[go: up one dir, main page]

DE1173843B - Device for the continuous removal of the material that has been dumped in a pile - Google Patents

Device for the continuous removal of the material that has been dumped in a pile

Info

Publication number
DE1173843B
DE1173843B DEM53755A DEM0053755A DE1173843B DE 1173843 B DE1173843 B DE 1173843B DE M53755 A DEM53755 A DE M53755A DE M0053755 A DEM0053755 A DE M0053755A DE 1173843 B DE1173843 B DE 1173843B
Authority
DE
Germany
Prior art keywords
recording device
conveyor belt
embankment
heap
release
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DEM53755A
Other languages
German (de)
Inventor
Dr-Ing Hellmuth Kuehn
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BWS Technologie GmbH
Original Assignee
Maschinenfabrik Buckau R Wolf AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maschinenfabrik Buckau R Wolf AG filed Critical Maschinenfabrik Buckau R Wolf AG
Priority to DEM53755A priority Critical patent/DE1173843B/en
Publication of DE1173843B publication Critical patent/DE1173843B/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/18Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G65/00Loading or unloading
    • B65G65/02Loading or unloading machines comprising essentially a conveyor for moving the loads associated with a device for picking-up the loads
    • B65G65/08Loading or unloading machines comprising essentially a conveyor for moving the loads associated with a device for picking-up the loads with reciprocating pick-up conveyors
    • B65G65/10Raking or scraping devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G65/00Loading or unloading
    • B65G65/02Loading or unloading machines comprising essentially a conveyor for moving the loads associated with a device for picking-up the loads
    • B65G65/16Loading or unloading machines comprising essentially a conveyor for moving the loads associated with a device for picking-up the loads with rotary pick-up conveyors
    • B65G65/20Paddle wheels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/18Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels
    • E02F3/181Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels including a conveyor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/18Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels
    • E02F3/183Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels with digging unit shiftable relative to the frame

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Ship Loading And Unloading (AREA)

Description

Vorrichtung zum kontinuierlichen Abtragen des zu einer Halde angeschütteten Gutes Schüttgüter, wie Brennstoffe, Steine, Erden od. dgl. werden vor ihrer technischen Verwertung oder Verarbeitung zur Vorratshaltung zu Halden angeschüttet, um einen Ausgleich zwischen der oft diskontinuierlichen Zufuhr und der davon unabhängigen diskontinuierlichen bzw. kontinuierlichen Entnahme zu schaffen und schließlich auch, um eine gewisse Vergleichmäßigung der Qualität des Schüttgutes zu erreichen.Device for the continuous removal of what has been poured into a dump Good bulk goods, such as fuels, stones, earth or the like. Are before their technical Utilization or processing for storage in heaps to a Balance between the often discontinuous supply and the independent one to create discontinuous or continuous removal and finally, in order to achieve a certain leveling of the quality of the bulk material.

Zum kontinuierlichen Abtragen des zu einer Halde angeschütteten Gutes ist es bekannt, auf einem gegen gegen die Böschung verfahrbaren Brückenträger ein parallel zur stirnseitigen Böschung der Halde hin-und herverfahrbares Löse- und Aufnahmegerät zu verwenden, dessen Lösegerät alle Schichten der Böschung der Höhe nach gleichzeitig erfaßt und dessen Aufnahmegerät das sich am Böschungsfuß ansammelnde gelöste Gut aufnimmt und an einen im Brükkenträger angeordneten Förderer abgibt. For the continuous removal of the material poured into a dump it is known to be on a bridge girder that can be moved against the embankment Loosening and moving back and forth parallel to the frontal slope of the heap To use recording device, its dissolving device all layers of the embankment of the height after detected at the same time and its recording device the accumulating at the foot of the embankment picks up dissolved material and delivers it to a conveyor arranged in the bridge girder.

Da die Halde einen dreieckförmigen oder trapezförmigen Querschnitt besitzt, wird von dem Lösegerät im Bereich der seitlichen Böschungen der Halde auf der Wegstrecke eine sich zum Ende der Wegstrecke stetig vermindernde Gutsmenge gelöst. Um eine stets gleiche Menge an Schüttgut abfördern zu können, ist es bekannt, dieFahrgeschwindigkeit derAufnahme- und Lösegerätes auf elektrischem Wege nach einem angenommenen Böschungswinkel zu regeln. Because the stockpile has a triangular or trapezoidal cross-section owns, the loosening device in the area of the side embankments of the heap the distance a steadily decreasing amount of material at the end of the distance is solved. In order to always be able to convey away the same amount of bulk material, it is known to use the travel speed the pick-up and release device by electrical means according to an assumed angle of repose to regulate.

Eine solche starre Regelung der Fahrgeschwindigkeit des Aufnahmegerätes ist jedoch unzulänglich, weil einerseits das in Schichten angeschüttete Gut oftmals unterschiedlicher Beschaffenheit hinsichtlich seiner Körnung und seines Feuchtigkeitsgehaltes ist, welche Faktoren den jeweiligen Böschungswinkel des Gutes verändern. Auch ist ein gleichmäßig hohes Anschütten der Halde praktisch nicht möglich. Wenn aber die Höhe und der Böschungswinkel des Schüttgutes wechselt, kann bei einer starren Regelung der Fahrgeschwindigkeit des Aufnahmegerätes keine stets gleich große Schüttgutmenge von dem Aufnahmegerät aufgenommen werden. Such a rigid regulation of the driving speed of the recording device is inadequate, however, because, on the one hand, the material often piled up in layers different properties in terms of its grain size and moisture content is what factors change the respective slope angle of the property. Also is a uniformly high filling of the heap is practically impossible. But if the The height and the angle of repose of the bulk material changes, can with a rigid regulation the travel speed of the recording device does not always have the same amount of bulk material be recorded by the recording device.

Die Erfindung vermeidet diesen Nachteil dadurch, daß eine im Abförderband angeordnete Förderbandwaage die Fahrgeschwindigkeit des Löse- und Aufnahmegerätes regelt. Wenn als Aufnahmegerät ein um eine horizontale Achse drehbares Schaufelrad verwendet wird, das das aufgenommene Gut an ein Zwischenförderband abgibt, ist es vorteilhaft, die Förderbandwaage in das Zwischenförderband einzubauen. The invention avoids this disadvantage in that one in the discharge conveyor belt arranged conveyor belt scale determines the speed of the release and pick-up device regulates. If a paddle wheel rotatable around a horizontal axis is used as a recording device is used, which delivers the picked up material to an intermediate conveyor belt, it is advantageous to install the conveyor belt scale in the intermediate conveyor belt.

Mit der Erfindung wird erreicht, daß die Regelung der Fahrgeschwindigkeit des Aufnahmegerätes von dem wechselnden Böschungswinkel und der wechselnden Haldenhöhe unabhängig ist. With the invention it is achieved that the control of the driving speed of the recording device from the changing angle of slope and the changing height of the dump is independent.

In der Zeichnung ist ein Ausführungsbeispiel schematisch dargestellt, und zwar zeigt A b b. 1 eine Seitenansicht, A b b. 2 eine Draufsicht der Vorrichtung. In the drawing, an embodiment is shown schematically, namely shows A b b. 1 is a side view, A b b. Figure 2 is a plan view of the device.

Längs den Seitenböschungen der Halde 1 sind Schienen 2 und 3 verlagert, auf welchen mittels der Fahrwerke 4 bis 7 ein Tragrahmen 8 für einen mit ihm verbundenen Brückenträger 9 verfahrbar ist, der ein Gitterwerk in Form eines Kastenträgers darstellt und sich parallel zur Stirnböschung der Halde erstreckt. Die Obergurte 10 des Brückenträgers 9 tragen Fahrschienen 11 und 12 für ein verfahrbares Haldenräumgerät. Das Haldenräumgerät besteht im wesentlichen aus einem Unterbau 13 mit den auf den Fahrschienen 11 und 12 verfahrbaren Fahrwerken 14, dem Kugeldrehkranz 15 sowie dem darauf schwenkbar gelagerten Oberbau 16. Der Oberbau 16 ist T-förmig und weist an der Seite einen Gegengewichtsausleger 17 mit Gegengewicht 18 und böschungsseitig je einen Vorbau 19 und 20 auf. In dem Vorbau 19 ist das Schaufelrad 21 gelagert, das das aufgenommene Gut auf ein ansteigendes Zwischenförderband 22 abgibt. Am Vorbau 20 ist eine sich über die Böschung erstreckende rotierende Stachelwalze 23 gelagert, die durch den Motor 24 angetrieben wird. Zur Anpassung an die Haldenneigung 25 ist die Stachelwalze 23 mittels der Seilwinde 26 und des Seilzuges 27 in seiner Neigung einstellbar. Rails 2 and 3 are shifted along the side slopes of heap 1, on which by means of the bogies 4 to 7 a support frame 8 for one connected to it Bridge girder 9 is movable, which represents a latticework in the form of a box girder and extends parallel to the front slope of the heap. The upper chords 10 of the bridge girder 9 support rails 11 and 12 for a mobile heap clearing device. The heap clearance device consists essentially of a substructure 13 with the on the rails 11 and 12 movable trolleys 14, the slewing ring 15 and the pivotable on it mounted superstructure 16. The superstructure 16 is T-shaped and has a on the side Counterweight boom 17 with counterweight 18 and one stem each on the slope side 19 and 20 on. In the stem 19, the paddle wheel 21 is mounted, which the recorded Good on a rising intermediate conveyor belt 22 delivers. There is a self on the stem 20 over the slope extending rotating spiked roller 23 supported by the Motor 24 is driven. The spiked roller is used to adapt to the slope of the dump 25 23 adjustable in its inclination by means of the cable winch 26 and the cable pull 27.

Die Seilwinde26 wird durch den Motor 26 a angetrieben.The winch 26 is driven by the motor 26 a.

Das von der Stachelwalze 23 gelöste und sich am Fuß der Böschung ansammelnde Gut wird von dem Schaufelrad21 aufgenommen und von dem ansteigenden Förderband 22 auf einen längs der Fahrschienen 11, 12 angeordneten Bandförderer 28 abgegeben. Für die entgegengesetzte Fahrtnchtung des Räumgerätes wird nach einer 1800-Schwenkung des Oberbaues 16 das von dem Zwischenförderer 22 aufgenommene Gut auf den Bandförderer 29 abgegeben. The loosened from the spiked roller 23 and located at the foot of the embankment accumulating material is picked up by the bucket wheel21 and by the rising Conveyor belt 22 on a belt conveyor arranged along the running rails 11, 12 28 submitted. For the opposite direction of the Clearing device After a 1800 pivoting of the superstructure 16, that of the intermediate conveyor 22 Picked up goods are delivered to the belt conveyor 29.

Die Bandförderer 28, 29 fördern das aufgenommene Gut quer zur Halde zu den Schütttrichtern 30, 31, unter denen sich das ortsfest angeordnete Förderband 32 befindet, welches längs der Halde angeordnet ist.The belt conveyors 28, 29 convey the material picked up across the heap to the hoppers 30, 31, under which the stationary conveyor belt is located 32 is located, which is arranged along the heap.

Zur Steuerung der Fahrgeschwindigkeit des Räumgerätes ist das Zwischenförderband 22 erfindüngsgemäß als Förderbandwaage ausgebildet, die über nicht dargestellte Einrichtungen den nicht dargestellten Fahrantrieb des Haldenräumgerätes steuert. Der Brückenträger 8, 9 kann stetig oder schrittweise gegen die Böschung 25 der Halde 1 verschoben werden, während das Haldenräumgerät mit ständig wechselnder Geschwindigkeit parallel zur Böschung automatisch hin- und herfährt. The intermediate conveyor belt is used to control the travel speed of the clearing device 22 according to the invention designed as a conveyor belt scale, which is not shown Devices controls the drive, not shown, of the heap clearing device. The bridge girder 8, 9 can be steadily or gradually against the slope 25 of the heap 1 can be moved while the heap clearing device with constantly changing speed automatically moves back and forth parallel to the embankment.

Der Oberbau 16 ist außer dem Kugeldrehkranz 15 über Rollen 33 an Fahrschienen 34 abgestützt, die an den Außengurten des Tragrahmens 8 angeordnet sind. In addition to the slewing ring 15, the superstructure 16 is connected via rollers 33 Running rails 34 supported, which are arranged on the outer belts of the support frame 8 are.

Claims (2)

Patentansprüche: 1. Vorrichtung zum kontinuierlichen Abtragen des zu einer Halde angeschütteten Gutes mittels eines auf einem gegen die stirnseitige Böschung der Halde verfahrbaren Brückenträger quer zur Böschung hin- und herverfahrbaren Löse- und Aufnahmegerätes, dessen Lösegerät alle Schichten der Böschung der Höhe nach gleichzeitig erfaßt und dessen Aufnahmegerät das sich am Böschungsfuß ansammelnde gelöste Gut aufnimmt und an einen im Brückenträger angeordneten Förderer abgibt, wobei die Fahrgeschwindigkeit des Löse- und Aufnahmegerätes entsprechend dem auf seiner Wegstrecke in Abhängigkeit von der unterschiedlichen Böschungshöhe in unterschiedlichen Mengen anfallenden Gut so geregelt wird, daß eine stets gleich große Menge Schüttgut vom Aufnahmegerät aufgenommen wird, dadurch gekennzeichnet, daß eine im Abförderband (22) angeordnete Förderbandwaage die Fahrgeschwindigkeit des Löse- und Aufnahmegerätes (21, 23) regelt. Claims: 1. Device for the continuous removal of the Goods poured into a dump by means of a on one against the frontal embankment the heap movable bridge girders back and forth across the embankment Detachment and recording device, its detachment device all layers of the slope of the height after detected at the same time and its recording device the accumulating at the foot of the embankment picks up dissolved material and delivers it to a conveyor arranged in the bridge girder, whereby the driving speed of the release and recording device according to the its route depending on the different embankment heights in different Amounts accumulating good is regulated so that an always the same amount of bulk material is picked up by the recording device, characterized in that one in the discharge conveyor (22) arranged conveyor belt scale determines the travel speed of the release and pick-up device (21, 23) regulates. 2. Vorrichtung nach Anspruch 1, mit einem um eine horizontale Achse drehbaren Schaufelrad als Aufnahmegerät, das das aufgenommene Gut an ein Zwischenförderband abgibt, dadurch gekennzeichnet, daß die Förderbandwaage in das Zwischenförderband (22) eingebaut ist. 2. Apparatus according to claim 1, having one about a horizontal axis rotatable paddle wheel as a recording device, which transfers the material to an intermediate conveyor belt dispenses, characterized in that the conveyor belt scale in the intermediate conveyor belt (22) is installed. In Betracht gezogene Druckschriften: Britische Patentschrift Nr. 862 336. Documents considered: British Patent No. 862 336.
DEM53755A 1962-08-01 1962-08-01 Device for the continuous removal of the material that has been dumped in a pile Pending DE1173843B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEM53755A DE1173843B (en) 1962-08-01 1962-08-01 Device for the continuous removal of the material that has been dumped in a pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEM53755A DE1173843B (en) 1962-08-01 1962-08-01 Device for the continuous removal of the material that has been dumped in a pile

Publications (1)

Publication Number Publication Date
DE1173843B true DE1173843B (en) 1964-07-09

Family

ID=7307798

Family Applications (1)

Application Number Title Priority Date Filing Date
DEM53755A Pending DE1173843B (en) 1962-08-01 1962-08-01 Device for the continuous removal of the material that has been dumped in a pile

Country Status (1)

Country Link
DE (1) DE1173843B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1253160B (en) * 1966-02-25 1967-10-26 Buckau Wolf Maschf R Device for loading and unloading a ring pile with a central tower
DE1281355B (en) * 1964-11-12 1968-10-24 Buckau Wolf Maschf R Device for the continuous removal of the material that has been dumped in a pile
FR2525575A1 (en) * 1982-04-23 1983-10-28 Belotti Pierre METHOD FOR OPERATING A STOCK OF PARTICULATE MATERIALS IN A TAS, AND IMPROVED MACHINE AND INSTALLATION FOR IMPLEMENTING IT
DE3247743C1 (en) * 1982-12-23 1984-03-15 O & K Orenstein & Koppel Ag, 1000 Berlin Opencast mining bucket wheel excavator superstructure - swivels on bridge linking endless tracks and bearing material discharge belt
CN109607230A (en) * 2018-12-11 2019-04-12 湖南长重机器股份有限公司 A kind of multi-faceted bucket wheel machine wind-proof device
CN109607231A (en) * 2018-12-11 2019-04-12 湖南长重机器股份有限公司 A kind of Wind-proof mechanism of bucket-wheel stacker reclaimer

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB862336A (en) * 1958-05-01 1961-03-08 Hewitt Robins Inc Improvements in apparatus for reclaiming material from storage piles

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB862336A (en) * 1958-05-01 1961-03-08 Hewitt Robins Inc Improvements in apparatus for reclaiming material from storage piles

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1281355B (en) * 1964-11-12 1968-10-24 Buckau Wolf Maschf R Device for the continuous removal of the material that has been dumped in a pile
DE1253160B (en) * 1966-02-25 1967-10-26 Buckau Wolf Maschf R Device for loading and unloading a ring pile with a central tower
FR2525575A1 (en) * 1982-04-23 1983-10-28 Belotti Pierre METHOD FOR OPERATING A STOCK OF PARTICULATE MATERIALS IN A TAS, AND IMPROVED MACHINE AND INSTALLATION FOR IMPLEMENTING IT
DE3247743C1 (en) * 1982-12-23 1984-03-15 O & K Orenstein & Koppel Ag, 1000 Berlin Opencast mining bucket wheel excavator superstructure - swivels on bridge linking endless tracks and bearing material discharge belt
CN109607230A (en) * 2018-12-11 2019-04-12 湖南长重机器股份有限公司 A kind of multi-faceted bucket wheel machine wind-proof device
CN109607231A (en) * 2018-12-11 2019-04-12 湖南长重机器股份有限公司 A kind of Wind-proof mechanism of bucket-wheel stacker reclaimer

Similar Documents

Publication Publication Date Title
EP2054552B1 (en) Method and device for renewing a ballast bed
DE3032559A1 (en) MOVABLE BAND CONVEYOR, IN PARTICULAR PLATE BAND CONVEYOR FOR CRUSHING PLANTS
DE4343148C2 (en) Mobile track bed processing machine
DE1481377A1 (en) Scraper loader for round storage spaces
DE1456657B1 (en) Device for clearing heaps
DE1173843B (en) Device for the continuous removal of the material that has been dumped in a pile
DE2122518B2 (en) Device for storing bulk material in layers parallel to the angle of slope
DE3834313C2 (en) Process and plant for the production of a ballast bed for a railway track
DE2231268B2 (en) RECOVERY DEVICE FOR ROUND, PREFERABLY CONE-SHAPED BUMPER STACKS
DE1175157B (en) Device for the continuous removal of a heaped heap by means of a heap clearing device that can be moved across the heap
DE667084C (en) Endless conveyor belt carried by an overhead track intended for open-cast mining
DE1281942B (en) Method and device for mixing different bulk material components
DE3519208A1 (en) Bridge device for removing dumps of loose material
DE605187C (en) Mobile depositing device intended for tipping up and down goods
DE3217745C2 (en) Movable incline conveyor
DE813374C (en) Storage arrangement with loading and unloading system
DE1281355B (en) Device for the continuous removal of the material that has been dumped in a pile
AT224016B (en) Removal scratches
DE19529235C2 (en) Device for producing a spoil tip in surface mining and its use
DE505153C (en) Overburden conveyor
DE915319C (en) Infeed conveyor line
DE1161215B (en) Device for removing heaps
DE672283C (en) Bucket wheel excavator with a bucket wheel boom that can be raised and lowered and moved against the impact of the excavator and with two bucket hoppers arranged next to one another for loading conveyor trains traveling next to one another
DE1243103B (en) System for removing a heap of debris from a storage area
DE424943C (en) Process for depositing the excavated material by means of an excavation conveyor bridge