[go: up one dir, main page]

CN221898771U - Microcomputer controlled 120 valve test bench - Google Patents

Microcomputer controlled 120 valve test bench Download PDF

Info

Publication number
CN221898771U
CN221898771U CN202323668126.XU CN202323668126U CN221898771U CN 221898771 U CN221898771 U CN 221898771U CN 202323668126 U CN202323668126 U CN 202323668126U CN 221898771 U CN221898771 U CN 221898771U
Authority
CN
China
Prior art keywords
module
button
cylinder
air cylinder
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323668126.XU
Other languages
Chinese (zh)
Inventor
黄刚
张志磊
韩彪
白晓彬
李炳军
刘遵席
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Zhiliang Electronic Science & Technology Co ltd
Original Assignee
Zhengzhou Zhiliang Electronic Science & Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Zhiliang Electronic Science & Technology Co ltd filed Critical Zhengzhou Zhiliang Electronic Science & Technology Co ltd
Priority to CN202323668126.XU priority Critical patent/CN221898771U/en
Application granted granted Critical
Publication of CN221898771U publication Critical patent/CN221898771U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fluid-Pressure Circuits (AREA)

Abstract

本实用新型涉及一种微机控制120阀试验台,包括压力采集模块、电磁阀模块、气动模块、夹持模块、模拟管系模块和控制模块,压力采集模块一端与气动模块连接,另一端与上位机连接,气动模块通过模拟管系模块与夹持模块连接,夹持模块用于夹持待测试的120阀,气动模块用于提供高压空气,电磁阀模块设置在模拟管系模块上,并与控制模块连接,用于控制模拟管系模块气路的通断。本实用新型能够通过微机控制系统实现对120阀的性能进行详细的检测,可进行连续检测,也可以对某个单项检测,以帮助检修者判断故障部位或者提供判断依据。

The utility model relates to a microcomputer-controlled 120 valve test bench, including a pressure acquisition module, a solenoid valve module, a pneumatic module, a clamping module, a simulation pipe system module and a control module. One end of the pressure acquisition module is connected to the pneumatic module, and the other end is connected to the host computer. The pneumatic module is connected to the clamping module through the simulation pipe system module. The clamping module is used to clamp the 120 valve to be tested. The pneumatic module is used to provide high-pressure air. The solenoid valve module is arranged on the simulation pipe system module and connected to the control module to control the on-off of the air path of the simulation pipe system module. The utility model can realize detailed detection of the performance of the 120 valve through a microcomputer control system, and can perform continuous detection or a single detection to help the maintenance personnel determine the fault location or provide a basis for judgment.

Description

微机控制120阀试验台Microcomputer controlled 120 valve test bench

技术领域Technical Field

本实用新型涉及试验设备技术领域,具体涉及一种微机控制120阀试验台。The utility model relates to the technical field of test equipment, in particular to a microcomputer-controlled 120-valve test bench.

背景技术Background Art

120阀空气制动机是铁路货运列车的主要制动系统,而120型空气控制阀是120阀空气制动机的重要部件,直接影响到制动机的可靠性,进而影响铁路货车的安全运行和铁路的正常行车,因此必须提高120型空气控制阀的检修质量,102阀在装车初期容易出现各种故障,而在列车上对120阀检修较为困难,如何对120阀进行测试以降低其装车故障,成为本领域技术人员亟需解决的问题。The 120-valve air brake is the main braking system of railway freight trains, and the 120-type air control valve is an important component of the 120-valve air brake, which directly affects the reliability of the brake, and then affects the safe operation of railway freight cars and the normal operation of railways. Therefore, the maintenance quality of the 120-type air control valve must be improved. The 102 valve is prone to various failures in the early stage of loading, and it is difficult to repair the 120 valve on the train. How to test the 120 valve to reduce its loading failure has become a problem that technical personnel in this field urgently need to solve.

实用新型内容Utility Model Content

本实用新型的目的是提供一种微机控制120阀试验台,模拟列车气路及运行环境,对120阀进行制动试验,解决120阀检修装车初期故障率高的问题。The utility model aims to provide a microcomputer-controlled 120 valve test bench, which simulates the train gas circuit and operating environment, performs a brake test on the 120 valve, and solves the problem of high failure rate in the initial stage of 120 valve inspection and installation.

为实现上述目的,本实用新型采用如下技术方案:In order to achieve the above purpose, the utility model adopts the following technical solutions:

一种微机控制120阀试验台,包括压力采集模块、电磁阀模块、气动模块、夹持模块、模拟管系模块和控制模块;所述压力采集模块一端与所述气动模块连接,另一端与上位机连接,所述气动模块通过所述模拟管系模块与所述夹持模块连接,所述夹持模块用于夹持待测试的120阀,所述气动模块用于提供高压空气,所述电磁阀模块设置在所述模拟管系模块上,并与所述控制模块连接,用于控制所述模拟管系模块气路的通断。A microcomputer-controlled 120 valve test bench comprises a pressure acquisition module, a solenoid valve module, a pneumatic module, a clamping module, a simulated piping module and a control module; one end of the pressure acquisition module is connected to the pneumatic module, and the other end is connected to a host computer; the pneumatic module is connected to the clamping module through the simulated piping module; the clamping module is used to clamp the 120 valve to be tested; the pneumatic module is used to provide high-pressure air; the solenoid valve module is arranged on the simulated piping module and is connected to the control module to control the on-off of the air circuit of the simulated piping module.

所述气动模块包括储风缸、副风缸、列车管容积风缸、紧急室、制动缸、加速缓解风缸和局减室,所述储风缸、副风缸、列车管容积风缸、紧急室、制动缸、加速缓解风缸和局减室均与所述模拟管系模块连接。The pneumatic module includes an air storage cylinder, an auxiliary air cylinder, a train pipe volume air cylinder, an emergency chamber, a brake cylinder, an acceleration relief air cylinder and a local reduction chamber, and the air storage cylinder, the auxiliary air cylinder, the train pipe volume air cylinder, the emergency chamber, the brake cylinder, the acceleration relief air cylinder and the local reduction chamber are all connected to the simulation pipe system module.

所述电磁阀模块包括电磁阀和电磁阀驱动组件,所述电磁阀设置有多个,各所述电磁阀一端与所述电磁阀驱动组件连接,另一端与所述模拟管系模块连接,所述电磁阀驱动组件与所述控制模块连接。The solenoid valve module includes a solenoid valve and a solenoid valve drive assembly. There are multiple solenoid valves, one end of each solenoid valve is connected to the solenoid valve drive assembly, and the other end is connected to the simulation piping module. The solenoid valve drive assembly is connected to the control module.

所述压力采集模块包括压力变送器,所述压力变送器设置有多个,各所述压力变送器一端与所述气动模块连接,另一端与所述控制模块连接。The pressure acquisition module includes a pressure transmitter, and a plurality of the pressure transmitters are provided. One end of each of the pressure transmitters is connected to the pneumatic module, and the other end is connected to the control module.

还包括机架,所述机架上设置有操作盘按钮模块,所述操作盘按钮模块与所述电磁阀模块对应设置,用于控制各所述电磁阀的通断。It also includes a frame, on which an operation panel button module is arranged. The operation panel button module is arranged corresponding to the solenoid valve module and is used to control the on and off of each solenoid valve.

所述操作盘按钮模块包括总控组、操纵阀组、快充风组、管切断组和试漏组;所述总控组包括主管路切断按钮;所述操纵阀组包括列车管容量风缸快充按钮、列车管容量风缸慢充按钮、第一列车管容量风缸排风按钮、第二列车管容量风缸排风按钮、第三列车管容量风缸排风按钮、第四列车管容量风缸排风按钮、第五列车管容量风缸排风按钮、列车管管路快排风按钮、第六列车管容量风缸排风按钮、副风缸排风按钮、加速缓解风缸排风按钮和制动缸容量风缸排风按钮;所述快充风组包括副风缸快充风按钮、加速缓解风缸快充风按钮、制动缸容量风缸快充风按钮和紧急室快充风按钮;所述管切断组包括列缸与列管间截断按钮、副缸与副管间截断按钮、制缸与制管间截断按钮、加缓缸与加缓管间截断按钮、列副管与压差计间截断按钮和列缸与加缓缸间截断按钮;所述试漏组包括副管与流量计间截断按钮、主阀排气口与流量计间截断按钮、加缓管口与流量计间截断按钮、局减口与流量计间截断按钮、局减口测漏气缸和加缓管口测漏气缸动作按钮、主阀排气口测漏气缸动作按钮。The operating panel button module includes a main control group, a control valve group, a fast-charging air group, a pipe cut-off group and a leak test group; the main control group includes a main line cut-off button; the control valve group includes a train pipe capacity air cylinder fast-charging button, a train pipe capacity air cylinder slow-charging button, a first train pipe capacity air cylinder exhaust button, a second train pipe capacity air cylinder exhaust button, a third train pipe capacity air cylinder exhaust button, a fourth train pipe capacity air cylinder exhaust button, a fifth train pipe capacity air cylinder exhaust button, a train pipe line fast exhaust button, a sixth train pipe capacity air cylinder exhaust button, an auxiliary air cylinder exhaust button, an acceleration relief air cylinder exhaust button and a brake cylinder capacity air cylinder exhaust button; the fast-charging air group includes an auxiliary The air cylinder quick-fill button, the acceleration relief air cylinder quick-fill button, the brake cylinder capacity air cylinder quick-fill button and the emergency room quick-fill button; the pipe cutting group includes the cut-off button between the column cylinder and the column tube, the cut-off button between the auxiliary cylinder and the auxiliary tube, the cut-off button between the control cylinder and the control tube, the cut-off button between the slow cylinder and the slow tube, the cut-off button between the column and the auxiliary tube and the pressure differential gauge, and the cut-off button between the column cylinder and the slow cylinder; the leak test group includes the cut-off button between the auxiliary tube and the flow meter, the cut-off button between the main valve exhaust port and the flow meter, the cut-off button between the slow tube port and the flow meter, the cut-off button between the local reduction port and the flow meter, the action button of the local reduction port leak detection cylinder and the slow tube port leak detection cylinder, and the action button of the main valve exhaust port leak detection cylinder.

本实用新型的有益效果:Beneficial effects of the utility model:

本实用新型的微机控制120阀试验台,压力采集模块一端与所述气动模块连接,另一端与上位机连接,气动模块通过模拟管系模块与夹持模块连接,夹持模块用于夹持待测试的120阀,气动模块用于提供高压空气,电磁阀模块设置在所述模拟管系模块上,并与控制模块连接,用于控制模拟管系模块气路的通断,通过电磁阀模块来控制气动模块和模拟管系模块的通断,从而模拟出各种故障,并通过压力采集模块采集到的压力来对120阀进行性能检测,检测过程可通过控制模块自动进行。The utility model is a microcomputer-controlled 120 valve test bench, wherein one end of a pressure acquisition module is connected to the pneumatic module, and the other end is connected to a host computer. The pneumatic module is connected to a clamping module via a simulation piping module, and the clamping module is used to clamp the 120 valve to be tested. The pneumatic module is used to provide high-pressure air. The solenoid valve module is arranged on the simulation piping module and is connected to a control module, and is used to control the on-off of the air path of the simulation piping module. The on-off of the pneumatic module and the simulation piping module is controlled by the solenoid valve module, thereby simulating various faults, and the performance of the 120 valve is tested by the pressure collected by the pressure acquisition module, and the testing process can be automatically performed by the control module.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1是本实用新型微机控制120阀试验台的原理图;Fig. 1 is a schematic diagram of a microcomputer-controlled 120-valve test bench of the utility model;

图2是本实用新型微机控制120阀试验台的管系原理图。FIG. 2 is a schematic diagram of the piping system of the microcomputer-controlled 120-valve test bench of the utility model.

图中各标记对应的名称:The names corresponding to the marks in the figure are:

1、列缸与列管间截断按钮,2、副缸与副管间截断按钮,3、制缸与制管间截断按钮,4、制动缸容量风缸排风按钮,5、加缓缸与加缓管间截断按钮,6、加缓管口与流量计间截断按钮,7、第六列车管容量风缸排风按钮,8、主阀排气口与流量计间截断按钮,9、加速缓解风缸快充风按钮,10、主管路切断按钮,11、副管与流量计间截断按钮,12、列缸与加缓缸间截断按钮,13、制动缸容量风缸快充风按钮,15、列副管与压差计间截断按钮,16、副风缸快充风按钮,17、紧急室快充风按钮,18、副风缸排风按钮,19、加速缓解风缸排风按钮,21、局减口与流量计间截断按钮,22、局减口测漏气缸和加缓管口测漏气缸动作按钮,23、主阀排气口测漏气缸动作按钮,1.1、列车管容量风缸快充按钮,1.2、列车管容量风缸慢充按钮,1.3、第一列车管容量风缸排风按钮,1.4、第二列车管容量风缸排风按钮,1.5、第三列车管容量风缸排风按钮,1.6、第四列车管容量风缸排风按钮,1.7、第五列车管容量风缸排风按钮。1. The cut-off button between the cylinder and the pipe, 2. The cut-off button between the auxiliary cylinder and the auxiliary pipe, 3. The cut-off button between the control cylinder and the control pipe, 4. The exhaust button of the brake cylinder capacity air cylinder, 5. The cut-off button between the slow cylinder and the slow pipe, 6. The cut-off button between the slow pipe port and the flow meter, 7. The exhaust button of the sixth train pipe capacity air cylinder, 8. The cut-off button between the main valve exhaust port and the flow meter, 9. The fast-charging button of the acceleration relief air cylinder, 10. The main line cut-off button, 11. The cut-off button between the auxiliary pipe and the flow meter, 12. The cut-off button between the cylinder and the slow cylinder, 13. The fast-charging button of the brake cylinder capacity air cylinder, 15. The cut-off button between the column auxiliary pipe and the differential pressure gauge, 16. The fast-charging button of the auxiliary air cylinder, 17. Emergency room fast-fill air button, 18. Auxiliary air cylinder exhaust button, 19. Accelerated relief air cylinder exhaust button, 21. Shut-off button between local reduction port and flow meter, 22. Local reduction port leak detection cylinder and deceleration pipe port leak detection cylinder action button, 23. Main valve exhaust port leak detection cylinder action button, 1.1. Train pipe capacity air cylinder fast-fill button, 1.2. Train pipe capacity air cylinder slow-fill button, 1.3. First train pipe capacity air cylinder exhaust button, 1.4. Second train pipe capacity air cylinder exhaust button, 1.5. Third train pipe capacity air cylinder exhaust button, 1.6. Fourth train pipe capacity air cylinder exhaust button, 1.7. Fifth train pipe capacity air cylinder exhaust button.

具体实施方式DETAILED DESCRIPTION

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述。The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

本实用新型实施例中的微机控制120阀试验台,是通过微机控制系统实现对120阀的性能进行详细的检测,可进行连续检测,也可以对某个单项检测,以帮助检修者判断故障部位或者提供判断依据。The microcomputer-controlled 120-valve test bench in the embodiment of the utility model realizes detailed detection of the performance of the 120 valves through a microcomputer control system. It can perform continuous detection or a single item detection to help the maintenance personnel determine the fault location or provide a basis for judgment.

如图1和图2所示,微机控制120阀试验台,包括压力采集模块、电磁阀模块、气动模块、夹持模块、模拟管系模块和控制模块,压力采集模块一端与气动模块连接,另一端与上位机连接,气动模块通过模拟管系模块与夹持模块连接,夹持模块能够夹持待测试的120阀,气动模块用于提供高压空气,电磁阀模块设置在模拟管系模块上,并与控制模块连接,用于控制模拟管系模块气路的通断。As shown in Figures 1 and 2, the microcomputer-controlled 120 valve test bench includes a pressure acquisition module, a solenoid valve module, a pneumatic module, a clamping module, a simulated piping module and a control module. One end of the pressure acquisition module is connected to the pneumatic module, and the other end is connected to the host computer. The pneumatic module is connected to the clamping module through the simulated piping module. The clamping module can clamp the 120 valve to be tested. The pneumatic module is used to provide high-pressure air. The solenoid valve module is arranged on the simulated piping module and is connected to the control module to control the on-off of the air circuit of the simulated piping module.

在实际使用时,通过压力采集模块,能够采集模拟管系模块中的压力,通过电磁阀模块来控制气动模块和模拟管系模块的通断,从而模拟出各种故障,通过压力采集模块采集到的压力来对120阀进行性能检测,检测过程可通过控制模块自动进行。In actual use, the pressure acquisition module can be used to collect the pressure in the simulated piping module, and the solenoid valve module can be used to control the on/off of the pneumatic module and the simulated piping module, thereby simulating various faults. The pressure collected by the pressure acquisition module is used to perform performance testing on the 120 valve, and the testing process can be automatically performed through the control module.

具体地,气动模块包括储风缸、副风缸、列车管容积风缸、紧急室、制动缸、加速缓解风缸和局减室,所述储风缸、副风缸、列车管容积风缸、紧急室、制动缸、加速缓解风缸和局减室均与所述模拟管系模块连接,其中,列车管容积风缸设置有两个,记为容积室一、容积室二,通过各风缸来存储各部压力空气,通过各风缸均连接有压力表,能够可视化观察各风缸的压力,本实施例中,配备4块1.5级双针压力表,分别显示总风和列风缸,副风缸和加速缓解风缸,列车管和紧急室,制动缸和局减室,5块1.6级压力表,储风缸,制动缸管,加速缓解风缸管,副风缸管,列车管的压力。Specifically, the pneumatic module includes an air storage cylinder, an auxiliary air cylinder, a train pipe volume air cylinder, an emergency chamber, a brake cylinder, an acceleration relief air cylinder and a local reduction chamber. The air storage cylinder, auxiliary air cylinder, train pipe volume air cylinder, emergency chamber, brake cylinder, acceleration relief air cylinder and local reduction chamber are all connected to the simulation pipe system module, wherein two train pipe volume air cylinders are provided, recorded as volume chamber one and volume chamber two, and each air cylinder is used to store the pressure air of each part. Each air cylinder is connected with a pressure gauge, and the pressure of each air cylinder can be visualized. In this embodiment, 4 1.5-level double-needle pressure gauges are equipped to display the total air and column air cylinders, auxiliary air cylinders and acceleration relief air cylinders, train pipes and emergency chambers, brake cylinders and local reduction chambers, 5 1.6-level pressure gauges, air storage cylinders, brake cylinder pipes, acceleration relief air cylinder pipes, auxiliary air cylinder pipes, and train pipes.

电磁阀模块,包括电磁阀和电磁阀驱动组件,电磁阀驱动组件采用带隔离功能的驱动板,来驱动各电磁阀动作,电磁阀驱动组件与控制模块连接,能够接收控制模块的指令来控制对应的电池阀开闭,本实施例中,电磁阀设置有32个,电磁阀采用板式连接阀,采用内先导二位二通电磁阀,来控制管路的充风、排风。The solenoid valve module includes a solenoid valve and a solenoid valve driving assembly. The solenoid valve driving assembly adopts a driving plate with an isolation function to drive each solenoid valve to operate. The solenoid valve driving assembly is connected to the control module and can receive instructions from the control module to control the opening and closing of the corresponding battery valve. In this embodiment, 32 solenoid valves are provided. The solenoid valve adopts a plate-type connecting valve and an internal pilot two-position two-way solenoid valve to control the charging and exhausting of the pipeline.

如图1所示,压力采集模块,包括压力变送器,能够把压力信号转换为电信号,压力变送器设置有多个,各压力变送器一端与气动模块连接,另一端与控制模块连接。As shown in FIG1 , the pressure acquisition module includes a pressure transmitter, which can convert the pressure signal into an electrical signal. There are multiple pressure transmitters, one end of each pressure transmitter is connected to the pneumatic module, and the other end is connected to the control module.

本实施例中,设置有十路压力变送器,分别对应储风缸、列车管、副风缸、工作风缸、容积室一、容积室二、制动缸、紧急列车管、紧急室、局减室。In this embodiment, ten pressure transmitters are provided, corresponding to the air storage cylinder, train pipe, auxiliary air cylinder, working air cylinder, volume chamber 1, volume chamber 2, brake cylinder, emergency train pipe, emergency room, and local reduction room respectively.

如图2所示,为120阀试验台的管系原理图,图2示出了管系模拟模块的具体结构,120阀包括主阀和紧急阀,主阀和紧急阀通过夹持模块固定,夹持模块设置在机架上,夹持模块上设置有与管系连接的端口,便于与管系模拟模块连接,同时,在机架上设置有操作盘按钮模块,操作盘按钮模块包括多个操作按钮,各操作按钮对应有电磁阀,通过外接控制按钮,可通过操作按钮,手动选择各气路的开闭,实现不同的功能,As shown in FIG2, it is a schematic diagram of the piping system of the 120 valve test bench. FIG2 shows the specific structure of the piping system simulation module. The 120 valve includes a main valve and an emergency valve. The main valve and the emergency valve are fixed by a clamping module. The clamping module is arranged on a rack. The clamping module is provided with a port connected to the piping system, which is convenient for connecting to the piping system simulation module. At the same time, an operation panel button module is arranged on the rack. The operation panel button module includes a plurality of operation buttons. Each operation button corresponds to a solenoid valve. Through an external control button, the opening and closing of each gas path can be manually selected through the operation button to realize different functions.

具体地,图2所示,操作盘按钮模块包括总控组、操纵阀组、快充风组、管切断组和试漏组;Specifically, as shown in FIG2 , the operation panel button module includes a master control group, a control valve group, a fast-filling air group, a pipe cutting group, and a leak test group;

总控组包括主管路切断按钮10,通过主管路切断按钮10,控制主管路的气路通断。The main control group includes a main line cut-off button 10, through which the main line cut-off button 10 is used to control the on and off of the gas path of the main line.

操纵阀组包括列车管容量风缸快充按钮1.1、列车管容量风缸慢充按钮1.2、第一列车管容量风缸排风按钮1.3、第二列车管容量风缸排风按钮1.4、第三列车管容量风缸排风按钮1.5、第四列车管容量风缸排风按钮1.6、第五列车管容量风缸排风按钮1.7、列车管管路快排风按钮、第六列车管容量风缸排风按钮7、副风缸排风按钮18、加速缓解风缸排风按钮19和制动缸容量风缸排风按钮4,通过不同的按钮,实现对应管路的通断。The control valve group includes a train pipe capacity air cylinder fast charge button 1.1, a train pipe capacity air cylinder slow charge button 1.2, a first train pipe capacity air cylinder exhaust button 1.3, a second train pipe capacity air cylinder exhaust button 1.4, a third train pipe capacity air cylinder exhaust button 1.5, a fourth train pipe capacity air cylinder exhaust button 1.6, a fifth train pipe capacity air cylinder exhaust button 1.7, a train pipe pipeline fast exhaust button, a sixth train pipe capacity air cylinder exhaust button 7, an auxiliary air cylinder exhaust button 18, an acceleration relief air cylinder exhaust button 19 and a brake cylinder capacity air cylinder exhaust button 4. Different buttons are used to realize the opening and closing of the corresponding pipelines.

快充风组包括副风缸快充风按钮16、加速缓解风缸快充风按钮9、制动缸容量风缸快充风按钮13和紧急室快充风按钮17,通过不同的按钮,实现对应管路的通断。The fast-charging air group includes an auxiliary air cylinder fast-charging air button 16, an acceleration relief air cylinder fast-charging air button 9, a brake cylinder capacity air cylinder fast-charging air button 13 and an emergency room fast-charging air button 17. Different buttons are used to realize the opening and closing of corresponding pipelines.

管切断组包括列缸与列管间截断按钮1、副缸与副管间截断按钮2、制缸与制管间截断按钮3、加缓缸与加缓管间截断按钮5、列副管与压差计间截断按钮15和列缸与加缓缸间截断按钮12,通过不同的按钮,实现对应管路的通断。The pipe cutting group includes a cut-off button 1 between the column cylinders and the column pipes, a cut-off button 2 between the auxiliary cylinder and the auxiliary pipe, a cut-off button 3 between the control cylinder and the control pipe, a cut-off button 5 between the buffer cylinder and the buffer pipe, a cut-off button 15 between the column auxiliary pipes and the pressure differential gauge, and a cut-off button 12 between the column cylinders and the buffer cylinder. Different buttons are used to realize the opening and closing of the corresponding pipelines.

试漏组包括副管与流量计间截断按钮11、主阀排气口与流量计间截断按钮8、加缓管口与流量计间截断按钮6、局减口与流量计间截断按钮21、局减口测漏气缸和加缓管口测漏气缸动作按钮22、主阀排气口测漏气缸动作按钮23,通过不同的按钮,实现对应管路的通断。The leak test group includes a cut-off button 11 between the auxiliary pipe and the flow meter, a cut-off button 8 between the main valve exhaust port and the flow meter, a cut-off button 6 between the slow-down pipe port and the flow meter, a cut-off button 21 between the local reduction port and the flow meter, an actuating button 22 for the leak detection cylinder of the local reduction port and the slow-down pipe port, and an actuating button 23 for the leak detection cylinder of the main valve exhaust port. Different buttons are used to realize the opening and closing of the corresponding pipelines.

显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员所获得的所有其他实施例,都属于本实用新型保护的范围。Obviously, the described embodiments are only a part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field belong to the protection scope of the utility model.

Claims (6)

1.一种微机控制120阀试验台,其特征在于:包括压力采集模块、电磁阀模块、气动模块、夹持模块、模拟管系模块和控制模块;所述压力采集模块一端与所述气动模块连接,另一端与上位机连接,所述气动模块通过所述模拟管系模块与所述夹持模块连接,所述夹持模块用于夹持待测试的120阀,所述气动模块用于提供高压空气,所述电磁阀模块设置在所述模拟管系模块上,并与所述控制模块连接,用于控制所述模拟管系模块气路的通断。1. A microcomputer-controlled 120 valve test bench, characterized in that it includes a pressure acquisition module, a solenoid valve module, a pneumatic module, a clamping module, a simulated piping module and a control module; one end of the pressure acquisition module is connected to the pneumatic module, and the other end is connected to a host computer, the pneumatic module is connected to the clamping module through the simulated piping module, the clamping module is used to clamp the 120 valve to be tested, the pneumatic module is used to provide high-pressure air, the solenoid valve module is arranged on the simulated piping module, and is connected to the control module, and is used to control the on-off of the air circuit of the simulated piping module. 2.根据权利要求1所述的微机控制120阀试验台,其特征在于:所述气动模块包括储风缸、副风缸、列车管容积风缸、紧急室、制动缸、加速缓解风缸和局减室,所述储风缸、副风缸、列车管容积风缸、紧急室、制动缸、加速缓解风缸和局减室均与所述模拟管系模块连接。2. The microcomputer-controlled 120-valve test bench according to claim 1 is characterized in that: the pneumatic module includes an air storage cylinder, an auxiliary air cylinder, a train pipe volume air cylinder, an emergency chamber, a brake cylinder, an acceleration relief air cylinder and a local reduction chamber, and the air storage cylinder, auxiliary air cylinder, train pipe volume air cylinder, emergency chamber, brake cylinder, acceleration relief air cylinder and local reduction chamber are all connected to the simulation pipe system module. 3.根据权利要求2所述的微机控制120阀试验台,其特征在于:所述电磁阀模块包括电磁阀和电磁阀驱动组件,所述电磁阀设置有多个,各所述电磁阀一端与所述电磁阀驱动组件连接,另一端与所述模拟管系模块连接,所述电磁阀驱动组件与所述控制模块连接。3. The microcomputer-controlled 120-valve test bench according to claim 2 is characterized in that: the solenoid valve module includes a solenoid valve and a solenoid valve drive assembly, and there are multiple solenoid valves, one end of each solenoid valve is connected to the solenoid valve drive assembly, and the other end is connected to the simulation piping module, and the solenoid valve drive assembly is connected to the control module. 4.根据权利要求3所述的微机控制120阀试验台,其特征在于:所述压力采集模块包括压力变送器,所述压力变送器设置有多个,各所述压力变送器一端与所述气动模块连接,另一端与所述控制模块连接。4. The microcomputer-controlled 120-valve test bench according to claim 3 is characterized in that: the pressure acquisition module includes a pressure transmitter, and there are multiple pressure transmitters, one end of each pressure transmitter is connected to the pneumatic module, and the other end is connected to the control module. 5.根据权利要求4所述的微机控制120阀试验台,其特征在于:还包括机架,所述机架上设置有操作盘按钮模块,所述操作盘按钮模块与所述电磁阀模块对应设置,用于控制各所述电磁阀的通断。5. The microcomputer-controlled 120-valve test bench according to claim 4 is characterized in that it also includes a frame, on which an operation panel button module is arranged, and the operation panel button module is arranged corresponding to the solenoid valve module for controlling the on and off of each solenoid valve. 6.根据权利要求5所述的微机控制120阀试验台,其特征在于:所述操作盘按钮模块包括总控组、操纵阀组、快充风组、管切断组和试漏组;所述总控组包括主管路切断按钮;所述操纵阀组包括列车管容量风缸快充按钮、列车管容量风缸慢充按钮、第一列车管容量风缸排风按钮、第二列车管容量风缸排风按钮、第三列车管容量风缸排风按钮、第四列车管容量风缸排风按钮、第五列车管容量风缸排风按钮、列车管管路快排风按钮、第六列车管容量风缸排风按钮、副风缸排风按钮、加速缓解风缸排风按钮和制动缸容量风缸排风按钮;所述快充风组包括副风缸快充风按钮、加速缓解风缸快充风按钮、制动缸容量风缸快充风按钮和紧急室快充风按钮;所述管切断组包括列缸与列管间截断按钮、副缸与副管间截断按钮、制缸与制管间截断按钮、加缓缸与加缓管间截断按钮、列副管与压差计间截断按钮和列缸与加缓缸间截断按钮;所述试漏组包括副管与流量计间截断按钮、主阀排气口与流量计间截断按钮、加缓管口与流量计间截断按钮、局减口与流量计间截断按钮、局减口测漏气缸和加缓管口测漏气缸动作按钮、主阀排气口测漏气缸动作按钮。6. The microcomputer-controlled 120-valve test bench according to claim 5 is characterized in that: the operation panel button module includes a master control group, a control valve group, a fast-filling air group, a pipe cut-off group and a leak test group; the master control group includes a main line cut-off button; the control valve group includes a train pipe capacity air cylinder fast-filling button, a train pipe capacity air cylinder slow-filling button, a first train pipe capacity air cylinder exhaust button, a second train pipe capacity air cylinder exhaust button, a third train pipe capacity air cylinder exhaust button, a fourth train pipe capacity air cylinder exhaust button, a fifth train pipe capacity air cylinder exhaust button, a train pipe line fast exhaust button, a sixth train pipe capacity air cylinder exhaust button, an auxiliary air cylinder exhaust button, an acceleration relief air cylinder exhaust button and a brake cylinder capacity air cylinder Cylinder exhaust button; the quick-fill air group includes the auxiliary air cylinder quick-fill air button, the acceleration relief air cylinder quick-fill air button, the brake cylinder capacity air cylinder quick-fill air button and the emergency room quick-fill air button; the pipe cutting group includes the cut-off button between the column cylinder and the column tube, the cut-off button between the auxiliary cylinder and the auxiliary tube, the cut-off button between the control cylinder and the control tube, the cut-off button between the slow cylinder and the slow tube, the cut-off button between the column auxiliary tube and the pressure differential gauge, and the cut-off button between the column cylinder and the slow cylinder; the leak test group includes the cut-off button between the auxiliary tube and the flow meter, the cut-off button between the main valve exhaust port and the flow meter, the cut-off button between the slow tube port and the flow meter, the cut-off button between the local reduction port and the flow meter, the action button of the local reduction port leak detection cylinder and the slow tube port leak detection cylinder, and the action button of the main valve exhaust port leak detection cylinder.
CN202323668126.XU 2023-12-29 2023-12-29 Microcomputer controlled 120 valve test bench Active CN221898771U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323668126.XU CN221898771U (en) 2023-12-29 2023-12-29 Microcomputer controlled 120 valve test bench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323668126.XU CN221898771U (en) 2023-12-29 2023-12-29 Microcomputer controlled 120 valve test bench

Publications (1)

Publication Number Publication Date
CN221898771U true CN221898771U (en) 2024-10-25

Family

ID=93131879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323668126.XU Active CN221898771U (en) 2023-12-29 2023-12-29 Microcomputer controlled 120 valve test bench

Country Status (1)

Country Link
CN (1) CN221898771U (en)

Similar Documents

Publication Publication Date Title
WO2021259325A1 (en) Testing apparatus and testing method for automatic pressure regulating valve of electronic braking system
CN201348557Y (en) Air leakage rate field test apparatus for air conditioner
CN103063378B (en) Spacecraft condensate water pipeline system general integral leakage fast leakage detection apparatus and leak hunting method
CN201307055Y (en) CHR2 valve bedstand
CN101813564B (en) Automation testing platform control air circuit system of subway brake unit
CN110293949A (en) A kind of bullet train Pneumatic brake systems small fault detection method
CN201028987Y (en) 10Mpa differential pressure type gas leakage detecting device
CN206804242U (en) Intermediate of brake valve air-leakage test experimental bench
CN221898771U (en) Microcomputer controlled 120 valve test bench
CN104089748A (en) Constant-pressure detection testing machine for air pressure of braking hose
CN110816209B (en) Method and device for obtaining filling parameters of air conditioning system
CN108801663B (en) Vehicle brake tester and brake test method
CN107478398A (en) A kind of brake valve testing stand and its automatic test method
US3596500A (en) Apparatus for testing airbrake control valves
CN109159780A (en) Integrity of train detection method and device based on the monitoring of train parting overpressure
CN203849026U (en) CRH train rescue system tester
CN210834054U (en) Air tightness test device for through passage system
CN202119601U (en) Quick detection system for air tightness of vehicles
CN220583708U (en) Portable air tightness test equipment
CN208607017U (en) A kind of vehicle braking exerciser
CN109443808B (en) An interface device for a vehicle braking intelligent test system
CN204154488U (en) Engineering truck brake experimental bench
CN214384532U (en) Pneumatic Test System for Basic Brake Products of Railway Vehicles
CN202372320U (en) Multi-purpose air tightness test bed
CN212159074U (en) Urban rail vehicle air spring pressure simulation tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant