[go: up one dir, main page]

CN221878635U - Artificial stone with aggregate on back - Google Patents

Artificial stone with aggregate on back Download PDF

Info

Publication number
CN221878635U
CN221878635U CN202420440945.4U CN202420440945U CN221878635U CN 221878635 U CN221878635 U CN 221878635U CN 202420440945 U CN202420440945 U CN 202420440945U CN 221878635 U CN221878635 U CN 221878635U
Authority
CN
China
Prior art keywords
stone
layer
aggregate
paving
artificial
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420440945.4U
Other languages
Chinese (zh)
Inventor
汤国彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202420440945.4U priority Critical patent/CN221878635U/en
Application granted granted Critical
Publication of CN221878635U publication Critical patent/CN221878635U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The artificial stone with aggregate on the back relates to an improvement of building decoration materials, in particular to an improvement of artificial stone and artificial stone plates. The stone material comprises a stone surface layer, a transition adhesive layer and a bone material layer, wherein the bone material layer is fixedly attached to the back surface of the stone surface layer through the transition adhesive layer; the aggregate layer is formed by mixing broken particles and viscose, and a plurality of uniform grooves are formed in the surface, far away from the stone surface layer, of the aggregate layer. The stone back paving layer is used for adding the bone material layer, and the stone paving is more stable by using the woolen surface and the grooves of the aggregate, so that the occurrence of hollowness can be almost stopped; the stone paving machine can improve stone paving efficiency, enable novice to accurately and stably pave, and reduce requirements on staff. After the technical scheme is adopted, the utility model has the beneficial effects that: the stone paving machine can facilitate the constructors to lay stones, reduce the requirements on the workers, eliminate hollows and other phenomena in stone paving, and enable the workers with new hands or poorer skills to easily finish the stone paving.

Description

背面带骨料的人造石材Artificial stone with aggregate back

技术领域Technical Field

本实用新型涉及一种建筑装饰材料的改进,具体涉及一种人造石材、人造石板材的改进。The utility model relates to an improvement of a building decoration material, in particular to an improvement of an artificial stone material and an artificial stone plate.

背景技术Background Art

石材通常是指人造石实体面材、人造石石英石、人造石岗石等,模拟仿制天然石材;在应用中常常利用水泥或者黏胶进行粘贴、也有进行石材干挂;但是大部分均为采用水泥浆贴挂。Stone usually refers to artificial stone solid surface materials, artificial stone quartz stone, artificial stone granite, etc., which simulate natural stone. In application, it is often pasted with cement or adhesive, and stone is also dry hung; but most of them are hung with cement slurry.

由于人造石材大多面积较大,石材正面均为经过打磨的展示面,而背面一般也为平整面部分设置有一些筋条凸起等,由于面积较大在黏贴中由于基面平整不够、石材背面整理的水泥浆不够平整均匀,在石材黏贴后常常出现空鼓或者不平整的现象,这类缺陷二次返工异常麻烦,人工、物料的成本都较高。尤其是新手或者手艺较差的工作人员施工更会造成较多的施工缺陷。Since most artificial stones have a large area, the front of the stone is a polished display surface, and the back is generally a flat surface with some ribs and protrusions. Due to the large area, the base surface is not flat enough and the cement slurry on the back of the stone is not flat and uniform. After the stone is pasted, hollows or unevenness often occur. This kind of defect is very troublesome to rework for the second time, and the labor and material costs are high. Especially when the construction is done by novices or workers with poor skills, more construction defects will be caused.

实用新型内容Utility Model Content

本实用新型的目的在于针对现有技术的缺陷和不足,提供一种背面带骨料的人造石材,它能方便施工人员进行石材的铺设,降低对工作人员的要求,在石材铺贴中可以消除空鼓等现象,即便是新手或者手艺较差的工作人员也能轻松完成石材的铺设。The purpose of the utility model is to provide an artificial stone with aggregate on the back to address the defects and shortcomings of the prior art, which can facilitate construction workers in laying stones, reduce the requirements for workers, eliminate hollowing and other phenomena during stone paving, and even novices or workers with poor skills can easily complete the laying of stones.

为实现上述目的,本实用新型采用以下技术方案是:它包含石材表面层1、过渡粘胶层2、骨料层3,骨料层3通过过渡粘胶层2固定贴敷在石材表面层1的背面;骨料层3由碎颗粒和黏胶混合而成,骨料层3远离石材表面层1的表面设置有多道均匀的凹槽31。To achieve the above purpose, the utility model adopts the following technical scheme: it comprises a stone surface layer 1, a transition adhesive layer 2, and an aggregate layer 3, wherein the aggregate layer 3 is fixedly applied to the back of the stone surface layer 1 through the transition adhesive layer 2; the aggregate layer 3 is composed of a mixture of crushed particles and adhesive, and a surface of the aggregate layer 3 away from the stone surface layer 1 is provided with a plurality of uniform grooves 31.

所述的骨料层3由碎石子和黏胶混合后固化而成,骨料层3远离过渡粘胶层2为碎石子自然生成面。骨料层3的外表面为碎石子自然面即为粗糙的表面,在铺设时碎石子自然面贴铺在地面通过混凝土或者黏胶粘贴,可以有更好的粘性,确保石材铺设的稳定性,几乎杜绝了空鼓的存在。The aggregate layer 3 is formed by mixing crushed stones and adhesive and then solidifying. The aggregate layer 3 is far away from the transition adhesive layer 2 and is the natural surface of crushed stones. The outer surface of the aggregate layer 3 is the natural surface of crushed stones, that is, a rough surface. When laying, the natural surface of crushed stones is pasted on the ground through concrete or adhesive, which can have better adhesion, ensure the stability of stone laying, and almost eliminate the existence of hollows.

所述凹槽31的截面为圆弧形。凹槽31是在骨料层3制备完成后通过机械设备铲削而成,设置凹槽31可以让石材再看铺贴过程中让混凝土和黏胶有更好的流动性,可以在空隙和凹槽31中填充混凝土和黏胶,使得石材铺设更稳定、粘合性更好,减少空鼓现象的发生。The cross section of the groove 31 is an arc shape. The groove 31 is scraped by mechanical equipment after the aggregate layer 3 is prepared. The groove 31 can allow the concrete and adhesive to have better fluidity during the stone paving process, and concrete and adhesive can be filled in the gaps and grooves 31, so that the stone paving is more stable and has better adhesion, and the occurrence of hollowing phenomenon is reduced.

所述的骨料层3由碎红砖块和黏胶混合后固化而成。选用碎红砖块可以更好的降低成本,也能有更好的吸水、防水性能。The aggregate layer 3 is formed by mixing and solidifying broken red bricks and adhesive. The use of broken red bricks can better reduce costs and have better water absorption and waterproof properties.

本实用新型的工作原理:它利用石材背面铺贴层增设骨料层,利用骨料的毛料面和凹槽,让石材铺贴更稳定,几乎可以杜绝空鼓的发生;可以提高石材铺设的效率,让新手也能准确稳定的铺设,降低对工作人员的要求。The working principle of the utility model: it uses the paving layer on the back of the stone to add an aggregate layer, and utilizes the rough surface and grooves of the aggregate to make the stone paving more stable, and can almost eliminate the occurrence of hollowing; it can improve the efficiency of stone paving, so that novices can also lay accurately and stably, and reduce the requirements for staff.

采用上述技术方案后,本实用新型有益效果为:它能方便施工人员进行石材的铺设,降低对工作人员的要求,在石材铺贴中可以消除空鼓等现象,即便是新手或者手艺较差的工作人员也能轻松完成石材的铺设。After adopting the above technical scheme, the beneficial effects of the utility model are: it can facilitate construction workers to lay stones, reduce the requirements for workers, eliminate hollowing and other phenomena during stone laying, and even novices or workers with poor skills can easily complete the laying of stones.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

图1是本实用新型的剖视图;Fig. 1 is a cross-sectional view of the utility model;

图2是本实用新型的轴测图;Fig. 2 is an axonometric view of the utility model;

图3是本实用新型的背面视图;Fig. 3 is a rear view of the utility model;

图4是图3的左视图。FIG. 4 is a left side view of FIG. 3 .

附图标记说明:石材表面层1、过渡粘胶层2、骨料层3、凹槽31。Description of the accompanying drawings: stone surface layer 1, transition adhesive layer 2, aggregate layer 3, groove 31.

具体实施方式DETAILED DESCRIPTION

参看图1-4所示,本具体实施方式采用的技术方案是:它包含石材表面层1、过渡粘胶层2、骨料层3,骨料层3通过过渡粘胶层2固定贴敷在石材表面层1的背面;骨料层3由碎颗粒和黏胶混合而成,骨料层3远离石材表面层1的表面设置有多道均匀的凹槽31;所述的骨料层3由碎石子和黏胶混合后固化而成,骨料层3远离过渡粘胶层2为碎石子自然生成面。所述凹槽31的截面为圆弧形。所述的骨料层3由碎红砖块和黏胶混合后固化而成。选用碎红砖块可以更好的降低成本,也能有更好的吸水、防水性能。Referring to Figures 1-4, the technical solution adopted in this specific embodiment is: it comprises a stone surface layer 1, a transition adhesive layer 2, and an aggregate layer 3, wherein the aggregate layer 3 is fixedly applied to the back of the stone surface layer 1 through the transition adhesive layer 2; the aggregate layer 3 is formed by mixing crushed particles and adhesive, and the surface of the aggregate layer 3 away from the stone surface layer 1 is provided with a plurality of uniform grooves 31; the aggregate layer 3 is formed by mixing crushed stones and adhesive and solidifying, and the aggregate layer 3 away from the transition adhesive layer 2 is a naturally generated surface of crushed stones. The cross section of the groove 31 is an arc shape. The aggregate layer 3 is formed by mixing crushed red bricks and adhesive and solidifying. The use of crushed red bricks can better reduce costs and also have better water absorption and waterproof properties.

本具体实施方式骨料层3的外表面为碎石子自然面即为粗糙的表面,在铺设时碎石子自然面贴铺在地面通过混凝土或者黏胶粘贴,可以有更好的粘性,确保石材铺设的稳定性,几乎杜绝了空鼓的存在。凹槽31是在骨料层3制备完成后通过机械设备铲削而成,设置凹槽31可以让石材再看铺贴过程中让混凝土和黏胶有更好的流动性,可以在空隙和凹槽31中填充混凝土和黏胶,使得石材铺设更稳定、粘合性更好,减少空鼓现象的发生。它利用石材背面铺贴层增设骨料层,利用骨料的毛料面和凹槽,让石材铺贴更稳定,几乎可以杜绝空鼓的发生;可以提高石材铺设的效率,让新手也能准确稳定的铺设,降低对工作人员的要求。The outer surface of the aggregate layer 3 of this specific embodiment is the natural surface of crushed stone, that is, a rough surface. When laying, the natural surface of the crushed stone is pasted on the ground through concrete or glue, which can have better adhesion, ensure the stability of stone laying, and almost eliminate the existence of hollows. The groove 31 is scraped by mechanical equipment after the preparation of the aggregate layer 3 is completed. The provision of the groove 31 can allow the concrete and glue to have better fluidity during the stone paving process. Concrete and glue can be filled in the gaps and grooves 31, making the stone laying more stable and better bonded, and reducing the occurrence of hollowing. It uses the paving layer on the back of the stone to add an aggregate layer, and uses the rough surface and grooves of the aggregate to make the stone paving more stable, which can almost eliminate the occurrence of hollows; it can improve the efficiency of stone paving, so that novices can also lay accurately and stably, and reduce the requirements for staff.

采用上述技术方案后,本实用新型有益效果为:它能方便施工人员进行石材的铺设,降低对工作人员的要求,在石材铺贴中可以消除空鼓等现象,即便是新手或者手艺较差的工作人员也能轻松完成石材的铺设。After adopting the above technical scheme, the beneficial effects of the utility model are: it can facilitate construction workers to lay stones, reduce the requirements for workers, eliminate hollowing and other phenomena during stone laying, and even novices or workers with poor skills can easily complete the laying of stones.

以上所述,仅用以说明本实用新型的技术方案而非限制,本领域普通技术人员对本实用新型的技术方案所做的其它修改或者等同替换,只要不脱离本实用新型技术方案的精神和范围,均应涵盖在本实用新型的权利要求范围当中。The above description is only used to illustrate the technical solution of the utility model rather than to limit it. Other modifications or equivalent substitutions made to the technical solution of the utility model by ordinary technicians in this field should be included in the scope of the claims of the utility model as long as they do not depart from the spirit and scope of the technical solution of the utility model.

Claims (4)

1.背面带骨料的人造石材,其特征在于:它包含石材表面层(1)、过渡粘胶层(2)、骨料层(3),骨料层(3)通过过渡粘胶层(2)固定贴敷在石材表面层(1)的背面;骨料层(3)由碎颗粒和黏胶混合而成,骨料层(3)远离石材表面层(1)的表面设置有多道均匀的凹槽(31)。1. An artificial stone with aggregate on the back, characterized in that it comprises a stone surface layer (1), a transition adhesive layer (2), and an aggregate layer (3), wherein the aggregate layer (3) is fixedly attached to the back of the stone surface layer (1) through the transition adhesive layer (2); the aggregate layer (3) is a mixture of crushed particles and adhesive, and a surface of the aggregate layer (3) away from the stone surface layer (1) is provided with a plurality of uniform grooves (31). 2.根据权利要求1所述的背面带骨料的人造石材,其特征在于:所述的骨料层(3)由碎石子和黏胶混合后固化而成,骨料层(3)远离过渡粘胶层(2)为碎石子自然生成面。2. The artificial stone with aggregate on the back according to claim 1 is characterized in that: the aggregate layer (3) is formed by mixing crushed stones and adhesive and then solidifying, and the aggregate layer (3) away from the transition adhesive layer (2) is a naturally generated surface of crushed stones. 3.根据权利要求1所述的背面带骨料的人造石材,其特征在于:所述凹槽(31)的截面为圆弧形。3. The artificial stone with aggregate on the back according to claim 1, characterized in that the cross section of the groove (31) is arc-shaped. 4.根据权利要求1所述的背面带骨料的人造石材,其特征在于:所述的骨料层(3)由碎红砖块和黏胶混合后固化而成。4. The artificial stone with aggregate on the back according to claim 1, characterized in that the aggregate layer (3) is formed by mixing and solidifying broken red bricks and adhesive.
CN202420440945.4U 2024-03-07 2024-03-07 Artificial stone with aggregate on back Active CN221878635U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420440945.4U CN221878635U (en) 2024-03-07 2024-03-07 Artificial stone with aggregate on back

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420440945.4U CN221878635U (en) 2024-03-07 2024-03-07 Artificial stone with aggregate on back

Publications (1)

Publication Number Publication Date
CN221878635U true CN221878635U (en) 2024-10-22

Family

ID=93099621

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420440945.4U Active CN221878635U (en) 2024-03-07 2024-03-07 Artificial stone with aggregate on back

Country Status (1)

Country Link
CN (1) CN221878635U (en)

Similar Documents

Publication Publication Date Title
CN101942905B (en) Method for treating assembly-type floorslab cracks
CN107268946A (en) A kind of color sand epoxy self-leveling construction technology
CN107601985A (en) A kind of ceramic tile interface agent
CN107619245A (en) A kind of surfacing self-leveling floor mortar and its construction method
CN111946021A (en) High belite sulphoaluminate cement non-partition crystal grindstone ground construction method
CN221878635U (en) Artificial stone with aggregate on back
CN201459570U (en) A concrete permeable floor tile
CN207363192U (en) Floor tile
CN105113360A (en) Linked grass paver produced from recycled aggregate
CN210597982U (en) Composite copper plate structure with back bolt on floor
CN109534765B (en) Travertine geological grouting material, its preparation method and technology for repairing underwater travertine geological fractures
CN219794760U (en) Floor tile hollowing grouting device
CN209723369U (en) Light sandwich concrete masonry is used for the structure and wall body structure of cold district
CN112663890A (en) Bonding type construction method for indoor large-size ceramic wall brick
CN117846265A (en) Auxiliary paving device for large ceramic tiles and construction method thereof
CN110054449A (en) A kind of ceramic tile bond, preparation method and application method
CN117605318A (en) A method of repairing slurry finish
CN106673540A (en) Super-strength ceramic tile interface agent
CN201809928U (en) Texture planning module unit for sealing ice flaws
CN101235256B (en) Cement bonding agent, road index mark cement dope and method for preparing road index mark by the same
CN204803713U (en) Novel brilliant athletic ground of wear -resisting coloured silk
CN205224514U (en) Structure is pasted by shop of floor tile
CN220319034U (en) A kind of no-wash exposed aggregate art floor
CN221799025U (en) A seamless terrazzo integral floor
CN209456827U (en) Floating floor decorating structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant