DE19824395C1 - Method for manufacture of railway bed - Google Patents
Method for manufacture of railway bedInfo
- Publication number
- DE19824395C1 DE19824395C1 DE1998124395 DE19824395A DE19824395C1 DE 19824395 C1 DE19824395 C1 DE 19824395C1 DE 1998124395 DE1998124395 DE 1998124395 DE 19824395 A DE19824395 A DE 19824395A DE 19824395 C1 DE19824395 C1 DE 19824395C1
- Authority
- DE
- Germany
- Prior art keywords
- base layer
- steel plates
- concrete
- anchor
- holes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B1/00—Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
- E01B1/002—Ballastless track, e.g. concrete slab trackway, or with asphalt layers
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/005—Making of concrete parts of the track in situ
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2204/00—Characteristics of the track and its foundations
- E01B2204/06—Height or lateral adjustment means or positioning means for slabs, sleepers or rails
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2204/00—Characteristics of the track and its foundations
- E01B2204/09—Ballastless systems
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2204/00—Characteristics of the track and its foundations
- E01B2204/13—Dowels for slabs, sleepers or rail-fixings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
Description
Die Erfindung betrifft ein Verfahren zum Herstellen eines schotterlosen Oberbausystems für zumindest ein Eisen bahngleis aus zwei Eisenbahnschienen, insbesondere für Hochgeschwindigkeitsstrecken, - auch als sogenannte Feste Fahrbahn bezeichnet -, wobei fortlaufend zunächst eine hydraulisch gebundene Tragschicht und auf der erhärteten Tragschicht eine Betontragschicht gefertigt wird, wobei anschließend in die Betontragschicht schienenparallele Reihen von Verankerungsbohrungen eingesenkt werden, in welche Ankerbolzen für Auflagerplatten jeweils einer daran zu befestigenden Schiene eingesetzt werden, und wobei danach einerseits die verbliebenen Hohlräume der Verankerungsbohrungen mit Vergußmaterial verfüllt und andererseits mit Hilfe eines Schalungskörpers Schienen auflagersockel betoniert werden, auf denen nach Erhärtung die Auflagerplatten aufgelagert und befestigt werden. Gegenstand der Erfindung ist auch eine Vorrichtung zum Setzen der Ankerbolzen, zum Verfüllen der verbliebenen Hohlräume der Verankerungsbohrungen und zum Betonieren der Schienenauflagersockel bei einem derartigen Verfahren.The invention relates to a method for producing a ballastless superstructure system for at least one iron Railway track from two railroad tracks, especially for High-speed lines - also as so-called festivals Roadway designates -, whereby initially continuously one hydraulically bound base layer and on the hardened Base layer is made of a concrete base layer, whereby then parallel to the concrete base course Rows of anchor holes are sunk in which anchor bolts for bearing plates one at each to be fastened rail, and wherein then on the one hand the remaining cavities of the Anchorage holes filled with potting material and on the other hand with the help of a formwork body rails support base to be concreted on which after hardening the support plates are stored and fastened. The invention also relates to a device for Place the anchor bolts to fill the remaining ones Cavities of the anchoring holes and for concreting the Rail support base in such a method.
Bei bekannten Verfahren der genannten Art (DE 44 11 889 A1) werden die Verankerungsbohrungen nur über einen Teil der Höhe der Betontragschicht geführt. Die gewindeartige äußere Profilierung der aus Verankerungsdübeln bestehenden Ankerbolzen bewirkt bei einer Beaufschlagung mit einer Zugkraft eine Lastübertragung durch Verbund mit der Mörtelschale, die ihrerseits in Verbund mit der umgebenden Betontragschicht steht. Die wirksame Verankerungstiefe ist in konstruktiver Hinsicht begrenzt durch die Einbindetiefe des Verankerungsdübels in die Betontragschicht. Je nach der Art der Profilierung des Verankerungsdübels erfolgt die Lastabtragung über Verbund nicht gleichförmig über die Länge der Profilierung. Vielmehr wird ein Großteil der Last bereits im oberen Drittel bis zur oberen Hälfte des profilierten Bereiches der Dübelhülse in die Mörtelschale bzw. den Beton der Betontragschicht übertragen. In der unteren Hälfte dagegen wird nur ein kleinerer Anteil der Last abgeleitet. Insgesamt erzielt man vergleichsweise niedrige Betonausbruchslasten, weil - vereinfacht ausgedrückt - die Spitze des Betonausbruchskraters bei dieser Art der Verankerung nicht bis an das untere Ende der Dübelhülse reicht. Die Verankerungstiefe ist dadurch stets kleiner als die Dicke des Verankerungsgrundes, d. h. der Betontragschicht.In known methods of the type mentioned (DE 44 11 889 A1) the anchor holes are only part of the Height of the concrete base course. The thread-like outer Profiling of the existing anchors Anchor bolt causes a Tensile force a load transmission through bond with the Mortar bowl, which in turn is bonded to the surrounding Concrete base layer stands. The effective anchorage depth is structurally limited by the embedment depth of the anchoring anchor in the concrete base layer. Depending on the The type of profiling of the anchoring anchor takes place Load transfer over composite not uniform over the Profiling length. Rather, much of the burden already in the upper third to the upper half of the profiled area of the dowel sleeve in the mortar shell or transfer the concrete of the concrete base course. In the the lower half, on the other hand, only a small proportion of Load derived. Overall, you achieve comparatively low concrete breakout loads because - simplified expressed - the tip of the concrete eruption crater at this type of anchoring does not reach the bottom of the Dowel sleeve is enough. The anchorage depth is therefore always less than the thickness of the anchoring base, d. H. of the Concrete base course.
Der Erfindung liegt die Aufgabe zugrunde, die Bauteildicke der Betontragschicht für die Verankerung möglichst voll zu nutzen und zwar mit großvolumigem Lastabtragungsbereich.The invention is based, the component thickness the concrete base layer for anchoring as fully as possible use with a large-volume load transfer area.
Die erfindungsgemäße Lösung dieser Aufgabe besteht in verfahrensmäßiger Hinsicht darin, daß vor dem Fertigen der Betontragschicht auf der erhärteten hydraulisch gebundenen Tragschicht im Bereich der späteren Verankerungsbohrungen elektrisch leitend miteinander verbundene Stahlplatten fixiert werden, daß die Verankerungsbohrungen bis zu den Stahlplatten geführt werden und daß die in die Veran kerungsbohrungen eingesetzten Ankerbolzen durch eine Lichtbogenbolzenschweißung mit den Stahlplatten verbunden werden. - Unter "Lichtbogenbolzenschweißung" ist dabei insbesondere eine Verschweißung nach DIN 1910-2, Ausgabe August 1977, Abschnitt 1.7.1 zu verstehen.The achievement of this task consists in procedurally in that before the manufacture of the Concrete base layer on the hardened hydraulically bound Base layer in the area of the later anchoring holes Steel plates electrically connected together be fixed that the anchoring holes up to the Steel plates are guided and that the in the veran anchor holes used by an anchor bolt Arc stud welding connected to the steel plates become. - Under "Arc stud welding" is included especially a weld according to DIN 1910-2, edition August 1977, section 1.7.1.
Die Erfindung geht hierbei von der Überlegung aus, daß die an die Ankerbolzen angeschweißten, über die Veran kerungsbohrungen überstehenden Stahlplatten zwischen der hydraulisch gebundenen Tragschicht und der Betontragschicht eine wesentlich bessere Einleitung der Ankerzugkräfte in die Betontragschicht besorgen, weil hierzu die Betontrag schicht über ihre gesamte Höhe und zufolge der Stahlplatten großvolumig herangezogen wird.The invention is based on the consideration that welded to the anchor bolts, via the veran steel plates protruding from the drill holes between the hydraulically bound base layer and the concrete base layer a much better introduction of the anchor tensile forces in get the concrete base layer because this is the concrete base layer over their entire height and according to the steel plates is used on a large volume.
Für die weitere Ausgestaltung bestehen im Rahmen der Erfindung mehrere Möglichkeiten. Der für das Anschweißen erforderliche Stromfluß wird im Rahmen des erfindungs gemäßen Verfahrens über die elektrisch leitende Verbindung der Stahlplatten besorgt. Diese kann vorzugsweise dadurch hergestellt werden, daß die Stahlplatten z. B. durch punkt verschweißten Stabstahl miteinander verbunden sind. Eine andere Möglichkeit besteht darin, die Stahlplatten in Form von Stahlplattenstreifen zu verlegen. Die für das Be tonieren der Betontragschicht erforderliche Fixierung der Stahlplatten wird vorzugsweise durch Aufkleben oder Anschießen mit Ankerbolzen an der hydraulisch gebundenen Tragschicht besorgt. Die in der Betontragschicht einzu bringenden Verankerungsbohrungen können mit Schnecken bohrern in den frischen, bereits angesteiften Beton der Tragschicht eingesenkt werden. Ohne weiteres besteht aber auch die Möglichkeit, diese Verankerungsbohrungen mit Hammerbohrern in den erhärteten Beton der Betontragschicht einzusenken. In allen Fällen wird dabei entferntes Betonmaterial abgesaugt. Um eine ordnungsgemäße Verschweißung sicherzustellen, empfiehlt es sich, die Stahlplatten an ihren am Boden der Verankerungsbohrungen befindlichen Bereichen durch Säubern in den zum Ver schweißen geeigneten Zustand zu bringen. Dies kann durch mechanische Behandlung der entsprechenden Bereiche erfol gen oder durch Einsatz von beschichteten Stahlplatten erreicht werden, deren Beschichtung lediglich entfernt wird.For further development there are within the Invention several ways. The one for welding required current flow is within the scope of the Invention method according to the electrically conductive connection the steel plates worried. This can preferably be done by are made that the steel plates z. B. by point welded steel bars are interconnected. A Another option is to shape the steel plates to be laid by steel plate strips. The for the Be toning the concrete base layer required fixing the Steel plates are preferably glued or Shoot with anchor bolts on the hydraulically bound Worried base layer. The one in the concrete base layer Bringing anchor holes can be done with snails drill into the fresh, already stiffened concrete of the Base layer can be sunk. Without further ado, however also the option of using these anchor holes Hammer drills in the hardened concrete of the concrete base course sink. In all cases this removes Aspirated concrete material. To be a proper one To ensure welding, it is recommended that Steel plates on their at the bottom of the anchoring holes areas by cleaning in the ver bring welding suitable condition. This can be done by mechanical treatment of the corresponding areas gene or by using coated steel plates can be achieved, the coating of which is only removed becomes.
Wie schon angegeben, ist Gegenstand der Erfindung auch eine Vorrichtung zum Setzen der Ankerbolzen, zum Verfüllen der verbliebenen Hohlräume der Verankerungsbohrungen und zum Betonieren der Schienenauflagersockel bei dem beschriebenen erfindungsgemäßen Verfahren, welches dadurch gekennzeichnet ist, daß ein Schalungskörper für einen Schienenauf lagersockel an einem Setzrahmen heb- und senkbar gelagert ist und daß an dem Setzrahmen Lichtbogenbolzenschweißgeräte befestigt sind, die in der Arbeitsstellung den Schalungskörper im Bereich von verschließbaren und abdichtenden Öffnungen durchdringen.As already stated, the subject of the invention is also a Device for setting the anchor bolts, for filling the remaining cavities of the anchoring holes and to Concreting the rail support base in the described method according to the invention, which is characterized is that a formwork body for a rail Bearing base on a frame can be raised and lowered is and that on the setting frame arc stud welding equipment are attached to the in the working position Formwork body in the area of closable and penetrate sealing openings.
Im folgenden wird die Erfindung anhand einer Zeichnung erläutert, deren Fig. 1 bis 6 die Herstellung eines schotterlosen Oberbausystems für ein Eisenbahngleis aus zwei Eisenbahnschienen, insbesondere für Hochgeschwindig keitsstrecken, in aufeinanderfolgenden Verfahrensschritten zeigen. In den Figuren ist dabei jeweils nur eine Gleis hälfte dargestellt. In the following the invention will be explained with reference to a drawing, whose FIGS. 1 to 6 show the production of a ballastless superstructure system for a railroad track from two railroad tracks, in particular for high-speed routes, in successive process steps. In the figures, only one half of the track is shown.
Wie aus Fig. 1 ersichtlich ist, wird mittels eines Gleitfertigers zunächst eine hydraulisch gebundene Trag schicht 1 hergestellt. Nach Erhärten der hydraulisch gebundenen Tragschicht 1 werden Einzelplatten 2 oder Stahlplattenstreifen, entweder durchgehend oder abschnitts weise, längs oder quer, so ausgelegt, daß sie unter Berücksichtigung der notwendigen Toleranzen als Ankerplatte für die später maßgenau zu setzenden Ankerbolzen 3 für die Schienenbefestigung dienen können. Die Fixierung der Stahlplatten 2 auf der hydraulisch gebundenen Tragplatte 1 erfolgt beispielsweise durch Verkleben mit einem minerali schen Baukleber oder durch Anschießen mit entsprechenden Bolzen. Die Fixierung muß die Lage der Stahlplatten 2 beim folgenden Betoniergang der Betontragschicht 4 sicher stellen.As can be seen from Fig. 1, a hydraulically bound base layer 1 is first produced by means of a slip paver. After hardening of the hydraulically bound base layer 1 , individual plates 2 or steel plate strips, either continuously or in sections, lengthways or crossways, are designed so that, taking into account the necessary tolerances, they can serve as an anchor plate for the anchor bolts 3 to be set later for the rail fastening. The fixing of the steel plates 2 on the hydraulically bound support plate 1 is carried out, for example, by gluing with a mineral building adhesive or by shooting with appropriate bolts. The fixation must ensure the position of the steel plates 2 in the following concreting of the concrete base layer 4 .
Werden Einzelplatten 2 verlegt, sind diese miteinander durch einen elektrischen Leiter zu verbinden, der beim Schweißvorgang für den erforderlichen Stromfluß sorgt. Dieser elektrische Leiter besteht im Ausführungsbeispiel aus einem mit den Stahlplatten 2 punktverschweißten Stahlstab 5. Die elektrotechnischen Forderungen des Fahrwegbetreibers werden dabei berücksichtigt.If individual plates 2 are laid, they must be connected to one another by an electrical conductor, which ensures the necessary current flow during the welding process. In the exemplary embodiment, this electrical conductor consists of a steel rod 5 that is spot-welded to the steel plates 2 . The electrotechnical requirements of the infrastructure manager are taken into account.
Anschließend wird die Bewehrung aus Betonstahl für die Betontragschicht 4 so verlegt, daß sie die unmittelbaren Verankerungsbereiche nicht kreuzt. Anschließend oder gleichzeitig mit der Bewehrungsverlegung wird die Beton tragschicht 4 betoniert (vgl. Fig. 2). In die Betontrag schicht 4 werden anschließend die Verankerungsbohrungen 6 eingesenkt. Dies kann mit Hilfe eines speziellen Schneckenbohrers oder dergleichen in den frischen, bereits angesteiften Beton geschehen. Eine andere Möglichkeit besteht darin, die Verankerungsbohrungen 6 mittels Hammerbohrern in den erhärteten Beton zu bohren. In allen Fällen werden jeweils die Verankerungsbohrungen 6 bis auf die Stahlplatten 2 gebohrt. Die Bohrerspitze ist aber so ausgebildet, daß sie den Bohrgrund, nämlich die Stahlplatte 2, ausreichend sauber schabt und mit einer integrierten Absaugvorrichtung 7 das Bohrgut entfernt wird (vgl. Fig. 3). Falls im vorangegangenen Schritt kein zum Verschweißen geeigneter Zustand erreicht worden ist, wird die im Bohrlochgrund freiliegende Stahlplatte 2 durch das Ankerloch in einem separaten Arbeitsgang so präpariert, daß sie den Erfordernissen für eine zuverlässige Ausführung der Lichtbogenbolzenschweißung genügt. In jedem Fall sind Verunreinigungen und Wasser zu entfernen. Die genannte Säuberungsaktion kann z. B. durch rotierende Schleifkörper oder Stahlbürsten mit integrierter Absaugung geschehen. Alternativ kann mit einer dünnen Beschichtung der Stahlplatten mit Folie oder Überzuglack gearbeitet werden, die beim Bohren bzw. Reinigen zerstört wird und damit das blanke Blech freilegt (vgl. Fig. 4). Die Durchmesser der Verankerungsbohrungen 6 sind dabei so gewählt, daß genügend Freiraum für die anzuschweißenden Ankerbolzen 3 und das zugehörige Werkzeug und Einbauhilfsmittel gegeben ist, um diese lagegenau zu plazieren.Then the reinforcement made of reinforcing steel is laid for the concrete base layer 4 so that it does not cross the immediate anchoring areas. Subsequently or simultaneously with the laying of the reinforcement, the concrete base layer 4 is concreted (cf. FIG. 2). In the concrete support layer 4 , the anchoring holes 6 are then sunk. This can be done with the help of a special auger or the like in the fresh, already stiffened concrete. Another possibility is to drill the anchoring holes 6 into the hardened concrete using hammer drills. In all cases, the anchoring holes 6 are drilled down to the steel plates 2 . However, the drill tip is designed so that it scrapes the drilling base, namely the steel plate 2 , sufficiently cleanly and the drilling material is removed with an integrated suction device 7 (cf. FIG. 3). If no condition suitable for welding has been reached in the previous step, the steel plate 2 exposed in the bottom of the borehole is prepared by the anchor hole in a separate operation in such a way that it meets the requirements for reliable execution of the arc stud welding. In any case, contamination and water must be removed. The cleaning operation mentioned can, for. B. done by rotating grinding wheels or steel brushes with integrated suction. Alternatively, a thin coating of the steel plates with foil or topcoat can be used, which is destroyed during drilling or cleaning and thus exposes the bare metal sheet (see FIG. 4). The diameters of the anchoring holes 6 are chosen so that there is sufficient space for the anchor bolts 3 to be welded on and the associated tools and installation aids in order to place them in the correct position.
Ausweislich Fig. 5 werden nunmehr Setzrahmen 8 lage- und höhengenau positioniert, woraufhin an den Schalungskörpern 9 befestigte Bolzenschweißgeräte 10 zusammen mit den Ankerbolzen 3 in die vorbereiteten Verankerungsbohrungen 6 eingefahren werden. Die elektrischen Kontakte werden in bekannter Weise geschlossen und die Verschweißung mit den Stahlplatten 2 am Bohrlochgrund ausgeführt, wobei die Gegenelektrode z. B. an einen benachbarten bereits verschweißten Ankerbolzen 3 angeschlossen wird. Der Strom fließt über die leitfähigen Verbindungen von Stahlplatte 2 zu Stahlplatte 2. Anschließend werden die Schweißgeräte 10 zurückgezogen und die Öffnungen der Durchdringungen 15 in der Schalungshaut verschlossen. Die verbliebenen Hohlräume der Verankerungsbohrungen 6 werden mit Vergußmörtel vergossen und der Schienenauflagersockel 11 mit Beton oder Mörtel betoniert. Die Vergußmasse kann mit Stahlfasern bewehrt sein.As evidenced by Fig. 5 will now be positionally set frame 8 and altitude accurately positioned, whereupon the formwork bodies 9 fixed stud welding devices 10 are retracted together with the anchor bolt 3 into the anchor holes 6 prepared. The electrical contacts are closed in a known manner and the welding to the steel plates 2 is carried out at the bottom of the borehole, the counter electrode being e.g. B. is connected to an adjacent welded anchor bolt 3 . The current flows via the conductive connections from steel plate 2 to steel plate 2 . The welding devices 10 are then withdrawn and the openings of the penetrations 15 in the formwork skin are closed. The remaining cavities of the anchoring holes 6 are poured with grout and the rail support base 11 is concreted with concrete or mortar. The potting compound can be reinforced with steel fibers.
Nach dem Entfernen des Schalungskörpers 9 und ausreichendem Erhärten der Vergußmasse können die Bauteile der Schienenstützpunkte und die Schiene 12 montiert werden. Hierzu wird eine Auflagerplatte 13 auf den Schienenauflagersockel 11 gelegt und mit Hilfe von auf die Ankerbolzen 3 aufgesetzten Muttern 14 befestigt. Anschließend wird die Schiene 12 in üblicher Weise auf der Auflagerplatte 13 befestigt. Den fertigen Schienenstütz punkt zeigt die Fig. 6.After the formwork body 9 has been removed and the casting compound has hardened sufficiently, the components of the rail support points and the rail 12 can be installed. For this purpose, a support plate 13 is placed on the rail support base 11 and fastened with the aid of nuts 14 placed on the anchor bolts 3 . The rail 12 is then attached to the support plate 13 in the usual manner. The finished rail support point is shown in FIG. 6.
Fig. 5 entnimmt man auch eine nur vom Prinzip her dargestellte Vorrichtung zum Setzen der Ankerbolzen 3, zum Verfüllen der verbliebenen Hohlräume der Verankerungsbohrungen 6 und zum Betonieren der Schienauf lagersockel 11. Man erkennt einen Schalungskörper 9 für einen Schienenauflagersockel 11, der an einem Setzrahmen 8 heb- und senkbar gelagert ist. Dieser Schalungskörper 9 weist außerhalb angeordnete Bolzenschweißgeräte 10 sowie abdichtende Durchdringungen 15 für die beiden einer Auflagerplatte 13 zugeordneten Ankerbolzen auf. Die Durchführungen für das Vergußmaterial bzw. den Beton für die Schienenauflagersockel 11 ist im einzelnen nicht dar gestellt. Fig. 5 also shows a device shown only in principle for setting the anchor bolts 3 , for filling the remaining cavities of the anchoring holes 6 and for concreting the Schienauf bearing base 11th One recognizes a formwork body 9 for a rail support base 11 , which is mounted on a setting frame 8 such that it can be raised and lowered. This formwork body 9 has bolt welding devices 10 arranged outside and sealing penetrations 15 for the two anchor bolts assigned to a support plate 13 . The bushings for the potting material or the concrete for the rail support base 11 is not shown in detail.
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE1998124395 DE19824395C1 (en) | 1998-05-30 | 1998-05-30 | Method for manufacture of railway bed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE1998124395 DE19824395C1 (en) | 1998-05-30 | 1998-05-30 | Method for manufacture of railway bed |
Publications (1)
Publication Number | Publication Date |
---|---|
DE19824395C1 true DE19824395C1 (en) | 1999-07-22 |
Family
ID=7869516
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE1998124395 Expired - Fee Related DE19824395C1 (en) | 1998-05-30 | 1998-05-30 | Method for manufacture of railway bed |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE19824395C1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102012103001A1 (en) * | 2012-04-05 | 2013-10-10 | Rte Technologie Gmbh | Fixed carriageway for rail vehicles and rail fastener for a fixed carriageway |
CN103572669A (en) * | 2013-11-01 | 2014-02-12 | 中铁三局集团有限公司 | Ballast bed and tunnel bottom defect regulating and constructing method as well as anchoring device |
CN115030506A (en) * | 2022-06-21 | 2022-09-09 | 中国五冶集团有限公司 | Installation method of light I-steel rail |
WO2023147612A1 (en) * | 2022-02-04 | 2023-08-10 | Porr Bau Gmbh | Track assembly, method for producing said track assembly, and method for renovating said track assembly |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3710188A1 (en) * | 1987-03-27 | 1988-10-13 | Achim Wirth | Clamped superstructure |
DE4415363C1 (en) * | 1994-05-02 | 1995-09-28 | Walter Bau Ag | A permanent way superstructure for railways, especially for bridges and processes for its manufacture |
DE4411889A1 (en) * | 1994-04-07 | 1995-10-12 | Hochtief Ag Hoch Tiefbauten | Ballastless track system for at least one railroad track and method of manufacture |
DE19516163C1 (en) * | 1995-02-25 | 1996-08-29 | Hochtief Ag Hoch Tiefbauten | Procedure for positionally accurate manufacture of arrangement of rail support points |
DE19522478A1 (en) * | 1995-06-21 | 1997-01-02 | Hochtief Ag Hoch Tiefbauten | Method of mounting train rails on concrete surface |
-
1998
- 1998-05-30 DE DE1998124395 patent/DE19824395C1/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3710188A1 (en) * | 1987-03-27 | 1988-10-13 | Achim Wirth | Clamped superstructure |
DE4411889A1 (en) * | 1994-04-07 | 1995-10-12 | Hochtief Ag Hoch Tiefbauten | Ballastless track system for at least one railroad track and method of manufacture |
DE4415363C1 (en) * | 1994-05-02 | 1995-09-28 | Walter Bau Ag | A permanent way superstructure for railways, especially for bridges and processes for its manufacture |
DE19516163C1 (en) * | 1995-02-25 | 1996-08-29 | Hochtief Ag Hoch Tiefbauten | Procedure for positionally accurate manufacture of arrangement of rail support points |
DE19522478A1 (en) * | 1995-06-21 | 1997-01-02 | Hochtief Ag Hoch Tiefbauten | Method of mounting train rails on concrete surface |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102012103001A1 (en) * | 2012-04-05 | 2013-10-10 | Rte Technologie Gmbh | Fixed carriageway for rail vehicles and rail fastener for a fixed carriageway |
CN103572669A (en) * | 2013-11-01 | 2014-02-12 | 中铁三局集团有限公司 | Ballast bed and tunnel bottom defect regulating and constructing method as well as anchoring device |
CN103572669B (en) * | 2013-11-01 | 2015-04-22 | 中铁三局集团有限公司 | Ballast bed and tunnel bottom defect regulating and constructing method as well as anchoring device |
WO2023147612A1 (en) * | 2022-02-04 | 2023-08-10 | Porr Bau Gmbh | Track assembly, method for producing said track assembly, and method for renovating said track assembly |
CN115030506A (en) * | 2022-06-21 | 2022-09-09 | 中国五冶集团有限公司 | Installation method of light I-steel rail |
CN115030506B (en) * | 2022-06-21 | 2023-08-22 | 中国五冶集团有限公司 | Installation method of light I-steel rail |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0735189B1 (en) | Method for producing a ballastless track superstrucure for at least one railway track | |
DE4414515A1 (en) | Process for anchoring a post or a row of posts in the ground, and fixed anchorage, formed by carrying out this process, of a post or a row of posts | |
DE2708664A1 (en) | Overhead cable support pylon - has assembled repairable free part and ground sunken plinth component | |
DE3042725A1 (en) | Elastically mounted ballast free railway track superstructure - has outside appliance simultaneously positioning precast concrete pieces in wet concrete slab | |
DE19824395C1 (en) | Method for manufacture of railway bed | |
DE4236766C2 (en) | Method for renovating a dam construction for a roadway | |
EP1026320B1 (en) | Method for building a ballastless track | |
DE10004194C2 (en) | Process for the production of a fixed railroad track on a bridge | |
DE19623305A1 (en) | Ground hardening equipment to prevent subsidence of railway line | |
DE102008032217A1 (en) | Basement for signal mast for railway track, has tie bar downwardly extending from support head into receiving space, and filling body filling receiving space for stationarly supporting tie bar in receiving space | |
DE10004626C2 (en) | Method for producing a derailment protection arrangement for a railroad track, a railroad track comprising a derailment protection arrangement and derailment protection arrangement | |
EP1576240B1 (en) | Method for constructing a rigid track and a communication track | |
EP1048783A1 (en) | Railway track and its construction method | |
EP2003251A1 (en) | Holder stem | |
WO2003104562A1 (en) | Precast concrete part and method | |
DE4325476A1 (en) | Method for producing a substructure for a track for rail vehicles | |
AT500950A4 (en) | METHOD FOR PRODUCING A TUNNEL TRACK FOR RAIL VEHICLES | |
DE10236535B4 (en) | Process for the production of a slab track with the traverse method on bridges and other art structures | |
AT500876B1 (en) | METHOD FOR MANUFACTURING A FIXED RAILWAY RAILWAY | |
DE2146159C3 (en) | Railway superstructure | |
EP3228757B1 (en) | Reinforcement device | |
EP1216326A1 (en) | Method for producing a soundproofed track | |
DE19824396C1 (en) | Method of producing a loose gravel railtrack esp. for high speed use | |
DE102004045766B4 (en) | Prefabricated slab and method for producing a solid track with such a precast slab | |
DE2636168A1 (en) | Frame integrated prefabricated component assembly building - has lost template frame for wall, ceiling and concrete type mass insertion |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8100 | Publication of the examined application without publication of unexamined application | ||
D1 | Grant (no unexamined application published) patent law 81 | ||
8364 | No opposition during term of opposition | ||
8339 | Ceased/non-payment of the annual fee |