[go: up one dir, main page]

DE102024102480B4 - Determining the blockage status of a roof gutter - Google Patents

Determining the blockage status of a roof gutter

Info

Publication number
DE102024102480B4
DE102024102480B4 DE102024102480.1A DE102024102480A DE102024102480B4 DE 102024102480 B4 DE102024102480 B4 DE 102024102480B4 DE 102024102480 A DE102024102480 A DE 102024102480A DE 102024102480 B4 DE102024102480 B4 DE 102024102480B4
Authority
DE
Germany
Prior art keywords
gutter
time series
value
precipitation
fill level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
DE102024102480.1A
Other languages
German (de)
Other versions
DE102024102480A1 (en
Inventor
Andreas Burgdorf
Tobias Meisen
Alexander Paulus
André Pomp
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bergische Univ Wuppertal Koerperschaft Des Oeffentlichen Rechts
Bergische Universitaet Wuppertal Koerperschaft Des Oeffentlichen Rechts
Original Assignee
Bergische Univ Wuppertal Koerperschaft Des Oeffentlichen Rechts
Bergische Universitaet Wuppertal Koerperschaft Des Oeffentlichen Rechts
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bergische Univ Wuppertal Koerperschaft Des Oeffentlichen Rechts, Bergische Universitaet Wuppertal Koerperschaft Des Oeffentlichen Rechts filed Critical Bergische Univ Wuppertal Koerperschaft Des Oeffentlichen Rechts
Priority to DE102024102480.1A priority Critical patent/DE102024102480B4/en
Publication of DE102024102480A1 publication Critical patent/DE102024102480A1/en
Application granted granted Critical
Publication of DE102024102480B4 publication Critical patent/DE102024102480B4/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F1/00Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through a meter in a continuous flow
    • G01F1/002Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through a meter in a continuous flow wherein the flow is in an open channel
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F1/00Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through a meter in a continuous flow
    • G01F1/76Devices for measuring mass flow of a fluid or a fluent solid material
    • G01F1/86Indirect mass flowmeters, e.g. measuring volume flow and density, temperature or pressure
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F23/00Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm
    • G01F23/22Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm by measuring physical variables, other than linear dimensions, pressure or weight, dependent on the level to be measured, e.g. by difference of heat transfer of steam or water
    • G01F23/26Indicating or measuring liquid level or level of fluent solid material, e.g. indicating in terms of volume or indicating by means of an alarm by measuring physical variables, other than linear dimensions, pressure or weight, dependent on the level to be measured, e.g. by difference of heat transfer of steam or water by measuring variations of capacity or inductance of capacitors or inductors arising from the presence of liquid or fluent solid material in the electric or electromagnetic fields
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • E04D13/076Devices or arrangements for removing snow, ice or debris from gutters or for preventing accumulation thereof

Landscapes

  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Electromagnetism (AREA)
  • Power Engineering (AREA)
  • Thermal Sciences (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

Verfahren zum Ermitteln eines Verstopfungszustands einer Dachrinne (1), mit folgenden Verfahrensschritten:
S1) in einer Trainingsphase unter Sicherstellung einer vollständig unverstopften Dachrinne (1):
S1a) zeitlich aufeinanderfolgendes Erfassen eines den Füllstand der Dachrinne (1) beschreibenden Füllstandswertes und Abspeichern des jeweils erfassten Füllstandswertes, so dass sich eine Füllstandswerte-Referenzzeitreihe ergibt, und
S1b) zeitlich aufeinanderfolgendes Erfassen eines Niederschlagswertes, der die Niederschlagsmenge pro Zeit und Fläche am Ort der Dachrinne (1) angibt, und Abspeichern des jeweils erfassten Niederschlagswertes, so dass sich eine Niederschlagswerte-Referenzzeitreihe ergibt, und
S2) in einer der Trainingsphase zeitlich nachgelagerten Überwachungsphase ohne Sicherstellung einer vollständig unverstopften Dachrinne (1):
S2a) zeitlich aufeinanderfolgendes Erfassen des Füllstandswertes und Abspeichern des jeweils erfassten Füllstandswertes, so dass sich eine Füllstandswerte-Istzeitreihe ergibt,
S2b) zeitlich aufeinanderfolgendes Erfassen des Niederschlagswertes und Abspeichern des jeweils erfassten Niederschlagswertes, so dass sich eine Niederschlagswerte-Istzeitreihe ergibt, und
S3) Abgleichen der Füllstandswerte-Istzeitreihe und der Niederschlagswerte-Istzeitreihe mit der Füllstandswerte-Referenzzeitreihe und der Niederschlagswerte-Referenzzeitreihe und Ermitteln des Verstopfungszustands der Dachrinne (1) auf der Grundlage dieses Abgleichs.
Method for determining the blockage state of a roof gutter (1), comprising the following procedure steps:
S1) in a training phase ensuring a completely unobstructed gutter (1):
S1a) time-sequential recording of a fill level value describing the fill level of the roof gutter (1) and storage of each recorded fill level value, so that a fill level value reference time series results, and
S1b) recording a precipitation value over time, indicating the amount of precipitation per unit time and area at the location of the gutter (1), and storing each recorded precipitation value, so that a precipitation value reference time series is obtained, and
S2) in a monitoring phase following the training phase without ensuring a completely unobstructed gutter (1):
S2a) Recording the fill level value sequentially over time and saving each recorded fill level value, so that a time series of actual fill level values is obtained,
S2b) recording and storing the precipitation value over time, so that a precipitation value time series is obtained, and
S3) Comparing the actual time series of fill levels and the actual time series of precipitation with the reference time series of fill levels and the reference time series of precipitation and determining the state of obstruction of the gutter (1) on the basis of this comparison.

Description

Die Erfindung betrifft ein Verfahren zum Ermitteln eines Verstopfungszustands einer Dachrinne.The invention relates to a method for determining a blockage state of a roof gutter.

Dachrinnen sind meistens an einem Dachrand eines Gebäudes angeordnet und dienen dazu Regenwasser aufzufangen und gezielt abzuleiten. Eine Dachrinne besteht in der Regel aus witterungsbeständigen Materialien wie Metall oder Kunststoff. Die Hauptfunktion besteht darin, das auf dem Dach anfallende Regenwasser zu sammeln und sicher zu Fallrohren oder Gullys zu leiten. Dies ermöglicht eine kontrollierte Ableitung des Wassers und trägt dazu bei, Wasserschäden an Bausubstanz, Fundamenten und Mauerwerk des Gebäudes zu vermeiden. Darüber hinaus minimieren Dachrinnen die Gefahr von Bodenerosion, da das Wasser gezielt und kontrolliert abgeleitet wird. Für eine optimale Funktion ist eine regelmäßige Wartung wichtig, um sicherzustellen, dass die Dachrinne frei von Ablagerungen wie Laub und Ästen ist, damit der Abfluss des Regenwassers nicht durch Verstopfungen in der Dachrinne behindert wird.Gutters are typically located along the roof edge of a building and serve to collect and channel rainwater. A gutter is usually made of weather-resistant materials such as metal or plastic. Its main function is to collect rainwater falling on the roof and safely direct it to downpipes or drains. This allows for controlled water drainage and helps prevent water damage to the building structure, foundations, and masonry. Furthermore, gutters minimize the risk of soil erosion because the water is channeled in a controlled manner. Regular maintenance is important for optimal performance to ensure that the gutter is free of debris such as leaves and twigs, preventing blockages that could impede the flow of rainwater.

Die CN 111640284 A beschreibt dazu ein drahtloses Dachentwässerungsüberwachungssystem und ein Frühwarnverfahren dafür. Das Überwachungssystem umfasst einen Dachniederschlagssensor, einen Dachrinnenwasserstandsensor, einen Fallrohrwasserstromsensor, ein drahtloses Kommunikationsmodul und einen Server. Der Dachniederschlagssensor ist auf einem Außendach angeordnet, der Dachrinnenwasserstandssensor ist in einer Dachentwässerungsrinne angeordnet und der Fallrohrwasserdurchflusssensor ist auf der Oberfläche oder einem Auslass eines Dachrinnenfallrohrs angeordnet. Der Dachniederschlagssensor, der Dachrinnenwasserstandsensor und der Fallrohrwasserdurchflusssensor sind alle mit dem drahtlosen Kommunikationsmodul verbunden und das drahtlose Kommunikationsmodul ist mit dem Server über ein drahtloses Netzwerk verbunden. Daten über den Niederschlag, den Wasserstand und die Abflussgeschwindigkeit können in Echtzeit erhalten werden. So wird eine Verstopfung der Dachrinne während eines Regenereignisses in Echtzeit gemeldet. Unmittelbar während eines Regenereignisses ist es jedoch oft nicht möglich, eine tatsächliche Verstopfung der Dachrinne zu erkennen. Eine sofortige Echtzeitmeldung einer Dachrinnenverstopfung führt daher häufig zu Fehlalarmen.The CN 111640284 A This document describes a wireless roof drainage monitoring system and an early warning system for it. The monitoring system comprises a roof rainfall sensor, a gutter water level sensor, a downpipe water flow sensor, a wireless communication module, and a server. The roof rainfall sensor is mounted on the exterior of the roof, the gutter water level sensor is located in a roof drainage gutter, and the downpipe water flow sensor is located on the surface or outlet of a roof gutter downpipe. The roof rainfall sensor, the gutter water level sensor, and the downpipe water flow sensor are all connected to the wireless communication module, which in turn is connected to the server via a wireless network. Data on rainfall, water level, and flow rate can be obtained in real time. This allows for real-time reporting of gutter blockages during a rain event. However, it is often not possible to detect an actual gutter blockage immediately during a rain event. Therefore, an immediate real-time notification of a blocked gutter often leads to false alarms.

Die US 2020/0048910 A1 betrifft ein Überwachungssystem für Dachrinnensysteme, das mithilfe von Sensoren verschiedene Betriebszustände erfasst. Erfasst werden beispielsweise Wasserstände, Temperatur, Niederschlagsmenge, UV-Strahlung oder der Verschmutzungsgrad der Rinne. Die Sensoren können optisch, kapazitiv, akustisch oder auf Basis elektromagnetischer Wellen arbeiten. Die Daten werden drahtlos übermittelt und können zur Vorhersage von Wartungsbedarf oder zur Steuerung weiterer Gebäudefunktionen verwendet werden. Das System kann sowohl in neue als auch bestehende Rinnen integriert werden.The US 2020/0048910 A1 This concerns a monitoring system for roof gutter systems that uses sensors to record various operating conditions. These include water levels, temperature, rainfall, UV radiation, and the degree of gutter soiling. The sensors can be optical, capacitive, acoustic, or electromagnetic. The data is transmitted wirelessly and can be used to predict maintenance needs or to control other building functions. The system can be integrated into both new and existing gutters.

Die CN 115168520 A beschreibt ein System und Verfahren zur langzeitigen Überwachung von Abwassernetzen auf Basis der Erfassung von Flüssigkeitsständen und Regenintensität. Mithilfe von Sensoren werden Anomalien an Probenahmestellen detektiert, etwa durch Vergleich mit historischen Daten oder Schwellenwerten. Ein Frühwarnsystem gibt Hinweise auf Störungen, wie etwa Verstopfungen, und berücksichtigt dabei unterschiedliche Betriebsmodi (Sonnentag/Regentag). Die Daten werden kartografisch visualisiert und durch KI-Modelle (z. B. LSTM) analysiert, um die Stabilität des Abwassernetzes zu verbessern und eine kontinuierliche Überwachung zu ermöglichen.The CN 115168520 A This describes a system and method for the long-term monitoring of wastewater networks based on the recording of fluid levels and rainfall intensity. Sensors detect anomalies at sampling points, for example, by comparison with historical data or threshold values. An early warning system provides indications of malfunctions, such as blockages, and takes into account different operating conditions (sunny day/rainy day). The data are visualized cartographically and analyzed using AI models (e.g., LSTM) to improve the stability of the wastewater network and enable continuous monitoring.

Ausgehend davon ist es die Aufgabe der vorliegenden Erfindung ein zuverlässiges und effizientes Verfahren zum Ermitteln eines Verstopfungszustands einer Dachrinne bereitzustellen.Based on this, the object of the present invention is to provide a reliable and efficient method for determining a blockage state of a roof gutter.

Diese Aufgabe wird durch den Gegenstand des Patentanspruchs 1 gelöst. Bevorzugte Weiterbildungen finden sich in den Unteransprüchen.This problem is solved by the subject matter of claim 1. Preferred embodiments are found in the dependent claims.

Erfindungsgemäß wird somit ein Verfahren zum Ermitteln eines Verstopfungszustands einer Dachrinne mit den folgenden Verfahrensschritten bereitgestellt: (1) in einer Trainingsphase unter Sicherstellung einer vollständig unverstopften Dachrinne: zeitlich aufeinanderfolgendes Erfassen eines den Füllstand der Dachrinne beschreibenden Füllstandswertes und Abspeichern des jeweils erfassten Füllstandswertes, so dass sich eine Füllstandswerte-Referenzzeitreihe ergibt, und zeitlich aufeinanderfolgendes Erfassen eines Niederschlagswertes, der die Niederschlagsmenge pro Zeit und Fläche am Ort der Dachrinne angibt, und Abspeichern des jeweils erfassten Niederschlagswertes, so dass sich eine Niederschlagswerte-Referenzzeitreihe ergibt, und (2) in einer an die Trainingsphase zeitlich nachgelagerten Überwachungsphase ohne Sicherstellung einer vollständig unverstopften Dachrinne: zeitlich aufeinanderfolgendes Erfassen des Füllstandswertes und Abspeichern des jeweils erfassten Füllstandswertes, so dass sich eine Füllstandswerte-Istzeitreihe ergibt, zeitlich aufeinanderfolgendes Erfassen des Niederschlagswertes und Abspeichern des jeweils erfassten Niederschlagswertes, so dass sich eine Niederschlagswerte-Istzeitreihe ergibt, und Abgleichen der Füllstandswerte-Istzeitreihe und der Niederschlagswerte-Istzeitreihe mit der Füllstandswerte-Referenzzeitreihe und der Niederschlagswerte-Referenzzeitreihe und Ermitteln des Verstopfungszustands der Dachrinne auf der Grundlage dieses Abgleichs.According to the invention, a method for determining the blockage status of a gutter is provided, comprising the following process steps: (1) in a training phase, ensuring a completely unblocked gutter: successive recording and storage of a fill level value describing the gutter's fill level, resulting in a fill level reference time series; successive recording and storage of a precipitation value indicating the amount of precipitation per unit of time and area at the gutter's location, resulting in a precipitation reference time series; and (2) in a monitoring phase following the training phase, without ensuring a completely unblocked gutter: successive recording and storage of the fill level value, resulting in an actual fill level time series; successive recording and storage of the precipitation value, resulting in a precipitation reference time series. a precipitation value actual time series is obtained, and comparison of the level value actual time series and the precipitation value actual time series with the level value reference time series and the precipitation Value reference time series and determining the blockage status of the gutter based on this comparison.

Die Erfindung sieht vor, dass in der Trainingsphase eine bestimmte Anzahl von Niederschlagsereignissen stattgefunden haben muss, bevor in die Überwachungsphase übergegangen werden kann. Dadurch sind in der Füllstandswerte-Referenzzeitreihe eine gewisse Anzahl möglicher Füllstandswerte der vollständig unverstopften Dachrinne enthalten, die dann entsprechend Niederschlagswerten der vollständig unverstopften Dachrinne in der Niederschlagswerte-Referenzzeitreihe zugeordnet werden können. Die Niederschlagswerte sind in Form der Niederschlagsmenge pro Zeit und Fläche am Ort der Dachrinne enthalten. Die Zeitreihen zeigen somit im Allgemeinen die Füllstände der Dachrinne bzw. Niederschlagswerte in einer bestimmten zeitlichen Abfolge. Dabei sind Zeiträume der Trainingsphasen für die Füllstandswerte-Referenzzeitreihe und die Niederschlagswerte-Referenzzeitreihe vorzugsweise identisch, so dass die Werte direkt miteinander korrelierbar sind. In diesem Kontext bevorzugt ist, dass die Zeitreihenwerte während eines Niederschlagereignisses sukzessive in Intervallen von 5 Minuten erfasst werden und danach in Intervallen von 15 Minuten.The invention provides that a certain number of precipitation events must have occurred during the training phase before the monitoring phase can begin. This ensures that the fill level reference time series contains a certain number of possible fill level values for a completely unobstructed gutter, which can then be assigned to corresponding precipitation values for a completely unobstructed gutter in the precipitation value reference time series. The precipitation values are represented as the amount of precipitation per unit time and area at the location of the gutter. The time series thus generally show the fill levels of the gutter or the precipitation values in a specific temporal sequence. Preferably, the training phase periods for the fill level reference time series and the precipitation value reference time series are identical, allowing for direct correlation of the values. In this context, it is preferred that the time series values are recorded successively at 5-minute intervals during a precipitation event and subsequently at 15-minute intervals.

Weiter bevorzugt ist, dass die Füllstandswerte der Füllstandswerte-Referenzzeitreihe unter Berücksichtigung von Abmessungen der Dachrinne, wie der Dachrinnenbreite, -länge, -höhe und/oder -neigung ermittelt werden. Die Füllstandswerte können dazu mit einem Füllstandssensor erfasst werden, der beispielsweise einen Wasserstandsensor in einem Steigrohr aufweist. Alternativ können auch Sensoren verwendet werden, die kapazitive Pads zur Messung der Füllstandshöhe verwenden. Das Berücksichtigen der Abmessungen der Dachrinne ermöglicht dabei eine genauere Einschätzung des Füllstandes der Dachrinne.Die aktuellen Niederschlagswerte können entsprechend mit einem Niederschlagssensor und/oder mit Wetterdaten vor Ort über GPS-Lokalisation erhalten werden.It is further preferred that the fill level values of the fill level reference time series are determined taking into account the dimensions of the gutter, such as its width, length, height, and/or slope. The fill level values can be recorded using a fill level sensor, which, for example, incorporates a water level sensor in a riser pipe. Alternatively, sensors using capacitive pads to measure the fill level can also be used. Considering the gutter dimensions allows for a more accurate assessment of the fill level. Current precipitation values can be obtained using a rain gauge and/or local weather data via GPS location.

Erfindungswesentlich ist nun, dass die in der Trainingsphase erfasste Füllstandswerte-Referenzzeitreihe sowie die Niederschlagswerte-Referenzzeitreihe mit der Füllstandswerte-Istzeitreihe und der Niederschlagswerte-Istzeitreihe in der Überwachungsphase abgeglichen werden. Die Referenzzeitreihen liefern eine genaue Kenntnis des Verhaltens der Dachrinne bei und kurz nach einem Niederschlagsereignis, so dass ein Verstopfungszustand der Dachrinne auf der Grundlage des Abgleichs der Referenzzeitreihen mit den Istzeitreihen ermöglicht ist. Ergibt der Abgleich der Füllstandswerte der Füllstandswerte-Istzeitreihe mit den Füllstandswerten der Füllstandswerte-Referenzzeitreihe bei einem vergleichbaren Niederschlagsereignis, dass die Füllstandswerte der Füllstandswerte Istzeitreihe während und nach dem Niederschlagsereignis generell höher oder oberhalb eines vorbestimmten Grenzwertes sind als diejenigen der Füllstandswerte-Referenzzeitreihe während und nach dem vergleichbaren Niederschlagsereignis, ist die Dachrinne verstopft. Hierbei wird das vergleichbare Niederschlagsereignis durch den Abgleich der Niederschlagswerte-Referenzzeitreihe mit der Niederschlagswerte-Istzeitreihe ermittelt. Nur anhand der in der Trainingsphase ermittelten Referenzzeitreihen ist es also möglich, für die konkrete Dachrinne einen Verstopfungszustand zu ermitteln. Vorteilhafterweise kann die Genauigkeit der Ermittlung des Verstopfungszustands bedarfsfallabhängig durch entsprechend ausführliche Trainingsphasen erhöht werden.The essential aspect of the invention is that the reference time series for fill levels and precipitation recorded during the training phase are compared with the actual time series for fill levels and precipitation during the monitoring phase. The reference time series provide precise knowledge of the gutter's behavior during and shortly after a precipitation event, thus enabling the detection of gutter blockage based on this comparison. If, during a comparable precipitation event, the comparison of the actual level values with the reference time series reveals that the actual level values during and after the event are generally higher than or above a predetermined threshold, then the gutter is considered blocked. The comparable precipitation event is determined by comparing the reference precipitation time series with the actual precipitation time series. Only using the reference time series determined during the training phase is it possible to determine the blockage status for a specific gutter. Advantageously, the accuracy of the blockage determination can be increased as needed through appropriately detailed training phases.

Generell kann der Verstopfungszustand auf verschiedene Arten angegeben werden. Gemäß einer bevorzugten Weiterbildung der Erfindung ist jedoch vorgesehen, dass der Verstopfungszustand ein Zustand aus einer endlichen Anzahl von Zuständen ist, die ein Maß für die Verstopfung der Dachrinne im Hinblick auf den Ablauf von Niederschlagswasser angeben. Beispielsweise kann die Verstopfung einer Dachrinne mit vier verschiedenen Zuständen gemessen werden: „nicht verstopft“, „leicht verstopft“, „stark verstopft“ und „vollständig verstopft“. So kann sofort nach Bekanntwerden des Zustandes auf eine einheitliche und verlässliche Art und Weise festgestellt werden, ob und wann Handlungsbedarf besteht bzw. die Dachrinne gereinigt werden sollte. In diesem Kontext kann der Verstopfungszustand gemäß einer weiteren bevorzugten Weiterbildung der Erfindung allerdings auch angeben, in welchem Maß der Abfluss von Niederschlagswasser aus der Dachrinne gehemmt ist. Diese Angabe kann dann z.B. prozentual erfolgen: 0 % = keine Hemmung bis 100 % = kein Abfluss mehr. Die prozentuale Angabe ermöglicht hier eine genauere Dosierung der Wartungsintervalle bzw. Reinigungsintervalle und gibt dem Anwender einen genaueren Einblick in die Entwicklung der Verstopfungszustände.In general, the degree of blockage can be indicated in various ways. However, according to a preferred embodiment of the invention, the degree of blockage is defined as a finite number of states that indicate the degree of blockage in the gutter with regard to the drainage of rainwater. For example, the blockage of a gutter can be measured using four different states: "not blocked," "slightly blocked," "severely blocked," and "completely blocked." This allows for a uniform and reliable determination of whether and when action is required or the gutter should be cleaned immediately after the condition is identified. In this context, according to a further preferred embodiment of the invention, the degree of blockage can also indicate the extent to which the drainage of rainwater from the gutter is impeded. This can then be expressed, for example, as a percentage: 0% = no impediment to 100% = no drainage. The percentage specification allows for a more precise dosage of maintenance or cleaning intervals and gives the user a more accurate insight into the development of blockage conditions.

Gemäß einer bevorzugten Weiterbildung der Erfindung umfasst das Verfahren zum Ermitteln des Verstopfungszustands der Dachrinne den folgenden weiteren Schritt: in der Trainingsphase, wobei die Dachrinne in verschiedene Verstopfungszustände gebracht wird: zeitlich aufeinanderfolgendes Erfassen und Abspeichern der Füllstandswerte in der Füllstandswerte-Referenzzeitreihe und der Niederschlagswerte in der Niederschlagswerte-Referenzzeitreihe für den jeweiligen Verstopfungszustand der Dachrinne. Es ist vorgesehen, dass die einzelnen Verstopfungszustände in der Dachrinne absichtlich herbeigeführt werden, um entsprechende Füllstandswerte und Niederschlagswerte zu erhalten. Dadurch, dass diese Verstopfungszustände bereits in der Füllstandswerte-Referenzzeitreihe und in der Niederschlagswerte-Referenzzeitreihe enthalten sind, können die entsprechenden Verstopfungszustände beim Vergleich der Istzeitreihen mit den Referenzzeitreihen mit höherer Genauigkeit erkannt werden.According to a preferred embodiment of the invention, the method for determining the blockage state of the gutter comprises the following further step: in the training phase, wherein the gutter is brought into various blockage states, the following steps are taken: the fill level values are successively recorded and stored in the fill level reference time series, and the precipitation values are recorded in the precipitation reference time series for the respective blockage state of the gutter. It is provided that the individual blockage states in the gutter are intentionally induced in order to obtain corresponding fill level and precipitation values. ten. Because these blockage conditions are already included in the level value reference time series and in the precipitation value reference time series, the corresponding blockage conditions can be identified with higher accuracy when comparing the actual time series with the reference time series.

Gemäß einer weiteren bevorzugten Weiterbildung der Erfindung ist vorgesehen, dass das Verfahren zum Ermitteln des Verstopfungszustands der Dachrinne die folgenden weiteren Schritte aufweist: in der Trainingsphase unter Sicherstellung der vollständig unverstopften Dachrinne: zeitlich aufeinanderfolgendes Erfassen wenigstens eines meteorologischen Wertes, wobei der wenigstens eine meteorologische Wert eine Luftfeuchtigkeit und/oder einer Temperatur und/oder einer Windrichtung und/oder eine Windstärke ist, und Abspeichern des jeweils erfassten meteorologischen Wertes, so dass sich eine meteorologische Werte-Referenzzeitreihe ergibt, und in der Überwachungsphase ohne Sicherstellung der vollständig unverstopften Dachrinne: zeitlich aufeinanderfolgendes Erfassen des meteorologischen Wertes, und Abspeichern des jeweils erfassten meteorologischen Wertes, so dass sich eine meteorologische Werte-Istzeitreihe ergibt, und Abgleichen der Füllstandswerte-Istzeitreihe, der Niederschlagswerte-Istzeitreihe und der meteorologischen Werte-Istzeitreihe mit der Füllstandswerte-Referenzzeitreihe, der Niederschlagswerte-Referenzzeitreihe und der meteorologischen Werte-Referenzzeitreihe und Ermitteln des Verstopfungszustands der Dachrinne auf der Grundlage dieses Abgleichs. Durch das Einbeziehen der meteorologischen Werte, die mit den Füllstandswerten abgeglichen werden, kann die Genauigkeit bei dem Ermitteln von Verstopfungszuständen weiter erhöht werden. Gleichzeitig können so auch Fehlalarme wie z.B. Verstopfungen durch Schnee o.ä. erkannt werden. Darüber hinaus können zusätzliche meteorologische Werte, wie z. B. die Windgeschwindigkeit, oder allgemein meteorologische Daten, die von einem Wetterdienst erhältlich sind, einbezogen werden. Auf diese Weise kann das Niederschlagsereignis besser beschrieben werden. Diese Werte können von einem externen Dienst, der Einheit selber aber auch von einem weiteren technischen System, wie einer SmartHome-Wetterstation, stammen.According to a further preferred embodiment of the invention, the method for determining the blockage status of the gutter comprises the following additional steps: in the training phase, ensuring that the gutter is completely unblocked: successive recording of at least one meteorological value, wherein the at least one meteorological value is humidity and/or temperature and/or wind direction and/or wind speed, and storage of each recorded meteorological value, resulting in a meteorological value reference time series; and in the monitoring phase, without ensuring that the gutter is completely unblocked: successive recording of the meteorological value, and storage of each recorded meteorological value, resulting in an actual meteorological value time series, and comparison of the actual fill level value series, the actual precipitation value series, and the actual meteorological value series with the fill level value reference time series, the precipitation value reference time series, and the meteorological value reference time series, and determination of the The system determines the blockage status of the gutter based on this comparison. By incorporating meteorological data, which is compared with the fill level readings, the accuracy of blockage detection can be further increased. This also allows for the detection of false alarms, such as blockages caused by snow or similar obstructions. Furthermore, additional meteorological data, such as wind speed, or general meteorological data from a weather service can be included. This allows for a more accurate description of the precipitation event. These values can originate from an external service, the unit itself, or another technical system, such as a smart home weather station.

Prinzipiell kann der Verstopfungszustand in regelmäßigen Intervallen gemeldet werden. Gemäß einer bevorzugten Weiterbildung der Erfindung ist jedoch vorgesehen, dass in der Überwachungsphase bei Überschreiten eines vorbestimmten Verstopfungszustandes automatisch eine Meldung erfolgt. Diese Meldung kann dann von einem Wartungsdienst, z. B. einer Dachdeckerfirma, und/oder dem Nutzer, z. B. einem Hausbesitzer, empfangen werden, der dann die Verstopfung entsprechend der Meldung beseitigen kann. Dadurch, dass die Meldung nur bei Überschreiten eines vordefinierten Verstopfungszustandes erfolgt, werden unnötige Wartungsarbeiten an der Dachrinne vermieden. Die Dachrinne wird effizient gewartet.In principle, the blockage status can be reported at regular intervals. However, according to a preferred embodiment of the invention, a notification is automatically sent during the monitoring phase if a predetermined blockage level is exceeded. This notification can then be received by a maintenance service, e.g., a roofing company, and/or the user, e.g., a homeowner, who can then clear the blockage accordingly. Because the notification is only sent when a predefined blockage level is exceeded, unnecessary maintenance work on the gutter is avoided. The gutter is maintained efficiently.

Grundsätzlich können die Trainingsphase und die Überwachungsphase beliebig lang sein. Gemäß einer bevorzugten Weiterbildung der Erfindung ist jedoch vorgesehen, dass in der Trainingsphase und in der Überwachungsphase das Erfassen der Füllstandswerte nicht beendet wird, bevor ein Füllstand von Null erfasst worden ist. Dadurch kann auch eine Verstopfung erkannt werden, die erst unmittelbar nach einem Niederschlagsereignis auftritt. Zum Beispiel, wenn Laub in ein fluidtechnisch mit der Dachrinne verbundenes Fallrohr gespült wird und das Fallrohr verstopft, so dass kleine Restmengen an Niederschlag in der Dachrinne verbleiben. Diese werden erkannt und können entsprechend gemeldet werden.In principle, the training and monitoring phases can be of any length. However, according to a preferred embodiment of the invention, the acquisition of fill level values is not terminated during the training and monitoring phases until a fill level of zero has been recorded. This allows for the detection of blockages that occur immediately after a rainfall event. For example, if leaves are washed into a downpipe connected to the gutter via a fluid system and the downpipe becomes blocked, leaving small residual amounts of precipitation in the gutter, these are detected and can be reported accordingly.

Es ist möglich den Verstopfungszustand auf verschiedene Arten zu ermitteln. Gemäß einer bevorzugten Weiterbildung ist jedoch vorgesehen, dass das Ermitteln des Verstopfungszustands der Dachrinne mit Hilfe eines künstlichen neuronalen Netzwerks erfolgt. Bevorzugt ist das neuronale Netzwerk ein rekurrentes neuronales Netzwerk. Gemäß einer besonders bevorzugten Weiterbildung der Erfindung ist weiter vorgesehen, dass das Ermitteln des Verstopfungszustands der Dachrinne mit Hilfe eines Zeitreihenvorhersagemodells erfolgt. Dadurch ist es dann möglich zukünftige Verstopfungen in Form der Verstopfungszustände mit einer gewissen Wahrscheinlichkeit vorherzusagen und entsprechend eine Meldung noch vor Eintritt eines Verstopfungszustands auszugeben. Noch weiter bevorzugt ist, dass das Zeitreihenvorhersagemodell ein Long Short-Term Memory Modell ist.It is possible to determine the blockage state in various ways. However, according to a preferred embodiment, the determination of the gutter blockage state is carried out using an artificial neural network. Preferably, the neural network is a recurrent neural network. According to a particularly preferred embodiment of the invention, the determination of the gutter blockage state is further carried out using a time series prediction model. This makes it possible to predict future blockages in the form of blockage states with a certain probability and to issue a notification accordingly before a blockage state occurs. It is even more preferred that the time series prediction model is a long short-term memory model.

Das Long Short-Term Memory (LSTM) ist eine Art rekurrentes neuronales Netzwerk (RNN), das entwickelt wurde, um das Problem des verschwindenden Gradienten in herkömmlichen rekurrentes neuronales Netzwerk zu lösen. LSTMs sind im Vergleich zu anderen RNNs und Sequenz-Lernverfahren wie Hidden Markov Modellen weniger empfindlich gegenüber der Länge der Lücken zwischen relevanten Informationen. Sie werden in verschiedenen Anwendungen wie Handschrifterkennung, Spracherkennung, maschinelle Übersetzung und im Gesundheitswesen eingesetzt. Ein typisches LSTM besteht aus einer Zelle und drei Toren: dem Eingabe-, dem Ausgabe- und dem Vergesstor. Diese Tore regeln den Informationsfluss in die Zelle hinein und aus ihr heraus. Das Vergesstor entscheidet, welche Informationen aus dem vorherigen Zustand verworfen werden, während das Eingangstor bestimmt, welche neuen Informationen gespeichert werden. Das Ausgangstor wiederum steuert, welche Informationen aus dem aktuellen Zustand ausgegeben werden. Durch diese Mechanismen kann das LSTM-Netzwerk nützliche langfristige Abhängigkeiten für Vorhersagen sowohl in aktuellen als auch in zukünftigen Zeitschritten aufrechterhalten.Long Short-Term Memory (LSTM) is a type of recurrent neural network (RNN) designed to overcome the vanishing gradient problem in conventional recurrent neural networks. Compared to other RNNs and sequence learning methods like Hidden Markov models, LSTMs are less sensitive to the length of gaps between relevant information. They are used in various applications, including handwriting recognition, speech recognition, machine translation, and healthcare. A typical LSTM consists of a cell and three gates: the input gate, the output gate, and the forget gate. These gates control the flow of information into and out of the cell. The forget gate determines which information from the previous state is discarded, while the input gate determines which new information is stored. The output gate, in turn, controls which information from the current state is output. Through these mechanisms, the LSTM network can maintain useful long-term dependencies for predictions in both current and future time steps.

Das LSTM-Modell ist besonders geeignet für das Erstellen von Zeitreihenvorhersagen aufgrund seiner Fähigkeit, lange Abhängigkeiten zu erfassen und Informationen über einen längeren Zeitraum für die Verarbeitung von Zeitreihenwerten zu speichern.The LSTM model is particularly suitable for creating time series forecasts due to its ability to capture long dependencies and store information over a longer period for processing time series values.

Dem LSTM-Modell werden entsprechend die Referenzzeitreihen der Trainingsphase als Eingabe zur Verfügung gestellt, woraufhin das LSTM-Modell auf die Eingabe Muster und Zusammenhänge erkennt, die in der Überwachungsphase zusammen mit dem Abgleich mit den Istzeitreihen eine Verstopfung, bzw. eine bevorstehende Verstopfung erkennen lassen. Werden dem LSTM-Modell in der Trainingsphase zusätzlich Füllstandswerte-Referenzzeitreihen, Niederschlagswerte-Referenzzeitreihen und meteorologische Werte-Referenzzeitreihen zur Verfügung gestellt, die Füllstandswerte, Niederschlagswerte und meteorologische Werte für die Verstopfungszustände enthalten, kann mit dem LSTM-Modell eine hohe Genauigkeit bei der Vorhersage und Ermittlung des Verstopfungszustandes der Dachrinne erreicht werden. In diesem Kontext ist in einer weiteren, bevorzugten Weiterbildung vorgesehen, dass Informationen zu Störobjekten wie Photovoltaik-Anlagen, Gauben und Satellitenschüsseln in dem Long Short-Term Memory Modell eingefügt sind. Zusammen mit den Abmessungen der Dachrinne ist das LSTM-Modell so personalisiert auf die Dachrinne angepasst. Das Ermitteln des Verstopfungszustands der Dachrinne kann dabei periodisch und/oder auf Abruf erfolgen. Dadurch kann im Bedarfsfall flexibel entschieden werden, wie oft die Ermittlung des Verstopfungszustandes entweder unter Berücksichtigung eines Energieeinsparungsaspekts oder eines Sicherheitsaspekts durchgeführt werden soll.The LSTM model is provided with the reference time series from the training phase as input. The LSTM model then recognizes patterns and correlations in this input, which, together with comparisons to actual time series, indicate a blockage or an impending blockage during the monitoring phase. If the LSTM model is additionally provided with reference time series for fill levels, precipitation, and meteorological values during the training phase—containing fill levels, precipitation, and meteorological data relevant to blockage conditions—it can achieve high accuracy in predicting and determining the blockage status of the gutter. In a further, preferred enhancement, information on obstructions such as photovoltaic systems, dormers, and satellite dishes is incorporated into the Long Short-Term Memory model. Combined with the gutter dimensions, this allows the LSTM model to be personalized to the specific gutter. Determining the blockage status of the gutter can be done periodically and/or on demand. This allows for flexible decisions, as needed, on how often the blockage status should be determined, either taking energy-saving or safety aspects into account.

Erfindungsgemäß ist darüber hinaus ein nichtflüchtiges, computerlesbares Speichermedium mit darauf abgespeicherten Befehlen, die bei ihrer Ausführung auf einem Prozessor das oben beschriebene Verfahren bewirken.According to the invention, a non-volatile, computer-readable storage medium with instructions stored on it is also provided, which, when executed on a processor, effect the method described above.

Die Erfindung betrifft weiter ein System mit einem Füllstandssensor, einer mit dem Füllstandssensor zur Signalübertragung verbundene Kommunikationsschnittstelle und einer Recheneinheit, wobei die Kommunikationsschnittstelle dazu ausgebildet ist einen mit dem Füllstandssensor gemessenen Füllstandswert an die Recheneinheit zu übertragen, und die Recheneinheit dazu ausgebildet ist das Verfahren zum Ermitteln des Verstopfungszustandes der Dachrinne, wie oben beschrieben, auszuführen. Die Signalübertragung kann dabei kabellos oder kabelgebunden sein. Der Füllstandssensor ist magnetisch oder mittels einer Schnappvorrichtung in oder an der Dachrinne angeordnet. Zur Kommunikation mit der Recheneinheit weist die Kommunikationsschnittstelle einen Mikrocontroller mit einer Sendeeinheit auf. Wie bereits erwähnt können die Niederschlagswerte vor Ort mit einem Niederschlagswertesensor gemessen und/oder über eine GPS-Lokalisation der Dachrinne abgerufen werden. Gleiches gilt für die meteorologischen Werte. Die entsprechenden Sensoren sind dann ebenfalls zur Signalübertragung mit der Kommunikationsschnittstelle verbunden. Die Sensoren und die Kommunikationsschnittstelle können mit Batterie, Akku, Photovoltaik oder einem Anschluss an ein Hausstromnetz betrieben werden.The invention further relates to a system comprising a level sensor, a communication interface connected to the level sensor for signal transmission, and a processing unit. The communication interface is configured to transmit a level value measured by the level sensor to the processing unit, and the processing unit is configured to execute the method for determining the blockage status of the gutter, as described above. Signal transmission can be wireless or wired. The level sensor is magnetically attached to or mounted on the gutter by means of a snap-in device. For communication with the processing unit, the communication interface includes a microcontroller with a transmitter. As already mentioned, precipitation values can be measured locally using a precipitation sensor and/or retrieved via GPS tracking of the gutter. The same applies to meteorological data. The corresponding sensors are also connected to the communication interface for signal transmission. The sensors and the communication interface can be powered by a battery, rechargeable battery, photovoltaic system, or a connection to a household electrical grid.

Nachfolgend wird die Erfindung unter Bezugnahme auf die Zeichnungen anhand bevorzugter Ausführungsbeispiele weiter im Detail beschrieben.The invention is described in more detail below with reference to the drawings and preferred embodiments.

In der Zeichnung zeigen

  • 1 schematisch ein Ablaufdiagramm für ein Verfahren zum Ermitteln eines Verstopfungszustandes einer Dachrinne gemäß einem bevorzugten Ausführungsbeispiel der Erfindung und
  • 2 schematisch ein System zum Ermitteln eines Verstopfungszustandes gemäß einem bevorzugten Ausführungsbeispiel der Erfindung.
The drawing shows
  • 1 schematically a flowchart for a method for determining a blockage state of a roof gutter according to a preferred embodiment of the invention and
  • 2 schematically a system for determining a blockage state according to a preferred embodiment of the invention.

Aus 1 ist schematisch ein Ablaufdiagramm für ein Verfahren zum Ermitteln eines Verstopfungszustandes einer Dachrinne 1 gemäß einem bevorzugten Ausführungsbeispiel der Erfindung ersichtlich. In einem ersten Schritt S1 ist vorgesehen, dass in einer Trainingsphase unter Sicherstellung einer vollständig unverstopften Dachrinne 1 in Schritt S1a das zeitlich aufeinanderfolgende Erfassen eines den Füllstand der Dachrinne 1 beschreibenden Füllstandswertes und das Abspeichern des jeweils erfassten Füllstandswertes in einer Füllstandswerte-Referenzzeitreihe erfolgt. Die Füllstandswerte werden mit einem in 2 ersichtlichen Füllstandssensor 2 gemessen. Der Füllstandssensor 2 weist einen Wasserstandsensor in einem Steigrohr auf. Die Füllstandswerte werden unter Berücksichtigung von Abmessungen der Dachrinne 1 linearisiert.Out of 1 A schematic flowchart for a method for determining the blockage status of a gutter 1 according to a preferred embodiment of the invention is shown. In a first step S1, it is provided that, during a training phase, while ensuring a completely unblocked gutter 1 in step S1a, a fill level value describing the fill level of the gutter 1 is successively recorded and stored in a fill level reference time series. The fill level values are measured using a 2 The visible fill level sensor 2 measures the water level. Fill level sensor 2 has a water level sensor in a riser pipe. The fill level values are linearized taking into account the dimensions of the gutter 1.

Parallel dazu ist in Schritt S1b das zeitlich aufeinanderfolgende Erfassen eines Niederschlagswertes, der die Niederschlagsmenge pro Zeit und Fläche am Ort der Dachrinne 1 angibt, und das Abspeichern des jeweils erfassten Niederschlagswertes in einer Niederschlagswerte-Referenzzeitreihe vorgesehen. Darüber hinaus erfolgt in Schritt S1d das zeitlich aufeinanderfolgende Erfassen meteorologischer Werte. Die meteorologischen Werte sind dabei eine Luftfeuchtigkeit, eine Temperatur eine Windstärke und eine Windrichtung am Ort der Dachrinne. Diese meteorologischen Werte werden in einer meteorologischen Werte-Referenzzeitreihe abgespeichert.In parallel, step S1b involves the sequential recording of a precipitation value, indicating the amount of precipitation per unit time and area at the location of gutter 1, and the storage of each recorded precipitation value in a precipitation value reference time series. Furthermore, step S1d involves the sequential recording of... Meteorological values. These meteorological values include humidity, temperature, wind speed, and wind direction at the location of the gutter. These meteorological values are stored in a meteorological reference time series.

Die Trainingsphase beinhaltet außerdem das Einbringen verschiedener Verstopfungszustände in die Dachrinne. Der Verstopfungszustand gibt dabei prozentual an, in welchem Maß der Abfluss von Niederschlagswasser aus der Dachrinne 1 gehemmt ist. Die Füllstandswerte und die Niederschlagswerte werden in Schritt S1c für den jeweiligen Verstopfungszustand der Dachrinne in der Füllstandswerte-Referenzzeitreihe und der Niederschlagswerte-Referenzzeitreihe erfasst und abgespeichert. Dabei ist sichergestellt, dass während der Trainingsphase mehrere Niederschlagsereignisse stattgefunden haben.The training phase also includes introducing various blockage conditions into the gutter. The blockage condition indicates, as a percentage, the degree to which the flow of rainwater from gutter 1 is impeded. In step S1c, the fill level and precipitation values are recorded and stored for each gutter blockage condition in the fill level and precipitation reference time series, respectively. This ensures that several precipitation events occur during the training phase.

Die Füllstandswerte-Referenzzeitreihe, die Niederschlagswerte-Referenzzeitreihe und die meteorologische Werte-Referenzzeitreihe werden als Eingabewerte zum Trainieren an ein Long Short-Term Memory Modell (LSTM-Modell) übergeben. Mit dem trainierten LSTM-Modell erfolgt in einer der Trainingsphase zeitlich nachgelagerten Überwachungsphase in Schritt S2 ohne Sicherstellung einer vollständig unverstopften Dachrinne 1 in den Schritten S2a bis S2c das zeitlich aufeinanderfolgende Erfassen des Füllstandswertes und Abspeichern des jeweils erfassten Füllstandswertes, so dass sich eine Füllstandswerte-Istzeitreihe ergibt, das zeitlich aufeinanderfolgende Erfassen und Abspeichern des Niederschlagswertes, so dass sich eine Niederschlagswerte-Istzeitreihe ergibt, und das zeitlich aufeinanderfolgende Erfassen des meteorologischen Wertes, und Abspeichern des jeweils erfassten meteorologischen Wertes, so dass sich eine meteorologische Werte-Istzeitreihe ergibt.The reference series of fill levels, precipitation values, and meteorological values are passed as input values to a Long Short-Term Memory (LSTM) model for training. In a monitoring phase following the training phase, step S2, without ensuring that the gutter 1 is completely unobstructed, the trained LSTM model performs the following steps (S2a to S2c): sequentially recording and storing the fill level value, resulting in an actual fill level value time series; sequentially recording and storing the precipitation value, resulting in an actual precipitation value time series; and sequentially recording and storing the meteorological value, resulting in an actual meteorological value time series.

In einem dritten Schritt S3 werden mit Hilfe des LSTM-Modells die Füllstandswerte-Istzeitreihe, die Niederschlagswerte-Istzeitreihe und die meteorologischen Werte-Istzeitreihe mit der Füllstandswerte-Referenzzeitreihe, der Niederschlagswerte-Referenzzeitreihe und der meteorologischen Werte-Referenzzeitreihe abgeglichen. Auf der Grundlage dieses Abgleichs wird mit dem LSTM-Modell dann der Verstopfungszustand der Dachrinne ermittelt. Gleichzeitig kann mit dem LSTM-Modell eine zukünftige Verstopfung in Form eines zukünftigen Verstopfungszustandes der Dachrinne, auf die Vorhersage der Zeitreihenwerte, hin prognostiziert werden. Der Verstopfungszustand des Dachrinne 1 bzw. die Prognose einer zukünftigen Verstopfung der Dachrinne 1 wird in regelmäßigen Intervallen durchgeführt. Diese Intervalle können von einem Anwender festgelegt werden.In a third step (S3), the LSTM model is used to compare the actual time series of water level values, precipitation values, and meteorological values with the reference time series of water level values, precipitation values, and meteorological values. Based on this comparison, the LSTM model then determines the blockage status of the gutter. Simultaneously, the LSTM model can predict future blockages based on the time series values. The blockage status of gutter 1, or the prediction of future blockages, is performed at regular intervals. These intervals can be defined by the user.

2 zeigt schließlich schematisch ein System zum Ermitteln eines Verstopfungszustandes gemäß einem bevorzugten Ausführungsbeispiel der Erfindung. In der Dachrinne 1 ist ein Füllstandssensor 2 magnetisch befestigt. Der Füllstandssensor 2 ist zur Übertragung des Füllstandswertes mit einer Kommunikationsschnittstelle 3 verbunden. Ein Niederschlagssensor 7 zur Erfassung eines Niederschlagswertes sowie ein Thermometer 8 zum Erfassen einer Temperatur, ein Hygrometer 9 zum Erfassen einer relativen Luftfeuchtigkeit und ein Windmesser 10 zum Erfassen von Windrichtung und Windstärke, sind ebenfalls zur Übertragung jeweiliger Werte mit der Kommunikationsschnittstelle 3 verbunden. Mit einer mit der Kommunikationsschnittstelle verbundenen Sendeeinheit 5 werden diese Werte an eine Empfangseinheit 6 einer Recheneinheit 4 übertragen. Innerhalb der Recheneinheit kann mit dem LSTM-Modell dann auf die übertragenen Werte hin der Verstopfungszustand der Dachrinne ermittelt werden. Die Recheneinheit kann lokal vorhanden sein oder auf einem externen Server liegen. Sobald ein Verstopfungszustand von 50 % oder mehr festgestellt wird, wird eine Meldung an einen Wartungsdienst gesendet, um eine Reinigung der Dachrinne zu veranlassen. 2 Figure 1 schematically shows a system for determining a blockage state according to a preferred embodiment of the invention. A level sensor 2 is magnetically attached in the gutter 1. The level sensor 2 is connected to a communication interface 3 for transmitting the level value. A precipitation sensor 7 for measuring precipitation, a thermometer 8 for measuring temperature, a hygrometer 9 for measuring relative humidity, and an anemometer 10 for measuring wind direction and speed are also connected to the communication interface 3 for transmitting their respective values. These values are transmitted to a receiving unit 6 of a processing unit 4 via a transmitter 5 connected to the communication interface. Within the processing unit, the blockage state of the gutter can then be determined based on the transmitted values using the LSTM model. The processing unit can be located locally or on an external server. As soon as a blockage of 50% or more is detected, a message is sent to a maintenance service to arrange for the gutter to be cleaned.

BezugszeichenlisteReference symbol list

11
Dachrinnegutter
22
FüllstandssensorLevel sensor
33
KommunikationsschnittstelleCommunication interface
44
Recheneinheitcomputing unit
55
SendeeinheitTransmitter unit
66
EmpfangseinheitReceiving unit
77
NiederschlagssensorRainfall sensor
88
Thermometerthermometer
99
Hygrometerhygrometer
1010
WindmesserAnemometer

Claims (13)

Verfahren zum Ermitteln eines Verstopfungszustands einer Dachrinne (1), mit folgenden Verfahrensschritten: S1) in einer Trainingsphase unter Sicherstellung einer vollständig unverstopften Dachrinne (1): S1a) zeitlich aufeinanderfolgendes Erfassen eines den Füllstand der Dachrinne (1) beschreibenden Füllstandswertes und Abspeichern des jeweils erfassten Füllstandswertes, so dass sich eine Füllstandswerte-Referenzzeitreihe ergibt, und S1b) zeitlich aufeinanderfolgendes Erfassen eines Niederschlagswertes, der die Niederschlagsmenge pro Zeit und Fläche am Ort der Dachrinne (1) angibt, und Abspeichern des jeweils erfassten Niederschlagswertes, so dass sich eine Niederschlagswerte-Referenzzeitreihe ergibt, und S2) in einer der Trainingsphase zeitlich nachgelagerten Überwachungsphase ohne Sicherstellung einer vollständig unverstopften Dachrinne (1): S2a) zeitlich aufeinanderfolgendes Erfassen des Füllstandswertes und Abspeichern des jeweils erfassten Füllstandswertes, so dass sich eine Füllstandswerte-Istzeitreihe ergibt, S2b) zeitlich aufeinanderfolgendes Erfassen des Niederschlagswertes und Abspeichern des jeweils erfassten Niederschlagswertes, so dass sich eine Niederschlagswerte-Istzeitreihe ergibt, und S3) Abgleichen der Füllstandswerte-Istzeitreihe und der Niederschlagswerte-Istzeitreihe mit der Füllstandswerte-Referenzzeitreihe und der Niederschlagswerte-Referenzzeitreihe und Ermitteln des Verstopfungszustands der Dachrinne (1) auf der Grundlage dieses Abgleichs.Method for determining the blockage status of a gutter (1), comprising the following procedure steps: S1) in a training phase, ensuring a completely unblocked gutter (1): S1a) successively recording a fill level value describing the fill level of the gutter (1) and storing each recorded fill level value, resulting in a fill level value reference time series, and S1b) successively recording a precipitation value indicating the amount of precipitation per unit time and area at the location of the gutter (1), and storing each recorded precipitation value S2) in a monitoring phase following the training phase without ensuring a completely unobstructed gutter (1): S2a) recording the fill level value and saving each recorded fill level value, resulting in an actual fill level value time series, S2b) recording the precipitation value and saving each recorded precipitation value, resulting in an actual precipitation value time series, and S3) comparing the actual fill level value and the actual precipitation value series with the fill level value reference time series and the precipitation value reference time series and determining the obstruction status of the gutter (1) based on this comparison. Verfahren nach Anspruch 1, wobei der Verstopfungszustand ein Zustand aus einer endlichen Anzahl von Zuständen ist, die ein Maß für die Verstopfung der Dachrinne (1) im Hinblick auf den Ablauf von Niederschlagswasser angeben.Procedure according to Claim 1 , where the blockage state is a state from a finite number of states which provide a measure of the blockage of the gutter (1) with respect to the drainage of rainwater. Verfahren nach Anspruch 1, wobei der Verstopfungszustand angibt, in welchem Maß der Abfluss von Niederschlagswasser aus der Dachrinne (1) gehemmt ist.Procedure according to Claim 1 , where the degree of obstruction indicates the extent to which the outflow of rainwater from the roof gutter (1) is inhibited. Verfahren nach einem der Ansprüche 2 oder 3, umfassend den folgenden weiteren Schritt: S1c) in der Trainingsphase, wobei die Dachrinne (1) in verschiedene Verstopfungszustände gebracht wird: zeitlich aufeinanderfolgendes Erfassen und Abspeichern der Füllstandswerte in der Füllstandswerte-Referenzzeitreihe und der Niederschlagswerte in der Niederschlagswerte-Referenzzeitreihe für den jeweiligen Verstopfungszustand der Dachrinne (1).Procedure according to one of the Claims 2 or 3 , comprising the following further step: S1c) in the training phase, whereby the gutter (1) is brought into different blockage states: time-sequential recording and storage of the fill level values in the fill level reference time series and the precipitation values in the precipitation reference time series for the respective blockage state of the gutter (1). Verfahren nach einem der vorhergehenden Ansprüche, umfassend die folgenden weiteren Schritte: in der Trainingsphase unter Sicherstellung der vollständig unverstopften Dachrinne (1): S1d) zeitlich aufeinanderfolgendes Erfassen wenigstens eines meteorologischen Wertes, wobei der wenigstens eine meteorologische Wert eine Luftfeuchtigkeit und/oder einer Temperatur und/oder einer Windrichtung und/oder eine Windstärke ist, und Abspeichern des jeweils erfassten meteorologischen Wertes, so dass sich eine meteorologische Werte-Referenzzeitreihe ergibt, und in der Überwachungsphase ohne Sicherstellung der vollständig unverstopften Dachrinne (1): S2c) zeitlich aufeinanderfolgendes Erfassen des meteorologischen Wertes, und Abspeichern des jeweils erfassten meteorologischen Wertes, so dass sich eine meteorologische Werte-Istzeitreihe ergibt, und S3) Abgleichen der Füllstandswerte-Istzeitreihe, der Niederschlagswerte-Istzeitreihe und der meteorologischen Werte-Istzeitreihe mit der Füllstandswerte-Referenzzeitreihe, der Niederschlagswerte-Referenzzeitreihe und der meteorologischen Werte-Referenzzeitreihe und Ermitteln des Verstopfungszustands der Dachrinne (1) auf der Grundlage dieses Abgleichs.A method according to any of the preceding claims, comprising the following further steps: in the training phase, ensuring that the gutter (1) is completely unobstructed: S1d) successively recording at least one meteorological value, wherein the at least one meteorological value is humidity and/or temperature and/or wind direction and/or wind speed, and storing each recorded meteorological value, so that a meteorological value reference time series is obtained, and in the monitoring phase, without ensuring that the gutter (1) is completely unobstructed: S2c) successively recording the meteorological value, and storing each recorded meteorological value, so that an actual meteorological value time series is obtained, and S3) comparing the actual fill level value time series, the actual precipitation value time series, and the actual meteorological value time series with the fill level value reference time series, the precipitation value reference time series, and the meteorological value reference time series, and determining the Congestion status of the gutter (1) based on this comparison. Verfahren nach einem der vorhergehenden Ansprüche, wobei in der Überwachungsphase bei Überschreiten eines vorbestimmten Verstopfungszustandes automatisch eine Meldung erfolgt.Method according to one of the preceding claims, wherein a message is automatically sent during the monitoring phase if a predetermined blockage state is exceeded. Verfahren nach einem der vorhergehenden Ansprüche, wobei in der Trainingsphase und in der Überwachungsphase das Erfassen der Füllstandswerte nicht beendet wird, bevor ein Füllstand von Null erfasst worden ist.Method according to one of the preceding claims, wherein in the training phase and in the monitoring phase the recording of the fill level values is not stopped until a fill level of zero has been recorded. Verfahren nach einem der vorhergehenden Ansprüche, wobei das Ermitteln des Verstopfungszustands der Dachrinne (1) mit Hilfe eines künstlichen neuronalen Netzwerks erfolgt.Method according to one of the preceding claims, wherein the determination of the blockage state of the gutter (1) is carried out using an artificial neural network. Verfahren nach einem der vorhergehenden Ansprüche, wobei das Ermitteln des Verstopfungszustands der Dachrinne (1) mit Hilfe eines Zeitreihenvorhersagemodells erfolgt.Method according to one of the preceding claims, wherein the determination of the blockage state of the gutter (1) is carried out using a time series prediction model. Verfahren nach Anspruch 9, wobei das Zeitreihenvorhersagemodell ein Long Short-Term Memory Modell ist.Procedure according to Claim 9 , where the time series forecast model is a Long Short-Term Memory model. Verfahren nach einem der vorigen Ansprüche, wobei das Ermitteln des Verstopfungszustands der Dachrinne (1) periodisch und/oder auf Abruf erfolgt.Method according to one of the preceding claims, wherein the determination of the blockage state of the gutter (1) is carried out periodically and/or on demand. Nichtflüchtiges, computerlesbares Speichermedium mit darauf abgespeicherten Befehlen, die bei ihrer Ausführung auf einem Prozessor ein Verfahren nach einem der vorhergehenden Ansprüche bewirken.Non-volatile, computer-readable storage medium containing instructions stored on it which, when executed on a processor, effect a method according to one of the preceding claims. System mit einem Füllstandssensor (2), einer mit dem Füllstandssensor (2) zur Signalübertragung verbundene Kommunikationsschnittstelle (3) und einer Recheneinheit (4), wobei die Kommunikationsschnittstelle (3) dazu ausgebildet ist einen mit dem Füllstandssensor (2) gemessenen Füllstandswert an die Recheneinheit (4) zu übertragen, und die Recheneinheit (4) dazu ausgebildet ist das Verfahren zum Ermitteln des Verstopfungszustandes der Dachrinne (1) nach einem der Ansprüche 1 bis 11 auszuführen.System comprising a level sensor (2), a communication interface (3) connected to the level sensor (2) for signal transmission, and a computing unit (4), wherein the communication interface (3) is configured to transmit a level value measured by the level sensor (2) to the computing unit (4), and the computing unit (4) is configured to perform the method for determining the state of obstruction. the gutter (1) after one of the Claims 1 until 11 to execute.
DE102024102480.1A 2024-01-29 2024-01-29 Determining the blockage status of a roof gutter Active DE102024102480B4 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE102024102480.1A DE102024102480B4 (en) 2024-01-29 2024-01-29 Determining the blockage status of a roof gutter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102024102480.1A DE102024102480B4 (en) 2024-01-29 2024-01-29 Determining the blockage status of a roof gutter

Publications (2)

Publication Number Publication Date
DE102024102480A1 DE102024102480A1 (en) 2025-07-31
DE102024102480B4 true DE102024102480B4 (en) 2026-02-05

Family

ID=96347236

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102024102480.1A Active DE102024102480B4 (en) 2024-01-29 2024-01-29 Determining the blockage status of a roof gutter

Country Status (1)

Country Link
DE (1) DE102024102480B4 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20200048910A1 (en) * 2017-03-31 2020-02-13 H D Sharman Ltd Monitoring Apparatus For Guttering System
CN111640284A (en) * 2020-05-21 2020-09-08 南京震坤物联网科技有限公司 Roof drainage wireless monitoring system and early warning method thereof
CN113221439A (en) * 2021-04-07 2021-08-06 浙江大学 BP neural network-based drainage system real-time calibration and dynamic prediction method
CN216428826U (en) * 2021-11-29 2022-05-03 中国铁路设计集团有限公司 Monitoring type siphon rainwater fill
CN114707678A (en) * 2022-04-15 2022-07-05 中国铁路设计集团有限公司 A roof siphon drainage intelligent monitoring and operation and maintenance system and method
CN115168520A (en) * 2022-07-07 2022-10-11 浙江卓锦环保科技股份有限公司 Long-term supervision method, system and medium for zero direct discharge of sewage based on liquid level perception

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20200048910A1 (en) * 2017-03-31 2020-02-13 H D Sharman Ltd Monitoring Apparatus For Guttering System
CN111640284A (en) * 2020-05-21 2020-09-08 南京震坤物联网科技有限公司 Roof drainage wireless monitoring system and early warning method thereof
CN113221439A (en) * 2021-04-07 2021-08-06 浙江大学 BP neural network-based drainage system real-time calibration and dynamic prediction method
CN216428826U (en) * 2021-11-29 2022-05-03 中国铁路设计集团有限公司 Monitoring type siphon rainwater fill
CN114707678A (en) * 2022-04-15 2022-07-05 中国铁路设计集团有限公司 A roof siphon drainage intelligent monitoring and operation and maintenance system and method
CN115168520A (en) * 2022-07-07 2022-10-11 浙江卓锦环保科技股份有限公司 Long-term supervision method, system and medium for zero direct discharge of sewage based on liquid level perception

Also Published As

Publication number Publication date
DE102024102480A1 (en) 2025-07-31

Similar Documents

Publication Publication Date Title
JP2007205001A (en) Flow prediction device
CN116227362A (en) A State Prediction Method of Municipal Drainage Network Based on Graph and Deep Learning
DE102018128443A1 (en) Drainage system and trench
EP4210473A1 (en) Irrigation and drainage device and/or water storage device, preferably for managing water, in particular irrigation of (green) spaces and/or plants
CN116029460A (en) Municipal construction engineering water conservation management platform based on big data
DE102008034923A1 (en) Airconditioning requirement controlling method for building with heater/airconditioner, involves calculating weather condition forecast and gathering weather physical values of short weather forecast for controlling heater/airconditioner
DE102024102480B4 (en) Determining the blockage status of a roof gutter
CN119514749A (en) Urban waterlogging risk early warning system and method
Dunkerley Rainfall intensity in short events: Evaluating the “I30 is equal to twice the rainfall depth” approach advised for use with the Universal Soil Loss Equation by Wischmeier & Smith (1978)
CN120338210B (en) Reservoir operation method based on deep learning adaptive dynamic network and reinforcement learning
EP4519720A1 (en) Measuring system and flood warning method
Strauss et al. Predictive maintenance of stormwater infrastructure using internet-of-things technology
CN119862517A (en) Drainage pipe network liquid level and risk prediction method
Barkotulla et al. Characterization and frequency analysis of consecutive days maximum rainfall at Boalia, Rajshahi and Bangladesh
DE102017125296B3 (en) Method for determining the hydraulic permeability of a filter and filter system with a hydraulic filter
CN119964342A (en) A regional flood prevention early warning system and method based on big data
DE102016111280B4 (en) Method for determining the annual efficiency of a thermal plant
Faure et al. Limits of radar rainfall forecasting for sewage system management: Results and application in Nancy
Faure et al. Real time weather radar data processing for urban hydrology in Nancy
DE102022111701A1 (en) Method for monitoring a treatment structure for rainwater and treatment structure for rainwater
DE102008012569B4 (en) Method and device for detecting events by means of at least two counters
CN121259975B (en) Intelligent monitoring system and method for drainage state of house surface gutter of railway station
Bastin et al. On-line river flow forecasting with ‘Hydromax': successes and challenges after twelve years of experience
CN119663955B (en) Urban smart drainage method and system
Hochedlinger et al. Online UV-Vis measurements–The basis for future pollution based sewer real time control in Linz

Legal Events

Date Code Title Description
R012 Request for examination validly filed
R016 Response to examination communication
R018 Grant decision by examination section/examining division