande und Kiese eingespart. Durch die Verwertung des Ziegelrecyclings an stelle der Deponierung bleibt wertvoller Deponieplatz für andere Zwecke erhal ten. Die mit dem Baustoff der Erfindung errichteten Bauwerke zeichnen sich durch hohe Stabilität aus. Eine derartige Stabilität ist insbesondere bei Däm men zum Hochwasserschutz notwendig. Die Bauwerke können raumsparend errichtet werden.The advantage of using the building material of the invention is low manufacturing against the same or improved use value of the building material over conventional materials. In addition, mineral resources become like rocks Sands and gravel saved. By recycling brick recycling Instead of the landfill, valuable landfill space remains for other purposes ten. The structures built with the building material of the invention stand out characterized by high stability. Such stability is particularly with insulation necessary for flood protection. The buildings can save space be erected.
Im folgenden wird die Erfindung anhand von Ausführungsbeispielen mit Bezug auf die beiliegenden Zeichnungen näher erläutert.In the following, the invention is based on exemplary embodiments with reference explained in more detail on the accompanying drawings.
In Fig. 1 ist der schichtweise Einbau des Baustoffes der Erfindung dargestellt. Oberhalb des anstehenden Untergrundes 1 mit verdichtetem Planum befindet sich eine Trennlage 2 aus nichtverrottbarem Kunststoff. Auf dieser befindet sich eine erste Schicht 3 des Baustoffes der Erfindung, die eine Höhe von 0,08 bis 0,30 m aufweist. Diese Schicht 3 wird nach oben durch eine weitere Trennla ge 2 aus nichtverrottbarem Kunststoff, der eine weitere Schicht 3 des erfin dungsgemäßen Baustoffes mit einer Höhe von 0,08 bis 0,30 m folgt, die wie derum durch eine Trennschicht 2 begrenzt ist. Auf dieser Schicht ist der Ober bau 4 angeordnet.In Fig. 1 the layered installation of the building material of the invention is shown. A separating layer 2 made of non-rotting plastic is located above the existing substrate 1 with compacted formation. On this there is a first layer 3 of the building material of the invention, which has a height of 0.08 to 0.30 m. This layer 3 is upwards by a further separation layer 2 made of non-decomposable plastic, which is followed by a further layer 3 of the building material according to the invention with a height of 0.08 to 0.30 m, which in turn is limited by a separation layer 2 . The upper building 4 is arranged on this layer.
Ein derartiges Bauwerk kann überdies weitere Schichten des erfindungs gemäßen Baustoffes, der durch Trennlagen eingeschlossen ist, umfassen.Such a structure can also further layers of the Invention according building material, which is enclosed by separating layers.
Fig. 2 zeigt eine Steilböschung unter Verwendung des erfindungsgemäßen Baustoffes. Diese besteht aus mehreren 0,05 bis 0,30 m hohen Schichten 3 des erfindungsgemäßen Baustoffes unter statisch/dynamischer Verdichtung, die durch Trennlagen 2 aus nichtverrottbarem Kunststoff getrennt werden. Oberhalb dieser Schichten ist eine Befestigung 5 für Straßen, Wege, Plätze usw. angeordnet. Die Schichten sind durch Abtreppungen von mindestens 0,05 m versetzt, um die Verzahnung mit Mutterboden 6 zu erleichtern. Die Mutterbodenabdeckung ist gegebenenfalls mit einem Erosionsschutz wie Be grünungsmatten oder Naßansaat versehen. Zur Abführung von Wasser ist das Bauwerk mit Dränageeinrichtungen 7 ausgestattet. Fig. 2 shows a steep slope using the building material according to the invention. This consists of several 0.05 to 0.30 m high layers 3 of the building material according to the invention with static / dynamic compression, which are separated by separating layers 2 made of non-rotten plastic. A fastening 5 for streets, paths, squares etc. is arranged above these layers. The layers are offset by steps of at least 0.05 m in order to facilitate the interlocking with topsoil 6 . The topsoil cover is optionally provided with an erosion protection, such as greening mats or wet seeding. To drain water, the building is equipped with drainage devices 7 .
In gleicher Weise ist der Einsatz des erfindungsgemäßen Baustoffes zur Er richtung von Dämmen möglich. In the same way, the use of the building material according to the invention for Er direction of dams possible.
Fig. 3 zeigt den Einsatz des erfindungsgemäßen Baustoffes als Baugruben auffüllung bzw. Bauwerkshinterfüllung. Dazu werden bis zu 0,5 m hohe Schichten 3 des erfindungsgemäßen Baustoffes mit einem Kalkgehalt von höchstens 3% in der Baugrube errichtet, die durch Trennlagen 2 voneinander getrennt sind. Die Begrenzung des Kalkgehaltes des Ziegelrecyclings ist not wendig im Hinblick auf gegebenenfalls erforderliche spätere Aufgrabungen. Zur Abführung von Wasser ist das Bauwerk mit Dränageeinrichtungen 7 ausge stattet. Die obere Schicht ist durch Mutterboden 6 oder einen anderen Aufbau bedeckt. Fig. 3 shows the use of the building material according to the invention as building pit or building backfill. For this purpose, up to 0.5 m high layers 3 of the building material according to the invention with a lime content of at most 3% are erected in the excavation pit, which are separated from one another by separating layers 2 . Limiting the lime content of brick recycling is necessary with regard to any later excavations that may be required. To drain water, the building is equipped with drainage devices 7 . The upper layer is covered by topsoil 6 or another structure.
Fig. 4 zeigt den Einsatz des erfindungsgemäßen Baustoffes als Gründung für Bauwerke. Auf der Oberfläche der Baugrube sind bis zu 0,30 m hohe Schich ten 3 des erfindungsgemäßen Baustoffes unter statisch/dynamischer Verdich tung errichtet, die durch Trennlagen 2 voneinander getrennt sind. Auf der obe ren Schicht ist die Fundamentplatte 8 aufgebracht. Fig. 4 shows the use of the building material according to the invention as a foundation for buildings. On the surface of the construction pit up to 0.30 m high layers 3 of the building material according to the invention are constructed under static / dynamic compression, which are separated from one another by separating layers 2 . The foundation plate 8 is applied to the upper layer.
Fig. 5 stellt ein Bauwerk unter Verwendung des erfindungsgemäßen Baustoffes dar, das für Verkehrsflächen mit geringer Beanspruchung oder für die Errich tung provisorischer Bauwerke geeignet ist. Dazu werden auf dem anstehenden Untergrund 1 mit verdichtetem Plan um Schichten 3 des erfindungsgemäßen Baustoffes unter statisch/dynamischer Verdichtung errichtet, die durch Trennla gen 2 voneinander getrennt sind. Die Dicke der einzelnen Schichten 3 hängt von den Tragfähigkeitsanforderungen der Straßenbauvorschriften und dem an stehenden Untergrund 1 ab. Die obere Schicht besitzt einen Kalkgehalt von mindestens 5% und ist zu der darunter liegenden Schicht aus dem erfindungs gemäßen Baustoff nicht in jedem Fall durch eine Trennlage abgegrenzt. Auf dieser Schicht ist die bituminöse Oberflächenversiegelung 9 aufgebracht. Eine Oberflächenversiegelung ist auch mit anderen Materialien möglich. Fig. 5 shows a building using the building material according to the invention, which is suitable for traffic areas with low stress or for the errich device provisional structures. For this purpose, on the upcoming subsoil 1 with a compacted plan around layers 3 of the building material according to the invention under static / dynamic compaction, which are separated by separation layers 2 from one another. The thickness of the individual layers 3 depends on the load-bearing capacity requirements of the road building regulations and the existing subsurface 1 . The upper layer has a lime content of at least 5% and is not always delimited by a separating layer from the underlying layer made of the building material according to the invention. The bituminous surface seal 9 is applied to this layer. Surface sealing is also possible with other materials.
In Fig. 6 ist der Einsatz des erfindungsgemäßen Baustoffes in Verbindung mit Flächendränage bei starkem Andrang von Grund- oder Schichtenwasser dar gestellt. Auf dem anstehenden Untergrund 1 mit verdichtetem Plan um befindet sich eine Trennlage 2 aus nichtverrottbarem Kunststoff. Auf dieser ist eine Flä chendränage 10, die beispielsweise aus einer Schotterschicht besteht, errich tet. Auf dieser befindet sich wiederum eine Trennlage 2, der eine Schicht 3 aus dem erfindungsgemaßen Baustoff folgt. Oberhalb dieser Schicht 3 ist der durch eine weitere Trennlage 2 getrennte Oberbau angeordnet.In Fig. 6, the use of the building material according to the invention in connection with surface drainage in the event of heavy rush of groundwater or strata is provided. A separating layer 2 made of non-rotting plastic is located on the upcoming substrate 1 with a compacted plan. On this is a surface drainage 10 , which consists for example of a layer of gravel, errich tet. On this in turn there is a separating layer 2 , which is followed by a layer 3 made of the building material according to the invention. Above this layer 3 , the superstructure separated by a further separating layer 2 is arranged.
Fig. 7 zeigt die Befüllung eines Mischwerkes 11 in Form eines Fahrmischers mit Ziegelrecycling und Kalk unter Verwendung eines transportablen Schütt- und Befüllungstrichters 12 und eines Lagegerätes 13 gegebenenfalls mit Wägevor richtung, das sich auf einer Rampe 14 aus Ziegelrecycling befindet. Fig. 7 shows the filling of a mixer 11 in the form of a truck mixer with brick recycling and lime using a portable pouring and filling funnel 12 and a storage device 13, optionally with Wägevor direction, which is located on a ramp 14 made of brick recycling.
11
Untergrund
Underground
22nd
Trennlagen
Separation layers
33rd
Baustoffschicht
Building material layer
44th
Oberbau
Superstructure
55
Befestigung
Attachment
66
Mutterboden
Topsoil
77
Dränageeinrichtungen
Drainage facilities
88th
Fundamentplatte
Foundation plate
99
bituminöse Oberflächenversiegelung
bituminous surface sealing
1010th
Flächendränage
Surface drainage
1111
Mischwerk
Mixer
1212th
Schütt- und Befüllungstrichter
Hopper and filling funnel
1313
Ladegerät
charger
1414
Rampe
ramp
Claims (11)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE1998151765 DE19851765A1 (en) | 1998-11-10 | 1998-11-10 | Building material, useful for traffic surface layers, dam and-or embankment cores or building foundations, consists of ground recycled brick mixed with lime |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE1998151765 DE19851765A1 (en) | 1998-11-10 | 1998-11-10 | Building material, useful for traffic surface layers, dam and-or embankment cores or building foundations, consists of ground recycled brick mixed with lime |
Publications (1)
Publication Number | Publication Date |
---|---|
DE19851765A1 true DE19851765A1 (en) | 2000-05-11 |
Family
ID=7887284
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE1998151765 Withdrawn DE19851765A1 (en) | 1998-11-10 | 1998-11-10 | Building material, useful for traffic surface layers, dam and-or embankment cores or building foundations, consists of ground recycled brick mixed with lime |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE19851765A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10245841A1 (en) * | 2002-09-26 | 2004-04-01 | Kossa, Hans-Peter, Dipl.-Ing. | Floodwater protection for dams comprises mineral completing elements and/or recycling materials placed preferably on the water side of the dam as a unit |
CN112853840A (en) * | 2021-01-12 | 2021-05-28 | 山东省交通科学研究院 | Waterproof composite regenerative road graded broken stone cushion material and graded broken stone cushion |
-
1998
- 1998-11-10 DE DE1998151765 patent/DE19851765A1/en not_active Withdrawn
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10245841A1 (en) * | 2002-09-26 | 2004-04-01 | Kossa, Hans-Peter, Dipl.-Ing. | Floodwater protection for dams comprises mineral completing elements and/or recycling materials placed preferably on the water side of the dam as a unit |
CN112853840A (en) * | 2021-01-12 | 2021-05-28 | 山东省交通科学研究院 | Waterproof composite regenerative road graded broken stone cushion material and graded broken stone cushion |
CN112853840B (en) * | 2021-01-12 | 2022-06-07 | 山东省交通科学研究院 | Waterproof composite regenerative road graded broken stone cushion material and graded broken stone cushion |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2541009C2 (en) | Improved road-building soil | |
EP0404999B1 (en) | Method of sealing landfills or the like | |
EP0374555B1 (en) | Method of surface sealing dumps | |
DE69923310T2 (en) | METHOD FOR FLOOR STABILIZATION FOR ROAD CONSTRUCTION WORKS | |
DE2727077C2 (en) | Process for the production of a liquid-tight barrier layer as lining of a pit for a landfill or the like. | |
WO2004065330A2 (en) | Building material and method for production thereof | |
DE19851765A1 (en) | Building material, useful for traffic surface layers, dam and-or embankment cores or building foundations, consists of ground recycled brick mixed with lime | |
CN211816368U (en) | Ecological environment-friendly foundation structure for reinforcing soft foundation | |
DE2321647A1 (en) | PROCESS AND FINISHED PART FOR THE PRODUCTION OF A CORE OR SURFACE SEAL | |
EP0907803B1 (en) | Capillary barrier for sealing external surfaces | |
EP2468955B1 (en) | Method for constructing a base course | |
EP1543890B1 (en) | Method for covering landfills and waste storage surfaces | |
WO2005108325A1 (en) | Dry mixture | |
EP3134581B1 (en) | Method and soil-stabilizing means | |
DE19856640C2 (en) | Mining stone for the production of long-term stable underground closure elements for underground cavities | |
Bush | Understanding stabilized earth construction | |
DE202004001884U1 (en) | Water-permeable ground cover for a building site comprises a layer consisting of at least one sand sublayer next to the building ground and a sublayer of broken stone above it | |
DD245001A1 (en) | PROCESS FOR MAKING MAESSER BASE SEALS | |
DE4412868A1 (en) | Sealing of waste disposal sites | |
DE3102619A1 (en) | Pavement for road construction | |
DE19835298C2 (en) | Layer structure for multi-layer, water-permeable form elements and fabrics of traffic areas and landscaping | |
EP1213393B1 (en) | Process for reinforcing mineral mixtures, in particular earthy mixtures, using fibrous materials | |
Alam | Developing Appropriate Roadbase for Bangladesh Pavements | |
AT504701B1 (en) | SURFACE SEALING FOR WASTE DEPONIES | |
EP1020415B1 (en) | Process for solidifying dusty to coarse-grained contaminated noxious waste |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8139 | Disposal/non-payment of the annual fee |