DE1026697B - Device for making boreholes for pillar or pile foundations - Google Patents
Device for making boreholes for pillar or pile foundationsInfo
- Publication number
- DE1026697B DE1026697B DEA19899A DEA0019899A DE1026697B DE 1026697 B DE1026697 B DE 1026697B DE A19899 A DEA19899 A DE A19899A DE A0019899 A DEA0019899 A DE A0019899A DE 1026697 B DE1026697 B DE 1026697B
- Authority
- DE
- Germany
- Prior art keywords
- pipe
- shoe
- drill
- drill shoe
- drilling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/385—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/56—Screw piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/72—Pile shoes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/22—Placing by screwing down
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Earth Drilling (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Description
Bei dem in Abb. 1 und 2 dargestellten Ausführungsbeispiel besteht die Vorrichtung gemäß der Erfindung aus einem Bohrrohr 1, dessen oberer Teil nicht gezeichnet ist und das, an seinem unteren Ende mit einem inneren Kragen 2 versehen ist, der mit der Innenwand des Rohres einen ringförmigen, nach unten offenen Raum 3 -bildet. Dieser Kragen ist an der Innenseite des Rohres 1, z. B. durch einen kegelförmigen Ring 4, befestigt.-Ferner weist die Vorrichtung einen zum Bohrrohr 1 gleichachsig liegenden, ringförmigen Bohrschuh 5 auf, dessen oberer Teil aus einer zylindrischen Hülse 6 besteht, die frei in dem -ringförmigen Raum 3 gleiten kann. Der untere Teil des Bohrschuhes 5 besteht aus einer Schraube oder Schnecke 7 mit breiten Flügeln, die sich in das Erdreich bohren, wenn der Bohrschuhs um seine Achse gedreht wird. Die untere Kante des Bohrschuhes 5 kann mit Zähnen 8 versehen sein, während der in der Achsmitte liegende Teil 9 hohl ist.In the embodiment shown in Fig. 1 and 2, the device according to the invention consists of a drill pipe 1, the upper part of which is not shown and which is provided at its lower end with an inner collar 2 which is annular with the inner wall of the pipe , 3-forms open space below. This collar is on the inside of the tube 1, for. B. by means of a conical ring 4. The device also has an annular drill shoe 5 coaxially to the drill pipe 1 , the upper part of which consists of a cylindrical sleeve 6 which can slide freely in the annular space 3. The lower part of the drill shoe 5 consists of a screw or auger 7 with wide wings which drill into the ground when the drill shoe is rotated about its axis. The lower edge of the drill shoe 5 can be provided with teeth 8, while the part 9 located in the center of the axis is hollow.
Die obere Kante der Hülse 6 enthält einen Zahnkranz 10, der den Teil ei=nes Klinkwerkes bildet und in den wenigstens eine Klinke 11 eingreift, die an dem oberen Teil des ringförmigen Raumes 3 auf einem an dem Rohr 1 befestigten Zapfen 12 gelagert ist. Vorzugsweise sind wenigstens zwei derartige Klinken 11 vorgesehen, die- symmetrisch zur Achse verteilt angeordnet sind. Die Bewegung jeder Klinke 11 ist nach unten z. B. durch einen Anschlag 13 begrenzt.The upper edge of the sleeve 6 contains a ring gear 10 which forms part of a ratchet mechanism and in which at least one pawl 11 engages, which is mounted on the upper part of the annular space 3 on a pin 12 attached to the tube 1. At least two such pawls 11 are preferably provided, which are arranged distributed symmetrically to the axis. The movement of each pawl 11 is downward z. B. limited by a stop 13.
In der normalen Arbeitsstellung ruht das Bohrrohr 1 auf der Schnecke 7, wobei die Kante 14 des Rohres 1 und die Kante 15 des inneren Kragens 2 sich auf den entsprechenden Schultern 16, 17 des Bohrschuhes 5 abstützen. In dieser Stellung sind die Klinken 11 im Eingriff mit den Zähnen 10 des Klinkwerkes. Entfernen sich -jedoch Rohr 1 und Bohrschuh 5 um einen bestimmten Abstand voneinander, wie in Abb. 2 dargestellt, so greifen die Klinken 11 nicht mehr in die Verzahnung 10 ein, und die beiden Teile 1 und 5 können sich frei gegeneinander bewegen.In the normal working position, the drill pipe 1 rests on the auger 7, wherein the edge 14 of the tube 1 and the edge 15 of the inner collar 2 are on the corresponding shoulders 16, 17 of the drill shoe 5 are supported. In this position the pawls 11 are in engagement with the teeth 10 of the ratchet mechanism. Move away -but pipe 1 and drill shoe 5 by a certain distance from each other, as in Fig. 2, the pawls 11 no longer engage in the toothing 10, and the two parts 1 and 5 can move freely against each other.
Wenn in der Stellung gemäß Abb. 1 das Rohr 1 im Sinne des Pfeiles Fl gedreht wird, so übertragen die in die Verzahnung 10 eingreifenden Klinken 11 die Drehbewegung auf dien Bohrschuhs in solchem Sinne, daß sich dieser in das Erdreich einschraubt und dabei nach unten bewegt. Bei einer Drehung des Rohres 1 entgegengesetzt zur Pfeilrichtung F1 gleiten die Klinken 11 lose auf den schrägen Flanken der Verzahnung 10.If in the position shown in Fig. 1 the pipe 1 is rotated in the direction of the arrow Fl, the pawls 11 engaging in the toothing 10 transmit the rotary movement to the drill shoe in such a way that it screws into the ground and thereby moves downwards . When the tube 1 rotates in the opposite direction to the direction of the arrow F1, the pawls 11 slide loosely on the inclined flanks of the toothing 10.
Der Flankenwinkel der einzelnen Zähne des Klinkwerkes 10 entspricht der maximalen Winkelbewegung des Rohres 1 in einem Sinne. Wenn man dem Rohr 1 daher eine hin- und hergehende oder kreuzweise Drehbewegung erteilt, so wird der Bohrschuh 5 immer in demselben Sinne verdreht, der seiner Abwärtsbewegung entspricht. .The flank angle of the individual teeth of the ratchet mechanism 10 corresponds the maximum angular movement of the tube 1 in one sense. If you have the pipe 1 therefore If a reciprocating or cross-wise rotary movement is issued, the drill shoe 5 always twisted in the same sense that corresponds to its downward movement. .
Wenn aus irgendeinem Grunde, z. B. in leichtem Boden, die Schnecke des Bohrschuhes das Bestreben hat, schneller als das Rohr in das Erdreich einzudringen, so wird sein Absenken nicht durch das Rohr behindert, da diese beiden Teile nicht zwangläufig miteinander verbunden sind, und der Kraftaufwand beim Bohren wird daher nicht vergrößert. Hierbei verläßt die Schnecke jedoch ihre Abstützung auf dem Rohr bis zu dem Augenblick, in dem die Klinken auf ihren Anschlägen 13 ruhen und nicht mehr in die Zähne des Klinkwerkes eingreifen. Die Schnecke wird dann nicht mehr bewegt, und das Rohr kann die Schnecke nicht verlassen. Es sinkt infolge seiner kreuzweisen Drehbewegung so lange ab, bis die Klinken von neuem in die Zähne des KIinkwerkes eingreifen.If for any reason, e.g. B. in light soil, the snail the drill shoe tends to penetrate the soil faster than the pipe, so its lowering is not hindered by the pipe, since these two parts are not are inevitably linked, and the effort required when drilling is therefore increased not enlarged. Here, however, the screw leaves its support on the pipe until the moment when the pawls rest on their stops 13 and not engage more in the teeth of the ratchet mechanism. The snail will then no longer be moves, and the pipe cannot leave the auger. It sinks as a result of it cross-wise turning movement until the pawls are again in the teeth of the Intervene.
Die Vorrichtung gemäß der Erfindung ermöglicht es also, den Kraftaufwand beim Absenken der Schnecke in das Erdreich zu verringern, da das Absenken der Schnecke in- gewissem Maße unabhängig von dem Rohr erfolgt.The device according to the invention thus makes it possible to reduce the expenditure of force when lowering the auger into the ground to decrease, as the lowering of the auger to some extent independent of the pipe.
Da das Rohr 1 nicht geschlossen ist, kann das durchstoßene Erdreich mittels einer geeigneten Vorrichtung gehoben werden, z. B. mittels einer Pumpe, wenn das Erdreich flüssig ist, mittels einer Sandpumpe oder eines Greifbohrers. Letzterer hat hierbei noch den Vorteil, daß er in allen Bodenarten, die zum Durchstoßen geeignet sind, wie festem Ton, Geröll, Kies usw., arbeiten kann, wobei er den zentralen Teil des Bohrloches auflockert, so daß es möglich ist; die Schnecke in diese Bodenarten, auf denen der Pfahl ruht, einzutreiben. Man kann daher auch stets die Zusammensetzung der durchstoßenen Erdschichten feststellen, und man kann mit der Bohrarbeit aufhören, wenn der Boden für die Gründung geeignet ist.Since the pipe 1 is not closed, the penetrated soil be lifted by means of a suitable device, e.g. B. by means of a pump, if the soil is liquid, by means of a sand pump or a grab drill. The latter has the advantage that it can penetrate all types of soil such as solid clay, rubble, gravel, etc., can work with the central Loosens part of the borehole so that it is possible; the snail in these types of soil, on which the stake rests. You can therefore always use the composition the pierced layers of earth, and you can stop drilling, if the soil is suitable for the foundation.
Das Betonieren kann unmittelbar in dem Bohrrohr durchgeführt werden, wobei dieses durch bekannte Mittel herausgezogen wird. Hierbei kann man kreuzweise Bewegungen des Rohres mit Vorteil durchführen. Man. kann ferner im: Innern des Bah.rrdhres ein leichtes Futterrohr anbringen, das mit Beton gefüllt ist und in den Boden eingelassen wird, während das Bohrrohr dann herausgezogen wird.Concreting can be carried out directly in the drill pipe, this being withdrawn by known means. Here you can cross Carry out movements of the pipe with advantage. Man. can also be in the interior of the Bah.rrdhres attach a lightweight casing that is filled with concrete and sunk into the ground while the drill pipe is then withdrawn.
In Abb.3 bis 7 sind verschiedene Möglichkeiten eines solchen Verfahrens unter Verwendung der Vorrichtung gemäß der Erfindung dargestellt. Bei dem Verfahren nach Abb. 3 wird, nachdem der Pfeiler auf der Bodenschicht ruht, auf welcher er verankert werden soll, das Bohrrohr durch eine Entleerungsvorrichtung, z. B. einen Greifbohrer, bis zum unteren Teil der Schnecke entleert. Der Beton wird dann eingefüllt, und das Rohr wird nach Maßgabe der Betonierung gemäß Abb. 4 herausgezogen.In Fig. 3 to 7 are different possibilities of such a procedure illustrated using the device according to the invention. In the process according to Fig. 3, after the pillar rests on the soil layer on which it to be anchored, the drill pipe through a drainage device, e.g. B. a Gripping drill, emptied to the lower part of the auger. The concrete is then poured in, and the pipe is pulled out according to the concreting according to Fig. 4.
Bei dem in Abb. 5 dargestellten Fall wird, nachdem Bohren und Absenken des Pfahles durchgeführt worden,sind, im Innern des Bohrrohres ein Futterrohr F angebracht, das dann gemäß Abb. 6 mit Beton gefüllt wird, worauf das Rohr 1 herausgezogen wird. Man kann gleichfalls in die Sohle des hohlen Bohrloches nuütfiels der Entleerungsieinriehtwng des Rohures eine Membran M in Form eines Fertigbetonpfropfens od. dgl. als Verschlußstück absenken, um einen dichteren Abschluß des Rohres zu erreichen. Nachdem dieses Verschlußstück eingebracht ist, kann man das oberhalb desselben vorhandene Wasser herauspumpen und dinn, Pfahlbeton @einfülilen.In the case shown in Fig. 5, after drilling and lowering of the pile have been carried out, a casing F attached, which is then filled with concrete according to Fig. 6, whereupon the pipe 1 is pulled out will. You can also enter the bottom of the hollow borehole using the drainage device des Rohures od a membrane M in the form of a ready-mixed concrete plug. Like. As a closure piece lower to achieve a tighter seal on the pipe. After this closure piece is introduced, you can pump out the water above it and pour in dinn, stake concrete @.
Endlich kann man auch bei verschiedenen Bodenarten, z. B. bei Kies, der gegen eine Zusammendrükkung wenig Widerstand bietet, am unteren Ende des Pfahles einen Hohlraum herstellen, der infolge des Böschungswitkels des Kiieses die in Abb. 7 dairgestellte Form erhält. Dieser Hohlraum wird dann mit Beton gefüllt, wodurch die Lasten besser auf das Erdreich übertragen werden. Bei allen diesen Verfahren verbleibt die Bohrschnecke 7 am Fuß des Pfahles und vergrößert dadurch dessen tragende Fläche gegen das Erdreich.Finally, you can also use different types of soil, e.g. B. gravel, which offers little resistance to compression, at the lower end of the post create a cavity that, due to the slope of the gravel, has the shape shown in Fig. 7 is given form. This cavity is then filled with concrete, creating the loads are better transferred to the ground. At all In this process, the auger 7 remains at the foot of the pile and is enlarged thereby its supporting surface against the ground.
Die Erfindung ist nicht auf die dargestellten beschriebenen Ausführungsformen beschränkt, die nur als Beispiel behandelt sind. So braucht insbesondere die Vorrichtung zum Übertragen der Drehbewegung des Bohrrohres in eine Richtung auf die Bohrschnecke nicht in der beschriebenen Weise ausgebildet zu sein und kann aus jeder anderen bekannten Vorrichtung dieser Art bestehen, z. B. können die Klinken durch einen fest an dem Rohr angebrachten Zahnkranz ersetzt werden.The invention is not limited to the illustrated embodiments described which are only treated as an example. So in particular needs the device for transmitting the rotary movement of the drill pipe in one direction to the auger not to be designed in the manner described and may consist of any other known device of this type exist, for. B. can the pawls by a The ring gear permanently attached to the pipe must be replaced.
Claims (1)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1026697X | 1953-04-13 |
Publications (1)
Publication Number | Publication Date |
---|---|
DE1026697B true DE1026697B (en) | 1958-03-20 |
Family
ID=9580251
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DEA19899A Pending DE1026697B (en) | 1953-04-13 | 1954-03-17 | Device for making boreholes for pillar or pile foundations |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE1026697B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US499703A (en) * | 1893-06-20 | Pouncing-roll | ||
FR501464A (en) * | 1919-07-07 | 1920-04-15 | Louis Hocquart | Reinforced concrete screw piles for foundations |
DE499703C (en) * | 1929-02-19 | 1930-06-16 | Wilhelm Eiselen Dipl Ing | Device for the stationary installation of signal and measuring devices under water |
GB368446A (en) * | 1931-01-05 | 1932-03-10 | Braithwaite And Company Engine | Improvements relating to screwing heads for screw piles, cylinders, and the like |
-
1954
- 1954-03-17 DE DEA19899A patent/DE1026697B/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US499703A (en) * | 1893-06-20 | Pouncing-roll | ||
FR501464A (en) * | 1919-07-07 | 1920-04-15 | Louis Hocquart | Reinforced concrete screw piles for foundations |
DE499703C (en) * | 1929-02-19 | 1930-06-16 | Wilhelm Eiselen Dipl Ing | Device for the stationary installation of signal and measuring devices under water |
GB368446A (en) * | 1931-01-05 | 1932-03-10 | Braithwaite And Company Engine | Improvements relating to screwing heads for screw piles, cylinders, and the like |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE69403643T2 (en) | GROUND DISPLACEMENT DRILL HEAD FOR MAKING A PILE IN THE GROUND | |
DE69823223T2 (en) | METHOD FOR HOLES AND FOUNDING PUNCHES | |
DE2849022A1 (en) | DEVICE FOR LIFTING EARTH HOLES WITH A CYLINDRICAL TOOL, IN PARTICULAR FOR CORE HOLES | |
DE2749039A1 (en) | PRE-FABRICATED CONCRETE PILES WITH ROTATING THREAD AND METHOD OF INSERTING THEM INTO THE SOIL | |
DE1784616A1 (en) | Method of anchoring posts for fencing, posts and tools for anchoring it | |
CH716469A1 (en) | Drilling head, reinforcement cage and drilling unit for making piles. | |
DE69406925T2 (en) | CONSTRUCTION METHOD OF A FOUNDATION PILE USING A PRE-FABRED PILE SLEEVE | |
WO2007028534A1 (en) | Method and device for consolidating soils and stabilizing foundations | |
CH676015A5 (en) | ||
DE4232290A1 (en) | Securing tunnel on foundation to prevent landslide - involves extrusion anchors in preset spacings, with injection carried out via anchor tubes | |
DE1026697B (en) | Device for making boreholes for pillar or pile foundations | |
DE1215603B (en) | Procedure for increasing the load-bearing capacity of prefabricated piles and prefabricated piles for carrying out this procedure | |
EP0542692B1 (en) | Device for anchoring construction parts to the ground | |
DE19616593C2 (en) | Concrete protection for endless screws | |
AT226160B (en) | Method of building secant pillars which have free parts | |
DE971834C (en) | Method and device for the production of in-situ concrete piles | |
DE618955C (en) | Equipment for the production of Ortpfählen with foldable jacket | |
DE764099C (en) | Process and device for the production of reinforced concrete piles | |
DE102004005238B3 (en) | Device for producing holes in the ground for anchoring and posts comprises an endless screw having several helix cutouts arranged in a part of the screw helix surfaces arranged behind the crown | |
DE1910556A1 (en) | Process for the production of foundation piles from in-situ concrete with extensions of the pile shaft and the pile base, as well as internal formwork for carrying out the process | |
DE1928471A1 (en) | Process and device for compacting and draining soil | |
DE202010006129U1 (en) | Device for introducing a vertical pipe arrangement into the soil | |
DE893779C (en) | Process for the production of mixed foundation piles from reinforced concrete or the like. | |
DE543422C (en) | Hollow screw pile | |
CH649334A5 (en) | Method of forming a concrete pile with widened pile foot in a soil |