CN2660003Y - Simultaneous follow-up anchor clip - Google Patents
Simultaneous follow-up anchor clip Download PDFInfo
- Publication number
- CN2660003Y CN2660003Y CN 200320123942 CN200320123942U CN2660003Y CN 2660003 Y CN2660003 Y CN 2660003Y CN 200320123942 CN200320123942 CN 200320123942 CN 200320123942 U CN200320123942 U CN 200320123942U CN 2660003 Y CN2660003 Y CN 2660003Y
- Authority
- CN
- China
- Prior art keywords
- groove
- clip
- clips
- retaining ring
- follow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
A simultaneous follow-up anchorage clip relates to the clip of a prestressing clip type anchorage used for a construction, which is two-piece type, and is characterized in that the a groove is arranged on a matching surface of the two clips; a ridge (1) is arranged on another matching surface; the groove and the ridge are in a clearance fit; the groove and the ridge on the clips of the utility model limit an axial displacement between the clips to make the clip follow up simultaneously so as to strengthen an axial acting force among the clips, and guarantee an even stress of the clips; thereby an anchoring dependability is improved without adding a purpose-built retaining ring. If a retaining ring groove is arranged on a tapered surface of the clip and a steel retaining ring or an O type rubber ring is arranged in the retaining ring groove, the retaining ring is controlled the retaining ring groove of the clip and an anchor plate axially and radially, and not easy to release, which further strengthens the axial acting force among the clips, and improves the anchoring dependability.
Description
Technical field
The utility model relates to a kind of building operations prestressed anchor assembly, particularly a kind of anchor clipper of follow-up simultaneously.
Background technology
The prestressed anchor of consumption maximum is the intermediate plate anchor in the market, the fine or not key of intermediate plate anchor quality depends on the design of intermediate plate, and in the existing working strand tapered anchorage, intermediate plate is generally three-chip type or two-piece type, afterbody has one to place the groove that constraint is enclosed, and the constraint circle is generally O type rubber ring.Because groove structure and constraint circle intensity are limit, intermediate plate is not enough in the mutual restraint forces of axis direction, this often causes in stretching process the intermediate plate follow-up uneven, and each intermediate plate is to the chucking power inequality of presstressed reinforcing steel and the pinch off presstressed reinforcing steel makes anchoring efficient can not get guaranteeing.
Technology contents
The technical problems to be solved in the utility model is: existing intermediate plate is not enough in the mutual restraint forces of axis direction, and do not locate between each sheet of intermediate plate, cause in stretching process the intermediate plate follow-up uneven and circumferentially between skewness, the problem that makes anchoring efficient can not get guaranteeing provides a kind of anchor clipper that can follow up simultaneously in stretching process.
The technical scheme that solves its above-mentioned technical problem is: a kind of simultaneously the follow-up anchor clipper, two-piece type is characterized in that: on the mutual bonding surfaces of two intermediate plates wherein a slice open a groove, another sheet is opened a tongue, is matched in clearance between the tongue and groove.
As another kind of pattern of the present utility model is to also have a constraint ring recess on the conical surface of this intermediate plate, and the constraint circle in the constraint ring recess is one the steel elastic ring or the O type rubber ring of opening to be arranged.
Owing to adopt said structure, a kind of anchor clipper of follow-up simultaneously of the utility model is compared with existing intermediate plate, has following beneficial effect:
1, the tongue and groove on the utility model intermediate plate has retrained the axial displacement between each sheet intermediate plate, each sheet intermediate plate is followed up simultaneously, strengthened axial active force between each sheet intermediate plate, guaranteed that each sheet intermediate plate is stressed evenly, need not increase special constraint circle, just can improve the reliability of anchoring.
2, if on the conical surface of intermediate plate, increase by a constraint ring recess again, the constraint circle of constraint in the ring recess is one the steel elastic ring or the O type rubber ring of opening to be arranged, this constraint is enclosed from the control and the difficult disengaging that axially and radially all have been subjected to intermediate plate constraint ring recess and anchor slab, retrain the axial displacement between each sheet intermediate plate, each sheet intermediate plate is followed up simultaneously, strengthened axial active force between each sheet intermediate plate, guaranteed that each sheet intermediate plate is stressed evenly, further improved the reliability of anchoring.
Description of drawings:
Fig. 1: embodiment one described a kind of anchor clipper structural representation of follow-up simultaneously;
Fig. 2: the utility model embodiment two described a kind of anchor clipper structural representations of follow-up simultaneously;
The A-A half sectional view of Fig. 3: Fig. 1 and Fig. 2.
The specific embodiment:
Below, a kind of technical characterictic of the anchor clipper of follow-up simultaneously to the utility model is further described in conjunction with the accompanying drawings and embodiments.
Embodiment one:
A kind of simultaneously the follow-up anchor clipper, two-piece type, on the mutual bonding surfaces of two intermediate plates wherein a slice open a groove, another sheet is opened a tongue (1), be matched in clearance (referring to Fig. 1, Fig. 3) between the tongue and groove, the afterbody of described intermediate plate has a constraint ring recess, is placed with a constraint circle in the groove.
Embodiment two:
A kind of simultaneously the follow-up anchor clipper, two-piece type, on the mutual bonding surfaces of two intermediate plates wherein a slice open a groove, another sheet is opened a tongue (1), is matched in clearance between the tongue and groove; Also have a constraint ring recess on the conical surface of this intermediate plate (2), the constraint circle in the constraint ring recess is one the steel elastic ring or the O type rubber ring (3) (referring to Fig. 2, Fig. 3) of opening to be arranged.
Claims (2)
1, a kind of simultaneously the follow-up anchor clipper, two-piece type is characterized in that: on the mutual bonding surfaces of two intermediate plates wherein a slice open a groove, another sheet is opened a tongue (1), is matched in clearance between the tongue and groove.
2, a kind of anchor clipper of follow-up simultaneously according to claim 1 is characterized in that: also have a constraint ring recess on the conical surface of this intermediate plate (2), the constraint circle in the constraint ring recess is one the steel elastic ring or the O type rubber ring (3) of opening to be arranged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200320123942 CN2660003Y (en) | 2003-11-15 | 2003-11-15 | Simultaneous follow-up anchor clip |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200320123942 CN2660003Y (en) | 2003-11-15 | 2003-11-15 | Simultaneous follow-up anchor clip |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2660003Y true CN2660003Y (en) | 2004-12-01 |
Family
ID=34348917
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200320123942 Expired - Fee Related CN2660003Y (en) | 2003-11-15 | 2003-11-15 | Simultaneous follow-up anchor clip |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2660003Y (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105887699A (en) * | 2015-02-16 | 2016-08-24 | 东京制纲株式会社 | Composite threadlike body tail end fixing structure |
CN109958232A (en) * | 2019-03-11 | 2019-07-02 | 中国建筑第八工程局有限公司 | Prestressed anchor clamp device and its application method |
CN115305814A (en) * | 2022-08-16 | 2022-11-08 | 山东中建八局投资建设有限公司 | Anchoring device for tensioning of suspending cables of arch bridges |
-
2003
- 2003-11-15 CN CN 200320123942 patent/CN2660003Y/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105887699A (en) * | 2015-02-16 | 2016-08-24 | 东京制纲株式会社 | Composite threadlike body tail end fixing structure |
CN109958232A (en) * | 2019-03-11 | 2019-07-02 | 中国建筑第八工程局有限公司 | Prestressed anchor clamp device and its application method |
CN115305814A (en) * | 2022-08-16 | 2022-11-08 | 山东中建八局投资建设有限公司 | Anchoring device for tensioning of suspending cables of arch bridges |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2660003Y (en) | Simultaneous follow-up anchor clip | |
CA3021081C (en) | Shear wall performance improving fastener | |
BR0309981A (en) | Method for the production of lactic acid or a salt thereof by simultaneous saccharification and starch fermentation | |
EP0569062A3 (en) | Method of making membrane-electrode assemblies for electrochemical cells and assemblies made thereby | |
CN208981794U (en) | Prestressed anchorage cable stop device | |
CN100560994C (en) | Fastening piece | |
CN2660004Y (en) | Simultaneous follow-up anchor clip | |
CN2670482Y (en) | Clamping piece of ground tackle | |
CN212561509U (en) | Novel recovery anchor rope of demountable assembly formula | |
CN214272656U (en) | Single-hole anchorage device for slow bonding prestress construction | |
CN112844533B (en) | A modular stone crushing tooth plate and industrial stone crusher | |
CN215289711U (en) | Bridge steel strand anchoring, tensioning and installing structure | |
CN109636001A (en) | Desulfurization pulp feeding system pH value adjusting method, system and computer-readable medium based on big data | |
CN115806985A (en) | Promoter suitable for Corynebacterium stasis and its application | |
CN2719979Y (en) | Anchor special for prestressed fanglun fiber sheet material | |
CN2621199Y (en) | Fixing device clamping piece with elastic groove | |
CN2616351Y (en) | Prestressed tubular pile end board | |
CN2621198Y (en) | Fixing device clamping piece | |
CN2673981Y (en) | Net like grain clamp apparatus of anchor | |
CN219528164U (en) | High-strength steel strand extrusion type anchorage device | |
CN2721776Y (en) | Plastic and wooden composite building formwork | |
CN2526387Y (en) | Indentation type steel fibre | |
CN2457271Y (en) | Combined anch cushion board | |
CN2630361Y (en) | Anchoring tool clamping element | |
CN2515453Y (en) | Friction clutch driven plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |