CN220337621U - Pipeline construction device - Google Patents
Pipeline construction device Download PDFInfo
- Publication number
- CN220337621U CN220337621U CN202321239202.2U CN202321239202U CN220337621U CN 220337621 U CN220337621 U CN 220337621U CN 202321239202 U CN202321239202 U CN 202321239202U CN 220337621 U CN220337621 U CN 220337621U
- Authority
- CN
- China
- Prior art keywords
- rod
- supporting plate
- plate
- rotating
- rotating rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
本实用新型公开了一种管道施工装置,属于市政工程施工技术领域。该一种管道施工装置包括第一支撑板,第一支撑板上设有第一调节组件,第一调节组件包括转动杆,转动杆插设于第一支撑板内,转动杆与支撑板转动连接,转动杆上套设有转动齿轮,支撑板顶部设有第二支撑板,第二支撑板底部固定连接有半齿轮,半齿轮与转动齿轮相互啮合,转动杆一端贯穿第一支撑板置于第一支撑板外从而解决现有的支撑架大部分固定设置,在将需要进行安装的管道放置于支撑架上后,不便于对管道的倾斜度进行调节,从而会使需要连接的管道口之间产生偏差,从而会给相邻管道之间的连接造成影响的问题。
The utility model discloses a pipeline construction device, which belongs to the technical field of municipal engineering construction. The pipeline construction device includes a first support plate. A first adjustment component is provided on the first support plate. The first adjustment component includes a rotation rod. The rotation rod is inserted into the first support plate. The rotation rod is rotationally connected to the support plate. , a rotating gear is set on the rotating rod, a second supporting plate is arranged on the top of the supporting plate, and a half gear is fixedly connected to the bottom of the second supporting plate. The half gear meshes with the rotating gear, and one end of the rotating rod penetrates the first supporting plate and is placed on the third supporting plate. A support plate is used to solve most of the existing fixed installations of the support frame. After placing the pipes that need to be installed on the support frame, it is inconvenient to adjust the inclination of the pipes, which will cause the gap between the pipe mouths that need to be connected. Deviations may occur that may affect the connection between adjacent pipes.
Description
技术领域Technical field
本实用新型涉及市政工程施工技术领域,具体涉及一种管道施工装置。The utility model relates to the technical field of municipal engineering construction, in particular to a pipeline construction device.
背景技术Background technique
市政工程是指市政基础设施建设工程,道路管道施工是市政工程中不可缺少的部分,目前在管道施工的工程中,经常需要进行管道的连接、更换等操作,为了保证道路管道施工效果,经常需要进行相邻的管道进行对齐操作,而后管道的后续连接或者回填定位操作时需要使用相应的工具将管道抬起而后实现管道的对齐;Municipal engineering refers to municipal infrastructure construction projects. Road pipeline construction is an indispensable part of municipal engineering. At present, in pipeline construction projects, operations such as pipe connection and replacement are often required. In order to ensure the effect of road pipeline construction, it is often necessary to Align adjacent pipes, and then use corresponding tools to lift the pipes for subsequent connection or backfill positioning operations to achieve alignment;
在对管道进行安装时都会预先设置支撑架对管道进行支撑,考虑到在对管道进行铺设时不同位置的地势是不相同的,而且安装后的支撑架也会因为土质产生一定的下限,现有的支撑架大部分固定设置,在将需要进行安装的管道放置于支撑架上后,不便于对管道的倾斜度进行调节,从而会使需要连接的管道口之间产生偏差,从而会给相邻管道之间的连接造成影响的问题,因此设置一种合理的一种管道施工装置。When installing pipelines, support frames will be pre-set to support the pipelines. Considering that the terrain at different locations is different when laying the pipelines, and the installed support frames will also have a certain lower limit due to soil quality, the existing Most of the support frames are fixed. After placing the pipes that need to be installed on the support frames, it is inconvenient to adjust the inclination of the pipes, which will cause deviations between the pipe mouths that need to be connected, thus causing damage to adjacent pipes. The connection between pipelines causes problems, so a reasonable pipeline construction device is installed.
实用新型内容Utility model content
本实用新型的目的是为了克服现有的支撑架大部分固定设置,在将需要进行安装的管道放置于支撑架上后,不便于对管道的倾斜度进行调节,从而会使需要连接的管道口之间产生偏差,从而会给相邻管道之间的连接造成影响的问题,因此设置一种合理的一种管道施工装置。The purpose of this utility model is to overcome most of the existing fixed installations of the support frame. After placing the pipes that need to be installed on the support frame, it is inconvenient to adjust the inclination of the pipes, which will cause the opening of the pipes that need to be connected to Deviations will occur between adjacent pipelines, which will affect the connection between adjacent pipelines. Therefore, a reasonable pipeline construction device is set up.
本实用新型提供了一种管道施工装置,包括第一支撑板,所述第一支撑板上设有第一调节组件,所述第一调节组件包括转动杆,所述转动杆插设于所述第一支撑板内,所述转动杆与所述支撑板转动连接,所述转动杆上套设有转动齿轮,所述支撑板顶部设有第二支撑板,所述第二支撑板底部固定连接有半齿轮,所述半齿轮与所述转动齿轮相互啮合,所述转动杆一端贯穿所述第一支撑板置于所述第一支撑板外。The utility model provides a pipeline construction device, which includes a first support plate. A first adjustment component is provided on the first support plate. The first adjustment component includes a rotating rod, and the rotating rod is inserted into the In the first support plate, the rotating rod is rotatably connected to the supporting plate. A rotating gear is set on the rotating rod. A second supporting plate is provided on the top of the supporting plate. The bottom of the second supporting plate is fixedly connected. There is a half gear, the half gear meshes with the rotating gear, and one end of the rotating rod penetrates the first support plate and is placed outside the first support plate.
较佳地,所述第一支撑板处于所述转动杆位置外侧开设有螺纹槽,所述转动杆上套设有限位件,所述限位件由第一连接部与第二连接部组成,所述第一连接部与所述转动杆螺纹连接,所述第二连接部口径大于所述转动杆口径,且与所述螺纹槽相互匹配。Preferably, the first support plate has a threaded groove outside the position of the rotating rod, and a limiting piece is set on the rotating rod. The limiting piece is composed of a first connecting part and a second connecting part. The first connecting part is threadedly connected to the rotating rod, and the second connecting part has a diameter larger than that of the rotating rod and matches the threaded groove.
较佳地,所述第一支撑板底部设有第二调节组件,所述第二调节组件包括第一支撑杆,所述第一支撑杆一端与所述第一支撑板底部铰接,所述第一支撑杆内插设有第二支撑杆,所述第一支撑杆与所述第二支撑杆上开设有若杆限位孔,所述限位孔内插设有限位杆。Preferably, a second adjustment component is provided at the bottom of the first support plate, and the second adjustment component includes a first support rod. One end of the first support rod is hinged to the bottom of the first support plate. A second support rod is inserted into one support rod. Rod limit holes are provided on the first support rod and the second support rod, and a limit rod is inserted into the limit holes.
较佳地,第二支撑杆底部固定连接有锚杆,所述锚杆上固定连接有若干倒刺。Preferably, an anchor rod is fixedly connected to the bottom of the second support rod, and a plurality of barbs are fixedly connected to the anchor rod.
较佳地,所述第二支撑板顶部固定连接有一对固定板,所述第二支撑板上开设有弧形放置槽,一对所述固定板上均设有夹持组件。Preferably, a pair of fixed plates are fixedly connected to the top of the second support plate, an arc-shaped placement groove is provided on the second support plate, and a clamping assembly is provided on each pair of the fixed plates.
较佳地,所述夹持组件包括螺杆,所述螺杆插设于所述固定板上,所述螺杆一端转动连接有夹持板,所述夹持板靠近所述固定板一侧固定连接有一对伸缩杆。Preferably, the clamping component includes a screw, the screw is inserted into the fixed plate, one end of the screw is rotatably connected to a clamping plate, and the clamping plate is fixedly connected to a side close to the fixed plate. To telescopic pole.
较佳地,所述转动杆与所述螺杆上均固定连接有转动块。Preferably, a rotating block is fixedly connected to both the rotating rod and the screw rod.
与现有技术相比,本实用新型的有益效果是:本实用新型的市政工程管道施工装置,本装置在进行使用时,先通过锚杆将设置的锚杆插设于地面之内后,通过第二调节组件先将所设置的第一支撑板调节水平,当需要对管道进行安装时,先将需要连接的管道放置于第二支撑板上后,这时若第二支撑板未处于水平位置时,操作人员可以转动设置的转动块使其带动设置的转动杆带动设置的转动齿轮进行转动,转动中的转动杆会与所设置的半齿轮进行啮合,这时半齿轮会带动设置第二支撑板进行转动从而将第二支撑板调节至水平位置,调节水平后再将限位件拧动至螺纹槽中对转动杆进行限位,再通过夹持组件将管道稳定夹持后,对相邻管道进行连接,从而解决现有的支撑架大部分固定设置,在将需要进行安装的管道放置于支撑架上后,不便于对管道的倾斜度进行调节,从而会使需要连接的管道口之间产生偏差,从而会给相邻管道之间的连接造成影响的问题。Compared with the existing technology, the beneficial effects of the present utility model are: when using the municipal engineering pipeline construction device of the utility model, the anchor rod is first inserted into the ground through the anchor rod, and then the anchor rod is inserted into the ground through the anchor rod. The second adjustment component first adjusts the level of the set first support plate. When the pipe needs to be installed, the pipe to be connected is first placed on the second support plate. At this time, if the second support plate is not in a horizontal position At this time, the operator can rotate the set rotating block to drive the set rotating rod to drive the set rotating gear to rotate. The rotating rotating rod will mesh with the set half gear. At this time, the half gear will drive the set second support. The plate is rotated to adjust the second support plate to a horizontal position. After adjusting the level, the limiter is screwed into the threaded groove to limit the rotation rod. After the pipe is stably clamped by the clamping assembly, the adjacent pipe is clamped stably. The pipes are connected to solve the problem of most of the existing fixed installations of the support frame. After placing the pipes that need to be installed on the support frame, it is inconvenient to adjust the inclination of the pipes, which will cause the gap between the pipe mouths that need to be connected. Deviations may occur that may affect the connection between adjacent pipes.
附图说明Description of the drawings
图1为本实用新型整体第一视角结构示意图;Figure 1 is a schematic diagram of the overall structure of the utility model from a first perspective;
图2为图1A处放大结构示意图;Figure 2 is an enlarged structural schematic diagram of Figure 1A;
图3为本实用新型整体第二视角结构示意图。Figure 3 is a schematic diagram of the overall structure of the utility model from a second perspective.
附图标记说明:1、第一支撑板;2、第二支撑板;3、第一调节组件;301、转动杆;302、转动齿轮;303、半齿轮;4、第二调节组件;401、第一支撑杆;402、第二支撑杆;403、限位孔;404、限位杆;5、螺纹槽;6、锚杆;7、倒刺;8、固定板;9、弧形放置槽;10、夹持组件;101、螺杆;102、夹持板;103、伸缩杆;11、转动块;12、限位件;1201、第一连接部;1202、第二连接部。Explanation of reference signs: 1. First supporting plate; 2. Second supporting plate; 3. First adjusting component; 301. Rotating rod; 302. Rotating gear; 303. Half gear; 4. Second adjusting component; 401. First support rod; 402, second support rod; 403, limit hole; 404, limit rod; 5, threaded groove; 6, anchor rod; 7, barb; 8, fixed plate; 9, arc placement groove ; 10. Clamping component; 101. Screw; 102. Clamping plate; 103. Telescopic rod; 11. Rotating block; 12. Limiting member; 1201. First connecting part; 1202. Second connecting part.
具体实施方式Detailed ways
下面结合附图1-3,对本实用新型的具体实施方式进行详细描述,但应当理解本实用新型的保护范围并不受具体实施方式的限制。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动的前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The specific embodiments of the present utility model will be described in detail below with reference to the accompanying drawings 1-3, but it should be understood that the protection scope of the present utility model is not limited by the specific embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without any creative work fall within the scope of protection of the present utility model.
本实用新型提供的一种管道施工装置,如图1-3所示,包括第一支撑板1,第一支撑板1上设有第一调节组件3,第一调节组件3包括转动杆301,转动杆301插设于第一支撑板1内,转动杆301与支撑板转动连接,转动杆301上套设有转动齿轮302,支撑板顶部设有第二支撑板2,第二支撑板2底部固定连接有半齿轮303,半齿轮303与转动齿轮302相互啮合,转动杆301一端贯穿第一支撑板1置于第一支撑板1外。The utility model provides a pipeline construction device, as shown in Figures 1-3, including a first support plate 1. The first support plate 1 is provided with a first adjustment component 3. The first adjustment component 3 includes a rotating rod 301. The rotating rod 301 is inserted into the first support plate 1. The rotating rod 301 is rotationally connected with the supporting plate. The rotating rod 301 is covered with a rotating gear 302. The second supporting plate 2 is arranged on the top of the supporting plate and the second supporting plate 2 is installed on the bottom. A half gear 303 is fixedly connected, and the half gear 303 meshes with the rotating gear 302. One end of the rotating rod 301 penetrates the first support plate 1 and is placed outside the first support plate 1.
本装置在进行使用时,先通过锚杆6将设置的锚杆6插设于地面之内后,通过第二调节组件4先将所设置的第一支撑板1调节水平,当需要对管道进行安装时,先将需要连接的管道放置于第二支撑板2上后,这时若第二支撑板2未处于水平位置时,操作人员可以转动设置的转动块11使其带动设置的转动杆301带动设置的转动齿轮302进行转动,转动中的转动杆301会与所设置的半齿轮303进行啮合,这时半齿轮303会带动设置第二支撑板2进行转动从而将第二支撑板2调节至水平位置,调节水平后再将限位件12拧动至螺纹槽5中对转动杆301进行限位,再通过夹持组件10将管道稳定夹持后,对相邻管道进行连接,从而解决现有的支撑架大部分固定设置,在将需要进行安装的管道放置于支撑架上后,不便于对管道的倾斜度进行调节,从而会使需要连接的管道口之间产生偏差,从而会给相邻管道之间的连接造成影响的问题When the device is in use, first insert the set anchor rod 6 into the ground through the anchor rod 6, and then adjust the level of the set first support plate 1 through the second adjustment component 4. When the pipeline needs to be adjusted During installation, first place the pipes to be connected on the second support plate 2. At this time, if the second support plate 2 is not in a horizontal position, the operator can rotate the set rotating block 11 to drive the set rotating rod 301. The set rotating gear 302 is driven to rotate, and the rotating rotating rod 301 will mesh with the set half gear 303. At this time, the half gear 303 will drive the set second support plate 2 to rotate, thereby adjusting the second support plate 2 to horizontal position, after adjusting the level, screw the limiter 12 into the threaded groove 5 to limit the rotation rod 301, and then clamp the pipe stably through the clamping assembly 10, and then connect the adjacent pipes to solve the problem. Some support frames are mostly fixed. After placing the pipes that need to be installed on the support frames, it is inconvenient to adjust the inclination of the pipes, which will cause deviations between the pipe mouths that need to be connected, thus causing problems for the related pipes. Problems affecting connections between adjacent pipes
优选的,如图1-2所示,第一支撑板1处于转动杆301位置外侧开设有螺纹槽5,转动杆301上套设有限位件12,限位件12由第一连接部1201与第二连接部1202组成,第一连接部1201与转动杆301螺纹连接,第二连接部1202口径大于转动杆301口径,且与螺纹槽5相互匹配。Preferably, as shown in Figure 1-2, the first support plate 1 is provided with a threaded groove 5 outside the position of the rotating rod 301, and a limiting member 12 is set on the rotating rod 301. The limiting member 12 is connected by the first connecting portion 1201 and The first connection part 1201 is threadedly connected to the rotating rod 301 . The diameter of the second connecting part 1202 is larger than the diameter of the rotating rod 301 and matches the threaded groove 5 .
在通过第一调节组件3将第二支撑板2调节水平后,转动设置的限位件12,使第一连接部1201在转动杆301上进行移动,使第二连接部1202移动至螺纹槽5中后,与螺纹槽5配合后对转动杆301进行限位。After adjusting the level of the second support plate 2 through the first adjustment component 3 , the limiting member 12 is rotated to move the first connecting part 1201 on the rotating rod 301 and move the second connecting part 1202 to the threaded groove 5 After it is in the middle, it cooperates with the thread groove 5 to limit the rotation rod 301.
优选的,如图1所示,第一支撑板1底部设有第二调节组件4,第二调节组件4包括第一支撑杆401,第一支撑杆401一端与第一支撑板1底部铰接,第一支撑杆401内插设有第二支撑杆402,第一支撑杆401与第二支撑杆402上开设有若杆限位孔403,限位孔403内插设有限位杆404,第二支撑杆402底部固定连接有锚杆6,锚杆6上固定连接有若干倒刺7。Preferably, as shown in Figure 1, a second adjustment component 4 is provided at the bottom of the first support plate 1. The second adjustment component 4 includes a first support rod 401. One end of the first support rod 401 is hinged to the bottom of the first support plate 1. The first support rod 401 has a second support rod 402 inserted therein. The first support rod 401 and the second support rod 402 are provided with rod limit holes 403. The limit holes 403 have a limit rod 404 inserted therein. An anchor rod 6 is fixedly connected to the bottom of the support rod 402, and a number of barbs 7 are fixedly connected to the anchor rod 6.
考虑到不同位置的地势不同,在通过锚杆6将第二支撑杆402固定后,拉动设置的第一支撑杆401使其带动第一支撑板1移动,将所设置的第一支撑板1条节水平后,再将限位杆404插设于限位孔403内对第一支撑杆401与第二支撑杆402的相对位置进行限位,设置的锚杆6增加抓地力使所设置的第二支撑杆402更加稳定。Taking into account the different topography at different locations, after the second support rod 402 is fixed through the anchor rod 6, the first support rod 401 is pulled to drive the first support plate 1 to move, and the first support plate 1 is moved After the joint is level, the limit rod 404 is inserted into the limit hole 403 to limit the relative position of the first support rod 401 and the second support rod 402. The set anchor rod 6 increases the gripping force of the set third support rod. The two support rods 402 are more stable.
优选的,如图1-3所示,第二支撑板2顶部固定连接有一对固定板8,第二支撑板2上开设有弧形放置槽9,一对固定板8上均设有夹持组件10,夹持组件10包括螺杆101,螺杆101插设于固定板8上,螺杆101一端转动连接有夹持板102,夹持板102靠近固定板8一侧固定连接有一对伸缩杆103,转动杆301与螺杆101上均固定连接有转动块11。Preferably, as shown in Figures 1-3, a pair of fixed plates 8 are fixedly connected to the top of the second support plate 2. The second support plate 2 is provided with an arc-shaped placement groove 9, and the pair of fixed plates 8 are both provided with clamping plates. Component 10. The clamping component 10 includes a screw 101. The screw 101 is inserted into the fixed plate 8. One end of the screw 101 is rotationally connected to a clamping plate 102. The clamping plate 102 is fixedly connected to a pair of telescopic rods 103 on one side close to the fixed plate 8. The rotating rod 301 and the screw rod 101 are both fixedly connected with the rotating block 11 .
在将需要进行安装的管道放置于第二支撑板2上的弧形放置槽9中后,操作人员转动设置的转动块11使设置的螺杆101进行转动,在设置的伸缩杆103的辅助下对设置的夹持板102进行推动,从而使夹持板102一侧与管道外侧壁紧贴对管道进行夹持。After placing the pipe to be installed in the arc-shaped placement groove 9 on the second support plate 2, the operator rotates the rotating block 11 to rotate the screw 101, and with the assistance of the telescopic rod 103, The clamping plate 102 is pushed so that one side of the clamping plate 102 is in close contact with the outer wall of the pipe to clamp the pipe.
本实用新型的一种管道施工装置使用方法如下:The usage method of a pipeline construction device of the present invention is as follows:
本装置在进行使用时,先通过锚杆6将设置的锚杆6插设于地面之内后,考虑到不同位置的地势不同,在通过锚杆6将第二支撑杆402固定后,拉动设置的第一支撑杆401使其带动第一支撑板1移动,将所设置的第一支撑板1条节水平后,再将限位杆404插设于限位孔403内对第一支撑杆401与第二支撑杆402的相对位置进行限位,设置的锚杆6增加抓地力使所设置的第二支撑杆402更加稳定,当需要对管道进行安装时,先将需要连接的管道放置于第二支撑板2上后,这时若第二支撑板2未处于水平位置时,操作人员可以转动设置的转动块11使其带动设置的转动杆301带动设置的转动齿轮302进行转动,转动中的转动杆301会与所设置的半齿轮303进行啮合,这时半齿轮303会带动设置第二支撑板2进行转动从而将第二支撑板2调节至水平位置,在通过第一调节组件3将第二支撑板2调节水平后,转动设置的限位件12,使第一连接部1201在转动杆301上进行移动,使第二连接部1202移动至螺纹槽5中后,与螺纹槽5配合后对转动杆301进行限位,在将需要进行安装的管道放置于第二支撑板2上的弧形放置槽9中后,操作人员转动设置的转动块11使设置的螺杆101进行转动,在设置的伸缩杆103的辅助下对设置的夹持板102进行推动,从而使夹持板102一侧与管道外侧壁紧贴对管道进行夹持,对相邻管道进行连接。When the device is in use, first insert the set anchor rod 6 into the ground through the anchor rod 6. Considering the different terrains at different locations, after fixing the second support rod 402 through the anchor rod 6, pull and set the device. The first support rod 401 drives the first support plate 1 to move. After leveling the first support plate 1, the limit rod 404 is inserted into the limit hole 403 to align the first support rod 401 The relative position of the second support rod 402 is limited, and the anchor rod 6 is provided to increase the grip and make the second support rod 402 more stable. When the pipeline needs to be installed, the pipeline to be connected is first placed on the second support rod 402. After the second support plate 2 is on, if the second support plate 2 is not in a horizontal position, the operator can rotate the rotating block 11 to drive the rotating rod 301 to drive the rotating gear 302 to rotate. The rotating rod 301 will mesh with the provided half gear 303. At this time, the half gear 303 will drive the second support plate 2 to rotate to adjust the second support plate 2 to a horizontal position. The first adjustment component 3 will then adjust the second support plate 2 to a horizontal position. After adjusting the level of the two support plates 2, rotate the limiter 12 so that the first connecting part 1201 moves on the rotating rod 301, and the second connecting part 1202 moves into the threaded groove 5, and then cooperates with the threaded groove 5. The rotating rod 301 is limited. After placing the pipe to be installed in the arc-shaped placement groove 9 on the second support plate 2, the operator turns the rotating block 11 to rotate the screw 101. After setting With the help of the telescopic rod 103, the clamping plate 102 is pushed, so that one side of the clamping plate 102 is in close contact with the outer wall of the pipe to clamp the pipe and connect adjacent pipes.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those of ordinary skill in the art will understand that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention. , substitutions and modifications, the scope of the present invention is defined by the appended claims and their equivalents.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321239202.2U CN220337621U (en) | 2023-05-22 | 2023-05-22 | Pipeline construction device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321239202.2U CN220337621U (en) | 2023-05-22 | 2023-05-22 | Pipeline construction device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220337621U true CN220337621U (en) | 2024-01-12 |
Family
ID=89444738
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321239202.2U Active CN220337621U (en) | 2023-05-22 | 2023-05-22 | Pipeline construction device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220337621U (en) |
-
2023
- 2023-05-22 CN CN202321239202.2U patent/CN220337621U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218745942U (en) | Auxiliary positioning device for welding pipeline | |
CN221210486U (en) | Pipeline construction clamping tool | |
CN113620181A (en) | Pipeline laying device is used in municipal construction road construction | |
CN220337621U (en) | Pipeline construction device | |
CN213290083U (en) | Positioning support for pipe joint installation | |
CN210050390U (en) | Strutting arrangement is used in town road pipeline construction | |
CN218543389U (en) | Installation device is assisted to infrastructure for building engineering | |
CN116480846A (en) | Building construction pipeline installation device and installation method thereof | |
CN214368153U (en) | Pre-buried positioner of pipeline for building water and electricity | |
CN221545856U (en) | Sewage pipeline laying and fixing device in municipal engineering | |
CN110645441B (en) | A trenchless repair device for sewer pipes and construction method thereof | |
CN220544618U (en) | A pipeline fixing fixture for pipeline trough construction | |
CN222768269U (en) | Pipe connection device | |
CN219571083U (en) | Water conservancy pipeline strutting arrangement | |
CN214364954U (en) | Side form bracing piece for building | |
CN219692468U (en) | Pipeline positioning bracket for water supply and drainage engineering | |
CN215674094U (en) | Engineering pipeline connection structure is used in construction of building plumbing | |
CN222472678U (en) | MPP tubular product welding auxiliary stay device | |
CN222234337U (en) | Electrical installation lifting tool | |
CN222085344U (en) | Building pipeline lays fixing device in hydraulic engineering | |
CN221704635U (en) | Pipeline support frame for hydraulic engineering | |
CN222697971U (en) | Adjustable pipe supporting device | |
CN219520835U (en) | Pipeline construction installation equipment | |
CN222277709U (en) | A support frame for water conservancy and hydropower construction | |
CN221943379U (en) | Valve support frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |