[go: up one dir, main page]

CN220440424U - Prompting device based on step electricity price time period - Google Patents

Prompting device based on step electricity price time period Download PDF

Info

Publication number
CN220440424U
CN220440424U CN202320326300.3U CN202320326300U CN220440424U CN 220440424 U CN220440424 U CN 220440424U CN 202320326300 U CN202320326300 U CN 202320326300U CN 220440424 U CN220440424 U CN 220440424U
Authority
CN
China
Prior art keywords
response
main control
information processing
processing module
control unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320326300.3U
Other languages
Chinese (zh)
Inventor
王建华
罗锦添
邵红山
王兴群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Guanghe Technology Co Ltd
Original Assignee
Guangzhou Guanghe Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Guanghe Technology Co Ltd filed Critical Guangzhou Guanghe Technology Co Ltd
Priority to CN202320326300.3U priority Critical patent/CN220440424U/en
Application granted granted Critical
Publication of CN220440424U publication Critical patent/CN220440424U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The application relates to a method based on a prompting device for the stepped electricity price time period. Belongs to electric power technical field, and this suggestion device includes: the system comprises a main control unit, a plurality of time control switches and a response unit, wherein the time control switches are connected with the response unit, and the main control unit is provided with a power price period judging module for judging the power price period of the current moment; the response unit is pre-stored with no prompt information of the same electricity price period; the main control unit is communicated with the corresponding time control switch according to different electricity price time periods and controls the response unit to respond to the corresponding prompt information, and technicians control the electric equipment through the prompt information so as to achieve the purposes of peak staggering production and energy consumption saving.

Description

Prompting device based on step electricity price time period
Technical Field
The present application relates to the field of electrical power technology, and more particularly to a reminder based on stepped electricity rate periods.
Background
In order to meet the electricity demand of different time periods, the generated electricity can meet the electricity demand of society as far as possible, meanwhile, the waste of the generated electricity is avoided, and the electricity demand of the public in one day is stabilized by adopting a step electricity price mode, so that the current common practice is adopted.
The power supply office generally divides the time of day into a plurality of different types of electricity consumption time periods such as peak, flat, valley and the like according to the electricity consumption requirements of the local society in each time of day, sets electricity prices of the different time of day, and divides the electricity prices into four price levels such as valley, flat, peak and peak, for example, 0.2597 yuan/degree for the valley section, 0.6354 yuan/degree for the flat section, 1.0654 yuan/degree for the peak section and 1.3248 yuan/degree for the peak section.
In order to reduce the production cost and the electricity consumption cost of production equipment, industrial enterprises need to stagger the peak of the equipment, but technicians do not have time concepts on the valley, the flat, the peak and the peak, so that the time efficiency of staggering the peak electricity consumption implementation is poor, and therefore, the design of the prompting device based on the stepped electricity price period is very important in application significance for prompting the technicians to perform the equipment staggering production.
Disclosure of Invention
In order to overcome the problems in the related art, the application provides a prompting device based on a stepped electricity price period, and the prompting device can respond to corresponding prompting information according to different electricity price periods, so that technicians can control production equipment according to different prompting information, and the aim of improving economic benefits of industrial enterprises is fulfilled.
The first aspect of the application provides a prompting device based on a step electricity price period, which comprises a main control unit, a plurality of time control switches and a response unit, wherein the time control switches are connected with the response unit,
the main control unit is provided with a power price period judging module for judging the power price period of the current moment;
the main control unit is communicated with the corresponding time control switch according to different electricity price time periods and controls the response unit to respond to the corresponding prompt information;
the response unit stores prompt information of different electricity price time periods in advance.
In one embodiment, the master control unit includes a control module;
the control module is communicated with the corresponding time control switch according to different electricity price time periods;
and controlling the corresponding prompt information of the response unit.
In one embodiment, the electricity price period includes valley, flat, peak, and peak segments;
the time-controlled switches comprise valley time-controlled switches, flat Duan Shikong switches, peak time-controlled switches and tip time-controlled switches;
the main control unit is communicated with the corresponding time control switch according to different electricity price time periods.
In one embodiment, the prompting device further comprises a relay, and the time control switch is connected with and disconnected from the response unit through the relay.
In one embodiment, the main control unit further comprises a communication connection module; the communication connection module is used for being in communication connection with electric equipment, and the control module is also used for controlling the start and stop of the electric equipment.
In one embodiment, the response unit comprises a number of response subunits, including a valley Duan Xiangying subunit, a flat Duan Xiangying subunit, a peak segment response subunit, and a peak segment response subunit;
the time control switch is connected with the corresponding response subunit through the relay.
In one embodiment, the valley Duan Xiangying subunit includes a first indicator, a first sound damping control, a first alarm, and a first information processing module;
the first information processing module receives the signal of the main control unit and controls the first indicator lamp, the first silencing control key and the first alarm to operate;
the first information processing module is capable of transmitting a processing signal to a user terminal.
In one embodiment, the flat Duan Xiangying subunit includes a second indicator light, a second sound damping control key, a second alarm, and a second information processing module;
the second information processing module receives the signal of the main control unit and controls the second indicator lamp, the second silencing control key and the second alarm to operate;
the second information processing module is capable of transmitting a processing signal to the user terminal.
In one embodiment, the peak section response subunit includes a third indicator light, a third silencing control key, a third alarm, and a third information processing module;
the third information processing module receives the signal of the main control unit and controls the third indicator lamp, the third silencing control key and the third alarm to operate;
the third information processing module is capable of transmitting a processing signal to the user terminal.
In one embodiment, the tip response subunit includes a fourth indicator light, a fourth silencing control key, a fourth alarm, and a fourth information processing module;
the fourth information processing module receives the signal of the main control unit and controls the fourth indicator lamp, the fourth silencing control key and the fourth alarm to operate;
the fourth information processing module is capable of transmitting a processing signal to the user terminal.
The technical scheme that this application provided can include following beneficial effect: the prompting device based on the step electricity price period comprises a main control unit, a plurality of time control switches and a response unit, wherein the time control switches are connected with the response unit, and the main control unit is provided with an electricity price period judging module for judging the electricity price period of the current moment; the response unit stores prompt information of different electricity price time periods in advance;
the main control unit is communicated with the corresponding time control switch according to different electricity price time periods and controls the response unit to respond to the corresponding prompt information, and technicians control the electric equipment through the prompt information so as to achieve the purpose of peak staggering production.
It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the application.
Drawings
The foregoing and other objects, features and advantages of the application will be apparent from the following more particular descriptions of exemplary embodiments of the application as illustrated in the accompanying drawings wherein like reference numbers generally represent like parts throughout the exemplary embodiments of the application.
Fig. 1 is a schematic structural view of a reminder device based on a stepped electricity price period shown in an embodiment of the present application;
fig. 2 is another schematic structural view of a reminder device based on a stepped electricity price period according to an embodiment of the present application;
fig. 3 is a schematic structural diagram of a master control unit according to an embodiment of the present disclosure;
fig. 4 is a schematic structural diagram of a response unit shown in an embodiment of the present application.
Reference numerals: 100. a main control unit; 101. the electricity price period judging module; 102. a control module; 103. a storage module; 104. a communication connection module; 200. a time-controlled switch; 201. a valley time control switch; 202. a flat section time control switch; 203. a peak time control switch; 204. a tip time control switch; 300. a response unit; 301. a valley Duan Xiangying subunit; 302. a flat Duan Xiangying subunit; 303. peak segment response subunits; 304. a tip response subunit; 400. and a relay.
Detailed Description
Preferred embodiments of the present application will be described in more detail below with reference to the accompanying drawings. While the preferred embodiments of the present application are shown in the drawings, it should be understood that the present application may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art.
The terminology used in the present application is for the purpose of describing particular embodiments only and is not intended to be limiting of the present application. As used in this application and the appended claims, the singular forms "a," "an," and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise. It should also be understood that the term "and/or" as used herein refers to and encompasses any or all possible combinations of one or more of the associated listed items.
It should be understood that although the terms "first," "second," "third," etc. may be used herein to describe various information, these information should not be limited by these terms. These terms are only used to distinguish one type of information from another. For example, a first message may also be referred to as a second message, and similarly, a second message may also be referred to as a first message, without departing from the scope of the present application. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include one or more such feature. In the description of the present application, the meaning of "a plurality" is two or more, unless explicitly defined otherwise.
Example 1
The power supply office generally divides the time of day into a plurality of different types of electricity consumption time periods such as peak, flat, valley and the like according to the electricity consumption requirements of the local society in each time of day, sets electricity prices of the different time of day, and divides the electricity prices into four price levels such as valley, flat, peak and peak, for example, 0.2597 yuan/degree for the valley section, 0.6354 yuan/degree for the flat section, 1.0654 yuan/degree for the peak section and 1.3248 yuan/degree for the peak section.
In order to reduce the production cost and the electricity consumption cost of production equipment, industrial enterprises need to stagger the peak of the equipment, but technicians do not have time concepts on the valley, the flat, the peak and the peak, so that the time efficiency of staggering the peak electricity consumption implementation is poor, and therefore, the design of the prompting device based on the stepped electricity price period is very important in application significance for prompting the technicians to perform the equipment staggering production.
Aiming at the problems, the embodiment of the application provides a prompting device based on a step electricity price period, which can respond to corresponding prompting information according to different electricity price periods, so that technicians can control production equipment according to different prompting information, and the aim of improving economic benefits of industrial enterprises is fulfilled.
The following describes the technical scheme of the embodiments of the present application in detail with reference to the accompanying drawings.
Fig. 1 is a schematic structural view of a reminder device based on a stepped electricity price period shown in an embodiment of the present application;
fig. 3 is a schematic structural diagram of a master control unit according to an embodiment of the present application.
See fig. 1 and 3.
The prompting device based on the step electricity price period comprises a main control unit 100, a plurality of time control switches 200 and a response unit 300, wherein the time control switches 200 are connected with the response unit 300,
the main control unit 100 is provided with a power price period judging module 101 for judging the power price period of the current moment;
further, the main control unit 100 further includes a storage module 103, where the storage module 103 is configured to set a stored electricity price period type, and illustratively includes a valley section, a flat section, a peak section, and a peak section.
The main control unit 100 of the embodiment of the present application can connect the corresponding time control switch 200 according to different electricity price periods, and control the response unit 300 to respond to the corresponding prompt information; the response unit 300 stores prompt information of different electricity rate periods in advance.
For example, the period judging module judges that the current moment is in the valley section, the main control unit 100 communicates with the time control switch 200 of the valley section according to the information of the valley section at the current moment, and further, the main control unit 100 also controls the prompt information of the corresponding valley section of the response unit 300, in this embodiment, the prompt information is not limited, and a technician can set the prompt information according to the requirement.
After the prompt information is sent, a technician can control the electric equipment according to the prompt information, or another implementation mode, namely, the control instruction is included in the prompt information, so that the electric equipment can be directly controlled, for example, the control instruction for closing the electric equipment or starting the electric equipment is included in the prompt information, and the implementation modes belong to the protection scope of the utility model in the embodiment of the application.
The beneficial effects of the embodiment of the application are that: the prompting device based on the step electricity price period comprises a main control unit, a plurality of time control switches and a response unit, wherein the time control switches are connected with the response unit, and the main control unit is provided with an electricity price period judging module for judging the electricity price period of the current moment; the response unit stores prompt information of different electricity price time periods in advance;
the main control unit is communicated with the corresponding time control switch according to different electricity price time periods and controls the response unit to respond to the corresponding prompt information, and technicians control the electric equipment through the prompt information so as to achieve the purpose of peak staggering production.
Example two
In addition to the technical scheme of the first embodiment, the main control unit of the prompting device of the embodiment of the application further includes a control module.
The following describes the technical scheme of the embodiments of the present application in detail with reference to the accompanying drawings.
Fig. 2 is another schematic structural view of a reminder device based on a stepped electricity price period according to an embodiment of the present application;
fig. 3 is a schematic structural diagram of a master control unit according to an embodiment of the present disclosure;
see fig. 2 and 3.
The main control unit 100 includes a control module 102; the control module 102 communicates with the corresponding time control switch 200 according to different electricity price time periods; and controls the corresponding prompt information of the response unit 300. That is, the control module 102 of the main control unit 100 is configured to control connection between the main control unit 100 and the time control switch 200, and, illustratively, when the electricity price period judging module 101 judges that the current moment is a valley period, the control module 102 controls the main control unit 100 to connect with the time control switch 200 of the valley period, and the further control module 102 is further configured to control the response unit 300 to respond to the prompt information of the valley period.
Further, the electricity price period of the embodiment of the application comprises valley sections, flat sections, peak sections and tip sections; the types of electricity rate periods described above are merely exemplary, and the types of electricity rate periods may be set according to actual applications, and the setting of the electricity rate periods is within the scope of the present application.
Further, the number of time-controlled switches 200 of the present embodiment include a valley-section time-controlled switch 201, a flat Duan Shikong switch 202, a peak-section time-controlled switch 203, and a peak-section time-controlled switch 204;
the main control unit 100 communicates with the corresponding time control switch 200 according to different electricity price periods. For example, when the electricity price period judging module 101 judges that the current time is a valley period, the control module 102 controls the main control unit 100 to be connected with the valley Duan Shikong switch 201;
for example, when the electricity price period judging module 101 judges that the current time is a flat segment, the control module 102 controls the main control unit 100 to be connected with the flat segment time control switch 202;
for example, when the electricity price period judging module 101 judges that the current time is a peak period, the control module 102 controls the main control unit 100 to be connected with the peak period time control switch 203;
for example, when the electricity price period judging module 101 judges that the current time is a tip segment, the control module 102 controls the main control unit 100 to connect with the tip segment time control switch 204.
Further, the prompting device of the embodiment of the present application further includes a relay, and the time control switch 200 is connected to and disconnected from the response unit 300 through the relay. The main control unit 100 controls the time control switch 200 to be connected with the response unit 300 through the relay.
The main control unit 100 further comprises a communication connection module 104; the communication connection module 104 is used for performing communication connection with the electric equipment, and the control module 102 is also used for controlling the start and stop of the electric equipment.
The beneficial effects of the embodiment of the application are that: the main control unit in the prompting device comprises a control module; the control module is communicated with the corresponding time control switch according to different electricity price time periods; and controlling corresponding prompt information of the response unit.
The main control unit also comprises a communication connection module; the communication connection module can be used for being in communication connection with the electric equipment, so that the control module can directly control the start and stop of the electric equipment.
Example III
The prompting device of the embodiment of the application is further designed for the response unit, the response unit of the embodiment of the application comprises a plurality of response subunits, and the plurality of response subunits comprise a valley Duan Xiangying subunit, a flat Duan Xiangying subunit, a peak section response subunit and a peak section response subunit.
The following describes the technical scheme of the embodiments of the present application in detail with reference to the accompanying drawings.
Fig. 2 is another schematic structural view of a reminder device based on a stepped electricity price period according to an embodiment of the present application;
fig. 3 is a schematic structural diagram of a master control unit according to an embodiment of the present disclosure;
fig. 4 is a schematic structural diagram of a response unit shown in an embodiment of the present application.
See fig. 2-4.
The time control switch 200 is connected to and disconnected from the corresponding response subunit through a relay, and the main control unit 100 is connected to and disconnected from the corresponding response subunit through the relay control time control switch 200.
For example, when the electricity price period judging module 101 judges that the current time is the valley period, the control module 102 controls the main control unit 100 to be connected with the valley Duan Shikong switch 201; further, the control relay connects the valley Duan Shikong switch 201 with the valley Duan Xiangying subunit 301, so that the valley Duan Xiangying subunit 301 responds to the corresponding prompting message, and when the valley Duan Xiangying subunit 301 is not required to respond to the corresponding prompting message, the control relay is turned off.
The valley Duan Xiangying subunit 301 includes a first indicator light, a first noise abatement control key, a first alarm, and a first information processing module;
the first information processing module receives signals of the main control unit 100 and controls the first indicator lamp, the first silencing control key and the first alarm to operate; for example, the first indicator light may be set to a green light.
Further, the first information processing module is further capable of sending a processing signal to the user terminal. The user terminal implemented by the method comprises, but is not limited to, a mobile phone terminal or a computer terminal, for example, a processing signal is sent to the mobile phone terminal, and a technician can check the processing signal through the mobile phone terminal, so that electric equipment is controlled, and the prompt information type of the prompt device does not need to be observed in real time.
The flat Duan Xiangying subunit 302 includes a second indicator light, a second silencing control key, a second alarm, and a second information processing module;
the second information processing module receives the signal of the main control unit 100 and controls the second indicator lamp, the second silencing control key and the second alarm to operate; for example, the second indicator light may be provided as a blue light.
The second information processing module is capable of transmitting a processing signal to the user terminal.
The peak section response subunit 303 includes a third indicator light, a third silencing control key, a third alarm, and a third information processing module;
the third information processing module receives the signal of the main control unit 100 and controls the third indicator lamp, the third silencing control key and the third alarm to operate; the third indicator light may be provided as a yellow light, for example.
The third information processing module is capable of transmitting a processing signal to the user terminal.
The tip response subunit 304 includes a fourth indicator light, a fourth silencing control key, a fourth alarm, and a fourth information processing module;
the fourth information processing module receives the signal of the main control unit 100 and controls the fourth indicator lamp, the fourth silencing control key and the fourth alarm to operate; the fourth indicator light may be provided as a red light, for example.
The fourth information processing module is capable of transmitting a processing signal to the user terminal.
Further, the first information processing module, the second information processing module, the third information processing module and the fourth information processing module include, but are not limited to, being capable of sending processing signals to the user terminal, and the implementation of the functions of the first information processing module, the second information processing module, the third information processing module and the fourth information processing module all belong to the protection scope of the application.
The beneficial effects of the embodiment of the application are that: the response unit of this application embodiment includes a plurality of response subunits, and a plurality of response subunits include millet Duan Xiangying subunits, flat Duan Xiangying subunits, peak section response subunit and sharp section response subunit, through the different prompt message of different response subunits, can more directly perceived and swift manage the consumer to reach the purpose of saving the energy consumption.
The specific manner in which the respective modules perform the operations in the apparatus of the above embodiments has been described in detail in the embodiments related to the method, and will not be described in detail herein.
The embodiments of the present application have been described above, the foregoing description is exemplary, not exhaustive, and not limited to the embodiments disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the various embodiments described. The terminology used herein was chosen in order to best explain the principles of the embodiments, the practical application, or the improvement of technology in the marketplace, or to enable others of ordinary skill in the art to understand the embodiments disclosed herein.

Claims (2)

1. The prompting device based on the step electricity price period is characterized by comprising a main control unit (100), a plurality of time control switches (200) and a response unit (300), wherein the time control switches (200) are connected with the response unit (300),
the main control unit (100) is provided with a power price period judging module (101) for judging the power price period of the current moment;
the main control unit (100) is communicated with the corresponding time control switch (200) according to different electricity price time periods and controls the response unit (300) to respond to the corresponding prompt information;
the response unit (300) stores prompt information of different electricity price time periods in advance;
the main control unit (100) comprises a control module (102);
the control module (102) controls and communicates the corresponding time control switch (200) according to different electricity price time periods;
and controlling the corresponding prompt information of the response unit (300);
the prompting device further comprises a relay, and the time control switch (200) is connected with the response unit (300) through the relay;
the main control unit (100) further comprises a communication connection module (104); the communication connection module (104) is used for carrying out communication connection with electric equipment, and the control module (102) is also used for controlling the start and stop of the electric equipment;
the response unit (300) comprises a plurality of response subunits, wherein the plurality of response subunits comprise a valley Duan Xiangying subunit (301), a flat Duan Xiangying subunit (302), a peak segment response subunit (303) and a peak segment response subunit (304);
the time control switch (200) is connected with the corresponding response subunit through the relay;
the valley Duan Xiangying subunit (301) comprises a first indicator light, a first silencing control key, a first alarm and a first information processing module;
the first information processing module receives signals of the main control unit (100) and controls the first indicator lamp, the first silencing control key and the first alarm to operate;
the first information processing module can send a processing signal to the user terminal;
the flat Duan Xiangying subunit (302) comprises a second indicator light, a second silencing control key, a second alarm and a second information processing module;
the second information processing module receives the signal of the main control unit (100) and controls the second indicator lamp, the second silencing control key and the second alarm to operate;
the second information processing module can send a processing signal to the user terminal;
the peak section response subunit (303) comprises a third indicator lamp, a third silencing control key, a third alarm and a third information processing module;
the third information processing module receives signals of the main control unit (100) and controls the third indicator lamp, the third silencing control key and the third alarm to operate;
the third information processing module can send a processing signal to the user terminal;
the tip response subunit (304) comprises a fourth indicator light, a fourth silencing control key, a fourth alarm and a fourth information processing module;
the fourth information processing module receives the signal of the main control unit (100) and controls the fourth indicator lamp, the fourth silencing control key and the fourth alarm to operate;
the fourth information processing module is capable of transmitting a processing signal to the user terminal.
2. The step electricity rate period-based reminder according to claim 1, wherein:
the electricity price time period comprises valley sections, flat sections, peak sections and tip sections;
the time control switches (200) comprise valley time control switches (201), flat Duan Shikong switches (202), peak time control switches (203) and tip time control switches (204);
the main control unit (100) is communicated with the corresponding time control switch (200) according to different electricity price time periods.
CN202320326300.3U 2023-02-27 2023-02-27 Prompting device based on step electricity price time period Active CN220440424U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320326300.3U CN220440424U (en) 2023-02-27 2023-02-27 Prompting device based on step electricity price time period

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320326300.3U CN220440424U (en) 2023-02-27 2023-02-27 Prompting device based on step electricity price time period

Publications (1)

Publication Number Publication Date
CN220440424U true CN220440424U (en) 2024-02-02

Family

ID=89692220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320326300.3U Active CN220440424U (en) 2023-02-27 2023-02-27 Prompting device based on step electricity price time period

Country Status (1)

Country Link
CN (1) CN220440424U (en)

Similar Documents

Publication Publication Date Title
CN102856741B (en) Multi-channel remote control switch socket
CN102918798B (en) Cascade Power over Ethernet system
CN102238311B (en) Set-top box and power management method thereof
CN103345211A (en) Intelligent home control system and control method
CN101673968A (en) Electric equipment control device and method
CN202475575U (en) Intelligent hand mobile household control system
CN106773959B (en) A kind of light current wake-up system and method based on the communication of two core wires
CN102867400A (en) Smart adapter and remote control system using same
CN220440424U (en) Prompting device based on step electricity price time period
CN102156462A (en) Household comprehensive intelligent management method
CN206696645U (en) A kind of intelligent remote on-off control system
CN203215919U (en) Low-power consumption standby circuit device and air conditioner
CN1322049A (en) Charging method for handset and its intelligent integrated charging device
CN102495558A (en) System and method for remotely controlling turn-on or turn-off of electric equipment by using radio frequency communication
CN113602220A (en) In-vehicle mobile phone forgetting reminding method and system
CN103021158B (en) Remote controller and testing device and method thereof
CN203553509U (en) Intelligent socket system
CN102625009A (en) Energy-saving wireless remote control system for indoor lamps and electrical appliances
CN111105608B (en) Wireless control system and wireless control method for realizing device power supply on-off operation
CN105478181A (en) Rice milling method of intelligent household rice mill
CN102738663B (en) Intelligent energy-saving power socket
CN105022283A (en) Household sound box and illumination intelligent control system and control method
CN211878439U (en) Intelligent electric energy detection system and intelligent energy-saving control system
CN202453721U (en) Global system for mobile communication (GSM) remote control and monitor device of generator
CN202159245U (en) Air-conditioner alarm and light control system for unattended machine room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant