CN221001229U - Building roof rainwater drainage device - Google Patents

Building roof rainwater drainage device Download PDF

Info

Publication number
CN221001229U
CN221001229U CN202322472323.8U CN202322472323U CN221001229U CN 221001229 U CN221001229 U CN 221001229U CN 202322472323 U CN202322472323 U CN 202322472323U CN 221001229 U CN221001229 U CN 221001229U
Authority
CN
China
Prior art keywords
drainage
rainwater
water
filter plate
house body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322472323.8U
Other languages
Chinese (zh)
Inventor
李运双
王丽华
张淑琴
蒋丹萍
柳小庆
吴礼斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Uadi Co ltd
Original Assignee
Zhejiang Uadi Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Uadi Co ltd filed Critical Zhejiang Uadi Co ltd
Priority to CN202322472323.8U priority Critical patent/CN221001229U/en
Application granted granted Critical
Publication of CN221001229U publication Critical patent/CN221001229U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The utility model discloses a building roof rainwater drainage device, which belongs to the technical field of roof drainage and comprises a roof body, wherein a rainwater storage room is arranged at the rear end of the roof body, a sedimentation tank is arranged at the upper side inside the rainwater storage room, a temporary storage cavity is arranged at the lower side of the sedimentation tank, a rainwater accommodating cavity is arranged at the lower side of the temporary storage cavity, and a plurality of conveying pipelines are arranged at the upper end of the roof body.

Description

Building roof rainwater drainage device
Technical Field
The utility model belongs to the technical field of roof drainage, and particularly relates to a building roof rainwater drainage device.
Background
Roofing refers to the surface of a building roof and also refers to the portion between the ridge and the eave.
China patent application number 2022203947906 discloses building roofing rainwater collection device, including room body, rainwater store room and rainwater collection unit, the rainwater is stored room and is contained the chamber by sedimentation tank, interim storage chamber and rainwater and constitute, be connected through impurity separation groove between sedimentation tank and the interim storage chamber, the one end in impurity separation groove is installed and is used for separating the sedimentation tank water deposit partition wall, be connected through impurity filter tank between interim storage chamber and the rainwater and hold the chamber, the storage partition wall that is used for separating storage chamber pond water is installed to impurity filter tank's one end, the drainage unit is installed to the one end in umbrella holding chamber, carry out the matcing connection through the water drainage tank between umbrella holding chamber and the drainage unit, can directly collect the rainwater that falls to the roof through the rainwater collection unit that is equipped with, deposit tank in the rainwater is stored room, interim storage chamber and rainwater hold the chamber and carry out further filtration to the rainwater, the application effect is better, the impurity is less, easy to handle, application scope is wider.
In the above-mentioned disclosed patent, the water receiving tank does not possess and filters the dust function, and impurity such as leaf easily drops into the water receiving tank, causes water receiving tank and water injection pipe to take place to block up, and former device room body front end does not possess the drainage function simultaneously, and room body front end drips can cause room body front end face to corrode, influences room body pleasing to the eye.
Disclosure of utility model
In order to solve the problems in the background technology, the utility model provides a rainwater drainage device for a building roof, which has the characteristics that a water receiving tank has a dust filtering and blocking function, and the water receiving tank and a water injection pipe are not easy to be blocked.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a building roofing rainwater drainage device, includes the room body, room body rear end is provided with the rainwater and stores between, and inside upside is provided with the sedimentation tank between the rainwater is stored, and the sedimentation tank downside is provided with interim storage chamber, and interim storage chamber downside is provided with the rainwater and holds the chamber, and room body upper end is provided with a plurality of transportation pipelines, and transportation pipeline is connected through connecting tube between storing with the rainwater, and transportation pipeline upper end is provided with a plurality of water injection pipes, and the water injection pipe upper end is provided with the water receiving tank, and the water receiving tank upper end is provided with filtering component.
Preferably, the filter component comprises a filter plate, folded plates, fixing bolts, fixing holes, diagonal rods and supporting rods, wherein the filter plate is arranged at the upper end of the water receiving tank, the folded plates are arranged on two sides of the filter plate, the diagonal rods are arranged at the upper ends of the folded plates, the filter plate is connected with the diagonal rods through the supporting rods, the filter plate is connected with a house body through the fixing bolts, and the fixing holes corresponding to the fixing bolts are formed in two ends of the house body.
Preferably, through holes corresponding to the fixing bolts are formed in the folded plates, and spot welding is performed between the supporting rods and the inclined rods and between the inclined rods and the folded plates.
Preferably, the lower end of the filter plate is tightly attached to the upper end of the water receiving tank after the filter plate is installed, and the distance between adjacent diagonal rods is the same.
Preferably, the upper side of the front end of the house body is provided with a drainage box, a sealing strip is arranged between the drainage box and the house body, drainage grooves are formed in the drainage box, inclined planes are arranged on two sides of the lower end of the drainage grooves, an arc-shaped surface is arranged on the upper side of the drainage groove close to one end of the house body, and extension plates are arranged at positions, corresponding to the drainage grooves, of two ends of the drainage box.
Preferably, the upper end of the extension plate is flush with the upper end of the inclined plane, the extension plate and the drainage box are of a welded integrated structure, and the sealing strip is connected with the drainage box through clamping.
Compared with the prior art, the utility model has the beneficial effects that:
1. According to the utility model, the filter plate is placed at the upper ends of the water receiving tanks through the filter assembly, meanwhile, the folded plates are lapped at the upper sides of the two ends of the house body, then the fixing bolts penetrate through the folded plates, and the fixing bolts are screwed into the fixing holes at the side edges of the house body, so that the effect of fixing the folded plates is achieved, the folded plates support the filter plate through the diagonal rods and the supporting rods, the filter plate filters water entering the water receiving tanks, the filter assembly is arranged to filter and block dust of the water entering the water receiving tanks, and the phenomenon that impurities such as leaves fall into the water receiving tanks to cause blockage of the water receiving tanks and the water injection pipes is avoided.
2. According to the utility model, the water at the upper end of the house body enters the water drainage groove of the water drainage box through the arc surface, the water flows out of the water drainage box through the inclined surface, the water is prevented from remaining in the water drainage groove by the inclined surface, meanwhile, the water is prevented from splashing on the house body when the water falls to the ground by the extending plate, and meanwhile, the sealing strip is arranged between the water drainage box and the house body to enable the water drainage box and the house body to be more attached, so that the water is prevented from entering a gap between the water drainage box and the house body.
Drawings
FIG. 1 is a perspective view of the present utility model;
FIG. 2 is a perspective view in cross-section of a stormwater reservoir at the time of installation of a filter panel in accordance with the utility model;
FIG. 3 is a cut-away perspective view of the drain box of the present utility model;
In the figure: 1. a house body; 2. a filter assembly; 21. a filter plate; 22. a folded plate; 23. a fixing bolt; 24. a fixing hole; 25. a diagonal rod; 26. a support rod; 3. a rainwater storage room; 4. a connecting pipe; 5. a transport pipe; 6. a drain box; 7. a water injection pipe; 8. a water receiving tank; 9. a sedimentation tank; 10. a temporary storage chamber; 11. a rain water accommodating chamber; 12. a drainage channel; 13. an arc surface; 14. an inclined plane; 15. a sealing strip; 16. an extension plate.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Example 1
Referring to fig. 1-3, the present utility model provides the following technical solutions: the utility model provides a building roofing rainwater drainage device, including the room body 1, room body 1 rear end is provided with the rainwater and stores between 3, the inside upside of rainwater is stored between 3 is provided with sedimentation tank 9, sedimentation tank 9 downside is provided with interim storage chamber 10, interim storage chamber 10 downside is provided with rainwater and holds chamber 11, room body 1 upper end is provided with a plurality of transportation pipelines 5, be connected through connecting tube 4 between transportation pipeline 5 and the rainwater is stored between 3, transportation pipeline 5 upper end is provided with a plurality of water injection pipes 7, water injection pipe 7 upper end is provided with water receiving tank 8, water receiving tank 8 upper end is provided with filter assembly 2.
Specifically, the filter assembly 2 includes filter 21, folded plate 22, fixing bolt 23, fixed orifices 24, diagonal rod 25 and bracing piece 26, and wherein, water receiving tank 8 upper end is provided with filter 21, and filter 21 both sides are provided with folded plate 22, and folded plate 22 upper end is provided with a plurality of diagonal rods 25, is connected through bracing piece 26 between filter 21 and the diagonal rod 25, is connected through fixing bolt 23 between filter 21 and the room body 1, and room body 1 both ends are provided with the fixed orifices 24 that correspond with fixing bolt 23.
Through adopting above-mentioned technical scheme, place filter 21 in a plurality of water receiving tank 8 upper ends, the folded plate 22 overlap joint is in room body 1 both ends upside simultaneously, later pass folded plate 22 with fixing bolt 23 again, and screw in fixing hole 24 of room body 1 side with fixing bolt 23, reach the effect of fixing folded plate 22, folded plate 22 supports filter 21 through diagonal rod 25 and bracing piece 26, filter 21 filters the water that gets into in the water receiving tank 8, can filter the dust blocking to the water that gets into in the water receiving tank 8 through setting up filter component 2, avoid impurity such as leaf to fall into in the water receiving tank 8, cause water receiving tank 8 and water injection pipe 7 to take place to block up.
Specifically, through holes corresponding to the fixing bolts 23 are formed in the folded plates 22, and spot welding is performed between the support rods 26 and the diagonal rods 25 and between the diagonal rods 25 and the folded plates 22.
Through adopting above-mentioned technical scheme, conveniently pass fixing bolt 23 through the through-hole in folded plate 22 and fix folded plate 22, spot welding makes between bracing piece 26 and diagonal 25 and between diagonal 25 and folded plate 22 sturdy and durable.
Specifically, the lower end of the filter plate 21 is tightly attached to the upper end of the water receiving tank 8 after the filter plate 21 is installed, and the distances between adjacent diagonal rods 25 are the same.
Through adopting above-mentioned technical scheme, the filter 21 is installed and is laminated more between filter 21 and the water receiving tank 8, can equally spaced apart from distributing between a plurality of diagonal rods 25.
When this embodiment is used, when building roofing rainwater drainage device uses, install the device in the suitable position, when rainwater weather appears, in the rainwater gets into water receiving tank 8, later in the rainwater gets into transportation pipeline 5 through water injection pipe 7, last in the rainwater gets into sedimentation tank 9 of rainwater storage room 3 through connecting pipeline 4, the rainwater after the sediment gets into interim storage chamber 10, later in the rainwater gets into rainwater holding chamber 11 and stores, through setting up filter assembly 2, place filter 21 in a plurality of water receiving tank 8 upper ends, the overlap joint of folded plate 22 is in room body 1 both ends upside, later pass the folded plate 22 with fixing bolt 23 again, and screw in fixing hole 24 of room body 1 side with fixing bolt 23, reach the effect of fixing folded plate 22, folded plate 22 supports filter 21 through diagonal rod 25 and bracing piece 26, filter plate 21 filters the water that gets into in water receiving tank 8, can filter the dust retaining through setting up filter assembly 2, avoid impurity such as leaf to fall into water receiving tank 8, cause water receiving tank 8 and water injection pipe 7 to take place the jam.
Example 2
This embodiment differs from embodiment 1 in that: the roof body 1 front end upside is provided with drainage box 6, is provided with sealing strip 15 between drainage box 6 and the roof body 1, is provided with water drainage tank 12 in the drainage box 6, and water drainage tank 12 lower extreme both sides are provided with inclined plane 14, and water drainage tank 12 is provided with arcwall face 13 near roof body 1 one end upside, and the both ends of drainage box 6 are provided with extension board 16 in the position that water drainage tank 12 corresponds.
Through adopting above-mentioned technical scheme, the water of room body 1 upper end gets into in the water drainage tank 12 of drainage box 6 through arcwall face 13, and water flows out drainage box 6 through inclined plane 14, and the setting of inclined plane 14 avoids water to remain in water drainage tank 12, and extension board 16 makes water exhaust distance keep away from room body 1 simultaneously, and it is on the room body 1 to splash when avoiding water to fall to ground, sets up sealing strip 15 between drainage box 6 and room body 1 simultaneously and makes more laminating between drainage box 6 and the room body 1, avoids water to get into in the gap between drainage box 6 and the room body 1.
Specifically, the upper end of the extension plate 16 is flush with the upper end of the inclined plane 14, the extension plate 16 and the drain box 6 are of a welded integrated structure, and the sealing strip 15 is connected with the drain box 6 through clamping.
Through adopting above-mentioned technical scheme, in the water passenger flow gold extension board 16 in the inclined plane 14, extension board 16 and drainage box 6 are welding integral type structure more sturdy and durable, and the block is connected and is conveniently dismantled and assembled the change to sealing strip 15.
When the embodiment is used, through setting up drainage box 6, the water of room body 1 upper end gets into in the water drainage tank 12 of drainage box 6 through arcwall face 13, water flows out drainage box 6 through inclined plane 14, the setting of inclined plane 14 avoids water to remain in water drainage tank 12, simultaneously extension board 16 makes water exhaust distance keep away from room body 1, splash to room body 1 when avoiding water to fall to ground, set up sealing strip 15 between drainage box 6 and room body 1 simultaneously and make laminating more between drainage box 6 and the room body 1, avoid water to get into in the gap between drainage box 6 and the room body 1.
The structure and working principle of the roof rainwater collecting device disclosed by the utility model are disclosed in a building roof rainwater collecting device disclosed by China patent application No. 2022203947906, a rainwater storage room 3, a connecting pipeline 4, a transportation pipeline 5, a water injection pipe 7, a water receiving tank 8, a sedimentation tank 9, a temporary storage cavity 10 and a rainwater containing cavity 11, wherein the working principle is that when rainwater weather occurs, rainwater enters the water receiving tank 8, then enters the transportation pipeline 5 through the water injection pipe 7, finally enters the sedimentation tank 9 of the rainwater storage room 3 through the connecting pipeline 4, the precipitated rainwater enters the temporary storage cavity 10, and then enters the rainwater containing cavity 11 for storage.
The working principle and the using flow of the utility model are as follows: when building roofing rainwater drainage device uses, install the device in the suitable position, when the rainwater weather appears, in the rainwater got into water receiving tank 8, later in the rainwater gets into transportation pipeline 5 through water injection pipe 7, last in the rainwater gets into sedimentation tank 9 of rainwater storage room 3 through connecting tube 4, rainwater after the sediment gets into interim storage chamber 10, later in rainwater gets into rainwater and holds chamber 11 and store, through setting up filter assembly 2, place filter 21 in a plurality of water receiving tank 8 upper ends, the overlap joint of folded plate 22 is in room body 1 both ends upside, afterwards pass fixing bolt 23 again and pass folded plate 22, and screw in fixing hole 24 of room body 1 side with fixing bolt 23, reach and support the effect that folded plate 22 was fixed, filter 21 through diagonal rod 25 and bracing piece 26, filter 21 filters the water that gets into in the water receiving tank 8, filter assembly 2 can filter the dust blocking to the water that gets into in the water receiving tank 8, avoid impurity such as leaf to drop into in the water receiving tank 8, cause water receiving tank 8 and water injection pipe 7 to take place to block up, through setting up drainage box 6, the water drainage box 1 upper end passes through 13 of roof box 6 and gets into in the water box 6, the time of water drainage box 1 is out of the slope 1 and the slope 1 is avoided leading to be out between the water drainage box 1 and the water drainage box 1, the water drainage box 1 is left in the slope 1 is out of the slope 1 and is avoided in the slope 1 to be more than the slope 1, the water box 1 is set up between the water drainage box 1 and the water drainage box 1 is more than the slope 1 is left in the slope 1 to the slope 1, and is avoided and the water box 1 to be left between the water box 1 is left to be more than the top to the top is left to the top is 1.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building roofing rainwater drainage device, includes the room body, its characterized in that: the house body rear end is provided with between the rainwater is stored, and inside upside is provided with the sedimentation tank between the rainwater is stored, and the sedimentation tank downside is provided with interim storage chamber, and interim storage chamber downside is provided with the rainwater and holds the chamber, and the house body upper end is provided with a plurality of transportation pipelines, through connecting tube connection between transportation pipeline and the rainwater is stored, and transportation pipeline upper end is provided with a plurality of water injection pipes, and the water injection pipe upper end is provided with the water receiving tank, and the water receiving tank upper end is provided with filtering component.
2. A building roof rainwater drainage apparatus as claimed in claim 1, wherein: the filter component comprises a filter plate, folded plates, fixing bolts, fixing holes, inclined rods and supporting rods, wherein the filter plate is arranged at the upper end of the water receiving tank, the folded plates are arranged on two sides of the filter plate, the inclined rods are arranged at the upper ends of the folded plates, the filter plate is connected with the inclined rods through the supporting rods, the filter plate is connected with a house body through the fixing bolts, and the fixing holes corresponding to the fixing bolts are formed in two ends of the house body.
3. A building roof rainwater drainage apparatus as claimed in claim 2, wherein: through holes corresponding to the fixing bolts are formed in the folded plates, and spot welding is conducted between the supporting rods and the inclined rods and between the inclined rods and the folded plates.
4. A building roof rainwater drainage apparatus as claimed in claim 2, wherein: the lower end of the filter plate is clung to the upper end of the water receiving tank after the filter plate is installed, and the distance between adjacent diagonal rods is the same.
5. A building roof rainwater drainage apparatus as claimed in claim 1, wherein: the drainage box is arranged on the upper side of the front end of the house body, the sealing strip is arranged between the drainage box and the house body, the drainage groove is arranged in the drainage box, inclined planes are arranged on two sides of the lower end of the drainage groove, an arc-shaped surface is arranged on the upper side of the drainage groove, which is close to one end of the house body, and extension plates are arranged at the positions, corresponding to the drainage grooves, of the two ends of the drainage box.
6. A building roof rainwater drainage apparatus as claimed in claim 5, wherein: the upper end of the extension plate is flush with the upper end of the inclined plane, the extension plate and the drainage box are of a welded integrated structure, and the sealing strip is connected with the drainage box through clamping.
CN202322472323.8U 2023-09-12 2023-09-12 Building roof rainwater drainage device Active CN221001229U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322472323.8U CN221001229U (en) 2023-09-12 2023-09-12 Building roof rainwater drainage device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322472323.8U CN221001229U (en) 2023-09-12 2023-09-12 Building roof rainwater drainage device

Publications (1)

Publication Number Publication Date
CN221001229U true CN221001229U (en) 2024-05-24

Family

ID=91088258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322472323.8U Active CN221001229U (en) 2023-09-12 2023-09-12 Building roof rainwater drainage device

Country Status (1)

Country Link
CN (1) CN221001229U (en)

Similar Documents

Publication Publication Date Title
CN221001229U (en) Building roof rainwater drainage device
CN215053730U (en) Rainwater treatment device
CN220266800U (en) Drainage tank of siphon type rainwater system
CN217326129U (en) House building waterproof construction
CN117097230A (en) Photovoltaic board support frame
DE19647351A1 (en) Rainwater drainage device usable in a rainwater collection system and method for draining rainwater from downpipes
CN214329086U (en) Rainwater collection device is used in gardens
CN113585823B (en) Waterproof structure of assembled container house
CN219825880U (en) Energy-saving roof of green building
CN221166384U (en) Rainwater collection device based on sponge city
CN218714425U (en) Assembled steel structure for high-rise building
CN220620757U (en) House construction waterproofing mechanism
CN221072824U (en) House rainwater diversion and collection structure
CN222435716U (en) A modular box-type drainage component
CN219754151U (en) Assembled sentry box
CN214460810U (en) Assembled building rainwater collection device
CN216999940U (en) Gardens ramp rainwater collection device
CN221345811U (en) Filtering structure of municipal drainage pipeline
CN217517705U (en) A rainwater collection and reuse system for micro-drainage buildings
CN214194894U (en) Novel water drainage tank device for highway engineering of environmental protection
CN220336268U (en) Eave structure convenient to drainage catchments
CN219710794U (en) Drainage structure for building
CN221321171U (en) Portable drainage device
EP2339074A1 (en) A rainwater collection device
CN209817223U (en) Roof rainwater drainage device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant