[go: up one dir, main page]

CN221796401U - A mining engineering deployment device - Google Patents

A mining engineering deployment device Download PDF

Info

Publication number
CN221796401U
CN221796401U CN202420208942.8U CN202420208942U CN221796401U CN 221796401 U CN221796401 U CN 221796401U CN 202420208942 U CN202420208942 U CN 202420208942U CN 221796401 U CN221796401 U CN 221796401U
Authority
CN
China
Prior art keywords
mining engineering
rubber roller
motor
material shaft
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420208942.8U
Other languages
Chinese (zh)
Inventor
孔祥伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Dongping Hongda Mining Co ltd
Original Assignee
Shandong Dongping Hongda Mining Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Dongping Hongda Mining Co ltd filed Critical Shandong Dongping Hongda Mining Co ltd
Priority to CN202420208942.8U priority Critical patent/CN221796401U/en
Application granted granted Critical
Publication of CN221796401U publication Critical patent/CN221796401U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Unwinding Of Filamentary Materials (AREA)

Abstract

本实用新型涉及采矿工程技术领域,公开了一种采矿工程布设装置,包括底座,底座上呈对称状设置有立板,立板之间设有卷料组件,卷料组件包括料轴,料轴外设有卷料筒,卷料筒两侧设有夹座,夹座套设在料轴外,立板外壁设有机架,机架上设有电机,电机输出端通过联轴器连接有橡胶滚筒,橡胶滚筒位于两个立板之间。将卷状管道的卷料筒套入料轴外,通过夹座进行紧固,确保其稳定。管道沿橡胶滚筒下方穿越,并导入两个导向筒之间的管槽。根据实际需求,调整导向筒的高度。启动电机后,电机驱动橡胶滚筒旋转,借助橡胶滚筒提供的较大摩擦力,进而带动接触的管道缓慢输送。如此一来,便实现了自动化布线,提升了管道布设的效率。

The utility model relates to the technical field of mining engineering, and discloses a mining engineering layout device, including a base, on which vertical plates are symmetrically arranged, a coiling assembly is arranged between the vertical plates, the coiling assembly includes a material shaft, a coiling drum is arranged outside the material shaft, clamping seats are arranged on both sides of the coiling drum, the clamping seats are sleeved outside the material shaft, a frame is arranged on the outer wall of the vertical plate, a motor is arranged on the frame, and a rubber roller is connected to the output end of the motor through a coupling, and the rubber roller is located between two vertical plates. The coiling drum of the rolled pipe is sleeved outside the material shaft and fastened by the clamping seat to ensure its stability. The pipe passes under the rubber roller and is introduced into the pipe groove between the two guide cylinders. The height of the guide cylinder is adjusted according to actual needs. After starting the motor, the motor drives the rubber roller to rotate, and with the help of the large friction provided by the rubber roller, the contacted pipe is driven to be slowly transported. In this way, automatic wiring is realized and the efficiency of pipeline layout is improved.

Description

一种采矿工程布设装置A mining engineering deployment device

技术领域Technical Field

本实用新型涉及采矿工程技术领域,具体为一种采矿工程布设装置。The utility model relates to the technical field of mining engineering, in particular to a mining engineering deployment device.

背景技术Background Art

采矿工程,顾名思义,是指采用各种技术手段,对地球深处的矿产资源进行勘探、评价、开发和利用的一门工程技术。它包括矿产资源的勘查、矿山设计、采矿方法、矿物加工、环境保护等多个方面。采矿工程师的任务就是要在保证经济效益的同时,最大限度地减少对环境的影响,实现可持续发展。Mining engineering, as the name suggests, refers to an engineering technology that uses various technical means to explore, evaluate, develop and utilize mineral resources deep in the earth. It includes mineral resource exploration, mine design, mining methods, mineral processing, environmental protection and other aspects. The task of mining engineers is to minimize the impact on the environment and achieve sustainable development while ensuring economic benefits.

在对采矿作业中,当前管道的布设方式存在一定的问题,主要表现在人工铺设的方式耗时耗力,这种方式主要依赖于人工操作,不仅耗费大量人力,而且工作效率较低。由于人工铺设受到人为因素的影响,如操作人员的技术水平、体力状况等,因此在实际操作过程中,难以保证管道布设的质量和速度。在特定通道内,人工铺设管道存在一定的困难。由于通道空间的限制,人工铺设管道时需要不断调整布线,以确保管道的顺畅。这一过程不仅增加了工作难度,还可能导致管道布设失误,从而影响整个采矿作业的进度。In mining operations, there are certain problems with the current pipeline laying method, mainly manifested in the time-consuming and labor-intensive manual laying method. This method mainly relies on manual operation, which not only consumes a lot of manpower but also has low work efficiency. Since manual laying is affected by human factors, such as the technical level and physical condition of the operator, it is difficult to ensure the quality and speed of pipeline laying during actual operation. In a specific channel, there are certain difficulties in manually laying pipelines. Due to the limitation of channel space, the wiring needs to be constantly adjusted when manually laying pipelines to ensure the smoothness of the pipeline. This process not only increases the difficulty of work, but may also lead to errors in pipeline laying, thus affecting the progress of the entire mining operation.

因此,基于上述技术问题,本领域的技术人员有必要研发一种采矿工程布设装置。Therefore, based on the above technical problems, it is necessary for technicians in this field to develop a mining engineering deployment device.

实用新型内容Utility Model Content

本实用新型目的是提供一种采矿工程布设装置,以解决上述背景技术中提出的问题。The utility model aims to provide a mining engineering deployment device to solve the problems raised in the above background technology.

为实现上述目的,本实用新型提供如下技术方案:In order to achieve the above purpose, the utility model provides the following technical solutions:

一种采矿工程布设装置技术方案,包括底座,所述底座上呈对称状设置有立板,所述立板之间设有卷料组件,所述卷料组件包括料轴,所述料轴外设有卷料筒,所述卷料筒两侧设有夹座,所述夹座套设在料轴外,所述立板外壁设有机架,所述机架上设有电机,所述电机输出端通过联轴器连接有橡胶滚筒,所述橡胶滚筒位于两个立板之间。A technical solution for a mining engineering deployment device includes a base, vertical plates are symmetrically arranged on the base, a winding assembly is arranged between the vertical plates, the winding assembly includes a material shaft, a winding drum is arranged outside the material shaft, clamping seats are arranged on both sides of the winding drum, the clamping seats are arranged outside the material shaft, a frame is provided on the outer wall of the vertical plate, a motor is arranged on the frame, the output end of the motor is connected to a rubber roller through a coupling, and the rubber roller is located between the two vertical plates.

作为一种优选的技术方案,所述夹座与料轴滑动配合,所述夹座上设有螺栓,所述螺栓端面与料轴相抵。As a preferred technical solution, the clamp seat is slidably matched with the material shaft, and a bolt is provided on the clamp seat, and the end face of the bolt is against the material shaft.

作为一种优选的技术方案,所述立板、机架均通过螺栓装配连接。As a preferred technical solution, the vertical plate and the frame are assembled and connected by bolts.

作为一种优选的技术方案,所述橡胶滚筒相邻一侧立板相对内壁上罐体设有调整滑口,所述调整滑口内设有定位组件,所述定位组件包括两个平行状分布的活动轴,所述活动轴两端伸入调整滑口内,且活动轴外设有导向筒,所述导向筒上设有多个管槽。As a preferred technical solution, an adjustment slide is provided on the inner wall of the tank body relative to the vertical plate on one side adjacent to the rubber roller, and a positioning assembly is provided in the adjustment slide. The positioning assembly includes two parallel distributed movable shafts, both ends of the movable shafts extend into the adjustment slide, and a guide cylinder is provided outside the movable shaft, and a plurality of pipe grooves are provided on the guide cylinder.

作为一种优选的技术方案,所述活动轴两端设有螺纹,且螺纹外设有螺帽,所述螺帽与立板相抵。As a preferred technical solution, threads are provided at both ends of the movable shaft, and nuts are provided outside the threads, and the nuts are against the vertical plate.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:

本实用新型为一种采矿工程布设装置,配置的卷料组件与定位组件,将卷状管道的卷料筒套入料轴外,通过夹座进行紧固,确保其稳定。管道沿橡胶滚筒下方穿越,并导入两个导向筒之间的管槽。根据实际需求,调整导向筒的高度。启动电机后,电机驱动橡胶滚筒旋转,借助橡胶滚筒提供的较大摩擦力,进而带动接触的管道缓慢输送。如此一来,便实现了自动化布线,提升了管道布设的效率。The utility model is a mining engineering laying device, which is equipped with a coiling assembly and a positioning assembly. The coiling drum of the rolled pipe is inserted into the outside of the material shaft and fastened by a clamping seat to ensure its stability. The pipe passes under the rubber roller and is introduced into the pipe groove between the two guide cylinders. The height of the guide cylinder is adjusted according to actual needs. After starting the motor, the motor drives the rubber roller to rotate, and with the help of the large friction provided by the rubber roller, the contacted pipe is slowly transported. In this way, automated wiring is realized and the efficiency of pipeline laying is improved.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1为一种采矿工程布设装置的整体结构示意图;FIG1 is a schematic diagram of the overall structure of a mining engineering deployment device;

图2为一种采矿工程布设装置的定位组件结构示意图;FIG2 is a schematic diagram of the structure of a positioning component of a mining engineering deployment device;

图3为一种采矿工程布设装置的卷料组件结构示意图。FIG. 3 is a schematic diagram of the structure of a coil assembly of a mining engineering deployment device.

附图标记中:1、底座;2、立板;201、调整滑口;21、料轴;22、夹座;23、螺栓;24、卷料筒;31、机架;32、电机;33、橡胶滚筒;41、活动轴;42、螺帽;43、导向筒;44、管槽。In the accompanying drawings, the following are numerals: 1, base; 2, vertical plate; 201, adjustment slide; 21, material shaft; 22, clamping seat; 23, bolt; 24, material reel; 31, frame; 32, motor; 33, rubber roller; 41, movable shaft; 42, nut; 43, guide cylinder; 44, pipe groove.

具体实施方式DETAILED DESCRIPTION

下面将详细描述本实用新型的各个方面的特征和示例性实施例,为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合附图及具体实施例,对本实用新型进行进一步详细描述。对于本领域技术人员来说,本实用新型可以在不需要这些具体细节中的一些细节的情况下实施。下面对实施例的描述仅仅是为了通过示出本实用新型的示例来提供对本实用新型更好的理解。The features and exemplary embodiments of various aspects of the present invention will be described in detail below. In order to make the purpose, technical solutions and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. For those skilled in the art, the present invention can be implemented without the need for some of these specific details. The following description of the embodiments is only intended to provide a better understanding of the present invention by illustrating examples of the present invention.

如图1、图2、图3所示,本实用新型提供一种采矿工程布设装置技术方案:包括底座1,底座1上对称布置有立板2,立板2之间配置卷料组件。组件包含料轴21,其外部设有卷料筒24,卷料筒24两侧安装有夹座22。夹座22与料轴21滑动配合,且夹座22上设有螺栓23,螺栓23端面与料轴21接触。夹座22包裹在料轴21外部,立板2的外壁设有机架31。立板2与机架31通过螺栓23进行装配连接,机架31之上安装有电机32。电机32的输出端通过联轴器与橡胶滚筒33连接。橡胶滚筒33位于两个立板2之间,其相邻一侧的立板2内壁上设有调整滑口201。调整滑口201内部配置有定位组件,包括两个平行分布的活动轴41。活动轴41两端伸入调整滑口201,外部设有导向筒43,导向筒43上设有多个管槽44。活动轴41两端设有螺纹,螺纹外部设有螺帽42,螺帽42与立板2接触。通过旋转螺帽42,使其脱离立板2,便可调整两个导向筒43的位置及相邻间距,从而适应多尺寸管道布线需求,提高工作效率。As shown in Figures 1, 2 and 3, the utility model provides a technical solution for a mining engineering layout device: it includes a base 1, on which vertical plates 2 are symmetrically arranged, and a coil assembly is arranged between the vertical plates 2. The assembly includes a material shaft 21, on the outside of which a coil drum 24 is arranged, and clamp seats 22 are installed on both sides of the coil drum 24. The clamp seat 22 is slidably matched with the material shaft 21, and a bolt 23 is arranged on the clamp seat 22, and the end face of the bolt 23 is in contact with the material shaft 21. The clamp seat 22 is wrapped around the outside of the material shaft 21, and a frame 31 is arranged on the outer wall of the vertical plate 2. The vertical plate 2 and the frame 31 are assembled and connected by bolts 23, and a motor 32 is installed on the frame 31. The output end of the motor 32 is connected to the rubber roller 33 through a coupling. The rubber roller 33 is located between the two vertical plates 2, and an adjustment slide 201 is arranged on the inner wall of the vertical plate 2 on the adjacent side. A positioning assembly is arranged inside the adjustment slide 201, including two parallel distributed movable shafts 41. Both ends of the movable shaft 41 extend into the adjustment slide 201, and a guide cylinder 43 is provided on the outside, and a plurality of pipe grooves 44 are provided on the guide cylinder 43. Both ends of the movable shaft 41 are provided with threads, and a nut 42 is provided on the outside of the threads, and the nut 42 is in contact with the vertical plate 2. By rotating the nut 42 to separate it from the vertical plate 2, the position and adjacent spacing of the two guide cylinders 43 can be adjusted, thereby meeting the requirements of multi-size pipeline wiring and improving work efficiency.

根据上述方案,在该实施方式中,将卷状管道的卷料筒24套入料轴21外,通过夹座22进行紧固,确保其稳定性。管道沿橡胶滚筒33下方穿越,并穿入两个导向筒43之间的管槽44。根据实际需求,调整导向筒43的高度。启动电机32后,电机32驱动橡胶滚筒33旋转,借助橡胶滚筒33提供的较大摩擦力,进而带动接触的管道缓慢输送。如此一来,便实现了自动化布线,提升了管道布设的效率。According to the above scheme, in this embodiment, the coiling drum 24 of the rolled pipe is inserted into the outside of the material shaft 21 and fastened by the clamping seat 22 to ensure its stability. The pipe passes under the rubber roller 33 and passes through the pipe groove 44 between the two guide cylinders 43. The height of the guide cylinder 43 is adjusted according to actual needs. After starting the motor 32, the motor 32 drives the rubber roller 33 to rotate, and with the help of the large friction provided by the rubber roller 33, the contacted pipe is slowly transported. In this way, automatic wiring is realized and the efficiency of pipeline layout is improved.

本实用新型的工作原理及使用流程:将本方案的各部件依次组装完成后,根据实际需求依次按以上各实施方式工作,即可全部工作步骤。The working principle and use process of the utility model: After the various components of the solution are assembled in sequence, all the working steps can be completed according to the above implementation methods in sequence according to actual needs.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent substitutions or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

在本实用新型的描述中,需要理解的是,术语“同轴”、“底部”、“一端”、“顶部”、“中部”、“另一端”、“上”、“一侧”、“顶部”、“内”、“前部”、“中央”、“两端”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present invention, it should be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "the other end", "upper", "one side", "top", "inside", "front", "center", "both ends" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

在本实用新型中,除非另有明确的规定和限定,术语“安装”、“设置”、“连接”、“固定”、“旋接”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系,除非另有明确的限定,对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本实用新型中的具体含义。In the present utility model, unless otherwise clearly stipulated and limited, the terms such as "installation", "setting", "connection", "fixation" and "screw-on" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. Unless otherwise clearly defined, ordinary technicians in this field can understand the specific meanings of the above terms in the utility model according to the specific circumstances.

依照本实用新型如上文的实施例,这些实施例并没有详尽叙述所有的细节,也不限制该实用新型仅为的具体实施例。显然,根据以上描述,可作很多的修改和变化。本说明书选取并具体描述这些实施例,是为了更好地解释本实用新型的原理和实际应用,从而使所属技术领域技术人员能很好地利用本实用新型以及在本实用新型基础上的修改使用。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。According to the embodiments of the present invention as described above, these embodiments do not describe all the details in detail, nor do they limit the present invention to specific embodiments. Obviously, many modifications and changes can be made based on the above description. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that technicians in the relevant technical field can make good use of the present invention and the modified use based on the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims (5)

1. The utility model provides a mining engineering lays device, its characterized in that, including base (1), be the symmetry form on base (1) and be provided with riser (2), be equipped with coil stock subassembly between riser (2), coil stock subassembly includes material axle (21), material axle (21) are equipped with a roll feed cylinder (24) outward, roll feed cylinder (24) both sides are equipped with cassette (22), cassette (22) cover is established outside material axle (21), riser (2) outer wall is equipped with frame (31), be equipped with motor (32) on frame (31), motor (32) output is connected with rubber cylinder (33) through the shaft coupling, rubber cylinder (33) are located between two risers (2).
2. The mining engineering layout apparatus according to claim 1, wherein: the clamping seat (22) is in sliding fit with the material shaft (21), a bolt (23) is arranged on the clamping seat (22), and the end face of the bolt (23) abuts against the material shaft (21).
3. A mining engineering layout apparatus according to claim 2, wherein: the vertical plate (2) and the frame (31) are assembled and connected through bolts (23).
4. A mining engineering layout according to claim 3, wherein: the tank body is equipped with adjustment smooth mouth (201) on the relative inner wall of adjacent one side riser (2) of rubber cylinder (33), be equipped with locating component in adjustment smooth mouth (201), locating component includes two parallel form loose axle (41) that distribute, in loose axle (41) both ends stretch into adjustment smooth mouth (201), and loose axle (41) are equipped with guide cylinder (43) outward, be equipped with a plurality of tube grooves (44) on guide cylinder (43).
5. The mining engineering layout apparatus according to claim 4, wherein: threads are arranged at two ends of the movable shaft (41), a nut (42) is arranged outside the threads, and the nut (42) is abutted against the vertical plate (2).
CN202420208942.8U 2024-01-29 2024-01-29 A mining engineering deployment device Active CN221796401U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420208942.8U CN221796401U (en) 2024-01-29 2024-01-29 A mining engineering deployment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420208942.8U CN221796401U (en) 2024-01-29 2024-01-29 A mining engineering deployment device

Publications (1)

Publication Number Publication Date
CN221796401U true CN221796401U (en) 2024-10-01

Family

ID=92871048

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420208942.8U Active CN221796401U (en) 2024-01-29 2024-01-29 A mining engineering deployment device

Country Status (1)

Country Link
CN (1) CN221796401U (en)

Similar Documents

Publication Publication Date Title
CN221796401U (en) A mining engineering deployment device
CN118682245B (en) Submerged arc welded steel pipe production process
CN207827542U (en) A high-efficiency and high-stability copper-clad aluminum wire composite machine conveying device
CN118907980A (en) High-voltage cable winding device for fully-mechanized coal mining face
CN108808424B (en) Earthing pole installs equipment
CN106936274A (en) A kind of stator fixing apparatus and its method
CN218134168U (en) Inside lining oil pipe latus rectum device
CN214539971U (en) Alignment equipment for electrical debugging
CN116532582A (en) Secondary cable core wire straightening tool
CN116929640A (en) Device for maintaining and detecting equipment used for underground cable pipeline of road
CN210763637U (en) Lightning protection detects automatic take-up
CN205882571U (en) Cable channel lays protection device
CN202570900U (en) Universal tooling for pipe benders
CN210209258U (en) Pipeline welding clamp
CN215452337U (en) Stainless steel coil pipe heat tracing conducting wire pipe penetrating system
CN210360356U (en) Electric roller machining positioning mechanism
CN209551329U (en) A kind of oil casing inner hole grinding equipment
CN104339140A (en) Coiling block rubber sleeve assembling and disassembling tool and assembling and disassembling method
CN202208568U (en) Guiding apparatus of copper pipe rewinding machine
CN220548694U (en) Nonmetal composite pipeline enhancement layer winding device
CN205297397U (en) Polished rod centering device
CN216943201U (en) Pipe body moving device for pipeline nondestructive testing equipment
CN220340318U (en) Alternating-current charging pile testing device
CN221995012U (en) Robot for disassembly and assembly of power transmission lines
CN221876128U (en) Automatic winding device for pipeline of building equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant