[go: up one dir, main page]

CN2660003Y - Simultaneous follow-up anchor clip - Google Patents

Simultaneous follow-up anchor clip Download PDF

Info

Publication number
CN2660003Y
CN2660003Y CN 200320123942 CN200320123942U CN2660003Y CN 2660003 Y CN2660003 Y CN 2660003Y CN 200320123942 CN200320123942 CN 200320123942 CN 200320123942 U CN200320123942 U CN 200320123942U CN 2660003 Y CN2660003 Y CN 2660003Y
Authority
CN
China
Prior art keywords
groove
clip
clips
retaining ring
follow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200320123942
Other languages
Chinese (zh)
Inventor
张继文
钱洋
赵克政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liuzhou OVM Machinery Co Ltd
Original Assignee
Liuzhou OVM Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liuzhou OVM Machinery Co Ltd filed Critical Liuzhou OVM Machinery Co Ltd
Priority to CN 200320123942 priority Critical patent/CN2660003Y/en
Application granted granted Critical
Publication of CN2660003Y publication Critical patent/CN2660003Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A simultaneous follow-up anchorage clip relates to the clip of a prestressing clip type anchorage used for a construction, which is two-piece type, and is characterized in that the a groove is arranged on a matching surface of the two clips; a ridge (1) is arranged on another matching surface; the groove and the ridge are in a clearance fit; the groove and the ridge on the clips of the utility model limit an axial displacement between the clips to make the clip follow up simultaneously so as to strengthen an axial acting force among the clips, and guarantee an even stress of the clips; thereby an anchoring dependability is improved without adding a purpose-built retaining ring. If a retaining ring groove is arranged on a tapered surface of the clip and a steel retaining ring or an O type rubber ring is arranged in the retaining ring groove, the retaining ring is controlled the retaining ring groove of the clip and an anchor plate axially and radially, and not easy to release, which further strengthens the axial acting force among the clips, and improves the anchoring dependability.

Description

A kind of anchor clipper of follow-up simultaneously
Technical field
The utility model relates to a kind of building operations prestressed anchor assembly, particularly a kind of anchor clipper of follow-up simultaneously.
Background technology
The prestressed anchor of consumption maximum is the intermediate plate anchor in the market, the fine or not key of intermediate plate anchor quality depends on the design of intermediate plate, and in the existing working strand tapered anchorage, intermediate plate is generally three-chip type or two-piece type, afterbody has one to place the groove that constraint is enclosed, and the constraint circle is generally O type rubber ring.Because groove structure and constraint circle intensity are limit, intermediate plate is not enough in the mutual restraint forces of axis direction, this often causes in stretching process the intermediate plate follow-up uneven, and each intermediate plate is to the chucking power inequality of presstressed reinforcing steel and the pinch off presstressed reinforcing steel makes anchoring efficient can not get guaranteeing.
Technology contents
The technical problems to be solved in the utility model is: existing intermediate plate is not enough in the mutual restraint forces of axis direction, and do not locate between each sheet of intermediate plate, cause in stretching process the intermediate plate follow-up uneven and circumferentially between skewness, the problem that makes anchoring efficient can not get guaranteeing provides a kind of anchor clipper that can follow up simultaneously in stretching process.
The technical scheme that solves its above-mentioned technical problem is: a kind of simultaneously the follow-up anchor clipper, two-piece type is characterized in that: on the mutual bonding surfaces of two intermediate plates wherein a slice open a groove, another sheet is opened a tongue, is matched in clearance between the tongue and groove.
As another kind of pattern of the present utility model is to also have a constraint ring recess on the conical surface of this intermediate plate, and the constraint circle in the constraint ring recess is one the steel elastic ring or the O type rubber ring of opening to be arranged.
Owing to adopt said structure, a kind of anchor clipper of follow-up simultaneously of the utility model is compared with existing intermediate plate, has following beneficial effect:
1, the tongue and groove on the utility model intermediate plate has retrained the axial displacement between each sheet intermediate plate, each sheet intermediate plate is followed up simultaneously, strengthened axial active force between each sheet intermediate plate, guaranteed that each sheet intermediate plate is stressed evenly, need not increase special constraint circle, just can improve the reliability of anchoring.
2, if on the conical surface of intermediate plate, increase by a constraint ring recess again, the constraint circle of constraint in the ring recess is one the steel elastic ring or the O type rubber ring of opening to be arranged, this constraint is enclosed from the control and the difficult disengaging that axially and radially all have been subjected to intermediate plate constraint ring recess and anchor slab, retrain the axial displacement between each sheet intermediate plate, each sheet intermediate plate is followed up simultaneously, strengthened axial active force between each sheet intermediate plate, guaranteed that each sheet intermediate plate is stressed evenly, further improved the reliability of anchoring.
Description of drawings:
Fig. 1: embodiment one described a kind of anchor clipper structural representation of follow-up simultaneously;
Fig. 2: the utility model embodiment two described a kind of anchor clipper structural representations of follow-up simultaneously;
The A-A half sectional view of Fig. 3: Fig. 1 and Fig. 2.
The specific embodiment:
Below, a kind of technical characterictic of the anchor clipper of follow-up simultaneously to the utility model is further described in conjunction with the accompanying drawings and embodiments.
Embodiment one:
A kind of simultaneously the follow-up anchor clipper, two-piece type, on the mutual bonding surfaces of two intermediate plates wherein a slice open a groove, another sheet is opened a tongue (1), be matched in clearance (referring to Fig. 1, Fig. 3) between the tongue and groove, the afterbody of described intermediate plate has a constraint ring recess, is placed with a constraint circle in the groove.
Embodiment two:
A kind of simultaneously the follow-up anchor clipper, two-piece type, on the mutual bonding surfaces of two intermediate plates wherein a slice open a groove, another sheet is opened a tongue (1), is matched in clearance between the tongue and groove; Also have a constraint ring recess on the conical surface of this intermediate plate (2), the constraint circle in the constraint ring recess is one the steel elastic ring or the O type rubber ring (3) (referring to Fig. 2, Fig. 3) of opening to be arranged.

Claims (2)

1, a kind of simultaneously the follow-up anchor clipper, two-piece type is characterized in that: on the mutual bonding surfaces of two intermediate plates wherein a slice open a groove, another sheet is opened a tongue (1), is matched in clearance between the tongue and groove.
2, a kind of anchor clipper of follow-up simultaneously according to claim 1 is characterized in that: also have a constraint ring recess on the conical surface of this intermediate plate (2), the constraint circle in the constraint ring recess is one the steel elastic ring or the O type rubber ring (3) of opening to be arranged.
CN 200320123942 2003-11-15 2003-11-15 Simultaneous follow-up anchor clip Expired - Fee Related CN2660003Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200320123942 CN2660003Y (en) 2003-11-15 2003-11-15 Simultaneous follow-up anchor clip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200320123942 CN2660003Y (en) 2003-11-15 2003-11-15 Simultaneous follow-up anchor clip

Publications (1)

Publication Number Publication Date
CN2660003Y true CN2660003Y (en) 2004-12-01

Family

ID=34348917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200320123942 Expired - Fee Related CN2660003Y (en) 2003-11-15 2003-11-15 Simultaneous follow-up anchor clip

Country Status (1)

Country Link
CN (1) CN2660003Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887699A (en) * 2015-02-16 2016-08-24 东京制纲株式会社 Composite threadlike body tail end fixing structure
CN109958232A (en) * 2019-03-11 2019-07-02 中国建筑第八工程局有限公司 Prestressed anchor clamp device and its application method
CN115305814A (en) * 2022-08-16 2022-11-08 山东中建八局投资建设有限公司 Anchoring device for tensioning of suspending cables of arch bridges

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887699A (en) * 2015-02-16 2016-08-24 东京制纲株式会社 Composite threadlike body tail end fixing structure
CN109958232A (en) * 2019-03-11 2019-07-02 中国建筑第八工程局有限公司 Prestressed anchor clamp device and its application method
CN115305814A (en) * 2022-08-16 2022-11-08 山东中建八局投资建设有限公司 Anchoring device for tensioning of suspending cables of arch bridges

Similar Documents

Publication Publication Date Title
CN2660003Y (en) Simultaneous follow-up anchor clip
CA3021081C (en) Shear wall performance improving fastener
BR0309981A (en) Method for the production of lactic acid or a salt thereof by simultaneous saccharification and starch fermentation
EP0569062A3 (en) Method of making membrane-electrode assemblies for electrochemical cells and assemblies made thereby
CN208981794U (en) Prestressed anchorage cable stop device
CN100560994C (en) Fastening piece
CN2660004Y (en) Simultaneous follow-up anchor clip
CN2670482Y (en) Clamping piece of ground tackle
CN212561509U (en) Novel recovery anchor rope of demountable assembly formula
CN214272656U (en) Single-hole anchorage device for slow bonding prestress construction
CN112844533B (en) A modular stone crushing tooth plate and industrial stone crusher
CN215289711U (en) Bridge steel strand anchoring, tensioning and installing structure
CN109636001A (en) Desulfurization pulp feeding system pH value adjusting method, system and computer-readable medium based on big data
CN115806985A (en) Promoter suitable for Corynebacterium stasis and its application
CN2719979Y (en) Anchor special for prestressed fanglun fiber sheet material
CN2621199Y (en) Fixing device clamping piece with elastic groove
CN2616351Y (en) Prestressed tubular pile end board
CN2621198Y (en) Fixing device clamping piece
CN2673981Y (en) Net like grain clamp apparatus of anchor
CN219528164U (en) High-strength steel strand extrusion type anchorage device
CN2721776Y (en) Plastic and wooden composite building formwork
CN2526387Y (en) Indentation type steel fibre
CN2457271Y (en) Combined anch cushion board
CN2630361Y (en) Anchoring tool clamping element
CN2515453Y (en) Friction clutch driven plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20041201

Termination date: 20101115