CN221796762U CN202322867826.5U CN202322867826U CN221796762U CN 221796762 U CN221796762 U CN 221796762U CN 202322867826 U CN202322867826 U CN 202322867826U CN 221796762 U CN221796762 U CN 221796762U
Authority
CN
China
Prior art keywords
steel bar
fixing
lifting
column
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322867826.5U
Other languages
Chinese (zh)
Inventor
陈曙霞
陈波
李新文
赵国辉
黄勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202322867826.5U priority Critical patent/CN221796762U/en
Application granted granted Critical
Publication of CN221796762U publication Critical patent/CN221796762U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

本实用新型公开了一种吊运钢筋束装置,包括龙门吊钩和钢管柱;所述钢管柱的两端固定安装有固定环,所述固定环为方形且上下两端分别套接有上吊环和下吊环,所述两组上吊环与龙门吊钩之间通过安装有钢丝绳连接;所述下吊环下安装有钢筋束夹,所述钢筋束夹的底部设置有夹钩,所述夹钩适于固定钢筋束。本实用新型解决了现有技术中常采用夹具为单组方向上的夹紧,不具备双向夹紧功能,容易因为高空搬运导致的脱钩掉落,产生伤人事故的技术问题。

The utility model discloses a device for lifting a steel bar bundle, comprising a gantry hook and a steel pipe column; fixing rings are fixedly installed at both ends of the steel pipe column, the fixing ring is square and has upper and lower lifting rings respectively sleeved at the upper and lower ends, and the two groups of upper lifting rings are connected to the gantry hook by installing a steel wire rope; a steel bar bundle clamp is installed under the lower lifting ring, and a clamping hook is arranged at the bottom of the steel bar bundle clamp, and the clamping hook is suitable for fixing the steel bar bundle. The utility model solves the technical problem that the clamps commonly used in the prior art are clamped in a single direction, do not have a bidirectional clamping function, and are easily unhooked and dropped due to high-altitude transportation, resulting in injuries.

Description

一种吊运钢筋束装置A device for lifting steel bar tendons

技术领域Technical Field

本实用新型属于钢筋束搬运技术领域,具体地说,涉及一种吊运钢筋束装置。The utility model belongs to the technical field of steel bar bundle transportation, and specifically relates to a steel bar bundle hoisting device.

背景技术Background Art

桥梁钢筋加工厂需要利用龙门吊进行钢筋束的吊运加工,通常在钢筋束的两端捆的钢筋上再利用钢丝绳捆在钢束的两端钢筋进行吊运。这种方法对钢丝绳的磨损大,需要人工在钢筋两端钢筋上安装钢丝绳,作业速度慢。Bridge steel bar processing plants need to use gantry cranes to lift and process steel bar bundles. Usually, steel wire ropes are tied to the steel bars at both ends of the steel bar bundle for lifting. This method causes great wear on the steel wire ropes, requires manual installation of the steel wire ropes on the steel bars at both ends of the steel bar, and has a slow operation speed.

其次,如CN201920581683.2一种吊装钢筋网的夹具,现有技术中常采用夹具为单组方向上的夹紧,不具备双向夹紧功能,容易因为高空搬运导致的脱钩掉落,产生伤人事故。Secondly, as in CN201920581683.2, a clamp for lifting steel mesh, the prior art often uses a clamp for clamping in a single direction, which does not have a two-way clamping function and is prone to unhooking and falling due to high-altitude transportation, causing injuries.

有鉴于此特提出本实用新型。In view of this, the present utility model is proposed.

实用新型内容Utility Model Content

为解决上述技术问题,本实用新型采用技术方案的基本构思是:In order to solve the above technical problems, the basic concept of the technical solution adopted by the utility model is:

为了提高钢筋束的吊运速度并减少钢丝绳的磨损,设计一种钢筋束专用吊钩装置,直接钩在钢筋束上进行吊运,相比钢筋绳直接吊装方法,除了龙门吊操作员外,也需要两人配合,操作人数相同但吊运的效率更高。In order to increase the lifting speed of the steel bar bundle and reduce the wear of the wire rope, a special hook device for the steel bar bundle is designed. It is directly hooked on the steel bar bundle for lifting. Compared with the direct lifting method of the steel bar rope, in addition to the gantry crane operator, two people are also required to cooperate. The number of operators is the same but the lifting efficiency is higher.

一种吊运钢筋束装置,包括龙门吊钩和钢管柱;A device for lifting a steel bar bundle, comprising a gantry hook and a steel pipe column;

所述钢管柱的两端固定安装有固定环,所述固定环为方形且上下两端分别套接有上吊环和下吊环,所述两组上吊环与龙门吊钩之间通过安装有钢丝绳连接;The two ends of the steel pipe column are fixedly installed with fixing rings, the fixing ring is square and the upper and lower ends are respectively sleeved with upper and lower lifting rings, and the two sets of upper lifting rings are connected to the gantry hook by installing a steel wire rope;

所述下吊环下安装有钢筋束夹,所述钢筋束夹的底部设置有夹钩,所述夹钩适于固定钢筋束。A steel bar bundle clamp is installed under the lower lifting ring, and a clamp hook is arranged at the bottom of the steel bar bundle clamp, and the clamp hook is suitable for fixing the steel bar bundle.

在更进一步的技术方案中,所述钢筋束夹为多组的菱形或平行四边形,交叉设置;In a further technical solution, the steel bar tendon clamps are multiple groups of rhombuses or parallelograms, which are cross-arranged;

夹钩内壁设置有摩擦齿,且摩擦齿的大小不小于钢筋束的钢筋直径。The inner wall of the clamp hook is provided with friction teeth, and the size of the friction teeth is not less than the diameter of the steel bars of the steel bar bundle.

在更进一步的技术方案中,所述钢管柱内设置有纵向安装柱,所述纵向安装柱与钢管柱的轴线相垂直,所述纵向安装柱内开设有安装腔,所述安装腔内安装有固定柱,所述固定柱上安装有补强件,所述补强件适于连接在钢筋束上。In a further technical solution, a longitudinal installation column is arranged in the steel pipe column, the longitudinal installation column is perpendicular to the axis of the steel pipe column, an installation cavity is opened in the longitudinal installation column, a fixing column is installed in the installation cavity, a reinforcement piece is installed on the fixing column, and the reinforcement piece is suitable for being connected to the steel bar bundle.

在更进一步的技术方案中,所述补强件包括移动框板,所述移动框板的顶部开设有上位置孔和下位置孔,所述下位置孔适于套接在固定柱上,所述移动框板适于在固定柱上移动;In a further technical solution, the reinforcing member comprises a movable frame plate, the top of the movable frame plate is provided with an upper position hole and a lower position hole, the lower position hole is suitable for being sleeved on a fixed column, and the movable frame plate is suitable for moving on the fixed column;

所述上位置孔内适于安装有锁紧件,所述锁紧件适于锁紧两组移动框板;The upper position hole is suitable for installing a locking piece, and the locking piece is suitable for locking two sets of movable frame plates;

所述移动框板下固定安装有夹板,所述夹板适于抵接在钢筋束的两侧。A clamping plate is fixedly installed under the movable frame plate, and the clamping plate is suitable for abutting against two sides of the steel bar bundle.

在更进一步的技术方案中,所述锁紧件包括U型杆,所述移动框板的顶部端部设置有C型板,且C型板的两侧开设有连接孔,所述U型杆适于插入两组连接孔内,所述C型板的另一侧安装有固定件。In a further technical solution, the locking member includes a U-shaped rod, a C-shaped plate is provided at the top end of the movable frame plate, and connecting holes are opened on both sides of the C-shaped plate, the U-shaped rod is suitable for being inserted into the two groups of connecting holes, and a fixing member is installed on the other side of the C-shaped plate.

在更进一步的技术方案中,所述固定件为C型杆,所述U型杆上开设有定位孔,所述定位孔适于插入C型杆。In a further technical solution, the fixing member is a C-shaped rod, and a positioning hole is formed on the U-shaped rod, and the positioning hole is suitable for inserting the C-shaped rod.

在更进一步的技术方案中,所述固定件包括移动板,所述U型杆上设置有螺纹部,所述移动板上开设有过渡孔,所述过渡孔大于U型杆的杆径,所述过渡孔外设置有固定筒,且固定筒内安装有旋转螺母,所述旋转螺母适于在固定筒内旋转,且旋转螺母螺纹连接在螺纹部上。In a further technical solution, the fixing member includes a movable plate, a threaded portion is provided on the U-shaped rod, a transition hole is opened on the movable plate, the transition hole is larger than the rod diameter of the U-shaped rod, a fixing cylinder is provided outside the transition hole, and a rotating nut is installed in the fixing cylinder, the rotating nut is suitable for rotating in the fixing cylinder, and the rotating nut is threadedly connected to the threaded portion.

有益效果:Beneficial effects:

本装置与常规钢筋束捆梆吊运相比,减少了钢丝绳与钢筋束的摩擦,提高了钢丝绳的使用寿命,由于自动夹紧钢筋束,吊运的速度加快,提高了工作效率。Compared with conventional steel bar bundle binding and lifting, this device reduces the friction between the steel wire rope and the steel bar bundle, and increases the service life of the steel wire rope. Due to the automatic clamping of the steel bar bundle, the lifting speed is accelerated, and the work efficiency is improved.

本实用新型通过纵向安装柱实现纵向的安装夹紧效果,且通过在固定柱上移动两组对称设置的补强件实现两侧夹紧,通过U型杆实现插接两组补强件并通过锁紧件实现锁紧。C型杆实现在多组定位孔内插接限位,实现对钢筋束进行限位。通过旋转螺母在螺纹部上螺纹连接实现相对限制两组补强件,来约束钢筋束进行搬运。The utility model realizes the longitudinal installation clamping effect through the longitudinal installation column, and realizes the clamping on both sides by moving two groups of symmetrically arranged reinforcement pieces on the fixed column, and realizes the plugging of the two groups of reinforcement pieces through the U-shaped rod and realizes the locking through the locking piece. The C-shaped rod realizes the plugging and limiting in the multiple groups of positioning holes, and realizes the limiting of the steel bar bundle. The two groups of reinforcement pieces are relatively restricted by the rotating nut and the threaded connection on the threaded part, so as to constrain the steel bar bundle for transportation.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

在附图中:In the attached picture:

图1为本实用新型实施例1的结构示意图;FIG1 is a schematic diagram of the structure of Embodiment 1 of the present utility model;

图2为图1的A处放大示意图;FIG2 is an enlarged schematic diagram of point A in FIG1 ;

图3为本实用新型实施例2的结构示意图;FIG3 is a schematic diagram of the structure of Embodiment 2 of the present utility model;

图4为本实用新型的纵向安装柱的内部示意图;FIG4 is a schematic diagram of the interior of the longitudinal mounting column of the present invention;

图5为本实用新型的移动框板与夹板示意图;FIG5 is a schematic diagram of a movable frame plate and a clamping plate of the utility model;

图6为本实用新型的实施例2的U型杆锁紧连接示意图;FIG6 is a schematic diagram of a U-shaped rod locking connection in Example 2 of the present utility model;

图7为本实用新型的实施例3的U型杆锁紧连接示意图。FIG. 7 is a schematic diagram of the locking connection of the U-shaped rod of Example 3 of the present utility model.

图中:1、龙门吊钩;2、上吊环;3、固定环;4、下吊环;5、钢筋束夹;6、夹钩;7、钢丝绳;8、钢管柱;9、摩擦齿;10、纵向安装柱;11、固定柱;12、移动框板;13、上位置孔;14、下位置孔;15、夹板;16、U型杆;17、C型板;18、连接孔;19、C型杆;20、移动板;21、固定筒;22、旋转螺母;100、钢筋束。In the figure: 1. gantry hook; 2. upper lifting ring; 3. fixed ring; 4. lower lifting ring; 5. steel bar bundle clamp; 6. clamp hook; 7. wire rope; 8. steel pipe column; 9. friction tooth; 10. longitudinal installation column; 11. fixed column; 12. movable frame plate; 13. upper position hole; 14. lower position hole; 15. clamping plate; 16. U-shaped rod; 17. C-shaped plate; 18. connecting hole; 19. C-shaped rod; 20. movable plate; 21. fixed cylinder; 22. rotating nut; 100. steel bar bundle.

具体实施方式DETAILED DESCRIPTION

为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合实施例,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本实用新型,并不用于限定本实用新型。In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail in combination with the embodiments below. It should be understood that the specific embodiments described here are only used to explain the utility model, and are not used to limit the utility model.

下面结合附图及具体实施例对本实用新型的应用原理作进一步描述。The application principle of the utility model is further described below in conjunction with the accompanying drawings and specific embodiments.

实施例1Example 1

如图1至图2所示,为本实用新型的一种实施方案,一种吊运钢筋束装置,包括龙门吊钩1和钢管柱8;As shown in FIG. 1 and FIG. 2 , an embodiment of the utility model is shown, a device for lifting a steel bar bundle, comprising a gantry hook 1 and a steel pipe column 8;

所述钢管柱8的两端固定安装有固定环3,所述固定环3为方形且上下两端分别套接有上吊环2和下吊环4,所述两组上吊环2与龙门吊钩1之间通过安装有钢丝绳7连接;The two ends of the steel pipe column 8 are fixedly installed with fixing rings 3, the fixing ring 3 is square and the upper and lower ends are respectively sleeved with an upper lifting ring 2 and a lower lifting ring 4, and the two sets of upper lifting rings 2 are connected to the gantry hook 1 by installing a steel wire rope 7;

所述下吊环4下安装有钢筋束夹5,所述钢筋束夹5的底部设置有夹钩6,所述夹钩6适于固定钢筋束100。A steel bar bundle clamp 5 is installed under the lower lifting ring 4 , and a clamp hook 6 is provided at the bottom of the steel bar bundle clamp 5 . The clamp hook 6 is suitable for fixing the steel bar bundle 100 .

钢筋束夹5为多组的菱形或平行四边形,交叉设置;让平行四边形或菱形变形引起夹钩6的张角大小改变夹紧不同大小的钢筋束。The steel bar bundle clamps 5 are multiple groups of rhombuses or parallelograms, which are cross-arranged; the parallelograms or rhombuses are deformed to cause the opening angle of the clamp hooks 6 to change, thereby clamping steel bars of different sizes.

夹钩6内壁设置有摩擦齿9,且摩擦齿9的大小不小于钢筋束100的钢筋直径。加工有摩擦齿9以消除夹钢筋束100时的滑动,摩擦齿9的大小不小于钢筋束100内单独钢筋直径,提高吊运的安全性。The inner wall of the clamp hook 6 is provided with friction teeth 9, and the size of the friction teeth 9 is not less than the diameter of the steel bar of the steel bar bundle 100. The friction teeth 9 are processed to eliminate slippage when clamping the steel bar bundle 100, and the size of the friction teeth 9 is not less than the diameter of the individual steel bar in the steel bar bundle 100, thereby improving the safety of lifting.

钢管柱8端固定环3采用粗钢筋加工,钢管柱8两端端打孔,穿过钢筋柱8并焊接在钢管柱8上。The fixing ring 3 at the end of the steel pipe column 8 is made of thick steel bars, holes are punched at both ends of the steel pipe column 8, passed through the steel bar column 8 and welded to the steel pipe column 8.

本吊运装置的加工,钢管柱8的长度略小于钢筋束100长度,小于10cm-50cm,两端焊上固定环3,其上安装上吊环2与下吊环4。In the processing of the present lifting device, the length of the steel pipe column 8 is slightly smaller than the length of the steel bar bundle 100, less than 10cm-50cm, and a fixing ring 3 is welded on both ends, on which an upper lifting ring 2 and a lower lifting ring 4 are installed.

吊钢筋束100时,本装置安装钢丝绳7,穿过上吊环2与下吊环4,挂在龙门吊钩1上。When the reinforcing bar bundle 100 is suspended, the device is provided with a steel wire rope 7 which passes through the upper suspension ring 2 and the lower suspension ring 4 and is hung on the gantry hook 1 .

本装置吊运到钢筋束100上方,钢管柱8与吊运的钢筋束100基本平行,龙门吊钩1下移,直到夹钩6对准钢筋束,夹钩6包围钢筋束100,龙门吊钩1慢慢向上提升,钢筋束100在重力作用下拉菱形或平行四边形轴承,使夹钩紧紧夹住钢筋束100。龙门吊钩1进行钢筋束100的运输,直到加工点,龙门吊钩1下移直到钢筋束100靠边地面,减少重力对夹钩6的拉力,夹钩6松开。再进行下一捆的钢筋束100的吊装与运输作业。The device is hoisted above the steel bar bundle 100, the steel pipe column 8 is substantially parallel to the hoisted steel bar bundle 100, the gantry hook 1 moves down until the clamping hook 6 is aligned with the steel bar bundle, the clamping hook 6 surrounds the steel bar bundle 100, the gantry hook 1 slowly rises, the steel bar bundle 100 pulls the diamond or parallelogram bearing under the action of gravity, so that the clamping hook tightly clamps the steel bar bundle 100. The gantry hook 1 transports the steel bar bundle 100 to the processing point, the gantry hook 1 moves down until the steel bar bundle 100 is close to the ground, reducing the tension of gravity on the clamping hook 6, and the clamping hook 6 is released. Then the hoisting and transportation operation of the next bundle of steel bar bundles 100 is carried out.

实施例2Example 2

如图3至图6所示,为本实用新型的另一种实施方案,在实施例1的基础上,实现侧向补强夹紧效果,所述钢管柱8内设置有纵向安装柱10,所述纵向安装柱10与钢管柱8的轴线相垂直,所述纵向安装柱10内开设有安装腔,所述安装腔内安装有固定柱11,所述固定柱11上安装有补强件,所述补强件适于连接在钢筋束100上。As shown in Figures 3 to 6, another implementation scheme of the present invention is to achieve a lateral reinforcement and clamping effect based on Example 1. A longitudinal mounting column 10 is provided in the steel pipe column 8. The longitudinal mounting column 10 is perpendicular to the axis of the steel pipe column 8. An installation cavity is provided in the longitudinal mounting column 10. A fixing column 11 is installed in the installation cavity. A reinforcement member is installed on the fixing column 11. The reinforcement member is suitable for being connected to the steel bar bundle 100.

如图5所示,补强件包括移动框板12,所述移动框板12的顶部开设有上位置孔13和下位置孔14,所述下位置孔14适于套接在固定柱11上,所述移动框板12适于在固定柱11上移动;上位置孔13内适于安装有锁紧件,所述锁紧件适于锁紧两组移动框板12;移动框板12下固定安装有夹板15,所述夹板15适于抵接在钢筋束100的两侧。As shown in Figure 5, the reinforcement includes a movable frame plate 12, the top of which is provided with an upper position hole 13 and a lower position hole 14, the lower position hole 14 is suitable for being sleeved on the fixed column 11, and the movable frame plate 12 is suitable for moving on the fixed column 11; a locking member is suitable for being installed in the upper position hole 13, and the locking member is suitable for locking two groups of movable frame plates 12; a clamping plate 15 is fixedly installed under the movable frame plate 12, and the clamping plate 15 is suitable for abutting against both sides of the steel bar bundle 100.

所述锁紧件包括U型杆16,所述移动框板12的顶部端部设置有C型板17,且C型板17的两侧开设有连接孔18,所述U型杆16适于插入两组连接孔18内,所述C型板17的另一侧安装有固定件。所述固定件为C型杆19,所述U型杆16上开设有定位孔,所述定位孔适于插入C型杆19。The locking member includes a U-shaped rod 16, a C-shaped plate 17 is provided at the top end of the movable frame plate 12, and connecting holes 18 are provided on both sides of the C-shaped plate 17, and the U-shaped rod 16 is suitable for being inserted into the two groups of connecting holes 18, and a fixing member is installed on the other side of the C-shaped plate 17. The fixing member is a C-shaped rod 19, and a positioning hole is provided on the U-shaped rod 16, and the positioning hole is suitable for inserting the C-shaped rod 19.

实施例3Example 3

如图7所示,为本实用新型的另一种实施方案,在实施例2的基础上,固定件包括移动板20,所述U型杆16上设置有螺纹部,所述移动板20上开设有过渡孔,所述过渡孔大于U型杆16的杆径,所述过渡孔外设置有固定筒21,且固定筒21内安装有旋转螺母22,所述旋转螺母22适于在固定筒21内旋转,且旋转螺母22螺纹连接在螺纹部上。旋转螺母22设置有柱状筒并在固定筒21内旋转连接,柱状筒与固定筒21之间安装连接轴承,图中未画出。As shown in FIG. 7 , another embodiment of the present utility model is shown. On the basis of Example 2, the fixing member includes a movable plate 20, a threaded portion is provided on the U-shaped rod 16, a transition hole is provided on the movable plate 20, the transition hole is larger than the rod diameter of the U-shaped rod 16, a fixed cylinder 21 is provided outside the transition hole, and a rotating nut 22 is installed in the fixed cylinder 21, the rotating nut 22 is suitable for rotating in the fixed cylinder 21, and the rotating nut 22 is threadedly connected to the threaded portion. The rotating nut 22 is provided with a columnar cylinder and is rotatably connected in the fixed cylinder 21, and a connecting bearing is installed between the columnar cylinder and the fixed cylinder 21, which is not shown in the figure.

对于本领域技术人员而言,显然本实用新型不限于上述示范性实施例的细节,而且在不背离本实用新型的精神或基本特征的情况下,能够以其他的具体形式实现本实用新型。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本实用新型的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本实用新型内。It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention.

此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This narrative method of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment can also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims (7)

1. The device for lifting the tendon is characterized by comprising a gantry lifting hook (1) and a steel pipe column (8);
The two ends of the steel pipe column (8) are fixedly provided with fixing rings (3), the fixing rings (3) are square, the upper ends and the lower ends of the fixing rings are respectively sleeved with an upper hanging ring (2) and a lower hanging ring (4), and the two groups of upper hanging rings (2) are connected with the gantry lifting hook (1) through steel wire ropes (7);
The steel bar bundle clamp (5) is arranged below the lower hanging ring (4), a clamping hook (6) is arranged at the bottom of the steel bar bundle clamp (5), and the clamping hook (6) is suitable for fixing the steel bar bundle (100).
2. A handling tendon device according to claim 1, characterized in that the tendon clamps (5) are diamond or parallelogram groups, arranged crosswise;
Friction teeth (9) are arranged on the inner wall of the clamping hook (6), and the size of the friction teeth (9) is not smaller than the diameter of the steel bars of the steel bar bundles (100).
3. The lifting tendon device according to claim 1, characterized in that a longitudinal mounting column (10) is arranged in the steel pipe column (8), the longitudinal mounting column (10) is perpendicular to the axis of the steel pipe column (8), a mounting cavity is formed in the longitudinal mounting column (10), a fixing column (11) is arranged in the mounting cavity, and a reinforcing member is arranged on the fixing column (11) and is suitable for being connected to the tendon (100).
4. A handling tendon device according to claim 3, characterized in that the reinforcement comprises a moving frame plate (12), the top of the moving frame plate (12) being provided with an upper position hole (13) and a lower position hole (14), the lower position hole (14) being adapted to be sleeved on the fixed column (11), the moving frame plate (12) being adapted to move on the fixed column (11);
A locking piece is arranged in the upper position hole (13) and is suitable for locking the two groups of movable frame plates (12);
A clamping plate (15) is fixedly arranged below the movable frame plate (12), and the clamping plate (15) is suitable for being abutted against two sides of the tendon (100).
5. The lifting tendon device as claimed in claim 4, characterized in that the locking member comprises a U-shaped rod (16), a C-shaped plate (17) is provided at the top end of the movable frame plate (12), connecting holes (18) are provided at both sides of the C-shaped plate (17), the U-shaped rod (16) is adapted to be inserted into the two groups of connecting holes (18), and a fixing member is mounted at the other side of the C-shaped plate (17).
6. The lifting tendon device as claimed in claim 5, characterized in that the fixing means is a C-shaped rod (19), the U-shaped rod (16) being provided with a positioning hole adapted to be inserted into the C-shaped rod (19).
7. The lifting tendon device according to claim 5, characterized in that the fixing member comprises a moving plate (20), a threaded portion is arranged on the U-shaped rod (16), a transition hole is formed in the moving plate (20), the transition hole is larger than the rod diameter of the U-shaped rod (16), a fixing cylinder (21) is arranged outside the transition hole, a rotating nut (22) is arranged in the fixing cylinder (21), the rotating nut (22) is suitable for rotating in the fixing cylinder (21), and the rotating nut (22) is in threaded connection with the threaded portion.
CN202322867826.5U 2023-10-25 2023-10-25 Device for lifting and conveying steel bar bundles Active CN221796762U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322867826.5U CN221796762U (en) 2023-10-25 2023-10-25 Device for lifting and conveying steel bar bundles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322867826.5U CN221796762U (en) 2023-10-25 2023-10-25 Device for lifting and conveying steel bar bundles

Publications (1)

Publication Number Publication Date
CN221796762U true CN221796762U (en) 2024-10-01

Family

ID=92879409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322867826.5U Active CN221796762U (en) 2023-10-25 2023-10-25 Device for lifting and conveying steel bar bundles

Country Status (1)

Country Link
CN (1) CN221796762U (en)

Similar Documents

Publication Publication Date Title
CN108975157B (en) Hoisting clamp special for spool
CN209685155U (en) A kind of combined type lifting system
CN109279500A (en) A tongs and a crane used for loading and unloading of circular objects
CN221796762U (en) Device for lifting and conveying steel bar bundles
CN208684234U (en) A kind of lifting device being exclusively used in I-beam wheel
CN220317073U (en) TRD shaped steel hoist and mount stability fixture and hoist thereof
CN209778055U (en) A general lifting device for lifting cylinder head
CN2723409Y (en) Special clamp for loading and unloading 8 ton aluminium ingot
CN211895663U (en) Scrap steel bucket hoisting structure
CN209038880U (en) It is a kind of to load and unload the tongs and crane that use for circular object
CN210528252U (en) Novel crane hook structure
CN210103273U (en) Steel rail hoisting device
CN211254971U (en) Become bundle of steel special lifting device
CN210973557U (en) A kind of high pier construction steel bar hoisting fixture
CN209536788U (en) Jaw arrangement is hung in a kind of transfer of crane girder
CN210558996U (en) Assembled building model platform double-limb column lifting appliance
CN205346692U (en) Swing arm tower machine of supporting multiple mounting means becomes width of cloth pulley yoke
CN209127874U (en) A concrete pole hoisting tool
CN2218731Y (en) Universal hanging clamp for steel products
CN208200138U (en) A kind of X-type I-steel hoisting clamp
CN2212581Y (en) Concrete pipe hoisting clamp
CN201605579U (en) Tubular pile trade steel cage hoist device
CN111891921A (en) Turning device for steel tube arch segment
CN221051348U (en) Special lifting appliance for air conditioning unit
CN218024976U (en) Building steel structure hoisting equipment capable of being quickly unhooked

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant