DE19850769A1 - Breaking plant for crushing of large-piece raw materials used in cement , gypsum or limestone industries has upper or front end of additional conveyor located above section of main conveyor extending in front of main hopper - Google Patents
Breaking plant for crushing of large-piece raw materials used in cement , gypsum or limestone industries has upper or front end of additional conveyor located above section of main conveyor extending in front of main hopperInfo
- Publication number
- DE19850769A1 DE19850769A1 DE1998150769 DE19850769A DE19850769A1 DE 19850769 A1 DE19850769 A1 DE 19850769A1 DE 1998150769 DE1998150769 DE 1998150769 DE 19850769 A DE19850769 A DE 19850769A DE 19850769 A1 DE19850769 A1 DE 19850769A1
- Authority
- DE
- Germany
- Prior art keywords
- main
- belt
- feed
- crushing
- conveyor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 239000002994 raw material Substances 0.000 title claims description 5
- 239000004568 cement Substances 0.000 title description 2
- 239000010440 gypsum Substances 0.000 title description 2
- 229910052602 gypsum Inorganic materials 0.000 title description 2
- 235000019738 Limestone Nutrition 0.000 title 1
- 239000006028 limestone Substances 0.000 title 1
- 241000273930 Brevoortia tyrannus Species 0.000 claims description 20
- 239000000463 material Substances 0.000 claims description 9
- 238000005065 mining Methods 0.000 description 2
- 235000008733 Citrus aurantifolia Nutrition 0.000 description 1
- 241000238631 Hexapoda Species 0.000 description 1
- 235000011941 Tilia x europaea Nutrition 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 239000004571 lime Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C23/00—Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
- B02C23/02—Feeding devices
Landscapes
- Engineering & Computer Science (AREA)
- Food Science & Technology (AREA)
- Crushing And Grinding (AREA)
- Disintegrating Or Milling (AREA)
Abstract
Description
Die Erfindung betrifft eine Brechanlage für die Zer kleinerung von grobstückigen Rohmaterialien, die mit mindestens zwei Zuführbändern - einem Hauptzuführband und einem Zuschlagband - versehen ist, über die das Brechgut dem Brecher aus mindestens zwei Aufgabebunkern - einem Hauptbunker und einem Zuschlagbunker - zugeführt wird. Bei den grobstückigen Rohmaterialien handelt es sich in erster Linie um Rohmaterialien der Zement-, Gips- und Kalkindustrie. Die Brechanlage kann eine stationäre, mobile oder semimobile Brechanlage sein.The invention relates to a crushing plant for the Zer reduction of coarse raw materials with at least two infeed belts - one main infeed belt and an additional belt - is provided, over which the Crushed material to the crusher from at least two feed bunkers - A main bunker and an additional bunker - fed becomes. The coarse raw materials are primarily raw materials of cement, Gypsum and lime industry. The crushing plant can stationary, mobile or semi-mobile crushing plant.
Brechanlagen der vorgenannten Art finden insbesondere dort Anwendung, wo mindestens zwei Materialien mit unterschiedlichen Eigenschaften vor der Zuführung in den Brecher gemischt werden sollen. In diesen Fällen wird dasjenige der Zuführbänder, mit dem das Hauptbrechgut - das mengenmäßig meiste - dem Brecher zugeführt wird, als Hauptzuführband bezeichnet, während das zweite Zu führband als Zuschlagband bezeichnet wird. Das über das Zuschlagband dem Brecher zuzuführende Brechgut wird demgemäß als Zuschlaggut bezeichnet. Das Zuschlaggut wird vor dem Brecher von dem Zuschlagband auf das Haupt zuführband übergeben, so daß beide Materialien gleich zeitig den Brecher erreichen.Crushing plants of the aforementioned type are particularly found wherever at least two materials are used different properties before feeding into the Crushers to be mixed. In these cases that of the feed belts with which the main material to be broken - most of the quantity - is fed to the crusher, referred to as the main feed belt, while the second Zu leader band is called the surcharge band. That about that Surcharge belt is crushed material to be fed to the crusher accordingly referred to as aggregate. The aggregate is in front of the crusher from the overhead conveyor to the head Pass the feed belt so that both materials are the same reach the crusher early.
Bei den bekannten Brechanlagen stehen die Zuführbänder mit den zugehörigen Bunkern quer zueinander und benöti gen separate Tragrahmen. Die Übergabe des Hauptbrech gutes an den Brecher erfolgt am Bandkopf des Haupt zuführbandes, während die Übergabe des Zuschlaggutes von dem Zuschlagband auf das Hauptzuführband im Bereich zwischen Hauptbunker und Bandkopf des Hauptzuführbandes erfolgt. Die beiden Bunker werden von Beladefahrzeugen auf gleichem Niveau von zwei Seiten angefahren und beschickt.The feed belts are in the known crushing plants with the associated bunkers transversely to each other and required separate frame. The handover of the main break good things about the crusher are done on the band head of the head feed belt during the transfer of the aggregate from the feed belt on the main feed belt in the area between the main bunker and the belt head of the main feed belt he follows. The two bunkers are used by loading vehicles approached on the same level from two sides and loaded.
Das Zuschlagband ist mindestens etwa gleich lang wie das Hauptzuführband. Beide Bänder beginnen in etwa gleicher Höhe und fördern unter etwa gleichem Steigungswinkel. Hierbei ist es oft notwendig, daß das Zuschlagband höher fördert als das Hauptzuführband, weil der Abwurfteil des Zuschlagbandes über eine Seitenschürze des Hauptzuführ bandes hinübergeführt werden muß. Die Seitenschürze hat die Aufgabe, ein Herabfallen des Brechgutes von dem Hauptzuführband zu verhindern.The surcharge band is at least about the same length as that Main feed belt. Both bands start approximately the same Height and convey at approximately the same pitch angle. Here it is often necessary that the surcharge band be higher promotes as the main feed belt because the discharge part of the Surcharge belt over a side apron of the main feeder bandes must be carried over. The side skirt has the task of dropping the crushed material from the Prevent main feed belt.
Die bekannten Brechanlagen weisen den Nachteil auf, daß die Förderer für die Zuschlagstoffe, also die Zuschlagbänder, verhältnismäßig lang sein müssen und daher sehr teuer sind. Darüber hinaus sind die langen Zuschlagbänder sehr schlecht zu transportieren, was ins besondere bei mobilen Brechanlagen erhebliche Schwierig keiten bereitet.The known crushing plants have the disadvantage that the conveyors for the aggregates, i.e. the Surcharge bands, must be relatively long and are therefore very expensive. In addition, the long ones Surcharge belts very difficult to transport, what ins Especially difficult with mobile crushing plants preparing.
Der Erfindung liegt die Aufgabe zugrunde, die bekannten Brechanlagen derart zu verbessern, daß die vorstehend geschilderten Nachteile nicht mehr auftreten.The invention has for its object the known To improve crushing plants so that the above described disadvantages no longer occur.
Die Lösung der gestellten Aufgabe besteht bei einer
Brechanlage der eingangs genannten Art darin,
The solution to the problem in a crushing plant of the type mentioned is
- - daß die beiden Aufgabebänder unmittelbar hinter einander angeordnet sind,- That the two feed belts immediately behind are arranged one above the other
- - daß die beiden Aufgabebänder in die gleiche Richtung fördern - That the two feed belts in the same direction promote
- - und daß - bezogen auf die Förderrichtung - das Zu schlagband hinter dem Hauptzuführband angeordnet ist.- And that - in relation to the direction of funding - the Zu impact belt is arranged behind the main feed belt.
Durch die erfindungsgemäße Ausgestaltung der Brechanlage kann diese seitlich einer beliebigen Stelle einer vor handenen Abbautrasse, beispielsweise eines Steinbruchs, angeordnet werden, während die bekannten Brechanlagen sich - wegen der Anordnung der beiden Aufgabebänder im rechten Winkel zueinander mit entsprechend angeordneten Zufahrten für die Beschickungsfahrzeuge - immer in einer Ecke der Abbautrasse befinden müssen.Due to the configuration of the crushing plant according to the invention can this one in front of any place existing mining terrace, for example a quarry, can be arranged while the known crushing plants itself - because of the arrangement of the two feed belts in the right angles to each other with appropriately arranged Access for the loading vehicles - always in one Corner of the mining terrace.
Ferner kann das Zuschlagband wesentlich kürzer und somit entsprechend leichter ausgeführt werden. Dabei ist bei dem als Plattenband ausgebildeten Zuschlagband nicht nur eine geringere Anzahl von Blechplatten erforderlich; es ist auch insgesamt eine leichtere Bauweise möglich, weil bei einem kürzeren Plattenband die auftretende Belastung geringer ist als bei einem längeren Plattenband.Furthermore, the surcharge band can be much shorter and thus accordingly easier to run. Here is at not only the surcharge band designed as a plate belt a smaller number of sheet metal plates required; it overall, a lighter design is possible because in the case of a shorter plate belt, the load that occurs is lower than with a longer plate conveyor.
Außerdem ergibt sich ein wesentlich geringeres Gesamt gewicht des Tragrahmens und damit auch ein geringerer Kostenaufwand.In addition, there is a much lower total weight of the support frame and thus also a lower one Expense.
Die erfindungsgemäße Ausgestaltung der Brechanlage ermöglicht es, diese wesentlich kleiner und leichter auszubilden, und damit auch kostengünstiger herzu stellen. Dies hat zur Folge, daß auch die Transportein richtungen kleiner und damit kostengünstiger ausgeführt werden können.The configuration of the crushing plant according to the invention allows them to be much smaller and lighter to train, and thus also cheaper put. As a result, the transport unit directions smaller and therefore less expensive can be.
Bei einer stationären Brechanlage wird durch die er findungsgemäße Ausgestaltung noch der weitere Vorteil erzielt, daß ein wesentlich geringerer Raum auszuheben ist und daß weniger Betonbau für die Zufahrtrampen zu den Beschickungsbunkern benötigt wird.In the case of a stationary crushing plant, the inventive design still another advantage achieved to excavate a much smaller space is and that less concrete construction for the access ramps too the loading bunkers is required.
Bei einer mobilen oder semimobilen Brechanlage wird durch die erfindungsgemäße Ausgestaltung der weitere Vorteil erzielt, daß ein wesentlich schnelleres Ver setzen der Brechanlage möglich ist. Auch wird eine gemeinsame Versorgung der Aufgabebänder mit Elektrik und Hydraulik ermöglicht. So ist beispielsweise nur ein Hydraulikaggregat erforderlich und es werden keine langen Verbindungsleitungen und keine elektrischen und hydraulischen Kupplungen zwischen den Bändern benötigt.With a mobile or semi-mobile crushing plant through the design according to the invention the further Advantage achieved that a much faster Ver setting the crushing plant is possible. Also one joint supply of the conveyor belts with electronics and Hydraulics enables. For example, there is only one Hydraulic unit required and there will be none long connecting lines and no electrical and hydraulic couplings between the belts required.
Ein weiterer Vorteil besteht darin, daß beim Versetzen der erfindungsgemäßen Brechanlage weniger Montage- und Justieraufwand erforderlich ist, denn die beiden Aufga bebänder brauchen weder mechanisch noch elektrisch noch hydraulisch voneinander entkoppelt, nicht einzeln an den neuen Standort transportiert und auch nicht anschließend wieder gekoppelt zu werden. Damit wird auch das Auf treten von Fehlern erheblich verringert.Another advantage is that when moving the crushing plant according to the invention less assembly and Adjustment effort is required because the two tasks Belts do not need mechanical, electrical or hydraulically decoupled, not individually to the transported to a new location and not afterwards to be paired again. This will also open up errors significantly reduced.
In Ausgestaltung der Erfindung befindet sich das untere bzw. das hintere Ende des Hauptzuführbandes mit Abstand vor dem Hauptbunker und ist das obere bzw. das vordere Ende des Zuschlagbandes über dem sich vor dem Hauptbunker erstreckenden Bereich des Hauptzuführbandes angeordnet.In the embodiment of the invention is the lower one or the rear end of the main feed belt at a distance in front of the main bunker and is the top or the front one End of the surcharge band above which before Main bunker extending area of the main feed belt arranged.
Durch diese Ausgestaltung der Brechanlage wird zunächst eine Schicht des Zuschlaggutes auf das Hauptzuführband aufgebracht, so daß das Zuschlaggut einen Aufprallpuffer für das Hauptbrechgut bildet. Dies ist insbesondere dann von besonderer Bedeutung, wenn die Überwachungsein richtung der Schichtdicke des Brechgutes im Hauptbunker versagt.This configuration of the crushing plant initially a layer of the aggregate on the main feed belt applied so that the aggregate an impact buffer for the main insect. This is especially so of particular importance when monitoring Direction of the layer thickness of the crushed material in the main bunker fails.
Anhand der Zeichnung ist ein Ausführungsbeispiel einer Brechanlage näher erläutert. Es zeigen:Based on the drawing, an embodiment is one Crushing plant explained in more detail. Show it:
Fig. 1 eine mobile oder semimobile Brechanlage in Betriebsstellung, in Vorderansicht; Figure 1 is a mobile or semi-mobile crushing plant in the operating position, in front view.
Fig. 2 die in Fig. 1 dargestellte Brechanlage in Drauf sicht; Fig. 2 is a plan view of the crushing plant shown in Figure 1;
Fig. 3 die in Fig. 1 dargestellte Brechanlage in Seitensicht; Fig. 3, the crushing plant shown in Figure 1 in side view; FIG.
Fig. 4 eine semimobile. Brechanlage während des Ver setzens. Fig. 4 is a semi-mobile. Crushing plant during placement.
Die in der Zeichnung als Ausführungsbeispiele darge stellten Brechanlagen sind mit zwei Zuführbändern - einem Hauptzuführband 1 und einem Zuschlagband 2- versehen, über die das Brechgut dem Brecher 3 aus zwei Auf gabebunkern - einem Hauptbunker 4 und einem Zuschlag bunker 5 - zugeführt wird. Die beiden Zuführbänder - Hauptzuführband 1 und Zuschlagband 2 - sind unmittel bar hintereinander angeordnet und fördern in die gleiche Richtung.The crushing plants shown in the drawing as exemplary embodiments Darge are provided with two feed belts - a main feed belt 1 and an aggregate belt 2 - via which the material to be crushed is fed to the crusher 3 from two feed bunkers - a main bunker 4 and an aggregate bunker 5 . The two feed belts - main feed belt 1 and aggregate belt 2 - are arranged immediately behind one another and convey in the same direction.
Das untere bzw. hinter Ende 1E des Hauptzuführbandes 1 befindet sich mit Abstand vor dem Hauptbunker 4, während das obere bzw. vordere Ende 2E des Zuschlagbandes 2 über dem sich vor dem Hauptbunker 4 erstreckenden Bereich des Hauptzuführbandes 1 angeordnet ist.The lower or rear end 1 E of the main feed belt 1 is located at a distance in front of the main bunker 4 , while the upper or front end 2 E of the aggregate belt 2 is arranged above the area of the main feed belt 1 extending in front of the main bunker 4 .
Claims (2)
- 1. daß die beiden Zuführbänder - Hauptzuführband (1) und Zuschlagband (2) - unmittelbar hinter einander angeordnet sind,
- 2. daß die beiden Zuführbänder - Hauptzuführband (1) und Zuschlagband (2) - in die gleiche Rich tung fördern
- 3. und daß - bezogen auf die Förderrichtung - das Zuschlagband (2) hinter dem Hauptzuführband (1) angeordnet ist.
- 1. that the two feed belts - main feed belt ( 1 ) and aggregate belt ( 2 ) - are arranged directly one behind the other,
- 2. that the two feed belts - main feed belt ( 1 ) and aggregate belt ( 2 ) - promote in the same direction Rich
- 3. and that - based on the conveying direction - the aggregate belt ( 2 ) is arranged behind the main feed belt ( 1 ).
- 1. daß das untere bzw. das hintere Ende (1E) des Hauptzuführbandes (1) sich mit Abstand vor dem Hauptbunker (4) befindet
- 2. und daß das obere bzw. das vordere Ende (2E) des Zuschlagbandes (2) über dem sich vor dem Haupt bunker (4) erstreckenden Bereich des Hauptzu führbandes (1) angeordnet ist.
- 1. that the lower or the rear end ( 1 E) of the main feed belt ( 1 ) is at a distance from the main bunker ( 4 )
- 2. and that the upper or the front end ( 2 E) of the aggregate belt ( 2 ) over the in front of the main bunker ( 4 ) extending area of the main conveyor belt ( 1 ) is arranged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE1998150769 DE19850769A1 (en) | 1998-11-04 | 1998-11-04 | Breaking plant for crushing of large-piece raw materials used in cement , gypsum or limestone industries has upper or front end of additional conveyor located above section of main conveyor extending in front of main hopper |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE1998150769 DE19850769A1 (en) | 1998-11-04 | 1998-11-04 | Breaking plant for crushing of large-piece raw materials used in cement , gypsum or limestone industries has upper or front end of additional conveyor located above section of main conveyor extending in front of main hopper |
Publications (1)
Publication Number | Publication Date |
---|---|
DE19850769A1 true DE19850769A1 (en) | 2000-05-11 |
Family
ID=7886624
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE1998150769 Withdrawn DE19850769A1 (en) | 1998-11-04 | 1998-11-04 | Breaking plant for crushing of large-piece raw materials used in cement , gypsum or limestone industries has upper or front end of additional conveyor located above section of main conveyor extending in front of main hopper |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE19850769A1 (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3608789A1 (en) * | 1986-03-15 | 1987-09-24 | Orenstein & Koppel Ag | MOBILE CRUSHER |
DE4016262C1 (en) * | 1990-05-19 | 1991-08-14 | Readymix Huettenzement Gmbh, 4600 Dortmund, De | Milling plant for lumpy material - comprises raw material silos connected by conveyor belts to a magnetic separator, a metal detector and a milling unit |
-
1998
- 1998-11-04 DE DE1998150769 patent/DE19850769A1/en not_active Withdrawn
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3608789A1 (en) * | 1986-03-15 | 1987-09-24 | Orenstein & Koppel Ag | MOBILE CRUSHER |
DE4016262C1 (en) * | 1990-05-19 | 1991-08-14 | Readymix Huettenzement Gmbh, 4600 Dortmund, De | Milling plant for lumpy material - comprises raw material silos connected by conveyor belts to a magnetic separator, a metal detector and a milling unit |
Non-Patent Citations (1)
Title |
---|
JP 10211443 AA.,In: Patent Abstracts of Japan * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1615723B1 (en) | Comminution device | |
EP0920555A1 (en) | Device for milling ground surfaces, specially roadways | |
EP3760313A1 (en) | Feeding hopper for a material processing device | |
WO2008031490A1 (en) | Mobile crusher plant | |
DE3803809C2 (en) | ||
EP0382922B1 (en) | Mobile crusher, especially for comminuting demolition materials and other rubble | |
DE3635762A1 (en) | Roller mill | |
DE3107955A1 (en) | DEVICE FOR UNDERGROUND MINING, ESPECIALLY FOR THE EXTRACTION OF MIGHTY FLOORS | |
EP4294572B1 (en) | High-pressure roller press | |
EP3505681B1 (en) | Silo vehicle and work train | |
DE10221253A1 (en) | Device for sieving, sorting or crushing bulk goods | |
DE3834381A1 (en) | Apparatus for comminuting and processing large-grained material | |
DE102007063067A1 (en) | Device for feeding and loading of bulk material, particularly semi circle bed bearing, has vertically adjusted medium column, and bearing surface for bulk material, which is sectionally arranged or designed around medium column | |
DE19850769A1 (en) | Breaking plant for crushing of large-piece raw materials used in cement , gypsum or limestone industries has upper or front end of additional conveyor located above section of main conveyor extending in front of main hopper | |
WO2002081090A2 (en) | Device for supplying a material | |
DE102011054086B4 (en) | Roller mill and method for comminuting brittle regrind | |
EP3750632B1 (en) | Feed unit for a treatment plant, in particular a crushing or screening plant | |
DE3235473A1 (en) | Chain scraper conveyor | |
EP3740446B1 (en) | Slope clearing system and method for removing bulk material from a bulk material pile | |
EP0131589A1 (en) | Crushing plant and operation method thereof. | |
DE4011655C2 (en) | ||
DE19731765B4 (en) | Plant for the treatment of crushed material, in particular salty debris | |
DE3331359C2 (en) | Bucket wheel bridge device | |
EP0250750B1 (en) | Transferring device for mined material, particularly for open cast machines | |
DE3144613A1 (en) | Bar screen with rotating rollers |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OM8 | Search report available as to paragraph 43 lit. 1 sentence 1 patent law | ||
8139 | Disposal/non-payment of the annual fee |