DE102004017006A1 - Verfahren zum Errichten eines Turmes - Google Patents
Verfahren zum Errichten eines Turmes Download PDFInfo
- Publication number
- DE102004017006A1 DE102004017006A1 DE102004017006A DE102004017006A DE102004017006A1 DE 102004017006 A1 DE102004017006 A1 DE 102004017006A1 DE 102004017006 A DE102004017006 A DE 102004017006A DE 102004017006 A DE102004017006 A DE 102004017006A DE 102004017006 A1 DE102004017006 A1 DE 102004017006A1
- Authority
- DE
- Germany
- Prior art keywords
- tower
- foundation
- leveling
- ring
- segment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
- E04H12/2253—Mounting poles or posts to the holder
- E04H12/2269—Mounting poles or posts to the holder in a socket
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/388—Separate connecting elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/08—Structures made of specified materials of metal
- E04H12/085—Details of flanges for tubular masts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
- E04H12/2284—Means for adjusting the orientation of the post or pole
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
- F03D13/22—Foundations specially adapted for wind motors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2240/00—Components
- F05B2240/90—Mounting on supporting structures or systems
- F05B2240/91—Mounting on supporting structures or systems on a stationary structure
- F05B2240/912—Mounting on supporting structures or systems on a stationary structure on a tower
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Paleontology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Chemical & Material Sciences (AREA)
- Wood Science & Technology (AREA)
- Materials Engineering (AREA)
- Sustainable Energy (AREA)
- Sustainable Development (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Wind Motors (AREA)
- Foundations (AREA)
Abstract
Es wird ein Verfahren zum Errichten eines Turmes, insbesondere eines Turmes einer Windenergieanlage, vorgesehen, welcher ein Fundament mit Segmentankern aufweist, wobei Verbindungselemente die Oberseite des Fundamentes ein vorgegebenes Maß überragen. Ein Ring wird an der Oberseite des Fundamentes nivelliert, ausgerichtet und fixiert. Eine durch die Nivellierung, Ausrichtung und Fixierung des Ringes entstandene Fuge wird mit einer Vergussmasse unterfüttert. Die Vergussmasse wird abgebunden und ein unteres Turmsegment auf dem nivellierten, ausgerichteten und fixierten Ring aufgestellt und damit verbunden.
Description
- Die vorliegende Erfindung betrifft ein Verfahren zum Errichten eines Turmes sowie eine Windenergieanlage mit einem Turm.
- Im Stand der Technik ist es bekannt, bei der Errichtung eines Turmes insbesondere für eine Windenergieanlage ein unteres Turmsegment auf die aus einem Fundament herausragenden Verbindungselemente mit einem Fußflansch aufzusetzen. Dieses untere Turmsegment wird ausgerichtet (nivelliert) und in der ausgerichteten Position fixiert. Dabei entsteht zwischen dem Fußflansch des unteren Turmsegments und der Oberseite des Fundaments eine Fuge. Diese Fuge wird mit einer Vergussmasse aufgefüllt, die dann abbinden muss, bevor sie belastet und der Turm weiter aufgebaut werden kann. Das Abbinden kann durchaus bis zu 24 Stunden dauern.
- Zum Handhaben des unteren Turmsegmentes wird ein großer Kran benötigt. Dieser wird aber erst nach dem Abbinden der Vergussmasse weiter für den Aufbau des Turms verwendet. Ein Verlegen des Kranes für die Dauer des Abbindens der Pagelfuge ist jedoch zu aufwändig und unterbleibt deshalb. Damit steht der teure Kran 24 Stunden untätig still.
- Aufgabe der Erfindung ist es daher, den Aufbau eines Turmes, insbesondere eines Turmes einer Windenergieanlage, zu rationalisieren.
- Diese Aufgabe wird durch ein Verfahren zum Errichten eines Turmes gemäß Anspruch 1 durch eine Windenergieanlage mit einem Turm, gemäß Anspruch 3 sowie durch Verwendung eines Nivellierringes zur Errichtung eines Turmes gemäß Anspruch 5, gelöst.
- Daher wird ein Verfahren zum Errichten eines Turmes, insbesondere eines Turmes einer Windenergieanlage vorgesehen, welcher ein Fundament mit Segmentankern aufweist, wobei die Verbindungselemente die Oberseite des Fundamentes um ein vorgegebenes Maß überragen. Ein Ring wird an der Oberseite des Fundamentes nivelliert, ausgerichtet und fixiert. Einer durch die Nivellierung, Ausrichtung und Fixierung des Ringes entstandenen Fuge wird mit einer Vergussmasse unterfüttert. Nachdem die Vergussmasse abgebunden ist, wird ein unteres Turmsegment auf dem nivellierten, ausgerichteten und fixierten Ring aufgestellt und damit verbunden. Dabei kann der Ring auch aus mehreren Segmenten gebildet sein.
- Dabei liegt der Erfindung die Erkenntnis zugrunde, dass es nicht auf die Nivellierung der unteren Turmsektion ankommt, sondern darauf, dass diese in situ exakt ausgerichtet ist. Dies kann aber auch unter Vermittlung eines Nivellierringes erreicht werden. Ein solcher Nivellierrng ist mit einem Flanschring vergleichbar, der mit deutlich geringerem Aufwand handhabbar ist als die untere Turmsektion, z. B. mit einem fahrzeuggestützten Kran. Auch die präzise Ausrichtung (Nivellierung) des Nivellierringes ist einfacher als der entsprechende Vorgang bei einer Turmsektion. Darüber hinaus kann der Nivellierring bei größerer Breite und/oder Dicke aus einem weniger hochwertigen Material als der Turmflansch hergestellt werden. Außerdem kann der Turmflansch in seiner Breite reduziert werden. Dadurch kann die Transportbreite besser ausgenutzt werden.
- Nach der Ausrichtung und Fixierung kann der Nivellierring in bekannter Weise mit Füllmaterial unterfüttert werden und das Material kann Abbinden. Während dieser Zeit kann aber der (fahrzeuggestützte) Kran bereits für andere Aufgaben eingesetzt werden, während der zur Handhabung der Turmsektionen erforderliche Kran noch nicht benötigt wird.
- Erst wenn das Material in der Fuge ausgehärtet ist, muss der große Kran zur Errichtung des Turmes, z. B. einer Windenergieanlage, bereitstehen und kann dann relativ zügig Segment für Segment den Turm errichten.
- Ein besonders rationeller Aufbau eines Turmes kann verwirklicht werden, wenn für das Fundament Fertigteile, insbesondere Beton-Fertigteile, verwendet werden. Diese werden auf der Baustelle einbaufertig angeliefert und zu einem Fundament verbunden, dass dann sofort und damit zeitsparend weiter verwendet werden kann.
- Die Erfindung wird nachstehend unter Bezugnahme auf die Figur erläutert.
-
1 zeigt eine schematische Schnittansicht eines Abschnittes eines Turmfußes. -
2a zeigt eine Draufsicht auf einen Turmfuß, -
2b zeigt eine Schnittansicht entlang des Schnittes A-A des Turmfußes von2a , -
2c zeigt eine vergrößerte Ansicht des Ausschnittes X von2b , und -
3 stellt eine perspektivische Ansicht eines Turmfußes dar. - Ein Fundament
10 kann als Fertigteilfundament, aber auch als Ortbeton-Fundament oder Transportbeton-Fundament ausgeführt sein. Ein oder mehrere Segmentanker12 werden in dem Fundament10 vorgesehen. Diese Segmentanker12 können in der Form und Anzahl an die besonderen Anforderungen des Fundaments angepasst sein. So kann ein z. B. einstückig ausgebildeter Segmentanker bei Ortbeton- oder Transportbeton-Fundamenten verwendet werden, der in die Bewehrung eingeflochten wird. Bei Fertigteil-Fundamenten werden hingegen mehrere Segmentanker verwendet, die in ihrer Form an das Fertigteil angepasst sind. Natürlich können auch bei Ortbeton- oder Transportbeton-Bauweise mehrere Segmentanker verwendet werden. - Mit dem Segementanker
12 sind Verbindungselemente14 verbunden. Die Verbindungselemente14 können als Gewindestangen ausgeführt sein, die mit Muttern15 in einer vorgegebenen Position an dem Segmentanker12 befestigt sind. Die Befestigungselemente14 erstrecken sich ein vorgegebenes Maß außerhalb des Fundamentes10 über die Fundamentoberseite11 hinaus. An Stelle einer Schraubverbindung kann auch eine Schweißverbindung verwendet werden. - An der Fundamentoberseite
11 wird dann ein einstückiger oder mehrstückig ausgeführter Nivellierring18 angeordnet. Dieser Nivellierring18 wird exakt nivelliert, so dass er eine perfekt ausgerichtete Basis für den Turm bildet. - Bei der Ausrichtung des Nivellierringes
18 entsteht zwangsläufig eine Fuge16 zwischen der Fundamentoberseite11 und dem Nivellierring18 . Sobald der Nivellierring18 in seiner vorgegebenen Lage fixiert ist, wird die Fuge16 mit einer Vergussmasse17 verfüllt. Nach dem Abbinden bzw. Aushärten dieser Vergussmasse17 ist der Nivellierring18 in seiner gewünschten Lage belastbar und ein unteres Turmsegment mit einem unteren Flanschring20 und einem dargestellten Turmwandblech22 kann auf den Nivellierring18 aufgesetzt werden. Die Gewindestangen14 greifen durch entsprechend positionierte Löcher im Nivellierring18 und im unteren Flanschring20 der unteren Turmsektion hindurch und Muttern15 werden aufgesetzt, um die untere Turmsektion unter Vermittlung des Nivellierringes18 fest mit dem Fundament10 zu verbinden. - In
2a ist eine Draufsicht auf einen Turmfuß gezeigt. In2b ist ein Querschnitt entlang des Schnittes A-A aus2a gezeigt. Wie in1 ist ein Fundament10 mit einer Fundamentoberfläche11 gezeigt. Insbesondere sind zwei Segmentanker12 sowie vier Gewindestangen14 gezeigt. In2c ist der Ausschnitt X vergrößert dargestellt. Diese Darstellung entspricht im Wesentlichen der Darstellung aus1 . - In
3 ist eine perspektivische Darstellung des Turmfußes mit einem aufgeschnittenen Teilstück gezeigt. Die Nivellierung des Turmfußes erfolgt wie gemäß1 beschrieben. - Da der Turm, z. B. einer Windenergieanlage, jetzt in einem Zug aufgebaut werden kann, muss für die schnelle Turmerrichtung nur einmal ein Kran bereitgestellt werden, der aber bis dahin andere Aufgaben erfüllen kann.
- Auch logistische Aufgaben werden vereinfacht. Bisher musste die untere Turmsektion wenigstens 24 Stunden vor den übrigen Turmteilen auf der Baustelle sein, um sie einwandfrei einbauen zu können. Natürlich konnten auch die übrigen Turmteile gleich mit angeliefert werden. Diese konnten jedoch nicht gleich verbaut werden und beanspruchten daher für die Wartezeit zusätzlichen Platz auf der Baustelle.
- Durch das erfindungsgemäße Verfahren können die Turmsegmente in einem Transport zeitnah zum Aufstellzeitpunkt angeliefert werden. Dadurch entfallen auch zusätzliche Umladevorgänge, nämlich vom Transportfahrzeug zunächst zur Zwischenlagerung auf dem Boden und dann später von dort zum Einbauort. Viel mehr können zeitnah (just in time) angelieferte Turmsegmente vom Transportfahrzeug abgeladen und sofort eingebaut werden.
- Bei der oben beschriebenen Lösung ist darauf zu achten, dass die Vergussmasse stets mit einer (materialabhängigen) Mindestdicke aufgetragen werden muss, da diese Vergussmasse die Kräfte vom Turm in das Fundament übertragen muss. Wenn die Vergussmasse zu dünn aufgetragen wird, kann diese Schicht brechen und zu erheblichen Schäden führen.
- Die oben beschriebene Lösung erweist sich als vorteilhaft hinsichtlich der Rationalisierung der Errichtung eines Turmes, insbesondere eines Turmes einer Windenergieanlage. Andererseits spielen auch die Kosten und Materialeigenschaften eine nicht unerhebliche Rolle. Es sei darauf hingewiesen, dass der unterste Flansch eines Turmsegmentes aus einem sehr hochwertigen Material hergestellt sein muss, um die Lasten aus dem Turm ableiten zu können. Wenn ein derartiger Turm auf ein Betonfundament gestellt wird, dann ist der Beton der Schwächere der beiden Verbindungspartner. Somit muss der Turmflansch in seiner Breite so ausgelegt werden, dass der Beton des Fundamentes nicht überlastet wird. Folglich muss der Flansch im unteren Turmsegment eine für den dabei verwendeten Stahl überdimensionierte Breite erhalten. Dies ist insbesondere hinsichtlich der Kosten des dabei verwendeten Stahles als nachteilhaft zu betrachten.
- Durch das Einfügen des Nivellierringes ist es nunmehr gemäß der Erfindung möglich, eine Art Übergangsstufe zwischen dem hoch belastbaren aber kostenintensiven Stahl des unteren Turmsegmentes und dem niedriger belastbaren Beton des Fundamentes einzufügen. Somit kann der Nivellierring eine ausreichende Breite aufweisen, um die Lasten der Windenergieanlage ohne Gefahr in das Fundament abzuleiten. Andererseits kann an dieser Stelle günstigerer bzw. billigerer Stahl verwendet werden, und somit kann der Flansch am unteren Turmsegment entsprechend schmaler und damit material- und kostensparender ausgeführt werden.
- Ein weiterer Vorteil kann dann zum Tragen kommen, wenn der Nivellierring in Segmenten ausgeführt und somit segmentweise gestapelt und transportiert werden kann. Wenn der Nivellierring einen großen Durchmesser aufweist, ist dies gemäß der Erfindung aus transporttechnischer Sicht nicht problematisch, weil dieser segmentweise gestapelt werden kann. Das untere Turmsegment weist einen schmaleren Fußflansch mit einer geringeren Breite auf, da nunmehr der Fußflansch materialspezifisch dimensioniert werden kann. Ferner kann somit auch die Transportbreite entsprechend verringert werden.
- In dem oben angeführten Beispiel wurde eine Errichtung beispielsweise eines Turmes einer Windenergieanlage an Land beschrieben. Eine Errichtung eines Turmes einer Windenergieanlage Off-shore, d.h. im Wasser oder im Meer, kann ebenfalls mit Hilfe des oben beschriebnen Nivellierringes sowie einer entsprechenden Nivellierung, bevor ein unteres Turmsegment angebracht wird, erfolgen.
Claims (5)
- Verfahren zum Errichten eines Turmes, insbesondere eines Turmes einer Windenergieanlage, welcher ein Fundament mit Segmentankern aufweist, wobei Verbindungselemente die Oberseite des Fundamentes um ein vorgegebenes Maß überragen, mit den Schritten: Nivellierung, Ausrichtung und Fixierung eines Ringes an der Oberseite des Fundamentes, Unterfütterung einer durch die Nivellierung, Ausrichtung und Fixierung des Ringes entstandenen Fuge mit einer Vergussmasse, Abbinden der Vergussmasse, und Aufstellen und Verbinden eines unteren Turmsegmentes auf dem nivellierten, ausgerichteten und fixierten Ring.
- Verfahren nach Anspruch 1, wobei Beton-Fertigteile für das Fundament (
10 ) verwendet werden. - Windenergieanlage mit einem Turm, welcher ein Fundament mit Segmentankern (
12 ) aufweist, mit Verbindungselementen (14 ), welche ein vorgegebenes Maß über die Oberseite des Fundamentes (10 ) hinausragen, und einem Nivellierung (18 ), welcher dazu geeignet ist, an der Oberseite des Fundamentes ausgerichtet und fixiert zu werden. - Windenergieanlage nach Anspruch 3, mit einer Vergussmasse (
17 ), welche eine durch Ausrichtung und Fixierung des Nivellierringes (18 ) entstandene Fuge unterfüttert, wobei nach Abbinden der Vergussmasse (17 ) ein unteres Turmsegment auf dem ausgerichteten und fixierten Nivellierung (18 ) aufgestellt und damit verbunden wird. - Verwendung eines Nivellierringes (
18 ) zur Errichtung eines Turmes, insbesondere eines Turmes einer Windenergieanlage, wobei der Nivellierung nach einer Ausrichtung und Fixierung mit einer Vergussmasse (17 ) unterfüttert wird, welche dann abgebunden wird, bevor ein unteres Turmsegment auf dem Nivellierring (18 ) aufgestellt und damit verbunden wird.
Priority Applications (21)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102004017006A DE102004017006B4 (de) | 2004-04-02 | 2004-04-02 | Verfahren zum Errichten eines Turmes |
ARP050101291A AR048458A1 (es) | 2004-04-02 | 2005-04-01 | Procedimiento para erigir una torre |
KR1020067021572A KR20060130755A (ko) | 2004-04-02 | 2005-04-04 | 타워를 건설하는 방법 |
AU2005229135A AU2005229135B2 (en) | 2004-04-02 | 2005-04-04 | Method for erecting a tower |
DK05716518.5T DK1735533T4 (da) | 2004-04-02 | 2005-04-04 | Fremgangsmåde til opføring af et tårn samt vindenergianlæg |
BRPI0509286-8A BRPI0509286B1 (pt) | 2004-04-02 | 2005-04-04 | Processo para erguer uma torre, instalação de energia eólica, e, uso de um anel de nivelamento |
SI200531359T SI1735533T1 (sl) | 2004-04-02 | 2005-04-04 | Postopek za postavitev stolpa ter vetrne elektrarne |
EP05716518.5A EP1735533B2 (de) | 2004-04-02 | 2005-04-04 | Verfahren zum errichten eines turmes sowie windenergieanlage |
ES05716518T ES2369669T5 (es) | 2004-04-02 | 2005-04-04 | Procedimiento para erigir una torre así como instalación de energía eólica |
PT05716518T PT1735533E (pt) | 2004-04-02 | 2005-04-04 | Processo para erguer uma torre, bem como uma central de energia eólica |
PCT/EP2005/003499 WO2005095792A1 (de) | 2004-04-02 | 2005-04-04 | Verfahren zum errichten eines turmes |
AT05716518T ATE521804T1 (de) | 2004-04-02 | 2005-04-04 | Verfahren zum errichten eines turmes sowie windenergieanlage |
NZ550073A NZ550073A (en) | 2004-04-02 | 2005-04-04 | Mounting a pylon on a ring that is leveled first then underlayed with grout and the foundation formed thereby |
JP2007503310A JP4726891B2 (ja) | 2004-04-02 | 2005-04-04 | タワーの立設方法 |
US11/547,387 US9206617B2 (en) | 2004-04-02 | 2005-04-04 | Tower and foundation |
CN2005800106378A CN1965165B (zh) | 2004-04-02 | 2005-04-04 | 建造塔的方法 |
PL05716518T PL1735533T3 (pl) | 2004-04-02 | 2005-04-04 | Sposób wznoszenia wieży, jak również elektrownia wiatrowa |
CA2561431A CA2561431C (en) | 2004-04-02 | 2005-04-04 | Method for erecting a tower |
JP2010026377A JP2010159625A (ja) | 2004-04-02 | 2010-02-09 | タワーの立設方法 |
CY20111100971T CY1111928T1 (el) | 2004-04-02 | 2011-10-11 | Μεθοδος για την κατασκευη ενος πυργου καθως και μιας ανεμογεννητριας |
US14/566,433 US20150089898A1 (en) | 2004-04-02 | 2014-12-10 | Method for erecting a tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102004017006A DE102004017006B4 (de) | 2004-04-02 | 2004-04-02 | Verfahren zum Errichten eines Turmes |
Publications (2)
Publication Number | Publication Date |
---|---|
DE102004017006A1 true DE102004017006A1 (de) | 2005-10-27 |
DE102004017006B4 DE102004017006B4 (de) | 2012-03-29 |
Family
ID=34962709
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102004017006A Revoked DE102004017006B4 (de) | 2004-04-02 | 2004-04-02 | Verfahren zum Errichten eines Turmes |
Country Status (19)
Country | Link |
---|---|
US (2) | US9206617B2 (de) |
EP (1) | EP1735533B2 (de) |
JP (2) | JP4726891B2 (de) |
KR (1) | KR20060130755A (de) |
CN (1) | CN1965165B (de) |
AR (1) | AR048458A1 (de) |
AT (1) | ATE521804T1 (de) |
AU (1) | AU2005229135B2 (de) |
BR (1) | BRPI0509286B1 (de) |
CA (1) | CA2561431C (de) |
CY (1) | CY1111928T1 (de) |
DE (1) | DE102004017006B4 (de) |
DK (1) | DK1735533T4 (de) |
ES (1) | ES2369669T5 (de) |
NZ (1) | NZ550073A (de) |
PL (1) | PL1735533T3 (de) |
PT (1) | PT1735533E (de) |
SI (1) | SI1735533T1 (de) |
WO (1) | WO2005095792A1 (de) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102011001250A1 (de) | 2011-03-14 | 2012-09-20 | Strabag Offshore Wind Gmbh | Vorrichtung und Verfahren für den Übergang zwischen einem Stahlturmabschnitt und einem vorgespannten Betonturmabschnitt |
DE102011085947A1 (de) | 2011-11-08 | 2013-05-08 | Wobben Properties Gmbh | Turmfußsektion einer Windenergieanlage |
DE102007060379C5 (de) * | 2007-12-12 | 2018-11-15 | Senvion Gmbh | Verankerung eines Turms einer Windenergieanlage |
RU197237U1 (ru) * | 2020-02-03 | 2020-04-14 | Николай Валентинович МЕДВЕДЕВ | Фундаментное анкерное крепление башенного крана |
WO2020212237A1 (de) | 2019-04-15 | 2020-10-22 | Wobben Properties Gmbh | Turmsegment und verfahren zum aufbau eines turms |
Families Citing this family (60)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102004017006B4 (de) | 2004-04-02 | 2012-03-29 | Aloys Wobben | Verfahren zum Errichten eines Turmes |
DE102004017008B4 (de) | 2004-04-02 | 2009-10-22 | Aloys Wobben | Verfahren zum Errichten eines Turmes |
EP2390421A3 (de) * | 2005-03-16 | 2012-07-25 | Illinois Tool Works Inc. | Turmfundamentsystem und Verfahren zur Bereitstellung solch eines Systems |
US8051627B2 (en) * | 2006-04-30 | 2011-11-08 | General Electric Company | Tower adapter, method of producing a tower foundation and tower foundation |
ES2326010B2 (es) * | 2006-08-16 | 2011-02-18 | Inneo21, S.L. | Estructura y procedimiento de montaje de torres de hormigon para turbinas eolicas. |
US8661752B2 (en) | 2006-09-21 | 2014-03-04 | Ahmed Phuly | Foundation with slab, pedestal and ribs for columns and towers |
DE102006058668A1 (de) * | 2006-12-13 | 2008-06-19 | Kleinsorge Verbindungstechnik Gmbh | Ankerstange, Verfahren zur Herstellung einer Ankerstange und Windkraftanlage |
WO2009056898A1 (es) | 2007-11-02 | 2009-05-07 | Alejandro Cortina-Cordero | Torre de concreto postensado para generadores eolicos |
JP5198011B2 (ja) * | 2007-08-10 | 2013-05-15 | 前田建設工業株式会社 | タワー基礎 |
US8555600B2 (en) | 2008-12-10 | 2013-10-15 | Cortina Innovations, S.A. De C.V. | Method for mounting in sections an annular tower for wind power generator, heliostatic power generator or chimney composed from three concrete segments or more |
EP2199469B1 (de) * | 2008-12-16 | 2012-06-06 | Vestas Wind Systems A/S | Fundament zum Verankern eines Windturbinenturms mit austauschbaren Ankerschrauben |
US8220214B1 (en) * | 2009-05-02 | 2012-07-17 | Purdy Charles L | Prefabricated weight distribution element |
DE102009019709A1 (de) | 2009-05-05 | 2010-11-11 | Wobben, Aloys | Verfahren zum Errichten eines Turmes und Turm |
US20110027100A1 (en) * | 2009-07-30 | 2011-02-03 | Daniel Francis Cummane | Mobile wind power station |
DE102009049435A1 (de) * | 2009-10-14 | 2011-04-28 | Wobben, Aloys | Verfahren zum Herstellen von Betonfertigteilen und Schalungseinheit zum Herste llen von Betonfertigteilen |
DK2375057T3 (en) | 2010-03-31 | 2016-08-15 | Siemens Ag | wind farms |
US20110131899A1 (en) * | 2010-04-30 | 2011-06-09 | Stefan Voss | Apparatus and method for producing a concrete foundation |
KR20120073154A (ko) * | 2010-08-24 | 2012-07-04 | 미츠비시 쥬고교 가부시키가이샤 | 풍력 발전 장치 및 풍차용 타워 시공 방법 |
FI125153B (fi) * | 2010-09-16 | 2015-06-15 | Peikko Group Oy | Menetelmä ja sovitelma tornimaisen rakenteen kiinnittämiseksi perustukseen |
CN102095052B (zh) * | 2010-11-25 | 2013-06-12 | 华锐风电科技(集团)股份有限公司 | 地脚螺栓锚固系统的安装方法及安装工业设备的方法 |
ES2400902B1 (es) * | 2011-05-25 | 2014-02-18 | Esteyco Energía S.L. | Procedimiento de asentamiento de una torre. |
EP2541059A2 (de) * | 2011-06-28 | 2013-01-02 | Gamesa Innovation & Technology, S.L. | Fundament für Windturbinentürme |
GB2494674B (en) * | 2011-09-15 | 2018-09-05 | Ronald Chambers Peter | A connection formed under water between a wind turbine tower and a wind turbine foundation |
ES2405034B1 (es) | 2011-11-17 | 2014-04-15 | Acciona Windpower, S.A. | Procedimiento y unidad para la fijación de una torre de un aerogenerador a una cimentación y aerogenerador que incorpora dicha unidad |
EP2821565A1 (de) | 2012-02-28 | 2015-01-07 | MS Enertech S.L. | Verbindung zwischen einem windturbinenturm und dessen fundament |
CN103114604B (zh) * | 2012-03-09 | 2015-04-22 | 中国电建集团西北勘测设计研究院有限公司 | 预应力混凝土圆筒型风力发电机组基础 |
KR101358213B1 (ko) * | 2012-07-05 | 2014-02-05 | 삼성중공업 주식회사 | 타워 지지 구조물 및 타워 지지 구조물 건조방법 |
CN102777334A (zh) * | 2012-07-21 | 2012-11-14 | 广东明阳风电产业集团有限公司 | 风力发电机组调平装置 |
CA2886770C (en) * | 2012-10-01 | 2018-02-13 | Valmont Industries, Inc. | Base angle attachment assemblies |
CN102979109B (zh) * | 2012-12-17 | 2015-06-17 | 中国电建集团西北勘测设计研究院有限公司 | 一种装配式预应力混凝土圆筒型柱体基础的设计方法 |
DK2746578T3 (en) * | 2012-12-21 | 2017-02-27 | Siemens Ag | Segmented tower bottom flange and method of mounting |
CN103046575B (zh) * | 2013-01-28 | 2015-07-29 | 中国电建集团西北勘测设计研究院有限公司 | 一种陆上四叶梅型的风机扩展基础结构 |
CA2908510A1 (en) * | 2013-03-29 | 2014-10-02 | Tindall Corporation | Core component and tower assembly for a tower structure |
DE102013211750A1 (de) * | 2013-06-21 | 2014-12-24 | Wobben Properties Gmbh | Windenergieanlage und Windenergieanlagen-Fundament |
DE102013213976A1 (de) * | 2013-07-17 | 2015-01-22 | Wobben Properties Gmbh | Verfahren zum Herstellen eines Fertigbetonteil-Segmentes eines Windenergieanlagen-Turmes |
US9003721B1 (en) | 2013-11-08 | 2015-04-14 | Siemens Aktiengesellschaft | Leveling arrangement for a tower |
US9869300B2 (en) * | 2014-01-16 | 2018-01-16 | Pacadar S.A.U. | Foundation for wind turbine tower and pre-assembly method of wind turbine tower |
KR101687972B1 (ko) * | 2014-11-20 | 2017-01-02 | 대우조선해양 주식회사 | 풍력발전기용 기초구조물 및 그 시공방법 |
DE102015203574A1 (de) * | 2015-02-27 | 2016-09-01 | Wobben Properties Gmbh | Windenergieanlagen-Fundament und Windenergieanlage |
CN104895101B (zh) * | 2015-06-10 | 2016-08-24 | 杭州江润科技有限公司 | 筏板基础高精度整体预埋大直径螺栓群结构的施工方法 |
DE102015216444A1 (de) * | 2015-08-27 | 2017-03-02 | Wobben Properties Gmbh | Windenergieanlage |
CA2997924A1 (en) * | 2015-08-31 | 2017-03-09 | Siemens Gamesa Renewable Energy, Inc. | Equipment tower having a concrete plinth |
US9518402B1 (en) * | 2015-09-04 | 2016-12-13 | Kundel Industries, Inc. | Anchoring system |
DE102015014070A1 (de) | 2015-10-30 | 2017-05-04 | Senvion Gmbh | Windenergieanlage, Lastenverteilungssystem einer Windenergieanlage und Verfahren zum Errichten eines Turms einer Windenergieanlage |
CN105350565B (zh) * | 2015-12-07 | 2017-04-05 | 湖南皓诺工程有限公司 | 一种风电场风机塔架基础修补加固方法 |
KR101888231B1 (ko) * | 2015-12-21 | 2018-09-06 | 고려대학교 산학협력단 | 수직도 오차 보정이 가능한 콘크리트 기초-타워 연결구조 |
ES2833505T3 (es) | 2015-12-21 | 2021-06-15 | Vestas Wind Sys As | Método para formar una cimentación de turbina eólica y sistema relacionado para formar una cimentación de este tipo |
WO2018051427A1 (ja) * | 2016-09-14 | 2018-03-22 | 三菱重工コンプレッサ株式会社 | 支持台、回転機械ユニット、及び回転機械ユニットの製造方法 |
CN106626048A (zh) * | 2016-10-08 | 2017-05-10 | 霍尔果斯新国金新能源科技有限公司 | 风力发电机的塔筒与基础的灌浆模具及灌浆方法 |
US10544559B2 (en) * | 2016-11-02 | 2020-01-28 | Inventus Holdings, Llc | Pier and mat foundation fortification and monitoring system |
CN106702907B (zh) * | 2016-12-19 | 2018-05-01 | 中交路桥建设有限公司 | 一种桥梁护栏底座可调节法兰盘施工方法 |
CN106592660A (zh) * | 2016-12-21 | 2017-04-26 | 神华集团有限责任公司 | 风机基础的修复方法 |
CN107130628A (zh) * | 2017-05-31 | 2017-09-05 | 中国二十冶集团有限公司 | 地脚螺栓预埋用法兰及地脚螺栓预埋的施工方法 |
DE102017125716A1 (de) * | 2017-11-03 | 2019-05-09 | Eno Energy Systems Gmbh | Verfahren zum Errichten eines Turms mit einer mehrteiligen Turmsektion und Teilsektion einer mehrteiligen Turmsektion eines Turms |
US20190257075A1 (en) * | 2018-02-22 | 2019-08-22 | Joseph W. Ball | Anchor bolt assembly and arrangement for concrete foundation designs |
MX2020012349A (es) * | 2018-05-18 | 2021-01-29 | Cetres Holdings Llc | Ancla protuberante para concreto. |
KR102619755B1 (ko) * | 2019-06-14 | 2023-12-29 | 페이코 그룹 오와이 | 조립식 건설 요소를 또 다른 건설 요소에 장착하는 방법 및 연결 배열체 |
CN113187305A (zh) * | 2021-05-26 | 2021-07-30 | 新余学院 | 一种电子信息工程通信塔连接装置 |
US11905924B2 (en) * | 2022-03-03 | 2024-02-20 | Barr Engineering Co. | Spreader box |
CN114962181B (zh) * | 2022-04-02 | 2025-01-28 | 中船海装风电有限公司 | 风电混合塔筒转接环及其上锚板安装方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6050038A (en) * | 1998-09-11 | 2000-04-18 | Fey; James M. | Foundation system for supporting a superstructure |
DE10045735A1 (de) * | 2000-09-15 | 2002-03-28 | Vetter Foerdertechnik Gmbh | Befestigung der Säule eines Säulenschwenkkranes auf einem Betonfundament |
DE10226996A1 (de) * | 2001-10-09 | 2003-04-10 | Aloys Wobben | Verfahren zur Erstellung eines Fundaments, insbesondere für einen Turm einer Windenergieanlage |
Family Cites Families (75)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US962699A (en) * | 1909-01-09 | 1910-06-28 | Unit Construction Co | Concrete construction. |
US1506173A (en) * | 1919-11-17 | 1924-08-26 | Hagen Hans Engelhart | Method of producing concrete poles |
GB606545A (en) | 1946-02-26 | 1948-08-16 | William Hubert James Miller | Improved shuttering for adjustable location of anchor bolts and anchor plates in concrete foundations, walls, floors and like supports |
US2724261A (en) * | 1951-05-24 | 1955-11-22 | Egil M Rensaa | Precast column attaching means |
DE1045735B (de) * | 1957-09-27 | 1958-12-04 | Knorr Bremse Gmbh | Gleitachslager mit durch Tiefstkanten gefuehrtem OElkreislauf |
US3503165A (en) * | 1967-06-12 | 1970-03-31 | Arrowall Corp | Prefabricated light weight panels of cementitious material |
US3645057A (en) * | 1970-10-13 | 1972-02-29 | Seymour M Kaplan | Base for mounting a traffic light pole in rotatable and vertically adjustable relation |
US3829540A (en) * | 1970-12-07 | 1974-08-13 | J Cox | Technique for aligning anchor bolts |
US3713262A (en) * | 1970-12-10 | 1973-01-30 | J Jatcko | Taper lock break-away pole structure |
JPS5312672B2 (de) * | 1972-11-15 | 1978-05-02 | ||
US3834094A (en) * | 1973-09-12 | 1974-09-10 | B Ferguson | Track system wall assembly for houses or the like |
AT347189B (de) * | 1977-04-06 | 1978-12-11 | Voest Ag | Fundamentverankerung fuer schwermaschinen |
JPS6043925B2 (ja) † | 1977-07-15 | 1985-10-01 | 日特建設株式会社 | 法面緑化のための施肥方法 |
JPS5578722A (en) | 1978-12-11 | 1980-06-13 | Mitsubishi Heavy Ind Ltd | Groundwork construction of steel smoke stuck |
US4228627A (en) * | 1979-04-16 | 1980-10-21 | Neill Joseph C O | Reinforced foundation structure |
US4327703A (en) * | 1979-10-09 | 1982-05-04 | Destree Allen L | Method of preparing concrete column for attachment to beam |
US4331314A (en) * | 1980-05-22 | 1982-05-25 | Allis-Chalmers Corporation | Hydraulic pump/turbine discharge ring support anchorage |
US4365929A (en) * | 1981-01-16 | 1982-12-28 | Philip Retz | Vertical wind turbine power generating tower |
US4438607A (en) * | 1982-03-29 | 1984-03-27 | A. O. Smith Harvestore Products, Inc. | Method and apparatus for leveling a storage structure |
JPS5968432A (ja) * | 1982-10-08 | 1984-04-18 | Hitoshi Mori | アンカ−ボルトの埋設方法 |
US4785593A (en) * | 1986-10-27 | 1988-11-22 | Munoz Jr Jose C | Structural building system |
DE3809113A1 (de) † | 1988-03-18 | 1989-09-28 | Mehne Fa Erwin | Verfahren zum aufstellen der stahl-hochbaukonstruktion eines hochregallagers und stahlkonstruktion dafuer |
US5110082A (en) * | 1988-09-21 | 1992-05-05 | Rowan Jr Robert L | Adjustable apparatus for supporting machinery or other load |
US4910930A (en) * | 1988-10-28 | 1990-03-27 | Base Isolation Consultants, Inc. | Seismic isolation structure |
US4887691A (en) * | 1988-11-04 | 1989-12-19 | Rotondo/Penn-Cast | Modular wall construction using posts and panels |
US5505033A (en) * | 1988-12-06 | 1996-04-09 | 501 Hitachi Metals Ltd. | Column base structure and connection arrangement |
DE8910744U1 (de) * | 1989-09-08 | 1991-01-17 | Schmidt, René P., Oberweningen | Dichtungsvorrichtung für Betonfugen |
FR2659685A1 (fr) † | 1990-03-16 | 1991-09-20 | Puglia Emilio | Dispositif pour ameliorer la fixation d'un support et le reglage de sa verticalite sur un massif d'ancrage. |
GB9024500D0 (en) * | 1990-11-10 | 1991-01-02 | Peace Steven J | A vertical axis wind turbine unit capable of being mounted on or to an existing chimney,tower or similar structure |
JPH0739665B2 (ja) * | 1992-04-24 | 1995-05-01 | 茂樹 林 | 擁壁ブロックの基礎構造 |
FR2692611B1 (fr) | 1992-06-17 | 1999-03-05 | Prefatlantique | Platine de fixation pour pylone. |
US5437519A (en) * | 1992-08-26 | 1995-08-01 | Roger Bullivant Of Texas, Inc. | Piles and pile forming methods |
GB2273310A (en) † | 1992-12-10 | 1994-06-15 | Thomas Steel Craik | Improvements relating to buildings |
US5308195A (en) * | 1993-02-12 | 1994-05-03 | The Reinforced Earth Company | Coping construction for a retaining wall |
US5379563A (en) * | 1993-09-13 | 1995-01-10 | Eastman Chemical Company | Anchoring assembly |
JP3362809B2 (ja) * | 1994-05-13 | 2003-01-07 | 積水ハウス株式会社 | 柱脚の支持装置 |
US5586417A (en) † | 1994-11-23 | 1996-12-24 | Henderson; Allan P. | Tensionless pier foundation |
JP3002107B2 (ja) * | 1994-12-19 | 2000-01-24 | 勤伍 内藤 | 柱脚構造及び柱脚工法 |
JP3622119B2 (ja) * | 1995-01-09 | 2005-02-23 | 日本鋳造株式会社 | 基礎の配筋方法 |
JP3458179B2 (ja) | 1995-02-03 | 2003-10-20 | 日本鋳造株式会社 | 柱脚部の固定構造 |
JPH09158215A (ja) * | 1995-12-07 | 1997-06-17 | Toshiba Eng & Constr Co Ltd | 大型機械の据付工法 |
US5707180A (en) * | 1995-12-26 | 1998-01-13 | Vickars Developments Co. Ltd. | Method and apparatus for forming piles in-situ |
US6264402B1 (en) * | 1995-12-26 | 2001-07-24 | Vickars Developments Co. Ltd. | Method and apparatus for forming piles in place |
JP3752310B2 (ja) * | 1996-05-20 | 2006-03-08 | 住友林業株式会社 | アンカーボルトの位置決め具及び方法 |
JPH09302675A (ja) * | 1996-05-20 | 1997-11-25 | Sumitomo Forestry Co Ltd | アンカーボルトの据え付け方法及び金具 |
JPH10121576A (ja) | 1996-10-16 | 1998-05-12 | Tomoe Corp | 柱脚固定構造 |
US5953864A (en) * | 1997-04-23 | 1999-09-21 | Rapid Wall Systems | Prefabricated modular concrete foundation wall systems and methods of constructing prefabricated modular concrete foundation wall systems |
EP1153172A1 (de) | 1999-01-22 | 2001-11-14 | NEG Micon A/S | Verfahren und anordnung für das giessen eines fundamentes eines turmes |
US6705058B1 (en) * | 1999-02-12 | 2004-03-16 | Newmark International Inc. | Multiple-part pole |
JP3381031B2 (ja) * | 1999-03-31 | 2003-02-24 | 日本鋳造株式会社 | 鋼管柱用ベースプレートの設計方法及び鋼管柱用ベースプレート |
JP2000034733A (ja) * | 1999-06-25 | 2000-02-02 | Okabe Co Ltd | 基礎の構造 |
IL134724A0 (en) * | 2000-02-24 | 2001-04-30 | Giltek Telecomm Ltd | Foundation for a tower and a method for its deployment on site |
DE10009072A1 (de) * | 2000-02-25 | 2001-08-30 | Sms Demag Ag | Montageverfahren zum Verankern einer Arbeitsmaschine auf einem Fundament |
US6503024B2 (en) * | 2000-03-06 | 2003-01-07 | Stan Rupiper | Concrete foundation pierhead and method of lifting a foundation using a jack assembly |
US6318034B1 (en) * | 2000-03-08 | 2001-11-20 | Tindall Corporation | Elevated storage tank |
DK174190B1 (da) * | 2000-04-12 | 2002-09-09 | Spaencom As | Fundament til vindmølle samt fremgangsmåde til montering heraf |
WO2002027105A1 (en) | 2000-09-27 | 2002-04-04 | Allan P Henderson | Perimeter weighted foundation for wind turbines and the like |
US6470645B1 (en) * | 2000-11-09 | 2002-10-29 | Beaird Industries, Inc. | Method for making and erecting a wind tower |
US6443656B1 (en) * | 2001-03-30 | 2002-09-03 | Abt, Inc. | Trench forming assembly having removable pin anchoring mechanism |
JP2003293938A (ja) | 2002-04-02 | 2003-10-15 | Tetra Co Ltd | 風力発電装置の施工方法 |
US20030196393A1 (en) * | 2002-04-22 | 2003-10-23 | Bowman Joseph M. | Weldless pole mounting structure and method of providing same |
DE10238033A1 (de) | 2002-08-20 | 2004-03-04 | Alpine Project Technology Gmbh | Betonfundament für einen Träger |
US7124547B2 (en) * | 2002-08-26 | 2006-10-24 | Bravinski Leonid G | 3-D construction modules |
US7222464B2 (en) * | 2002-12-18 | 2007-05-29 | Suehiro-System Co., Ltd. | Anchor bolt and installing method thereof |
FI20022235L (fi) * | 2002-12-19 | 2002-12-19 | Rautaruukki Oyj | Poikittaiskuormitetun tornin perustus |
US7533505B2 (en) * | 2003-01-06 | 2009-05-19 | Henderson Allan P | Pile anchor foundation |
US6808350B1 (en) * | 2003-01-27 | 2004-10-26 | Norman L. Tooman | Anchor bolt cap and method of use |
US7025176B1 (en) * | 2003-06-09 | 2006-04-11 | Tooman Norman L | Bolt greaser unit |
ATE427450T1 (de) * | 2003-06-27 | 2009-04-15 | Alstom Technology Ltd | Befestigungsvorrichtung eines maschinenfusses einer maschine und verfahren zur befestigung desselben |
ES2280852T3 (es) * | 2003-08-09 | 2007-09-16 | General Electric Company | Cimiento para torre, en particular para una turbina de energia eolica. |
NL1024581C2 (nl) * | 2003-10-21 | 2005-04-22 | Gmb Beton En Ind Noord West B | Windmolenfundatie. |
DE102004017008B4 (de) * | 2004-04-02 | 2009-10-22 | Aloys Wobben | Verfahren zum Errichten eines Turmes |
DE102004017006B4 (de) | 2004-04-02 | 2012-03-29 | Aloys Wobben | Verfahren zum Errichten eines Turmes |
US8801370B2 (en) * | 2006-10-12 | 2014-08-12 | General Electric Company | Turbine case impingement cooling for heavy duty gas turbines |
DE102007060379C5 (de) | 2007-12-12 | 2018-11-15 | Senvion Gmbh | Verankerung eines Turms einer Windenergieanlage |
-
2004
- 2004-04-02 DE DE102004017006A patent/DE102004017006B4/de not_active Revoked
-
2005
- 2005-04-01 AR ARP050101291A patent/AR048458A1/es not_active Application Discontinuation
- 2005-04-04 JP JP2007503310A patent/JP4726891B2/ja not_active Expired - Fee Related
- 2005-04-04 WO PCT/EP2005/003499 patent/WO2005095792A1/de active Application Filing
- 2005-04-04 PL PL05716518T patent/PL1735533T3/pl unknown
- 2005-04-04 AT AT05716518T patent/ATE521804T1/de active
- 2005-04-04 CA CA2561431A patent/CA2561431C/en not_active Expired - Fee Related
- 2005-04-04 AU AU2005229135A patent/AU2005229135B2/en not_active Ceased
- 2005-04-04 SI SI200531359T patent/SI1735533T1/sl unknown
- 2005-04-04 BR BRPI0509286-8A patent/BRPI0509286B1/pt active IP Right Grant
- 2005-04-04 NZ NZ550073A patent/NZ550073A/en not_active IP Right Cessation
- 2005-04-04 ES ES05716518T patent/ES2369669T5/es not_active Expired - Lifetime
- 2005-04-04 CN CN2005800106378A patent/CN1965165B/zh not_active Expired - Lifetime
- 2005-04-04 KR KR1020067021572A patent/KR20060130755A/ko active Search and Examination
- 2005-04-04 EP EP05716518.5A patent/EP1735533B2/de not_active Expired - Lifetime
- 2005-04-04 DK DK05716518.5T patent/DK1735533T4/da active
- 2005-04-04 US US11/547,387 patent/US9206617B2/en active Active
- 2005-04-04 PT PT05716518T patent/PT1735533E/pt unknown
-
2010
- 2010-02-09 JP JP2010026377A patent/JP2010159625A/ja active Pending
-
2011
- 2011-10-11 CY CY20111100971T patent/CY1111928T1/el unknown
-
2014
- 2014-12-10 US US14/566,433 patent/US20150089898A1/en not_active Abandoned
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6050038A (en) * | 1998-09-11 | 2000-04-18 | Fey; James M. | Foundation system for supporting a superstructure |
DE10045735A1 (de) * | 2000-09-15 | 2002-03-28 | Vetter Foerdertechnik Gmbh | Befestigung der Säule eines Säulenschwenkkranes auf einem Betonfundament |
DE10226996A1 (de) * | 2001-10-09 | 2003-04-10 | Aloys Wobben | Verfahren zur Erstellung eines Fundaments, insbesondere für einen Turm einer Windenergieanlage |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102007060379C5 (de) * | 2007-12-12 | 2018-11-15 | Senvion Gmbh | Verankerung eines Turms einer Windenergieanlage |
DE102011001250A1 (de) | 2011-03-14 | 2012-09-20 | Strabag Offshore Wind Gmbh | Vorrichtung und Verfahren für den Übergang zwischen einem Stahlturmabschnitt und einem vorgespannten Betonturmabschnitt |
WO2012122976A2 (de) | 2011-03-14 | 2012-09-20 | Ed. Züblin Ag | Vorrichtung und verfahren für den übergang zwischen einem stahlturmabschnitt und einem vorgespannten betonturmabschnitt |
WO2012122976A3 (de) * | 2011-03-14 | 2012-11-15 | Ed. Züblin Ag | Vorrichtung und verfahren für den übergang zwischen einem stahlturmabschnitt und einem vorgespannten betonturmabschnitt |
DE102011085947A1 (de) | 2011-11-08 | 2013-05-08 | Wobben Properties Gmbh | Turmfußsektion einer Windenergieanlage |
WO2013068403A1 (de) | 2011-11-08 | 2013-05-16 | Wobben Properties Gmbh | Fundament einer windenergieanlage |
US9322396B2 (en) | 2011-11-08 | 2016-04-26 | Wobben Properties Gmbh | Foundation for a wind turbine |
RU2611086C2 (ru) * | 2011-11-08 | 2017-02-21 | Воббен Пропертиз Гмбх | Секция башенного основания ветроэнергетической установки |
WO2020212237A1 (de) | 2019-04-15 | 2020-10-22 | Wobben Properties Gmbh | Turmsegment und verfahren zum aufbau eines turms |
RU197237U1 (ru) * | 2020-02-03 | 2020-04-14 | Николай Валентинович МЕДВЕДЕВ | Фундаментное анкерное крепление башенного крана |
Also Published As
Publication number | Publication date |
---|---|
US20080302038A1 (en) | 2008-12-11 |
CA2561431C (en) | 2010-11-30 |
JP2010159625A (ja) | 2010-07-22 |
BRPI0509286B1 (pt) | 2018-06-05 |
PT1735533E (pt) | 2011-10-18 |
DK1735533T3 (da) | 2011-11-21 |
JP4726891B2 (ja) | 2011-07-20 |
EP1735533B2 (de) | 2020-03-25 |
KR20060130755A (ko) | 2006-12-19 |
NZ550073A (en) | 2011-07-29 |
AU2005229135A1 (en) | 2005-10-13 |
CN1965165B (zh) | 2011-08-10 |
WO2005095792A1 (de) | 2005-10-13 |
ATE521804T1 (de) | 2011-09-15 |
US9206617B2 (en) | 2015-12-08 |
BRPI0509286A (pt) | 2007-09-18 |
CN1965165A (zh) | 2007-05-16 |
ES2369669T5 (es) | 2020-11-16 |
AU2005229135B2 (en) | 2010-12-16 |
EP1735533A1 (de) | 2006-12-27 |
CY1111928T1 (el) | 2015-11-04 |
US20150089898A1 (en) | 2015-04-02 |
AR048458A1 (es) | 2006-04-26 |
CA2561431A1 (en) | 2005-10-13 |
SI1735533T1 (sl) | 2011-10-28 |
PL1735533T3 (pl) | 2012-04-30 |
EP1735533B1 (de) | 2011-08-24 |
ES2369669T3 (es) | 2011-12-02 |
DE102004017006B4 (de) | 2012-03-29 |
JP2007535634A (ja) | 2007-12-06 |
DK1735533T4 (da) | 2020-06-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE102004017006B4 (de) | Verfahren zum Errichten eines Turmes | |
DE102004017008B4 (de) | Verfahren zum Errichten eines Turmes | |
EP3662122B1 (de) | Fundament für ein bauwerk | |
DE102008010660B3 (de) | Errichtung einer Windenergieanlage | |
DE102007060379C5 (de) | Verankerung eines Turms einer Windenergieanlage | |
WO2014067884A1 (de) | Verfahren zur herstellung eines turmbauwerks aus stahlbeton | |
DE102019217692A1 (de) | Fundament für einen Turm einer Windkraftanlage | |
EP2715013B1 (de) | Verbindungsanordnung und verfahren zur herstellung einer durchstanzsicherung einer nachträglichen querkraftverstärkung bzw. eines bewehrungsanschlusses | |
DE69108246T2 (de) | Verfahren zur errichtung einer gründungsstruktur für eine gebäude-unterkonstruktion. | |
EP3607147A1 (de) | Offshore bauwerk | |
EP0872607B1 (de) | Bauelement, daraus hergestellte Schwergewichtsmauer und Verfahren zur Herstellung der Schwergewichtsmauer | |
EP2893139B1 (de) | Anordnung zur hochfesten verankerung eines einen spannstab aufweisenden spannglieds in einem bauteil sowie verfahren zur herstellung einer solchen verankerung | |
DE102007057291A1 (de) | Verfahren zur Herstellung einer Eckverbindung für Beton-Fertigteile | |
EP3696320B1 (de) | Brückenwiderlager mit verbindung zwischen widerlagerwandbewehrung und flügelwandelement | |
DE10045735A1 (de) | Befestigung der Säule eines Säulenschwenkkranes auf einem Betonfundament | |
EP4248039A1 (de) | Fundament für einen turm für eine windkraftanlage | |
DE3442912A1 (de) | Verfahren zur herstellung eines koecherfundamentes | |
EP2400063A1 (de) | Gründungssystem | |
AT506242B1 (de) | Plattenelement für ein bauwerklager | |
DE202010011624U1 (de) | Gründungsstruktur | |
DE102010040332A1 (de) | Gründungselement | |
DE2402593A1 (de) | Verfahren zum eintreiben eines aus beton bestehenden fertigpfahles in den grund sowie dazu geeigneter fertigpfahl und pfahlschuh | |
DE202020106971U1 (de) | Fundament für eine Windkraftanlage | |
DE102010035035A1 (de) | Gründung für eine Offshore-Windenergieanlage | |
DE102014006581A1 (de) | Vorrichtung, Verfahren und System zur erschütterungs- und setzungsfreien Gründung und Befestigung von Bauteilen im Baugrund |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OP8 | Request for examination as to paragraph 44 patent law | ||
R019 | Grant decision by federal patent court | ||
R026 | Opposition filed against patent | ||
R026 | Opposition filed against patent | ||
R026 | Opposition filed against patent | ||
R026 | Opposition filed against patent |
Effective date: 20120612 |
|
R006 | Appeal filed | ||
R008 | Case pending at federal patent court | ||
R010 | Appeal proceedings settled by withdrawal of appeal(s) or in some other way | ||
R037 | Decision of examining division or of federal patent court revoking patent now final |