DE10008693A1 - Concrete reinforcing steel method/machine for concrete steel rolling mill produces round strips containing smooth/ribbed connected bars, straightened, slit, and cut-to-length - Google Patents
Concrete reinforcing steel method/machine for concrete steel rolling mill produces round strips containing smooth/ribbed connected bars, straightened, slit, and cut-to-lengthInfo
- Publication number
- DE10008693A1 DE10008693A1 DE2000108693 DE10008693A DE10008693A1 DE 10008693 A1 DE10008693 A1 DE 10008693A1 DE 2000108693 DE2000108693 DE 2000108693 DE 10008693 A DE10008693 A DE 10008693A DE 10008693 A1 DE10008693 A1 DE 10008693A1
- Authority
- DE
- Germany
- Prior art keywords
- round
- cross
- strip
- slitting
- straightening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
- 229910001294 Reinforcing steel Inorganic materials 0.000 title 1
- 229910000831 Steel Inorganic materials 0.000 title 1
- 238000000034 method Methods 0.000 title 1
- 238000005096 rolling process Methods 0.000 title 1
- 239000010959 steel Substances 0.000 title 1
- 238000001816 cooling Methods 0.000 abstract 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract 1
- 238000004804 winding Methods 0.000 abstract 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/16—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling wire rods, bars, merchant bars, rounds wire or material of like small cross-section
- B21B1/163—Rolling or cold-forming of concrete reinforcement bars or wire ; Rolls therefor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/46—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21F—WORKING OR PROCESSING OF METAL WIRE
- B21F1/00—Bending wire other than coiling; Straightening wire
- B21F1/02—Straightening
- B21F1/026—Straightening and cutting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/16—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling wire rods, bars, merchant bars, rounds wire or material of like small cross-section
- B21B1/18—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling wire rods, bars, merchant bars, rounds wire or material of like small cross-section in a continuous process
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B13/00—Metal-rolling stands, i.e. an assembly composed of a stand frame, rolls, and accessories
- B21B2013/006—Multiple strand rolling mills; Mill stands with multiple caliber rolls
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B15/00—Arrangements for performing additional metal-working operations specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B15/0007—Cutting or shearing the product
- B21B2015/0014—Cutting or shearing the product transversely to the rolling direction
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B15/00—Arrangements for performing additional metal-working operations specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B15/0007—Cutting or shearing the product
- B21B2015/0021—Cutting or shearing the product in the rolling direction
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B15/00—Arrangements for performing additional metal-working operations specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B2015/0057—Coiling the rolled product
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B15/00—Arrangements for performing additional metal-working operations specially combined with or arranged in, or specially adapted for use in connection with, metal-rolling mills
- B21B2015/0071—Levelling the rolled product
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Metal Rolling (AREA)
Abstract
Description
Fig. 2.1 und 2.2 zeigen Betonstahlerzeugungsanlagen entsprechend heutigem Stand der Technik bestehend aus Stahlwerk, Knüppelstranggußanlage und Stabstahl/Drahtwalz werk. Fig. 2.1 and 2.2 show reinforcing steel production plants according to the current state of the art consisting of steel mill, billet continuous casting plant and bar steel / wire rolling mill.
Die Gesamtanlage besteht aus folgenden Anlagenteilen:
The overall system consists of the following system components:
- 1. Stahlwerk1. Steel mill
- 2. Mehradrige kontinuierliche Stranggießanlage mit oszillierender Kokille zur Erzeugung von Quadrat-, Rechteck- oder Rundknüppeln in der Regel in Abmessunge von flächen gleichen Querschnitten entsprechend einem Quadrat von 100 bis 150 mm Kantenlänge und einer Länge von ca. 10-12 m.2. Multi-core continuous caster with oscillating mold for production of square, rectangular or round billets usually in the dimensions of surfaces same cross-sections corresponding to a square of 100 to 150 mm edge length and a length of about 10-12 m.
- 3. Querteilanlage zum Unterteilen der endlosen Stränge mit jeweils einer Schere je Ader.3. Cross-cutting system for dividing the endless strands with one pair of scissors per wire.
- 4. Quertransport/Kühlbett mit Zulaufrollgang zum Walzwerksofen4. Cross transport / cooling bed with feed roller table to the rolling mill furnace
- 5. Walzwerksofen.5. Rolling mill furnace.
-
6. Walzwerk mit
- 1. 6.1 Entzunderung
- 2. 6.2 Vorstraße mit 6 Gerüsten, Gerüst 1-6, in H oder H-V-Anordnung und einer Schere
- 3. 6.3 Zwischenstraße mit 6 Gerüsten, Gerüst 7-12, in H oder H-V-Anordnung und einer Schere.
- 4. 6.4 Vorfertigstraße mit 4H- und 2V-Gerüsten, Gerüst 13-18, mit maximal 4- fach Slitvorrichtung hinter Gerüst 18.
- 5. 6.5 Fertigstraße - maximal 4 adrig mit jeweils 1H- und 1V-Gerüst für einen Oval- und Rundstich
- 6. 6.6 Wasser-Luft-Kühlstrecke, jeweils eine je Ader, zur thermischen Behandlung z. B. ähnlich Tempcore, Thermex oder ähnlichen Wärmebehandlungsver fahren.
- 7. 6.7 Kühlbettauflauf mit jeweils einer Schere, Bremstreiber und Klapprinnenpaar je Ader zum Abbremsen der auf Kühlbettlänge geteilten Stäbe bei hohen Auf laufgeschwindigkeiten von ca. 30 m/s., wobei die Kühlbettlänge ein Viel faches der Verkaufslänge der Stäbe ist.
- 8. 6.8 Kühlbett als Quertransport z. B. Rechenkühlbett zum gleichzeitigen Abkühlen und Vorrichten der wärmebehandelten Stäbe in Kühlbettlängen auf Kalt scherentemperatur.
- 9. 6.9 Querteilanlage z. B. Kaltschere zur Unterteilen von Stäben mit Kühlbett länge in Lagen gesammelt auf Verkaufslänge.
- 10. 6.10 Quertransport der Stäbe mit Verkaufslänge zur Bündel- und Bindeanlage zum Sammeln von Stäben in Lagen zu Bündeln und zum Binden der Bündel.
- 1. 6.1 Descaling
- 2. 6.2 Rough mill with 6 stands, stands 1-6 , in H or HV arrangement and a pair of scissors
- 3. 6.3 Intermediate line with 6 scaffolding, scaffolding 7-12 , in H or HV arrangement and scissors.
- 4. 6.4 Prefabrication mill with 4H and 2V stands, stand 13-18 , with a maximum of 4 slit devices behind stand 18 .
- 5. 6.5 finishing train - maximum of 4 cores, each with 1H and 1V framework for an oval and circular stitch
- 6. 6.6 water-air cooling section, one per wire, for thermal treatment z. B. drive similar to Tempcore, Thermex or similar heat treatment.
- 7. 6.7 Cooling bed casserole with scissors, brake driver and pair of folding troughs per wire for braking the bars divided on the cooling bed length at high running speeds of approx. 30 m / s., The cooling bed length being a multiple of the sales length of the bars.
- 8. 6.8 cooling bed as cross transport z. B. rake cooling bed for simultaneous cooling and preparation of the heat-treated bars in cooling bed lengths to cold shear temperature.
- 9. 6.9 cross-cutting system z. B. Cold scissors for dividing bars with cooling bed length in layers collected on sales length.
- 10. 6.10 Transverse transport of the rods with sales length to the bundle and binding system for collecting rods in layers into bundles and for binding the bundles.
Das Herstellungsverfahren und die damit verbundenen Anlagen und Maschinen ent
wickelten sich aus der ein- und mehradrigen Herstellung von Stabstahl oder Draht
durch Walzen, wobei zur Erhöhung der Produktion für Betonstahl folgende Maß
nahmen durchgeführt wurden:
The manufacturing process and the associated systems and machines developed from the single and multi-core production of steel bars or wire by rolling, whereby the following measures were taken to increase the production for reinforcing steel:
- 1. Reversier und halbkontinuierliche Walzwerke entwickelten sich zu vollkonti nuierlichen Walzwerken1. Reversing and semi-continuous rolling mills developed into full cont nuclear rolling mills
- 2. Endwalzgeschwindigkeiten wurden erhöht bis zu einer Grenze, die mit der Konstruktion von Bremssystemen der Stäbe im Kühlbettauflaufrollgang mit Bremsschiebern oder maximal beherrschbaren Auslaufgeschwindigkeit aus dem Drahtbloch für Draht in Coils beim Durchlauf des Drahtes durch Führungen gegeben war.2. Final rolling speeds were increased up to a limit with that Construction of brake systems of the bars in the cooling bed roller table with Brake sliders or maximum controllable outlet speed the wire block for wire in coils as the wire passes through Guided tours were given.
- 3. Endwalzgeschwindigkeiten wurden weiter erhöht durch Entwicklung neuer Bremssysteme mit Bremstreibern und Klapprinnen im Kühlbettauflauf zur Er höhung der Stabaulaufgeschwindigkeit auf ca. 30 m/s für 8 mm ∅ Beton rippenstahl oder mehr als 120 m/sec aus dem Drahtblock für Coils durch Entwicklung geeigneter Führungs- und Wasserkühllinien und Windungsleger. Weitere Erhöhung der Auslaufgeschwindigkeit aus dem letzten Walzgerüst scheitern an der Betriebssicherheit, da die Walzstäbe mit hohen Laufge schwingkeiten durch Führungen zum Ausbrechen beim Durchlauf neigen.3. Final rolling speeds were further increased by developing new ones Braking systems with brake drivers and folding channels in the cooling bed overrun for the Er increase of the stabilization running speed to approx. 30 m / s for 8 mm ∅ concrete rib steel or more than 120 m / sec from the wire block for coils Development of suitable guide and water cooling lines and winding layers. Further increase in the outlet speed from the last roll stand fail due to operational safety, since the roller bars with high running edges vibrations through guides tend to break out during passage.
- 4. Erhöhung der Produktion durch Slitten (Längsteilen) nach Gerüst 18 auf 2, 3 oder 4 Adern durch Erhöhung des Summenmetergewichtes des aus Gerüst 18 auslaufenden Querschnitts gegenüber einadrigem Fertigwalzen bei Beibe haltung der Austrittsgeschwindigkeit des Walzstabes. Durch Slitten wird auch der Streckgrad vom Anstichquerschnitt bis zum Fertigquerschnitt und damit die Anzahl notwendiger Gerüste gegenüber 1-adriger Walzung bei gleichem Anstichquerschnitt reduziert4. Increase in production by slides (longitudinal parts) according to stand 18 on 2, 3 or 4 cores by increasing the total weight per meter of the cross-section emerging from stand 18 compared to single-core finish rolling while maintaining the exit speed of the rolling rod. Slides also reduce the degree of stretching from the tapping cross-section to the finished cross-section and thus the number of stands required compared to 1-wire rolling with the same tapping cross-section
- 1. Das Längsteilen (Slitten) erfolgt im warmen Zustand bei gleichzeitig hoher Laufgeschwindigkeit der Stäbe und der Auflauf der Einzellstäbe auf das Kühlbett erfolgt ebenfalls mit hohen Geschwindigkeiten von ca. 30 m/s. Durch Manipulationen der Stäbe bei hohen Längstransport geschwindigkeiten wie z. B. Slitten, Bremsen und Übergeben der Stäbe auf den Quertransport kommt es zu häufigen Störungen, da die hohen Geschwindigkeiten technische nicht beherrscht sind und zum Aus brechen der Stäbe führen. Außerdem werden die hierfür notwendigen Maschinen kompliziert und damit teuer und störanfällig.1. The slitting takes place in the warm state at the same time high running speed of the bars and the run-up of the single cell bars the cooling bed also takes place at high speeds of approx. 30 m / s. By manipulating the bars during high longitudinal transport speeds such as B. sledging, braking and handing over the bars There are frequent interferences on the cross transport because of the high Speeds are not mastered technically and to the end break the rods. In addition, the necessary for this Machines are complicated and therefore expensive and prone to failure.
- 2. Das Auswalzen aus einem Knüppel mit großem Anstichquerschnitt, des viel größer als der metallurgisch notwendige Anstichqerschnitt ist, führt zu einer hohen Anzahl von Walzstichen und damit bei vollkontinuierli chen Walzwerken zu einer hohen Anzahl von Walzgerüsten und damit unnötig hohen Investitions- und Betriebskosten, die außerdem durch sytembedingte hohe Geschwindigkeiten der Walzstäbe noch weiter erhöht werden.2. The rolling out of a billet with a large cross-section, the is much larger than the piercing cross section required for metallurgy to a high number of roll passes and thus with fully continuous Chen rolling mills to a high number of rolling stands and thus unnecessarily high investment and operating costs, which also through system-related high speeds of the rolling rods even further increase.
Fig. 3.1 und 3.2 zeigen eine erfindungsgemäße Änderung des im bekannten Walzprozesses auf einem konventionellen Walzwerk wie in Fig. 2.2 behandelten Materials in mehreren Erzeugungsstufen. Aus einem Anstichquerschnitt z. B. Quadrat wird in mehreren vornehmlich Horizotalgerüsten ein Rechteckbandquerschnitt vor den beiden Profilierstichen ebenfalls in 2 Horizontalgerüsten zunächst das Ovalband und dann das Rundband mit mehreren nebeneinander liegenden und durch Längsrippen miteinander verbundenen Rundadern mit Querrippen oder glatter Oberfläche gewalzt, wobei das Rundband aus beliebig vielen Adern besteht. Das Rundband kann eine Wasserkühl- und Luftausgleichsstrecke durchlaufen bevor es ohne Längsteilung (Slitten) auf Kühlbettlänge im Durchlauf geschnitten wird. Die Kühlbettlänge ist ein Vielfaches der Verkaufslänge. Fig. 3.1 and 3.2 show a change according to the invention in the known rolling process on a conventional rolling mill as shown in Fig. 2.2 treated material in several production steps. From a tapping cross section z. B. Square, in several primarily horizontal frames, a rectangular strip cross-section in front of the two profiling stitches is also rolled in 2 horizontal stands, first the oval strip and then the round strip with several circular cores lying next to one another and connected by longitudinal ribs with transverse ribs or a smooth surface, the round strip consisting of any number of cores . The round belt can run through a water cooling and air equalization section before it is cut to length in the cooling bed without slitting. The cooling bed length is a multiple of the sales length.
Das Rundband mit Kühlbettlänge wird im Kühlbettauflauf abgebremst und auf das Kühlbett abgelegt, wo es zum weiteren Abkühlen und Vorrichten quertransportiert wird.The round belt with cooling bed length is braked in the cooling bed casserole and onto the Cooling bed placed where it transports for further cooling and preparation becomes.
Wenn das Rundband die Richttemperatur erreicht hat, läuft das Rundband in eine mehradrige Richtmaschine, danach in eine Längsteilanlage (Slitten) und danach zu einer Querteilschere, so daß nach diesen 3 Verfahrensschritten einzelne gerade Stäbe mit Längsrippen und Querrippen oder glatter Oberfläche in Verkaufslängen vorliegen.When the round belt has reached the target temperature, the round belt runs into one Multi-core straightening machine, then in a slitting line and then closed a pair of cross-cut scissors, so that after these 3 process steps individual straight Rods with longitudinal ribs and transverse ribs or smooth surface in sales lengths available.
Die einzelnen Stäbe werden gesammelt, gebündelt und versandbereit gemacht.The individual sticks are collected, bundled and made ready for dispatch.
Fig. 4 zeigt eine andere erfindungsgemäße Betonstahlerzeugungsanlage. Fig. 4 shows another reinforcing steel production plant according to the invention.
Im Gegensatz zum heutigen Stand der Technik werden folgende Prinzipien
angewendet:
In contrast to the current state of the art, the following principles are applied:
- 1. Endabmessungsnahes Gießen mit hohen Gießgeschwindigkeiten zum einadrigen Endlosgießwalzen mit glattem rechteckigem oder ovalvorpro filierten Bandgießquerschnitt.1. Near-dimensional casting with high casting speeds for single core continuous casting rolls with smooth rectangular or oval prepro filleted strip casting cross section.
-
2. Minimierung der Walzarbeit und Anzahl der Walzgerüste auf ca. 2 oder 3, da
nur eine Profilierung vom Rechteckflachband oder vorn Ovalband vorge
nommen wird. Nach der Profilierung liegt ein Profilband mit einer großen
Anzahl an den Längsrippen zusammenhängenden Einzelrundprofilen vor.
Dieses Rundprofilband besitzt ein hohes Metergewicht, weshalb schon kleine Auslaufgeschwindigkeiten zu hohen Produktionen führen. Kleine Auslauf geschwindigkeiten erhöhen die Betriebssicherheit und verringern die Investitions- und Betriebskosten.
Das Profilband wird thermisch im Durchlauf bei niedrigen Geschwindigkeiten durch gezieltes Oberflächenhärten und Anlassen sowie Kühlen auf Richttemperatur behandelt und mit Richtemperaturen nach der gewünschten Wärmebehandlung entweder einer Richt- und Längsteilanlage oder nur einer Querteilanlage und Haspelanlage ohne Längsteilen zugeführt. Hierbei entstehen Schwerbunde mit gerippten oder glattem Rundband, die auf Betonstahlweiterverarbeitungsanlagen (Fig. 5) abgehaspelt, gerichtet, längsgeteilt (slitting), auf Fertiglängen abgelängt werden, um z. B. zu Betonstahlmatten geschweißt zu werden. Das Abhaspeln, Richten, Längs- und Querteilen kann "inline" im Walzwerk oder "offline" in einer Anlage z. B. in einer Betohstahlmattenherstellungs anlage erfolgen.
Erst jetzt, nachdem das Profilband wärmebehandelt ist, wird dieses längs geteilt.
Auch diese Anlage kann wie die unter Fig. 3.1 und 3.2 gezeigten Anlagen ein Kühlbett und die hier gezeigten zugehörigen Anlagenteile aufweisen. Die Längsteilung erfolgt im Bereich der Längsrippe des Rippenstahls. Betonstahl kann nach Fig. 6 ebenfalls nach dem gleichen Prinzip des erfidungs gemäßen Walzens von Rundbändern auf einer Warmbandstraße heutiger Aus führung erzeugt werden, wobei die letzten beiden Gerüste der Warmbandstraße die Funktion der Gerüste im Abschnitt 2 und 3 in Fig. 4.1 übernehmen. Der weitere Prozeßablauf kann auf den bekannten Anlagenteilen einer Warmbandstraße erfolgen.2. Minimization of the rolling work and number of roll stands to approx. 2 or 3, since only profiling is carried out by the rectangular flat strip or the oval strip in front. After profiling, there is a profile strip with a large number of individual round profiles connected to the longitudinal ribs.
This round profile belt has a high weight per meter, which is why even low outlet speeds lead to high productions. Small outlet speeds increase operational safety and reduce investment and operating costs.
The profile strip is thermally treated in a continuous process at low speeds by targeted surface hardening and tempering as well as cooling to the straightening temperature and fed with straightening temperatures after the desired heat treatment either to a straightening and slitting line or only to a cross-cutting line and coiler without slitting. This creates heavy bundles with ribbed or smooth round belt, which are reeled off on rebar processing plants ( Fig. 5), straightened, slit, cut to length to z. B. to be welded to reinforcing steel mesh. The reeling, straightening, longitudinal and transverse parts can "inline" in the rolling mill or "offline" in a system z. B. in a rebar mesh plant.
Now that the profile tape has been heat-treated, it is divided lengthways.
This system, like the systems shown in FIGS . 3.1 and 3.2, can also have a cooling bed and the associated system parts shown here. The longitudinal division takes place in the area of the longitudinal rib of the rib steel. Reinforcing steel can also be produced according to FIG. 6 according to the same principle of the rolling of round strips on a hot strip mill of today's design, the last two stands of the hot strip mill taking over the function of the stands in sections 2 and 3 in FIG. 4.1. The rest of the process can take place on the known parts of a hot strip mill.
11
Anstichquerschnitt
Tapping cross section
22
Sandquerschnitt
Sand cross section
33rd
Ovalband
Oval band
44
Rundband
Walzwerk
Wasserkühl- und Ausgleichsstrecke
Kühlbettschere
Kühlbett
Rollenrichtmaschine
Längsteilanlage
Querteilschere
Stabsammel- und bündelvorrichtung
Fertigbearbeitungslinie
Round belt
Rolling mill
Water cooling and compensation section
Cooling bed shears
Cooling bed
Roller straightener
Slitting line
Cross cut shears
Rod collecting and bundling device
Finishing line
11
Flachband
Flat ribbon
22
Ovalband
Oval band
33rd
Rundband
Walzwerksofen
Knüppelschweißmaschine
Entzunderung
Vorgerüstgruppe
Querteilschere
Zwischengerüstgruppe
Querteilschere
Fertiggerüstgruppe
Wasserkühl- und Ausgleichsstrecke
Kühlbettschere
Kühlbett
Wie Round belt
Rolling mill furnace
Billet welding machine
Descaling
Roughing stand group
Cross cut shears
Intermediate scaffold group
Cross cut shears
Finishing stand group
Water cooling and compensation section
Cooling bed shears
Cooling bed
How
Fig.Fig.
3.1 Position 5-9
3.1 Position 5-9
A Flachband gegossen
B Ovalband gewalzt
C Rundband gewalzt
D Bund aus Rundband
Kontinuierliche Stranggießanlage
Profilierwalzgerüst 1
Profilierwalzgerüst 2
Wasserkühl- und Ausgleichsstrecke
Richtanlage
Querteilschere
Haspelanlage
A flat ribbon cast
B Rolled oval band
C Rolled round strip
D Round band waistband
Continuous caster
Roll forming stand 1
Roll forming stand 2
Water cooling and compensation section
Straightening system
Cross cut shears
Decoiler
A Flachband gegossen - entfällt gegenüber 4.1
B Ovalband gegossen und nicht gewalzt wie in 4.1
C Rundband gewalzt
D Bund aus Rundband
Kontinuierliche Stranggießanlage
Profilierwalzgerüst 1 - entfällt gegenüber 4.1
Profilierwalzgerüst 2
Wasserkühl- und Ausgleichsstrecke
Richtanlage
Querteilschere
Haspelanlage
A cast flat ribbon - omitted compared to 4.1
B Oval strip cast and not rolled as in 4.1
C Rolled round strip
D Round band waistband
Continuous caster
Roll forming stand 1 - not applicable compared to 4.1
Roll forming stand 2
Water cooling and compensation section
Straightening system
Cross cut shears
Decoiler
A Rundband abgewickelt
B Rundband gerichtet
C Längsgeteiltes = Einzelrundstäbe endlos
D Einzelrundstäbe endlich
E Betonstahlmatte
Anlage 1 - Abwickelhaspel Rundbandbunde
Anlage 1 -Richtmaschine Rundband
Anlage 1 - Längsteilschere
Anlage 1 - Querteilschere
Anlage 1 - Betonstahlmattenschweißmaschine
Anlage 2 - mit Maschinen 1-4
a Strang a = Stab a
b Strang b = Stab b
c Strang c = Stab c
d Strang d = Stab d
e Strang e = Stab e
f Strang f = Stab f
g Strang g = Stab g
A round tape unwound
B round belt directed
C Longitudinally divided = single round bars endless
D single round rods finally
E Reinforcing steel mat
Appendix 1 - Decoiler round band coils
Attachment 1 straightening machine round belt
Appendix 1 - slitting shear
Appendix 1 - Cross-cut shears
Appendix 1 - Reinforcing steel mesh welding machine
Appendix 2 - with machines 1-4
a strand a = rod a
b strand b = rod b
c strand c = rod c
d strand d = rod d
e strand e = rod e
f strand f = rod f
g strand g = rod g
A Bramme gegossen oder gewalzt
B Bramme mit Walztemperatur
C Flachband
D Ovalband
E Rundband gewalzt mit Walztemperatur
F Rundband wärmebehandelt
G Rundbandbund
Walzwerksbrammenerwärmofen
Warmbandwalzgerüst 1
Warmbandwalzgerüst 2
Warmbandwalzgerüst 3
Warmbandwalzgerüst 4
Warmbandwalzgerüst 5 = Ovalbandgerüst
Warmbandwalzgerüst 6 = Rundbandgerüst
Wasserkühlstrecket
Haspelanlage
A slab cast or rolled
B Slab with rolling temperature
C ribbon
D oval band
E Round strip rolled at the rolling temperature
F Round band heat treated
G round band
Rolling mill slab heating furnace
Hot strip mill 1
Hot strip mill 2
Hot strip mill stand 3
Hot strip mill stand 4
Hot strip mill stand 5 = oval strip stand
Hot strip mill stand 6 = round strip stand
Water cooling stretcher
Decoiler
Fig. 1 DIN 488 - Blatt 2 Bild 1 und 2 Fig. 1 DIN 488 - sheet 2 picture 1 and 2
Fig. 2.1 und 2.2 Layout eines Betonstahllerzeugungsanlage nach heutigem Stand der Technik Fig. 2.1 and 2.2 layout of a rebar plant according to the current state of the art
Fig. 3.1 und 3.2 Layout einer erfindungsgemäßen Betonstahlerzeugungsanlage als Erweiterung einer Anlage nach heutigem Stand der Technik Fig. 3.1 and 3.2 layout of a concrete steel production plant according to the invention as an extension of a plant according to the current state of the art
Fig. 4,1 und 4.2 Layout einer erfindungsgemäßen Betonstahlerzeugungsanlage nach dem Gießwalzprinziep Fig. 4.1 and 4.2 layout of a concrete steel production plant according to the invention after the Gießwalzprinziep
Fig. 5 Layout einer offline Längsteilanlage zum Längsteilen eines Schwerbundes aus Vielfachrundband nach erfindungsgemäßen Verfahren Fig. 5 layout of an offline slitting line for slitting a heavy bundle from multiple round band according to the inventive method
Fig. 6 Layout einer Warmbandstraße heutiger Bauart, auf der neben konventionellem Warmband auch Rundband in Schwerbunden nach dem erfindungsgemäßen Verfahren hergestellt werden. Fig. 6 layout of a hot strip mill of today's type, on which, in addition to conventional hot strip, round strip in heavy bundles are produced by the method according to the invention.
Claims (5)
Minimierung der Walzarbeit und Walzgerüste. Erreichen hoher Produktionen bei kleinen Auslaufgeschwindigkeiten durch hohe Anzahl der nebeneinander und miteinander verbundenen Rundquerschnitten im Rundband. Richten, Längs- und Querteilen nach dem Haspeln "in- oder offline".3. Near-dimensional casting with high casting speeds for continuous casting of smooth rectangular strip or pre-profiled z. B. oval band with any number of adjacent oval cross sections connected by longitudinal ribs.
Minimization of the rolling work and roll stands. Achieve high productions at low outlet speeds due to the high number of round cross-sections connected and interconnected in the round belt. Straightening, slitting and cross cutting after reeling "in or offline".
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE2000108693 DE10008693A1 (en) | 2000-02-24 | 2000-02-24 | Concrete reinforcing steel method/machine for concrete steel rolling mill produces round strips containing smooth/ribbed connected bars, straightened, slit, and cut-to-length |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE2000108693 DE10008693A1 (en) | 2000-02-24 | 2000-02-24 | Concrete reinforcing steel method/machine for concrete steel rolling mill produces round strips containing smooth/ribbed connected bars, straightened, slit, and cut-to-length |
Publications (1)
Publication Number | Publication Date |
---|---|
DE10008693A1 true DE10008693A1 (en) | 2001-09-06 |
Family
ID=7632260
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE2000108693 Ceased DE10008693A1 (en) | 2000-02-24 | 2000-02-24 | Concrete reinforcing steel method/machine for concrete steel rolling mill produces round strips containing smooth/ribbed connected bars, straightened, slit, and cut-to-length |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE10008693A1 (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101920271A (en) * | 2010-07-27 | 2010-12-22 | 福建三宝特钢有限公司 | Controlled rolling and controlled cooling production process of HRB400 (Hot-rolled Ribbed-steel Bar 400) steel bar |
WO2012099638A1 (en) * | 2011-01-18 | 2012-07-26 | Nucor Corporation | Threaded rebar manufacturing process and system |
CN103212575A (en) * | 2013-03-18 | 2013-07-24 | 甘肃酒钢集团宏兴钢铁股份有限公司 | Method for eliminating wave warp after through water cooling of hot rolled ribbed steel bar |
CN105436233A (en) * | 2015-12-16 | 2016-03-30 | 重庆麦拓科技有限公司 | Processing technology of cold-rolled steel bar |
US9551150B2 (en) | 2010-06-24 | 2017-01-24 | Nucor Corporation | Tensionable threaded rebar bolt |
CN111167855A (en) * | 2019-12-26 | 2020-05-19 | 河钢股份有限公司承德分公司 | Rod and wire rod concurrent heating rolling process |
CN111330973A (en) * | 2020-04-07 | 2020-06-26 | 首钢水城钢铁(集团)有限责任公司 | Two-line cutting rolling process for right-handed anchor rod steel bar |
CN115716187A (en) * | 2022-12-06 | 2023-02-28 | 山东钢铁集团永锋临港有限公司 | Phi 28mm two-slitting rolling process |
-
2000
- 2000-02-24 DE DE2000108693 patent/DE10008693A1/en not_active Ceased
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9551150B2 (en) | 2010-06-24 | 2017-01-24 | Nucor Corporation | Tensionable threaded rebar bolt |
CN101920271A (en) * | 2010-07-27 | 2010-12-22 | 福建三宝特钢有限公司 | Controlled rolling and controlled cooling production process of HRB400 (Hot-rolled Ribbed-steel Bar 400) steel bar |
CN101920271B (en) * | 2010-07-27 | 2012-02-15 | 福建三宝特钢有限公司 | Controlled rolling and controlled cooling production process of HRB400 (Hot-rolled Ribbed-steel Bar 400) steel bar |
WO2012099638A1 (en) * | 2011-01-18 | 2012-07-26 | Nucor Corporation | Threaded rebar manufacturing process and system |
US9855594B2 (en) | 2011-01-18 | 2018-01-02 | Nucor Corporation | Threaded rebar manufacturing process and system |
US9010165B2 (en) | 2011-01-18 | 2015-04-21 | Nucor Corporation | Threaded rebar manufacturing process and system |
CN103212575B (en) * | 2013-03-18 | 2016-08-24 | 甘肃酒钢集团宏兴钢铁股份有限公司 | A kind of eliminate the method for wave bending after hot rolled ribbed bars Water cooling |
CN103212575A (en) * | 2013-03-18 | 2013-07-24 | 甘肃酒钢集团宏兴钢铁股份有限公司 | Method for eliminating wave warp after through water cooling of hot rolled ribbed steel bar |
CN105436233A (en) * | 2015-12-16 | 2016-03-30 | 重庆麦拓科技有限公司 | Processing technology of cold-rolled steel bar |
CN111167855A (en) * | 2019-12-26 | 2020-05-19 | 河钢股份有限公司承德分公司 | Rod and wire rod concurrent heating rolling process |
CN111167855B (en) * | 2019-12-26 | 2022-03-15 | 河钢股份有限公司承德分公司 | Rod and wire rod concurrent heating rolling process |
CN111330973A (en) * | 2020-04-07 | 2020-06-26 | 首钢水城钢铁(集团)有限责任公司 | Two-line cutting rolling process for right-handed anchor rod steel bar |
CN115716187A (en) * | 2022-12-06 | 2023-02-28 | 山东钢铁集团永锋临港有限公司 | Phi 28mm two-slitting rolling process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE3241745C2 (en) | Process for the production of hot-rolled steel strip from continuously cast raw material in directly successive work steps | |
EP0415987B2 (en) | Process for continuous production of steel strip or steel sheet from flat products made by the circular-arc type continuous casting process | |
EP1951451B1 (en) | Method for producing a hot-rolled steel strip and combined casting and rolling installation for carrying out the method | |
DE4402402B4 (en) | Process for producing hot-rolled steel strip from continuously cast starting material and plant for carrying out the process | |
DE202011110779U1 (en) | Plant for the production of flat rolled products | |
WO1997036699A1 (en) | Method and arrangement for producing hot-rolled steel strip | |
EP1519798B1 (en) | Method and casting roller plant for the semi-endless or endless rolling by casting of a metal in particular a steel strip which may be transversely separated as required after solidification | |
EP0761326A1 (en) | Installation for producing hot rolled thin strip | |
EP3341142B1 (en) | Method for operating an installation based on the csp concept | |
AT506065B1 (en) | METHOD FOR THE CONTINUOUS AUSTENITIC ROLLING OF A PRECONDUCT MADE IN A CONTINUOUS PLANTING PROCESS, AND A COMBINED CASTING AND ROLLING MACHINE TO PERFORM THE METHOD | |
DE10008693A1 (en) | Concrete reinforcing steel method/machine for concrete steel rolling mill produces round strips containing smooth/ribbed connected bars, straightened, slit, and cut-to-length | |
EP2663412B1 (en) | Equipment and method for producing hot-rolled strips | |
DE102019207459A1 (en) | Casting mill for batch and continuous operation | |
DE920362C (en) | Process and system for the production of metal semi-finished products of various types (wires, bars, rods, plates, strips, sheets or the like) | |
DE10206243A1 (en) | Process for the continuous rolling of a metal strand, in particular a steel strand, which is dimensioned as a thin slab and has a casting speed, and associated continuous casting machine | |
DE10137944A1 (en) | Rolling mill, for extra-thin product range, combines thin slab caster and roll stand train with interposed descaler and heat-treating furnace followed by lengthed strip-to-coil winches | |
DE19512953A1 (en) | Method and device for producing hot-rolled steel strip | |
DE102005011254B4 (en) | Method and casting-rolling plant for producing hot strip of steel materials | |
DE10261632B4 (en) | Process and rolling plant for the production of wire, bars or seamless tubes | |
AT511657B1 (en) | COMMISSIONING OF A FINISHED ROLLING CABLE IN A GIESS-WALZ-VERBUNDANLAGE | |
EP0893168B1 (en) | Method for producing hot strip of 0.5 mm thickness in a hot strip mill | |
EP3027331B1 (en) | Casting and rolling plant and method for producing slabs | |
WO2000012235A1 (en) | Method and device for producing hot-rolled wide strip, notably from thin slabs | |
AT511674B1 (en) | COMMISSIONING OF A FINISHED ROLLING CABLE IN A GIESS-WALZ-VERBUNDANLAGE | |
DE10025080A1 (en) | Method of making metal tape |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
ON | Later submitted papers | ||
8101 | Request for examination as to novelty | ||
8105 | Search report available | ||
8110 | Request for examination paragraph 44 | ||
8131 | Rejection |