But construction waste recovery processing equipment
Technical Field
The application relates to the technical field of construction waste recovery, in particular to a construction waste recoverable treatment device.
Background
Building waste refers to waste materials such as concrete, bricks, tiles, wood, metal, plastic, glass, plasterboard, etc. generated during construction, demolition, decoration, repair and reconstruction. These waste materials are produced in very large quantities in areas where urban and construction activities are frequent. Conventionally, construction waste is generally regarded as waste, and is directly landfilled or incinerated, which causes waste of resources and environmental pollution. In recent years, more and more countries and regions are beginning to pay attention to recycling of construction waste, and various measures are taken to convert it into reusable resources.
In the related art, construction waste is when handling, the constructor usually will concentrate the rubbish and place in construction waste recovery processing incasement earlier, then rethread vehicle pulls away construction waste recovery processing case and discharges, current construction waste recovery processing case generally comprises rectangle box and protection case lid, constructor opens the case lid and can put in rubbish to the box is inside, however, construction waste is inside usually to contain a large amount of dust, when the personnel put in rubbish into the incasement, the incasement gas can outwards gush out, drive the inside dust granule diffusion of rubbish, thereby can bring certain influence for surrounding activity personnel's health, be unfavorable for actual use, consequently, skilled person provides a construction waste recoverable processing equipment, in order to solve the problem that above-mentioned background art was put forward.
Disclosure of utility model
In order to solve the problem that the construction waste provided in the background art generally contains a large amount of dust, when people put the waste into the box, gas in the box can outwards gush out to drive dust particles in the waste to diffuse, so that the health of surrounding movable people can be influenced to a certain extent.
The application provides a recyclable construction waste treatment device which adopts the following technical scheme:
The utility model provides a but building rubbish recovery processing equipment, includes building rubbish recovery processing case, the top of building rubbish recovery processing case articulates there is the protecting cover, the inner wall fixedly connected with of protecting cover draws dust box, the inner wall bottom of building rubbish recovery processing case is provided with the air exhauster, the inner wall bottom sliding connection of building rubbish recovery processing case has the dust box, the dust box is located one side of air exhauster, the air exhauster is kept away from one end of dust box runs through building rubbish recovery processing case, one side fixedly connected with of building rubbish recovery processing case with the dust extraction pipe that the dust box is linked together, the dust extraction pipe is kept away from one end of building rubbish recovery processing case runs through the protecting cover with the dust extraction box is linked together.
Through adopting above-mentioned technical scheme, when constructor puts in rubbish, start the air exhauster and pass through the dust extraction pipe and draw the cooperation of dirt box, can draw the gaseous that has the dust with building rubbish recovery processing case opening part gushes out, when the gaseous entering dust collection box that has the dust inside, can carry out certain filtration to the air through the dust collection box to can reduce the dust diffusion condition of personnel when putting in rubbish, can bring certain safety guarantee to surrounding movable personnel's health.
Preferably, the construction waste recycling box comprises a rectangular box, a partition plate is fixedly connected to the inner wall of the rectangular box, the exhaust fan and the dust collecting box are both located on the lower surface of the partition plate, a first mounting opening is formed in the top of the rectangular box, one side of the protective cover is located in the first mounting opening, a second mounting opening penetrating through the rectangular box is formed in one side of the rectangular box, and the dust collecting box penetrates through the second mounting opening.
Through adopting above-mentioned technical scheme, the division board can protect effect to air exhauster and the dust collection box that rectangular box internally mounted, and first installing port can be convenient for protect the lid and install and use, and the second installing port can be convenient for personnel install and dismantle the dust collection box.
Preferably, one side fixedly connected with mounting panel of rectangle case, the upper surface fixedly connected with pneumatic cylinder of mounting panel, the output of pneumatic cylinder articulates there is a word angle sign indicating number, the one end that the word angle sign indicating number is kept away from the pneumatic cylinder with one side of protective cover articulates each other.
Through adopting above-mentioned technical scheme, can control the protective cover through a word angle sign indicating number and rotate from the articulated position with the rectangle case when the pneumatic cylinder starts to can be convenient for personnel adjust the position of use of dust extraction box through the protective cover.
Preferably, the dust extraction box comprises a first rectangular box fixedly connected with the inner wall of the protective cover, and a plurality of dust extraction holes penetrating the first rectangular box are uniformly formed in one side, close to the rectangular box, of the first rectangular box.
Through adopting above-mentioned technical scheme, start the air exhauster and can suck the gas that has the dust to the rectangular box opening part gush out through evenly seting up a plurality of dust extraction hole on first rectangular box.
Preferably, the dust collecting box comprises a second rectangular box positioned in the second mounting opening, a limit cover is hinged to the upper surface of the second rectangular box, vent holes penetrating through the second rectangular box are formed in two sides of the second rectangular box, a plurality of mounting grooves are uniformly formed in the bottom of the inner wall of the second rectangular box, and a filter plate is arranged in the mounting grooves.
Through adopting above-mentioned technical scheme, can restrict the mounted position of installing at the inside filter of mounting groove when spacing lid is closed, when the air that has the dust gets into inside the second rectangle box, can carry out certain filtration to the dust of air inside through a plurality of filter.
Preferably, a viewing port penetrating through the rectangular box is formed in one side, away from the hydraulic cylinder, of the rectangular box, and a transparent protection plate is arranged in the viewing port.
Through adopting above-mentioned technical scheme, look over mouthful and transparent guard plate cooperation, can be convenient for personnel look over how much of rubbish that rectangular box inside placed.
Preferably, the lower surface of the limit cover is fixedly connected with a sealing gasket, and the upper surface of the sealing gasket is abutted to the upper surfaces of the rectangular box and the filter plates.
Through adopting above-mentioned technical scheme, when spacing lid is closed, can play certain sealed effect between spacing lid and rectangle case and the several filter through sealed the pad.
In summary, the application has the following beneficial technical effects:
1. According to the construction waste recyclable treatment equipment, the installation position of the dust extraction box can be limited through the arranged protective cover, when a constructor puts in waste, the exhaust fan is started to be matched with the dust extraction box through the dust extraction pipe, dust-containing gas can be extracted from the opening part of the construction waste recycling treatment box, when the dust-containing gas enters the dust collection box, the dust collection box can be used for carrying out certain filtering treatment on the air, so that the dust diffusion condition of the constructor when the constructor puts in the waste can be reduced, and certain safety guarantee can be brought to the physical health of surrounding movable personnel;
2. According to the construction waste recyclable treatment equipment, the partition plate can protect the exhaust fan and the dust collecting box which are arranged in the rectangular box, the first mounting port can facilitate the mounting and the use of the protective cover, the second mounting port can facilitate the mounting and the dismounting of the dust collecting box by personnel, the protective cover can be controlled to rotate from the hinging position with the rectangular box through the straight angle code when the hydraulic cylinder is started, so that the personnel can conveniently adjust the using position of the dust collecting box through the protective cover, the checking port is matched with the transparent protective plate, and the personnel can conveniently check the amount of waste placed in the rectangular box;
3. this but building rubbish recovery processing equipment, the air exhauster that starts to set up can be to the rectangle case opening part gushing out the gas that has the dust through evenly seting up a plurality of dust extraction hole on first rectangle box and carry out the suction, when spacing lid is closed, can play certain sealed effect at the air that has the dust when entering second rectangle box inside between spacing lid and rectangle case and several filter through sealed pad, can carry out certain filtration to the dust of air inside through the several filter to can prevent that the gas that has the dust from leaking.
Drawings
FIG. 1 is a schematic overall structure of an embodiment of the present application;
FIG. 2 is a schematic view of a protective cover in an open cross-sectional configuration in an embodiment of the application;
FIG. 3 is a schematic view of a closed cross-sectional structure of a protective cover in an embodiment of the application;
fig. 4 is an enlarged schematic view of the structure a in fig. 2 according to an embodiment of the present application.
The reference numerals indicate that 1, a construction waste recycling treatment box, 101, a rectangular box, 102, a partition plate, 103, a first installation opening, 104, a second installation opening, 2, a protective cover, 3, a dust extraction box, 301, a first rectangular box, 302, a dust extraction hole, 4, an exhaust fan, 5, a dust collection box, 501, a second rectangular box, 502, a limit cover, 503, a vent hole, 504, an installation groove, 505, a filter plate, 6, a dust extraction pipe, 7, an installation plate, 8, a hydraulic cylinder, 9, a straight corner code, 10, a sealing gasket, 11, a viewing opening and 12, and a transparent protective plate.
Detailed Description
The application is described in further detail below with reference to fig. 1-4.
The embodiment of the application discloses a recyclable construction waste treatment device. Referring to fig. 1, 2 and 3, this construction waste recoverable treatment facility, including construction waste recovery treatment case 1, the top of construction waste recovery treatment case 1 articulates there is shield cover 2, the inner wall fixedly connected with of shield cover 2 draws dust box 3, the inner wall bottom of construction waste recovery treatment case 1 is provided with air exhauster 4, the inner wall bottom sliding connection of construction waste recovery treatment case 1 has dust box 5, dust box 5 is located one side of air exhauster 4, air exhauster 4 is kept away from dust box 5's one end and is run through construction waste recovery treatment case 1, one side fixedly connected with of construction waste recovery treatment case 1 is linked together with dust box 5's dust extraction pipe 6, dust extraction pipe 6 is kept away from construction waste recovery treatment case 1's one end and is run through shield cover 2 and be linked together with dust extraction box 3.
In this embodiment, but the inside construction waste recovery processing case 1 that sets up in this construction waste recovery processing equipment is used for placing the construction waste that needs to retrieve, articulated on the construction waste recovery processing case 1 has protective cover 2, the protective cover 2 of setting can open and shut as required, can protect the inside of construction waste recovery processing case 1 when protective cover 2 is closed, inner wall fixedly connected with dust extraction box 3 at protective cover 2, when constructor opens protective cover 2 and is standing, can be with dust extraction box 3 towards the opening part of construction waste recovery processing case 1, inner wall bottom at construction waste recovery processing case 1 is provided with air exhauster 4, thereby can control when constructor puts in rubbish start-up air exhauster 4, through the dust extraction pipe 6 and the cooperation of dust extraction box 3 that set up, can pump the gas that has the dust with the construction waste recovery processing case 1 opening part, when the gas that has the dust gets into the inside of dust collection box 5, can carry out certain filtration treatment to the gas through dust collection box 5, thereby can reduce the dust diffusion condition when the construction waste recovery processing case 1, can be more the health of the application, can be guaranteed in fact that the health of the personnel is used to the diffusion of the dust.
In a further preferred embodiment of the present utility model, as shown in fig. 1, 2 and 3, the construction waste recycling treatment box 1 comprises a rectangular box 101, a partition plate 102 is fixedly connected to the inner wall of the rectangular box 101, the exhaust fan 4 and the dust collection box 5 are both located on the lower surface of the partition plate 102, a first mounting opening 103 is formed in the top of the rectangular box 101, one side of the protective cover 2 is located inside the first mounting opening 103, a second mounting opening 104 penetrating the rectangular box 101 is formed in one side of the rectangular box 101, and the dust collection box 5 penetrates inside the second mounting opening 104.
In this embodiment, can separate the space of rectangle case 101 inside through division board 102 to can play certain guard action to the air exhauster 4 and the dust collecting box 5 of the inside installed of rectangle case 101, can be convenient for protect lid 2 to install and use through the first installing port 103 of seting up, can be convenient for personnel install and dismantle dust collecting box 5 through the second installing port 104 of seting up.
In a further preferred embodiment of the present utility model, as shown in fig. 2 and 3, a mounting plate 7 is fixedly connected to one side of the rectangular box 101, a hydraulic cylinder 8 is fixedly connected to the upper surface of the mounting plate 7, an output end of the hydraulic cylinder 8 is hinged with a straight angle code 9, and one end of the straight angle code 9 away from the hydraulic cylinder 8 is hinged with one side of the protective cover 2.
In this embodiment, the mounting position of the hydraulic cylinder 8 can be limited by the mounting plate 7, and the protecting cover 2 can be controlled to rotate from the hinge position with the rectangular box 101 by the arranged straight angle code 9 when the hydraulic cylinder 8 is started, so that a person can conveniently adjust the using position of the dust extraction box 3 by the protecting cover 2.
In a further preferred embodiment of the present utility model, as shown in fig. 1, a viewing port 11 is formed on a side of the rectangular box 101 away from the hydraulic cylinder 8, and a transparent protection plate 12 is disposed inside the viewing port 11.
In this embodiment, the personnel can be convenient for look over how much rubbish that rectangular box 101 inside was placed through the viewing port 11 of seting up, can protect viewing port 11 position through transparent guard plate 12.
In a further preferred embodiment of the present utility model, as shown in fig. 1, 2 and 3, the dust extraction box 3 includes a first rectangular box 301 fixedly connected to the inner wall of the protective cover 2, and a plurality of dust extraction holes 302 penetrating the first rectangular box 301 are uniformly formed on one side of the first rectangular box 301 close to the rectangular box 101.
In this embodiment, when the exhaust fan 4 is started, the dust-laden gas flushed out from the opening portion of the rectangular box 101 can be sucked through the plurality of dust suction holes 302 uniformly formed in the first rectangular box 301, so that a dust removal effect can be achieved.
In a further preferred embodiment of the present utility model, as shown in fig. 1, 2 and 4, the dust collecting box 5 includes a second rectangular box 501 located inside the second mounting opening 104, a limit cover 502 is hinged on the upper surface of the second rectangular box 501, ventilation holes 503 penetrating the second rectangular box 501 are formed on two sides of the second rectangular box 501, a plurality of mounting grooves 504 are uniformly formed on the bottom of the inner wall of the second rectangular box 501, and a filter plate 505 is disposed inside the mounting grooves 504.
In this embodiment, the limiting cover 502 that sets up can open and shut as required, can restrict the mounted position of installing the inside filter 505 of mounting groove 504 when limiting cover 502 is closed, when the air that has the dust passes through from the ventilation hole 503 inside of seting up, can carry out certain filtration to the dust of air inside through the several filter 505 that sets up, and the filtration mesh number of the several filter 505 that sets up is arranged from small to big to can strengthen the filter effect to the dust.
In a further preferred embodiment of the present utility model, as shown in fig. 4, a gasket 10 is fixedly connected to the lower surface of the limit cover 502, and the upper surface of the gasket 10 abuts against the upper surfaces of the rectangular box 101 and the plurality of filter plates 505.
In this embodiment, when the limit cover 502 is closed, the gasket 10 provided can be positioned between the limit cover 502 and the contact surfaces of the rectangular box 101 and the filter plates 505, so that a certain sealing effect can be achieved, and the gas with dust can be prevented from leaking.
The implementation principle of the construction waste recyclable treatment equipment provided by the embodiment of the application is as follows:
When the dust collection box is used, a user needs to open the protective cover 2 to be placed vertically, the dust collection box 3 faces the opening part of the building waste collection treatment box 1, the exhaust fan 4 can be controlled to be started when the constructor puts in waste, the exhaust fan 4 is matched with the dust collection box 3 through the dust collection pipe 6 when being started, and dust-containing gas can be pumped out of the opening part of the building waste collection treatment box 1, when the dust-containing gas enters the dust collection box 5, the dust collection box 5 can carry out certain filtering treatment on the air, so that the dust diffusion condition of the user when putting in the waste can be reduced, certain safety guarantee can be brought to the physical health of surrounding movable personnel, and the dust collection box is more beneficial to practical use.
The above embodiments are not intended to limit the scope of the application, so that the equivalent changes of the structure, shape and principle of the application are covered by the scope of the application.