DE1234173B - Process for producing gas-tight line clamps in the mine - Google Patents
Process for producing gas-tight line clamps in the mineInfo
- Publication number
- DE1234173B DE1234173B DEE28646A DEE0028646A DE1234173B DE 1234173 B DE1234173 B DE 1234173B DE E28646 A DEE28646 A DE E28646A DE E0028646 A DEE0028646 A DE E0028646A DE 1234173 B DE1234173 B DE 1234173B
- Authority
- DE
- Germany
- Prior art keywords
- mine
- producing gas
- tight
- dams
- tight line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims description 6
- 239000000203 mixture Substances 0.000 claims description 9
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 7
- 235000008733 Citrus aurantifolia Nutrition 0.000 claims description 6
- 235000011941 Tilia x europaea Nutrition 0.000 claims description 6
- 239000004571 lime Substances 0.000 claims description 6
- 239000004927 clay Substances 0.000 claims description 5
- 239000011230 binding agent Substances 0.000 claims description 3
- 239000000428 dust Substances 0.000 claims description 3
- 239000011435 rock Substances 0.000 claims description 3
- 238000003825 pressing Methods 0.000 claims description 2
- 235000019738 Limestone Nutrition 0.000 description 5
- 239000006028 limestone Substances 0.000 description 5
- 238000004519 manufacturing process Methods 0.000 description 5
- 239000004568 cement Substances 0.000 description 4
- 239000000843 powder Substances 0.000 description 4
- 238000005065 mining Methods 0.000 description 3
- 230000000052 comparative effect Effects 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 239000003245 coal Substances 0.000 description 1
- 239000011440 grout Substances 0.000 description 1
- 239000011396 hydraulic cement Substances 0.000 description 1
- 239000004572 hydraulic lime Substances 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
- E21F15/005—Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
- E21F17/103—Dams, e.g. for ventilation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
- E21F17/103—Dams, e.g. for ventilation
- E21F17/107—Dams, e.g. for ventilation inflatable
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Processing Of Solid Wastes (AREA)
- Soil Conditioners And Soil-Stabilizing Materials (AREA)
Description
DEUTSCHESGERMAN
PATENTAMTPATENT OFFICE
AUSLEGESCHRIFTEDITORIAL
Int. Cl.:Int. Cl .:
E21fE21f
Deutsche KL: 5 d-17/00German KL: 5 d-17/00
Nummer: 1 234173Number: 1 234173
Aktenzeichen: E 28646 VI a/5 dFile number: E 28646 VI a / 5 d
Anmeldetag: 6. Februar 1965Filing date: February 6, 1965
Auslegetag: 16. Februar 1967Opened on: February 16, 1967
Die Erfindung betrifft ein Verfahren zum Herstellen gasdichter Streckendämme im Grubenbetrieb durch Einpressen eines pumpfähigen Gemisches aus Kalkstein, einem hydraulischen Bindemittel und Wasser in vorher errichtete Schutzwände. Solche Dämme werden im Untertagebetrieb des Steinkohlenbergbaus in der Weise hergestellt, daß man in den ausgeraubten Strecken am Dammende und am Dammanfang Stützwände errichtet und den durch diese Wände gebildeten Hohlraum zunächst mit Bergeversatz und dann mit einem pumpfähigen, aus praktisch reinem hochprozentigem Kalksteinmehl, gegebenenfalls Zement und Wasser bestehenden Brei anfüllt. Ein pumpfähiges Gemisch kann, wie aus der Zeitschrift »Glückauf«, 1954, S. 777, bekannt, aus einer Zement-Gesteinsstaubtrübe in einem Verhältnis von 1:3 der Feststoffanteile bestehen. Da die Dämme zur Verhinderung des Austritts von Grubengas gasdicht sein müssen, ist es beim bekannten Verfahren meistens erforderlich, sie nachzuverpressen oder zwei Dämme nebeneinander zu errichten.The invention relates to a method for producing gas-tight road embankments in mining operations Injection of a pumpable mixture of limestone, a hydraulic binder and water in previously erected protective walls. Such dams are used in underground coal mining Manufactured in such a way that retaining walls are placed in the looted stretches at the end of the dam and at the beginning of the dam erected and the cavity formed by these walls first with a mountain offset and then with a pumpable, made of practically pure high-percentage limestone powder, possibly cement and water replenishes existing pulp. A pumpable mixture can, as from the magazine "Glückauf", 1954, p. 777, known from a cement rock dust slurry in a ratio of 1: 3 of the solids exist. Since the dams have to be gas-tight to prevent the escape of mine gas, with the known method it is usually necessary to re-grout them or to press two dams next to each other to build.
Der Erfindung liegt die Aufgabe zugrunde, diesen Nachteil zu vermeiden. Nach dem Verfahren der Erfindung erfolgt die Herstellung gasdichter Streckendämme im Grubenbetrieb durch Einpressen eines pumpfähigen Gemisches aus Gesteinsstaub, einem hydraulischen Bindemittel und Wasser zwischen vorher errichtete Stützwände in der Weise, daß ein mindestens 5% Ton enthaltender Kalkmergel verwendet wird.The invention is based on the object of avoiding this disadvantage. According to the procedure of Invention, the production of gas-tight road embankments takes place in the mine by pressing in a pumpable mixture of rock dust, a hydraulic binder and water between before erected retaining walls in such a way that a lime marl containing at least 5% clay is used.
Verfahren zum Herstellen gasdichter
Streckendämme im GrubenbetriebMethod of making gas-tight
Road embankments in the mine
Anmelder:Applicant:
ELSA Zement- und Kalkwerke A. G.,ELSA cement and lime works A. G.,
NeubeckumNeubeckum
Als Erfinder benannt:Named as inventor:
DipL-Chem. Hans Joachim Tennstedt,DipL-Chem. Hans Joachim Tennstedt,
NeubeckumNeubeckum
Vergleichsversuche haben ergeben, daß ein solches Gemisch keinen Volumenverlust aufweist, worauf bei Verwendung der bekannten Mittel zur Herstellung von Dämmen im Naßverfahren zurückzuführen ist, daß die Dämme nicht völlig gasdicht sind.Comparative tests have shown that such a mixture has no loss of volume, whereupon when using the known means for the production of dams in the wet process is due, that the dams are not completely gas-tight.
Zur Durchführung der Vergleichsversuche wurden die aus der nachstehenden Tabelle ersichtlichen Stoffe mit Wasser bis zu einer pumpfähigen Konsistenz angerührt, in Standzylinder gefüllt und der Volumenverlust gemessen.The substances shown in the table below were used to carry out the comparative tests mixed with water to a pumpable consistency, filled into standing cylinders and the loss of volume measured.
%Water content
%
%Substance content
%
pro m3 Volume loss
per m 3
Kalksteinmehl mit etwa 97% CaCO3 und Zement
im Verhältnis 4:1 bis 7:1
Kalksteinmehl mit etwa 97% CaCO3 und hoch
hydraulischer Kalk im Verhältnis 6:1
Kalkmergel mit etwa 70 bis 75% CaCO3 und etwa
8 bis 10% Ton und hydraulischer Zement im Ver
hältnis 6:1 Limestone powder with about 97% CaCO 3
Limestone powder with about 97% CaCO 3 and cement
in a ratio of 4: 1 to 7: 1
Limestone powder with about 97% CaCO 3 and high
hydraulic lime in a ratio of 6: 1
Lime marl with about 70 to 75% CaCO 3 and about
8 to 10% clay and hydraulic cement in ver
ratio 6: 1
26
26,5
31 bis 35,5 23
26th
26.5
31 to 35.5
74
73,5
69 bis 64,577
74
73.5
69 to 64.5
12 bis 201
101
kein Volumenverlust401
12 to 201
101
no volume loss
Mit Hilfe des erfindungsgemäßen Gemisches lassen sich ohne Nachverpressen völlig gasdichte Dämme im Naßverfahren herstellen, da beim Erhärten des Gemisches kein Volumenverlust eintritt.With the aid of the mixture according to the invention, completely gas-tight dams can be created without further grouting Manufacture using the wet process, as there is no loss of volume when the mixture hardens.
Trotz der verhältnismäßig hohen, für die Pumpfähigkeit des erfindungsgemäßen Gemisches erforderlichen Wassermenge weist das erhärtete Gemisch ausgezeichnete Festigkeitswerte bei einer für gasdichte Dämme im Bergbau erwünschten Elastitizität auf. Der für Zwecke der Erfindung in Frage kommende Kalkmergel kann so viel Ton enthalten, wie es die für den Damm erforderliche Festigkeit zuläßt. Es empfiehlt sich, in der Regel einen Kalkmergel zu verwenden, der nicht mehr als etwa 10 % Ton enthält.Despite the relatively high levels required for the pumpability of the mixture according to the invention Amount of water, the hardened mixture has excellent strength values at one for gas-tight Dams on the elasticity desired in mining. The one in question for the purposes of the invention Lime marl can contain as much clay as the strength of the dam allows. It it is recommended to use a lime marl that does not contain more than about 10% clay.
709 509/87709 509/87
Claims (1)
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEE28646A DE1234173B (en) | 1965-02-06 | 1965-02-06 | Process for producing gas-tight line clamps in the mine |
BE676049D BE676049A (en) | 1965-02-06 | 1966-02-04 | |
GB520666A GB1141311A (en) | 1965-02-06 | 1966-02-07 | Improvements in or relating to processes for the construction of gas-tight dams in mine workings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEE28646A DE1234173B (en) | 1965-02-06 | 1965-02-06 | Process for producing gas-tight line clamps in the mine |
Publications (1)
Publication Number | Publication Date |
---|---|
DE1234173B true DE1234173B (en) | 1967-02-16 |
Family
ID=7073453
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DEE28646A Pending DE1234173B (en) | 1965-02-06 | 1965-02-06 | Process for producing gas-tight line clamps in the mine |
Country Status (3)
Country | Link |
---|---|
BE (1) | BE676049A (en) |
DE (1) | DE1234173B (en) |
GB (1) | GB1141311A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0774446A1 (en) * | 1995-11-17 | 1997-05-21 | Compagnie Du Sol | Mortar with high thermal conductivity and process for making such mortar |
CN113236357A (en) * | 2021-06-17 | 2021-08-10 | 贵州大学 | Remote movable filling system and method |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1163755B (en) * | 1961-06-12 | 1964-02-27 | Bergwerksverband Gmbh | Process for the erection of dams in mine workings, especially at risk of firedamp |
-
1965
- 1965-02-06 DE DEE28646A patent/DE1234173B/en active Pending
-
1966
- 1966-02-04 BE BE676049D patent/BE676049A/xx not_active IP Right Cessation
- 1966-02-07 GB GB520666A patent/GB1141311A/en not_active Expired
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1163755B (en) * | 1961-06-12 | 1964-02-27 | Bergwerksverband Gmbh | Process for the erection of dams in mine workings, especially at risk of firedamp |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0774446A1 (en) * | 1995-11-17 | 1997-05-21 | Compagnie Du Sol | Mortar with high thermal conductivity and process for making such mortar |
CN113236357A (en) * | 2021-06-17 | 2021-08-10 | 贵州大学 | Remote movable filling system and method |
Also Published As
Publication number | Publication date |
---|---|
BE676049A (en) | 1966-06-16 |
GB1141311A (en) | 1969-01-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE3526508A1 (en) | METHOD FOR SEALING A STORAGE OF METAL CATIONS CONTAINING | |
DE3005366C2 (en) | ||
DE19603805A1 (en) | Binder mixture for the production of mineral slag-free sealing wall materials and process for the production of this binder mixture | |
DE2326647B2 (en) | BUILDING MATERIAL MIXTURE | |
DE2216039C3 (en) | Hydraulically setting material for expansion purposes in mining | |
DE1234173B (en) | Process for producing gas-tight line clamps in the mine | |
DE3932046C3 (en) | Fracture field offset method | |
DE1252227B (en) | Process for the expansion of tunnels to be produced by means of shield jacking | |
DE2243482B2 (en) | Fireproof spray compound | |
DE2736971C2 (en) | ||
DE2064617C3 (en) | Process for the construction of closing dams for dropped mine workings | |
DE4312570C2 (en) | Aqueous, thixotropic, binder and bentonite-containing slurry for diaphragm walls | |
DE2032428B1 (en) | Use of a pumpable mixture for grouting road dams and the like in underground operations | |
DE2032428C (en) | Use of a pumpable mixture for grouting road dams and the like in underground operations | |
DE909881C (en) | Method of making seals | |
DE901271C (en) | Methods of improving cement slurry | |
AT363886B (en) | PROCESS FOR BREAKDOWN OF THICK CARBON IN AT LEAST TWO DISC DISKS | |
DE800217C (en) | Method of making chamotte | |
DE3629768A1 (en) | Preferably water-containing, settable composition for use as building material in the construction of building elements | |
DE719732C (en) | Process for the production of concrete bodies | |
DE19856640A1 (en) | Underground closure element construction material for underground shaft, gallery and borehole closures comprises construction blocks of sand and clay and/or bentonite | |
DE1533812C (en) | Spulversetz procedure for filling in excavated pit spaces | |
DE1921084B1 (en) | Hydraulically setting dry mortar powder | |
DE3925639A1 (en) | Coal-mine gallery-backfilling system - uses fine granular free-flowing material introduced at roof | |
DE814733C (en) | Relief protection for mine route linings |