CN220538752U - Geotechnical pipe bag reinforced by using composite mode - Google Patents
Geotechnical pipe bag reinforced by using composite mode Download PDFInfo
- Publication number
- CN220538752U CN220538752U CN202322204430.2U CN202322204430U CN220538752U CN 220538752 U CN220538752 U CN 220538752U CN 202322204430 U CN202322204430 U CN 202322204430U CN 220538752 U CN220538752 U CN 220538752U
- Authority
- CN
- China
- Prior art keywords
- geotextile
- cushion layer
- bag
- reinforcing cushion
- bag body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Revetment (AREA)
Abstract
Description
技术领域Technical field
本实用新型涉及土工管袋领域,具体是涉及一种使用复合方式加固的土工管袋。The utility model relates to the field of geotechnical pipe bags, specifically to a geotechnical pipe bag reinforced using a composite method.
背景技术Background technique
土工管袋最初用于围堤工程中, 由于其过滤效果好, 已被应用到环境保护、农业等领域, 随着人们研究的深入,其应用领域会越来越广泛。土工管袋脱水固化法是在疏浚的过程中,利用土工管袋等效孔径具有的过滤结构和袋内液体压力两个动力因素,使水渗出管袋外,污泥存留在管袋内,从而达到减少污泥体积的效果。Geotechnical pipe bags were originally used in embankment projects. Due to their good filtration effect, they have been applied to environmental protection, agriculture and other fields. As people's research deepens, their application fields will become more and more extensive. The geotube bag dehydration and solidification method uses two dynamic factors, the filter structure of the equivalent pore size of the geotube bag and the liquid pressure in the bag, to cause water to seep out of the tube bag and sludge to remain in the tube bag during the dredging process. Thereby achieving the effect of reducing sludge volume.
土工管袋一般在其两端端部设置缝合区,在填充污泥后,端部缝合区由于会受到污泥向外的作用力,容易破裂。特别对于大型土工管袋而言,其周长越长,其内填充高度越高,端部缝合区越容易破裂,对其端面缝合的强力要求就越高,若土工管袋一旦破裂,不仅泥浆会渗出,从而影响施工进度,还会存在安全风险。Geotechnical pipe bags are generally provided with suture areas at both ends. After being filled with sludge, the end suture areas are prone to rupture due to the outward force of the sludge. Especially for large geotube bags, the longer the circumference and the higher the filling height, the easier it is for the end suture area to break, and the higher the strength requirements for the end sutures. Once the geotube bag ruptures, not only the mud will seep through out, thereby affecting the construction progress, and there will also be safety risks.
实用新型内容Utility model content
本实用新型的目的是提供一种使用复合方式加固袋体端部缝合处缝合强力的土工管袋。The purpose of this utility model is to provide a geotechnical pipe bag that uses a composite method to reinforce the seams at the ends of the bag body with strong stitching.
为了实现上述的目的,本实用新型提供的一种使用复合方式加固的土工管袋, 包括袋体,袋体上设置有至少一个注入口, 注入口与袋体内部连通, 注入口设置在袋体长度方向的两端之间,袋体在其长度方向的至少一端端部上设置有缝合部,缝合部沿袋体的宽度方向延伸,缝合部包括第一土工织物部、第二土工织物部和加强垫层, 第一土工织物部、第二土工织物部和加强垫层堆叠设置并通过缝合线缝合在一起。In order to achieve the above purpose, the utility model provides a geotechnical pipe bag reinforced by a composite method, including a bag body. The bag body is provided with at least one injection port. The injection port is connected to the inside of the bag body. The injection port is arranged on the bag body. Between the two ends in the length direction, the bag body is provided with a suture portion on at least one end of the bag body in the length direction. The suture portion extends along the width direction of the bag body. The suture portion includes a first geotextile portion, a second geotextile portion and a second geotextile portion. The reinforcing cushion layer, the first geotextile part, the second geotextile part and the reinforcing cushion layer are stacked and sewn together through sutures.
由上述方案可见,通过在缝合部内增加加强垫层,有利于提高袋体端部的缝合强力和牢固度,避免因填充较多填充料后,导致端部缝合部位出现破裂,有利于提高土工管袋的使用寿命, 降低安全风险。It can be seen from the above solution that by adding a reinforcing cushion layer in the suture part, it will help to improve the suture strength and firmness of the end of the bag body, avoid rupture of the end suture part due to filling with more filler, and help improve the geotechnical pipe. Extend the life of the bag and reduce safety risks.
进一步的方案是, 第一土工织物部的自由端向第二土工织物部方向折叠并形成第一容纳腔, 第二土工织物部的自由端向第一土工织物部方向折叠并形成第二容纳腔,加强垫层的数量设为两个, 两个加强垫层分别设置在第一容纳腔和第二容纳腔内。A further solution is that the free end of the first geotextile part is folded towards the direction of the second geotextile part and forms a first accommodation cavity, and the free end of the second geotextile part is folded towards the direction of the first geotextile part and forms a second accommodation cavity. , the number of reinforcing cushion layers is set to two, and the two reinforcing cushion layers are respectively arranged in the first accommodation cavity and the second accommodation cavity.
由上述方案可见,通过在第一容纳腔和第二容纳腔内均设置有加强垫层,有利于进一步提高袋体端部的缝合强力和牢固度。It can be seen from the above solution that by providing a reinforcing cushion layer in both the first accommodation cavity and the second accommodation cavity, it is helpful to further improve the sewing strength and firmness of the bag end.
进一步的方案是,加强垫层平铺设置,或者,加强垫层折叠设置。A further solution is to strengthen the tiled setting of the cushion, or to strengthen the folding setting of the cushion.
进一步的方案是,设置在第一容纳腔内的加强垫层与第一容纳腔的腔壁缝合在一起并形成第一缝合边,设置在第二容纳腔内的加强垫层与第二容纳腔的腔壁缝合在一起并形成第二缝合边, 第一缝合边与第二缝合边缝合在一起。A further solution is that the reinforcing cushion layer disposed in the first accommodating cavity is sewn together with the cavity wall of the first accommodating cavity to form a first seam edge, and the reinforcing cushion layer disposed in the second accommodating cavity is sewn together with the second accommodating cavity. The cavity walls are sewn together to form a second suture edge, and the first suture edge and the second suture edge are sewn together.
进一步的方案是, 第一容纳腔的腔壁、第二容纳腔的腔壁和两个所述加强垫层通过同一缝合线缝合在一起。A further solution is that the cavity wall of the first accommodation cavity, the cavity wall of the second accommodation cavity and the two reinforcing cushion layers are sewn together through the same suture line.
进一步的方案是, 第一土工织物部的自由端与第二土工织物部的自由端相互包裹设置,加强垫层设置在第一土工织物部的内侧,或者,加强垫层设置在第二土工织物部的内侧, 或者,加强垫层设置在第一土工织物部与第二土工织物部之间。A further solution is that the free end of the first geotextile part and the free end of the second geotextile part are wrapped around each other, and the reinforcing cushion layer is disposed inside the first geotextile part, or the reinforcing cushion layer is disposed on the inside of the second geotextile part. The inner side of the geotextile part, or the reinforcing cushion layer is provided between the first geotextile part and the second geotextile part.
进一步的方案是, 第一土工织物部的自由端向第二土工织物部方向折叠并形成第一容纳腔, 第二土工织物部的自由端向第一土工织物部方向折叠并形成第二容纳腔;加强垫层折叠设置,且加强垫层的折叠两边分别设置在第一容纳腔和第二容纳腔内。A further solution is that the free end of the first geotextile part is folded towards the direction of the second geotextile part and forms a first accommodation cavity, and the free end of the second geotextile part is folded towards the direction of the first geotextile part and forms a second accommodation cavity. ; The reinforced cushion layer is folded and arranged, and the folded sides of the reinforced cushion layer are respectively arranged in the first accommodation cavity and the second accommodation cavity.
进一步的方案是,加强垫层为无纺布。A further solution is that the reinforcing cushion layer is non-woven fabric.
进一步的方案是,加强垫层的长度与袋体端部的宽度匹配。A further solution is that the length of the reinforcing cushion layer matches the width of the bag end.
进一步的方案是,袋体的外侧设置有连接环。A further solution is to provide a connecting ring on the outside of the bag body.
附图说明Description of drawings
图1是本实用新型第一实施例的俯视图。Figure 1 is a top view of the first embodiment of the present invention.
图2是本实用新型第一实施例中缝合部的结构图。Figure 2 is a structural diagram of the suture part in the first embodiment of the present invention.
图3是现有技术中土工管袋的端面缝合结构图。Figure 3 is a structural diagram of the end face stitching of a geotube bag in the prior art.
图4是本实用新型第二实施例中缝合部的结构图。Figure 4 is a structural diagram of the suture part in the second embodiment of the present invention.
图5是本实用新型第三实施例中缝合部的结构图。Figure 5 is a structural diagram of the suture part in the third embodiment of the present invention.
图6是本实用新型第四实施例中缝合部的结构图。Figure 6 is a structural diagram of the suture part in the fourth embodiment of the present invention.
以下结合附图及实施例对本实用新型作进一步说明。The utility model will be further described below in conjunction with the accompanying drawings and examples.
具体实施方式Detailed ways
土工管袋第一实施例:The first embodiment of geotube bag:
参见图1和图2, 本实施例提供的一种使用复合方式加固的土工管袋,包括袋体1,袋体1上设置有至少一个注入口12,注入口12与袋体1内部连通,注入口12设置在袋体1长度方向的两端之间。本实施例以两个注入口12为例, 两个注入口12分别靠近袋体1长度方向的对应端端部设置,便于同时向袋体1两端填充污泥等填料。Referring to Figures 1 and 2, this embodiment provides a geotube bag reinforced with a composite method, including a bag body 1. The bag body 1 is provided with at least one injection port 12, and the injection port 12 is connected to the inside of the bag body 1. The injection port 12 is provided between the two ends of the bag body 1 in the length direction. This embodiment takes two injection ports 12 as an example. The two injection ports 12 are respectively provided close to corresponding ends in the length direction of the bag body 1 to facilitate filling of fillers such as sludge into both ends of the bag body 1 at the same time.
袋体1在其长度方向的至少一端端部上设置有缝合部11,优选地,在袋体1长度方向的两端均设置有缝合部11,缝合部11沿袋体1的宽度方向延伸,缝合部11的长度与袋体1的宽度相等。缝合部11包括第一土工织物部111 a、第二土工织物部112a和加强垫层113a,第一土工织物部111 a、第二土工织物部112a和加强垫层113a堆叠设置并通过缝合线114缝合在一起。第一土工织物部111 a和第二土工织物部112a的材料与袋体1的材料相同。The bag body 1 is provided with a stitching portion 11 on at least one end of the bag body 1 in the length direction. Preferably, the stitching portion 11 is provided on both ends of the bag body 1 in the length direction. The stitching portion 11 extends along the width direction of the bag body 1. The length of the sewing part 11 is equal to the width of the bag body 1 . The suture part 11 includes a first geotextile part 111 a, a second geotextile part 112 a and a reinforcing cushion layer 113 a. The first geotextile part 111 a, the second geotextile part 112 a and the reinforcing cushion layer 113 a are stacked and passed through the suture line 114 Sew together. The materials of the first geotextile part 111 a and the second geotextile part 112 a are the same as the material of the bag body 1 .
在本实施例中,第一土工织物部111 a为袋体1上部的侧壁,第二土工织物部112a为袋体1下部的侧壁, 第一土工织物部111 a设置在第二土工织物部112a的上方。第一土工织物部111 a的自由端向第二土工织物部112a方向折叠并形成第一容纳腔115a, 第一容纳腔115a朝向袋体1内部一侧设置开口;第二土工织物部112a的自由端向第一土工织物部111a方向折叠并形成第二容纳腔116a, 第二容纳腔116a朝向袋体1内部一侧设置开口。In this embodiment, the first geotextile part 111 a is the side wall of the upper part of the bag body 1 , the second geotextile part 112 a is the side wall of the lower part of the bag body 1 , and the first geotextile part 111 a is disposed on the second geotextile part. above part 112a. The free end of the first geotextile part 111a is folded toward the second geotextile part 112a to form a first accommodation cavity 115a. The first accommodation cavity 115a is provided with an opening toward the inside of the bag body 1; the free end of the second geotextile part 112a is The end is folded toward the first geotextile part 111a to form a second accommodation cavity 116a. The second accommodation cavity 116a is provided with an opening toward the inner side of the bag body 1.
加强垫层113a设置在第一容纳腔115a和第二容纳腔116a内。在本实施例中,加强垫层113a的数量设为两个, 两个加强垫层113a分别设置在第一容纳腔115a和第二容纳腔116a内。加强垫层113a平铺设置,或者,加强垫层113a折叠设置,本实施例优选为后者,有利于提高缝合部11的缝合强力和牢固度。The reinforcing cushion layer 113a is provided in the first accommodation cavity 115a and the second accommodation cavity 116a. In this embodiment, the number of reinforcing cushion layers 113a is set to two, and the two reinforcing cushion layers 113a are respectively provided in the first accommodation cavity 115a and the second accommodation cavity 116a. The reinforcing cushion layer 113a is laid flat, or the reinforcing cushion layer 113a is folded. In this embodiment, the latter is preferred, which is beneficial to improving the sewing strength and firmness of the suture portion 11.
设置在第一容纳腔115a内的加强垫层113a首先与第一容纳腔115a的上下两侧腔壁缝合在一起并形成第一缝合边;设置在第二容纳腔116a内的加强垫层113a与第二容纳腔116a的上下两侧腔壁缝合在一起并形成第二缝合边;然后,将第一缝合边与第二缝合边缝合在一起,此时,第一缝合边与第二缝合边的缝合线114位于缝合部11的朝外一侧。The reinforcing cushion layer 113a disposed in the first accommodating cavity 115a is first sewn together with the upper and lower side walls of the first accommodating cavity 115a to form a first suture edge; the reinforcing cushion layer 113a disposed in the second accommodating cavity 116a and The upper and lower walls of the second accommodation cavity 116a are sewn together to form a second suture edge; then, the first suture edge and the second suture edge are sewn together. At this time, the first suture edge and the second suture edge are The suture line 114 is located on the outward side of the suture portion 11 .
加强垫层113a可以为能提高缝合强力的、可缝合连接的材料,本实施例中加强垫层113a优选为无纺布,加强垫层113a的长度与袋体1端部的宽度匹配,优选为,加强垫层113a的长度与袋体1端部的宽度相等,使得缝合部11的全线长度均具有基本相等的缝合强力。经测试,本实施例采用无纺布加固端面缝合强力为110kN/m。The reinforcing cushion layer 113a can be a material that can improve the suture strength and can be sutured and connected. In this embodiment, the reinforcing cushion layer 113a is preferably non-woven fabric. The length of the reinforcing cushion layer 113a matches the width of the end of the bag body 1, preferably , the length of the reinforcing cushion layer 113a is equal to the width of the end of the bag body 1, so that the entire length of the suture portion 11 has substantially equal suture strength. After testing, the end-face stitching strength of this embodiment using non-woven fabric reinforcement is 110kN/m.
在图1中,袋体1的外侧设置有多个连接环13, 多个连接环13分别设置在袋体1的四个外周壁上,具体地,袋体1长度方向的两个侧壁以及宽度方向的两个侧壁上均设置有连接环13,且位于袋体1长度方向上的连接环13数量多于位于袋体1宽度方向上的连接环13数量。In Figure 1, a plurality of connecting rings 13 are provided on the outside of the bag body 1. The plurality of connecting rings 13 are respectively provided on the four peripheral walls of the bag body 1. Specifically, the two side walls in the length direction of the bag body 1 and Connecting rings 13 are provided on both side walls in the width direction, and the number of connecting rings 13 located in the length direction of the bag body 1 is greater than the number of connecting rings 13 located in the width direction of the bag body 1 .
对比例:Comparative ratio:
参见图3,现有的土工管袋一般采用普通端面缝合, 即:第一土工织物部20的自由端向第二土工织物部21折叠,第二土工织物部21的自由端向第一土工织物部20折叠,然后通过缝合线30将两个折叠部缝合在一起。经测试, 普通端面缝合的缝合强力为60kN/m。Referring to Figure 3, existing geotube bags generally use ordinary end-face stitching, that is: the free end of the first geotextile part 20 is folded toward the second geotextile part 21, and the free end of the second geotextile part 21 is folded toward the first geotextile. The folded portion 20 is folded, and then the two folded portions are sewn together through the suture line 30 . After testing, the stitching strength of ordinary end-face stitching is 60kN/m.
由此可见,采用无纺布加固端面缝合的缝合强力比普通端面缝合的缝合强力大,即采用无纺布加固端面缝合的缝合强力得到了提升,且提升幅度为:F=(110-60)/60*100%=83%。It can be seen that the suture strength of end-face sutures reinforced with non-woven fabrics is greater than that of ordinary end-face sutures, that is, the suture strength of end-face sutures reinforced with non-woven fabrics has been improved, and the improvement is: F = (110-60) /60*100%=83%.
土工管袋第二实施例:Second embodiment of geotube bag:
参见图4,在上述土工管袋第一实施例的基础上, 本实施例的第一土工织物部111b的自由端向第二土工织物部112b方向折叠并形成第一容纳腔115b, 第一容纳腔115b朝向袋体1内部一侧设置开口;第二土工织物部112b的自由端向第一土工织物部111 a方向折叠并形成第二容纳腔116b,第二容纳腔116b朝向袋体1内部一侧设置开口。加强垫层113b的数量设为两个,其中一个加强垫层113b平铺在第一容纳腔115b内,另一个加强垫层113b平铺在第二容纳腔116b内,第一容纳腔115b的腔壁、第二容纳腔116b的腔壁和两个加强垫层113b通过同一缝合线114缝合在一起。Referring to Figure 4, based on the first embodiment of the geotube bag described above, the free end of the first geotextile part 111b of this embodiment is folded toward the second geotextile part 112b to form a first accommodation cavity 115b. The cavity 115b is provided with an opening toward the inside of the bag body 1; the free end of the second geotextile part 112b is folded toward the first geotextile part 111a to form a second accommodation cavity 116b, and the second accommodation cavity 116b is towards the inside of the bag body 1. Openings are provided on the side. The number of reinforcing cushion layers 113b is set to two, of which one reinforcing cushion layer 113b is laid flat in the first accommodation cavity 115b, and the other reinforcing cushion layer 113b is laid flat in the second accommodation cavity 116b. The cavity of the first accommodation cavity 115b The wall, the cavity wall of the second accommodation cavity 116b and the two reinforcing cushion layers 113b are sewn together through the same suture line 114.
土工管袋第三实施例:The third embodiment of geotube bag:
参见图5,在上述土工管袋第一实施例的基础上, 本实施例的第一土工织物部111c的自由端与第二土工织物部112c的自由端相互包裹设置,加强垫层113c设置在第一土工织物部111 c的内侧, 或者,加强垫层113c设置在第二土工织物部112c的内侧, 或者,加强垫层113c设置在第一土工织物部111 c与第二土工织物部112c之间并同时被缝合线114缝合。具体地:第一土工织物部111 c的自由端向下折叠并形成第一容纳腔115c, 第二土工织物部112c的自由端向上折叠并形成第二容纳腔116c。第一土工织物部111 c的自由端设置在第二容纳腔116c内,加强垫层113c以平铺或折叠的方式设置在第一容纳腔115c内;或者,第二土工织物部112c的自由端设置在第一容纳腔115c内,加强垫层113c以平铺或折叠的方式设置在第二容纳腔116c内;又或者,加强垫层113c设置在第一容纳腔115c自由端和第二容纳腔116c自由端之间。缝合线114同时穿过第一土工织物部111 c、第二土工织物部112c和加强垫层113c。Referring to Figure 5, based on the first embodiment of the geotube bag mentioned above, the free end of the first geotextile part 111c and the free end of the second geotextile part 112c of this embodiment are wrapped around each other, and the reinforcing cushion layer 113c is provided on The reinforcing cushion layer 113c is provided inside the first geotextile part 111c, or the reinforcing cushion layer 113c is provided inside the second geotextile part 112c, or the reinforcing cushion layer 113c is provided between the first geotextile part 111c and the second geotextile part 112c and are sutured by the suture line 114 at the same time. Specifically: the free end of the first geotextile part 111c is folded downward to form the first accommodation cavity 115c, and the free end of the second geotextile part 112c is folded upward to form the second accommodation cavity 116c. The free end of the first geotextile part 111c is arranged in the second accommodation cavity 116c, and the reinforcing cushion layer 113c is arranged in the first accommodation cavity 115c in a flat or folded manner; or, the free end of the second geotextile part 112c is arranged in the first accommodation cavity 115c, and the reinforcing cushion layer 113c is arranged in the second accommodation cavity 116c in a flat or folded manner; alternatively, the reinforcing cushion layer 113c is arranged at the free end of the first accommodation cavity 115c and the second accommodation cavity 116c between free ends. The suture line 114 passes through the first geotextile part 111 c, the second geotextile part 112 c and the reinforcing cushion layer 113 c at the same time.
土工管袋第四实施例:The fourth embodiment of geotube bag:
参见图6,在上述土工管袋第一实施例的基础上, 本实施例的第一土工织物部111d的自由端向第二土工织物部112d方向折叠并形成第一容纳腔115d, 第二土工织物部112d的自由端向第一土工织物部111 a方向折叠并形成第二容纳腔116d。Referring to Figure 6, based on the first embodiment of the geotube bag described above, the free end of the first geotextile part 111d of this embodiment is folded toward the second geotextile part 112d to form a first accommodation cavity 115d. The free end of the fabric portion 112d is folded toward the first geotextile portion 111a to form a second accommodation cavity 116d.
加强垫层113d的数量设为一个,加强垫层113d的两端折叠设置,且加强垫层113d的两个折叠边分别设置在第一容纳腔115d和第二容纳腔116d内。缝合线114同时穿过第一土工织物部111 d、第二土工织物部112d和加强垫层113d的两个折叠边。The number of the reinforcing cushion layer 113d is set to one, both ends of the reinforcing cushion layer 113d are folded, and the two folded edges of the reinforcing cushion layer 113d are respectively disposed in the first accommodation cavity 115d and the second accommodation cavity 116d. The suture line 114 passes through the two folded edges of the first geotextile part 111d, the second geotextile part 112d and the reinforcing cushion layer 113d at the same time.
综上可见, 本实用新型通过在缝合部内增加加强垫层,有利于提高袋体端部的缝合强力和牢固度,避免因填充较多填充料后, 导致端部缝合部位出现破裂,有利于提高土工管袋的使用寿命, 降低安全风险。To sum up, it can be seen that by adding a reinforcing cushion layer in the suture part of the utility model, it is conducive to improving the suture strength and firmness of the end of the bag body, avoiding the rupture of the end suture part due to filling with more fillers, and is conducive to improving the The service life of geotube bags reduces safety risks.
最后需要强调的是, 以上仅为本实用新型的优选实施例,并不用于限制本实用新型,对于本领域的技术人员来说, 本实用新型可以有各种变化和更改,凡在本实用新型的精神和原则之内,所做的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。Finally, it should be emphasized that the above are only preferred embodiments of the present utility model and are not intended to limit the present utility model. For those skilled in the art, the present utility model can have various changes and modifications. Within the spirit and principles of this utility model, any modifications, equivalent substitutions, improvements, etc. shall be included in the protection scope of this utility model.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322204430.2U CN220538752U (en) | 2023-08-15 | 2023-08-15 | Geotechnical pipe bag reinforced by using composite mode |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322204430.2U CN220538752U (en) | 2023-08-15 | 2023-08-15 | Geotechnical pipe bag reinforced by using composite mode |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220538752U true CN220538752U (en) | 2024-02-27 |
Family
ID=89968328
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322204430.2U Active CN220538752U (en) | 2023-08-15 | 2023-08-15 | Geotechnical pipe bag reinforced by using composite mode |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220538752U (en) |
-
2023
- 2023-08-15 CN CN202322204430.2U patent/CN220538752U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7891914B2 (en) | Geotextile tube | |
KR100710415B1 (en) | Geotextile Tube | |
JP3571005B2 (en) | Flex container for civil engineering | |
AU7803998A (en) | Improved geotextile container and method of producing same | |
CN105369835A (en) | Sand quilt and offshore pile foundation anti-scouring treatment method applying sand quilt | |
CN220538752U (en) | Geotechnical pipe bag reinforced by using composite mode | |
TWM443023U (en) | Sea bottom deposit sand bag | |
JPH11323936A (en) | Banking structure and stabilizing construction method therefor | |
CN208472699U (en) | A kind of discharge structure of Soft Ground | |
JP3191096U (en) | Flexible container | |
JP3702871B2 (en) | Sandbag, sandbag installation method and banking method using the sandbag | |
EP2032766A1 (en) | Bag filled with swelling material upon contact with water | |
CN209741902U (en) | Reverse filtering drainage retaining wall | |
CN222453072U (en) | Geotechnical container for reinforcing and filling cuffs | |
CN111305153A (en) | A reinforced anti-filter liner type riprap bank revetment sand-filled pipe bag | |
CN206090454U (en) | Geotechnique's pipe bag | |
CN218318519U (en) | A geotechnical big bag suitable for sinking and silting | |
JP3650712B2 (en) | Bags for civil engineering bag materials and filling materials | |
CN218489285U (en) | Anti-seepage gasket with good anti-tearing effect | |
CN219099931U (en) | Prefill flood prevention bag | |
CN221941222U (en) | A multi-layer impact-resistant filter tube bag system | |
CN211773308U (en) | Wave-resistant sand quilt dike | |
CN212984229U (en) | Novel bentonite waterproof blanket | |
RU85206U1 (en) | SOFT PIPELINE BALLASTING CONTAINER | |
KR101517888B1 (en) | A process of preparing embankment by using geocontainer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 519000 No. 601, Nangang West Road, gaolangang Economic Zone, Zhuhai, Guangdong Patentee after: Soma Industrial (Zhuhai) Co.,Ltd. Country or region after: China Address before: 519050 Nankang West Road No. 601, Gaolan Port Economic Zone, Zhuhai, Guangdong Patentee before: TEN CATE INDUSTRIAL ZHUHAI Co.,Ltd. Country or region before: China |