CN222103102U - A stable structure for installing a pipe gallery project - Google Patents
A stable structure for installing a pipe gallery project Download PDFInfo
- Publication number
- CN222103102U CN222103102U CN202420427808.7U CN202420427808U CN222103102U CN 222103102 U CN222103102 U CN 222103102U CN 202420427808 U CN202420427808 U CN 202420427808U CN 222103102 U CN222103102 U CN 222103102U
- Authority
- CN
- China
- Prior art keywords
- wall
- pipeline
- connecting seat
- frame body
- pipe gallery
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 claims abstract description 42
- 238000013016 damping Methods 0.000 claims abstract description 14
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 14
- 230000000087 stabilizing effect Effects 0.000 claims description 8
- 230000006978 adaptation Effects 0.000 abstract description 6
- 230000000694 effects Effects 0.000 abstract description 3
- 238000011084 recovery Methods 0.000 abstract description 3
- 238000010276 construction Methods 0.000 description 6
- 230000003139 buffering effect Effects 0.000 description 2
- 239000004567 concrete Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000006641 stabilisation Effects 0.000 description 2
- 238000011105 stabilization Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 210000001503 joint Anatomy 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a pipe gallery engineering installation stable structure, which relates to the technical field of pipe gallery engineering and comprises a mounting frame body and a pipeline, wherein a flexible top layer is fixedly connected to the top of the mounting frame body, an upper locating clamp is arranged at the bottom end part of a damping spring, the pipeline is arranged on the outer wall of the bottom of the upper locating clamp, and a right locating clamp is arranged on the outer wall of the right side of the pipeline. This piping lane engineering installation stable structure, go up the locating clip and implement pressure directly over to the pipeline, left side locating clip and right locating clip implement pressure to two sides about the pipeline, fixed collet plays the bearing effect to the pipeline, through the first connecting seat with one mounting bracket body external wall connection aim at another mounting bracket body external wall connection's second connecting seat, the two carry out the block and connect, the concatenation is convenient, and practice thrift on-the-spot engineering time, the quick recovery of piping lane top road of being convenient for, in the hole of first connecting seat is gone into with the connecting bolt again, the second connecting seat is rather than the adaptation, the stable connection of reinforcing connected node department.
Description
Technical Field
The utility model relates to the technical field of pipe gallery engineering, in particular to a pipe gallery engineering installation stable structure.
Background
Pipe gallery refers to a large number of pipes in chemical industry and related factories, which are concentrated together, are arranged outside a device or a factory building, are usually supported in the air by brackets to form a similar appearance as a corridor, and also have large-scale device pipes which are concentrated and laid underground and are composed of upright posts, cross beams and trusses of steel structures or reinforced concrete structures.
The current piping lane engineering installation mainly adopts two kinds of construction methods, and first is for mixing earth at job site pouring in situ, and the second is for after the piping lane pours the shaping in advance, carries out the operation of assembling at construction site, and it is firm effect relatively poor that its butt joint department is firm when the prefab of current piping lane engineering installation stable structure is spliced from top to bottom, and whole shock attenuation buffering effect is not good, takes place the piping lane body easily and subsides.
Accordingly, in view of the above, research and improvement are made on the existing structure and the existing defects, and a stable installation structure for pipe gallery engineering is proposed.
Disclosure of utility model
The utility model aims to provide a pipe gallery engineering installation stable structure so as to solve the problems in the background technology.
In order to achieve the above purpose, the pipe gallery engineering installation stable structure comprises an installation frame body and a pipeline, wherein the top of the installation frame body is fixedly connected with a flexible top layer, the inner wall of the top of the installation frame body is fixedly connected with a damping spring, the bottom end part of the damping spring is provided with an upper locating clamp, the pipeline is arranged on the outer wall of the bottom of the upper locating clamp, the outer wall of the left side of the pipeline is connected with a left locating clamp, the outer wall of the right side of the pipeline is provided with a right locating clamp, and the outer wall of the bottom of the pipeline is connected with a fixed bottom bracket.
Furthermore, the outer walls of the left locating clamp and the right locating clamp are respectively provided with an adjusting bolt, and the outer walls of the side surfaces of the adjusting bolts are connected with component force rods.
Further, the first supporting seat is fixed on the outer wall of the bottom of the adjusting bolt, and the second supporting seat is arranged on the outer wall of the bottom of the fixed bottom bracket.
Further, the bottom outer walls of the first supporting seat and the second supporting seat are connected with the bottom inner wall of the installation frame body, and the top outer wall of the first supporting seat is higher than the top outer wall of the second supporting seat.
Further, the left side outer wall and the right side outer wall of the mounting frame body are provided with first extension seats, and the bottom outer wall height of the first extension seats is consistent with the bottom outer wall height of the mounting frame body.
Further, the inside threaded connection of first extension seat has the reinforcing bolt, and the reinforcing bolt is symmetrical distribution with the vertical axis of mounting bracket body as the symmetry axis.
Further, the front outer wall of the mounting frame body is provided with a first connecting seat, and the rear outer wall of the mounting frame body is fixed with a second connecting seat.
Further, the outer wall of the first connecting seat is matched with the outer wall of the second connecting seat, and connecting bolts are arranged in the first connecting seat and the second connecting seat.
The utility model provides a pipe gallery engineering installation stable structure, which has the following beneficial effects:
1. This piping lane engineering installation stable structure, damping spring receives the extrusion of the pipeline of diameter equidimension not and produces flexible and resilience, drives the position of going up the locating clip and produces the removal thereupon to this adaptation pipeline that different diameters are greater than, carries out pressure directly over it, adjusts the rotation angle of left locating clip and right locating clip, screw up the adjustment bolt, fixed left locating clip and right locating clip's position, with this realization is according to the diameter size of pipeline to adjust left locating clip and right locating clip's the angle rather than contacting, carries out pressure to its left and right sides, fixed collet plays the bearing effect to the pipeline.
2. This piping lane engineering installation stable structure, first connecting seat and second connecting seat looks adaptation, through the second connecting seat that aligns another mounting bracket body outer wall connection with the first connecting seat of one mounting bracket body outer wall connection, the two carry out the block and connect, the concatenation is convenient, and practice thrift on-the-spot engineering time, the quick recovery of piping lane top road of being convenient for, in the hole of first connecting seat, second connecting seat and adaptation is gone into to the bolt of will connecting again, the stable connection of reinforcing junction department.
Drawings
FIG. 1 is a schematic elevational view of a piping lane engineering installation stabilization structure of the present utility model;
FIG. 2 is a schematic side view of a piping lane engineering installation stabilization structure of the present utility model;
fig. 3 is a schematic perspective view of a first connection seat of a pipe gallery engineering installation stabilizing structure according to the present utility model.
In the figure, 1, a mounting frame body; 2, a flexible top layer, 3, a damping spring, 4, an upper locating clamp, 5, a pipeline, 6, a left locating clamp, 7, a right locating clamp, 8, a fixed base, 9, an adjusting bolt, 10, a component force rod, 11, a first supporting seat, 12, a second supporting seat, 13, a first extending seat, 14, a reinforcing bolt, 15, a first connecting seat, 16, a second connecting seat and 17, a connecting bolt.
Detailed Description
Embodiments of the present utility model are described in further detail below with reference to the accompanying drawings and examples. The following examples are illustrative of the utility model but are not intended to limit the scope of the utility model.
As shown in fig. 1-3, a pipe gallery engineering installation stable structure comprises a mounting frame body 1 and a pipeline 5, wherein the top of the mounting frame body 1 is fixedly connected with a flexible top layer 2, the top inner wall of the mounting frame body 1 is fixedly connected with a damping spring 3, the bottom end part of the damping spring 3 is provided with an upper positioning clamp 4, the pipeline 5 is arranged on the bottom outer wall of the upper positioning clamp 4, the left side outer wall of the pipeline 5 is connected with a left positioning clamp 6, the right side outer wall of the pipeline 5 is provided with a right positioning clamp 7, the bottom outer wall of the pipeline 5 is connected with a fixed collet 8, the left positioning clamp 6 and the outer wall of the right positioning clamp 7 are both provided with adjusting bolts 9, the side outer wall of the adjusting bolts 9 are connected with component force rods 10, the bottom outer wall of the adjusting bolts 9 is fixedly provided with a first supporting seat 11, the bottom outer wall of the fixed collet 8 is provided with a second supporting seat 12, the bottom outer wall of the first supporting seat 11 and the second supporting seat 12 is connected with the bottom inner wall of the mounting frame body 1, the top outer wall of the first supporting seat 11 is higher than the top outer wall of the second supporting seat 12, the left outer wall of the mounting frame body 1 and the outer wall of the right side outer wall of the mounting frame body is provided with a first extending seat 13, and the bottom of the first supporting seat is identical to the first outer wall of the first supporting seat 1 in height;
The concrete operation is as follows, the installation frame body 1 is placed in a flattened foundation pit, the pipeline 5 is installed in the installation frame body 1, the upper, lower, left and right side outer walls of the pipeline 5 are respectively attached to the upper locating clamp 4, the fixed bottom support 8, the left locating clamp 6 and the right locating clamp 7, the top of the flexible top layer 2 is arc-shaped, the pressure can be dispersed, the compression resistance of the installation frame body 1 is increased, and the service life of the installation frame body 1 is prolonged;
The damping spring 3 is connected with the mounting frame body 1 and the upper positioning clamp 4 to play a certain buffering role, and the damping spring 3 is extruded by the pipelines 5 with different diameters to generate expansion and rebound, so that the position of the upper positioning clamp 4 is driven to move, the damping spring is suitable for the pipelines 5 with different diameters to apply pressure to the parts right above the pipelines;
The left locating clamp 6 and the right locating clamp 7 can rotate around the top of the first supporting seat 11, the adjusting bolt 9 is connected with the left locating clamp 6 and the first supporting seat 11, the adjusting bolt 9 is connected with the right locating clamp 7 and the first supporting seat 11, the rotation angles of the left locating clamp 6 and the right locating clamp 7 are adjusted, the adjusting bolt 9 is screwed down, the positions of the left locating clamp 6 and the right locating clamp 7 are fixed, so that the contact angles of the left locating clamp 6 and the right locating clamp 7 are adjusted according to the diameter of the pipeline 5, and the pressure is applied to the left side surface and the right side surface of the pipeline;
The first supporting seat 11 supports the bottoms of the left positioning clamp 6, the right positioning clamp 7 and the adjusting bolt 9, the component force rod 10 supports the side surfaces of the left positioning clamp 6, the right positioning clamp 7 and the adjusting bolt 9, the second supporting seat 12 supports the fixed bottom bracket 8, and the fixed bottom bracket 8 supports the pipeline 5;
as shown in fig. 1-3, the first extension seat 13 is internally and in threaded connection with a reinforcing bolt 14, the reinforcing bolt 14 is symmetrically distributed by taking the vertical central axis of the mounting frame body 1 as a symmetrical axis, the front outer wall of the mounting frame body 1 is provided with a first connecting seat 15, the rear outer wall of the mounting frame body 1 is fixedly provided with a second connecting seat 16, the outer wall of the first connecting seat 15 is matched with the outer wall of the second connecting seat 16, and the interiors of the first connecting seat 15 and the second connecting seat 16 are provided with connecting bolts 17;
The concrete operation is as follows, through the inside of screwing in the reinforcing bolt 14 first extension seat 13, the bottom of reinforcing bolt 14 gets into the construction ground inside afterwards, fix the position of mounting bracket body 1, first connecting seat 15 and second connecting seat 16 looks adaptation, through the first connecting seat 15 with one mounting bracket body 1 outer wall connection aim at another mounting bracket body 1 outer wall connection's second connecting seat 16, the two carry out the block connection, the concatenation is convenient, and practice thrift the on-the-spot engineering time, the quick recovery of piping lane top road of being convenient for, in the hole of first connecting seat 15 is driven into again to connecting bolt 17, the second connecting seat 16 and its adaptation, the bottom of connecting bolt 17 is bored when the construction ground is inside, accomplish the fixed of first connecting seat 15 and second connecting seat 16 position, the stable connection of reinforcing junction department.
In summary, as shown in fig. 1-3, when the pipe gallery engineering installation stable structure is used, firstly, the installation frame body 1 is placed in a flattened foundation pit, the pipeline 5 is installed in the installation frame body 1, the upper, lower, left and right outer walls of the pipeline 5 are respectively attached to the upper locating clamp 4, the fixed collet 8, the left locating clamp 6 and the right locating clamp 7, the top of the flexible top layer 2 is arc-shaped, pressure can be dispersed, the damping spring 3 is connected with the installation frame body 1 and the upper locating clamp 4, the damping spring 3 is extruded by the pipelines 5 with different diameters to generate expansion and rebound, then, the positions of the upper locating clamp 4 are driven to move to apply pressure to the right upper part of the pipeline 5, the rotation angles of the left locating clamp 6 and the adjusting bolt 9 are adjusted, the positions of the left locating clamp 6 and the adjusting bolt 9 are tightened, so that the angles of the left locating clamp 6 and the adjusting bolt 9, which are contacted with the left and right locating clamp are adjusted according to the diameters of the pipeline 5, the first supporting seat 11 plays a role in supporting component force on the left locating clamp 6, the right locating clamp 7 and the bottom part of the adjusting bolt 9 play a role in supporting the left locating clamp 8 and the left and the right locating clamp 8, and the second supporting seat 10 plays a role in supporting the left locating clamp 8 and supporting the base 8 and supporting the left locating clamp is supported by the fixed collet 8.
The reinforcing bolt 14 is screwed into the first extending seat 13, then the bottom of the reinforcing bolt 14 enters the construction ground, the position of the mounting frame body 1 is fixed, the first connecting seat 15 connected with the outer wall of the mounting frame body 1 is aligned with the second connecting seat 16 connected with the outer wall of the other mounting frame body 1, the first connecting seat 15 and the second connecting seat 16 are connected in a clamping mode, the connecting bolt 17 is nailed into the holes of the first connecting seat 15 and the second connecting seat 16 and the holes of the second connecting seat, and when the bottom of the connecting bolt 17 is drilled into the construction ground, the position of the first connecting seat 15 and the second connecting seat 16 is fixed.
The embodiments of the utility model have been presented for purposes of illustration and description, and are not intended to be exhaustive or limited to the utility model in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments were chosen and described in order to best explain the principles of the utility model and the practical application, and to enable others of ordinary skill in the art to understand the utility model for various embodiments with various modifications as are suited to the particular use contemplated.
Claims (8)
1. The utility model provides a piping lane engineering installation stable structure, includes mounting bracket body (1) and pipeline (5), its characterized in that, the top fixedly connected with flexible top layer (2) of mounting bracket body (1), and the top inner wall fixedly connected with damping spring (3) of mounting bracket body (1), damping spring's (3) bottom tip is provided with locating clip (4), pipeline (5) set up in the bottom outer wall of last locating clip (4), and the left side outer wall connection of pipeline (5) has left locating clip (6), the right side outer wall of pipeline (5) is provided with right locating clip (7), and the bottom outer wall connection of pipeline (5) has fixed collet (8).
2. The pipe gallery engineering installation stabilizing structure according to claim 1, wherein the outer walls of the left locating clamp (6) and the right locating clamp (7) are respectively provided with an adjusting bolt (9), and the side outer walls of the adjusting bolts (9) are connected with a component force rod (10).
3. The pipe gallery engineering installation stabilizing structure according to claim 2, wherein a first supporting seat (11) is fixed on the outer wall of the bottom of the adjusting bolt (9), and a second supporting seat (12) is arranged on the outer wall of the bottom of the fixed base (8).
4. The pipe gallery engineering installation stabilizing structure according to claim 3, wherein the bottom outer walls of the first supporting seat (11) and the second supporting seat (12) are connected with the bottom inner wall of the installation frame body (1), and the top outer wall of the first supporting seat (11) is higher than the top outer wall of the second supporting seat (12).
5. The pipe gallery engineering installation stabilizing structure according to claim 1, wherein the left side outer wall and the right side outer wall of the installation frame body (1) are respectively provided with a first extension seat (13), and the height of the bottom outer wall of the first extension seat (13) is consistent with that of the bottom outer wall of the installation frame body (1).
6. The pipe gallery engineering installation stabilizing structure according to claim 5, wherein the first extension seat (13) is internally connected with reinforcing bolts (14) in a threaded manner, and the reinforcing bolts (14) are symmetrically distributed by taking the vertical central axis of the installation frame body (1) as a symmetry axis.
7. The pipe gallery engineering installation stabilizing structure according to claim 1, wherein the front outer wall of the installation frame body (1) is provided with a first connecting seat (15), and the rear outer wall of the installation frame body (1) is fixedly provided with a second connecting seat (16).
8. The pipe gallery engineering installation stabilizing structure according to claim 7, wherein the outer wall of the first connecting seat (15) is matched with the outer wall of the second connecting seat (16), and connecting bolts (17) are arranged inside the first connecting seat (15) and the second connecting seat (16).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420427808.7U CN222103102U (en) | 2024-03-06 | 2024-03-06 | A stable structure for installing a pipe gallery project |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420427808.7U CN222103102U (en) | 2024-03-06 | 2024-03-06 | A stable structure for installing a pipe gallery project |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN222103102U true CN222103102U (en) | 2024-12-03 |
Family
ID=93620393
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202420427808.7U Active CN222103102U (en) | 2024-03-06 | 2024-03-06 | A stable structure for installing a pipe gallery project |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN222103102U (en) |
-
2024
- 2024-03-06 CN CN202420427808.7U patent/CN222103102U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5217191A (en) | Pipe hangers or the like | |
| CN112081391A (en) | Single-pipe splicing device for steel structure truss | |
| CN222103102U (en) | A stable structure for installing a pipe gallery project | |
| CN214657041U (en) | Adjusting type fixture for cast-in-place concrete pile guide pipe | |
| CN221348192U (en) | Inner supporting structure for pipeline construction and pre-fixing frame matched with inner supporting structure | |
| CN216045822U (en) | Adjustable fixing device of bending section pump line | |
| CN116045082B (en) | A seismic bracket for installing water supply and drainage pipeline | |
| CN215829159U (en) | Split type long sleeper rail adjusting support | |
| CN214738756U (en) | Steel construction building connecting device | |
| CN214500467U (en) | Antidetonation support convenient to adjust | |
| CN219471588U (en) | Verticality adjuster for vertical component of assembly structure | |
| CN223460029U (en) | Auxiliary installation device for embedding square and round reducer pipe joints | |
| CN219196830U (en) | Anti-seismic reinforcing structure for building support | |
| CN223609053U (en) | Expansion screw | |
| CN219119282U (en) | Quick installing support of production pipeline in metal mine vertical shaft | |
| CN222435467U (en) | Pipe hanging support structure and support system for rough stone retaining wall ditch | |
| CN222513779U (en) | A steel structure bracket for pipeline installation and positioning | |
| CN222760421U (en) | A pipeline support device for municipal pipeline network construction | |
| CN222543226U (en) | A pipeline support assembly for a high-rise building | |
| CN220486455U (en) | Supporting and fixing device for lower template of concrete structure in foundation pit | |
| CN220598143U (en) | Simple positioning device for embedded ribs of expansion joints of prefabricated box girders | |
| CN220014243U (en) | Device for hanging pipeline on roof | |
| CN221336125U (en) | Auxiliary fixture for bending fire-fighting monitoring line road distributed on wood die | |
| CN222140293U (en) | Steel structure fixing device | |
| CN223305391U (en) | A non-embedded scaffolding wall connection |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |