[go: up one dir, main page]

CN220117713U - Jacking steel platform of super high-rise office building engineering - Google Patents

Jacking steel platform of super high-rise office building engineering Download PDF

Info

Publication number
CN220117713U
CN220117713U CN202321161631.2U CN202321161631U CN220117713U CN 220117713 U CN220117713 U CN 220117713U CN 202321161631 U CN202321161631 U CN 202321161631U CN 220117713 U CN220117713 U CN 220117713U
Authority
CN
China
Prior art keywords
steel platform
fixedly connected
threaded rod
office building
super high
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202321161631.2U
Other languages
Chinese (zh)
Inventor
许云鹏
罗晓生
张国文
张鹏达
高锐
王超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN202321161631.2U priority Critical patent/CN220117713U/en
Application granted granted Critical
Publication of CN220117713U publication Critical patent/CN220117713U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model relates to a jacking steel platform for super high-rise office building engineering, which comprises a steel platform, wherein the top of the steel platform is fixedly connected with a fence, the bottom of the steel platform is fixedly connected with a mounting box, the right side of the mounting box is fixedly connected with a motor, one end of an output shaft of the motor is fixedly connected with a bidirectional threaded rod, one end of the bidirectional threaded rod, which is far away from the motor, is rotationally connected with the inner wall of the mounting box, and the outer surface of the bidirectional threaded rod is in threaded connection with two movable plates. This jacking steel platform of super high-rise office building engineering, when steel platform is when needs remove, drive the inside rotation of two-way threaded rod at the mounting box through the starter motor for two fly leaves one end under the circumstances that has the sliding tray, drives two sliding block extrusion piece, makes the loading board under the extrusion of sloping block, and the loading board moves down along the guide bar, thereby lets the gyro wheel move the outside of mounting box, promotes the steel platform at this moment and removes can, reaches the effect of quick adjustment gyro wheel.

Description

一种超高层办公楼工程的顶升钢平台A kind of jacking steel platform for super high-rise office building engineering

技术领域Technical field

本实用新型涉及钢平台技术领域,具体为一种超高层办公楼工程的顶升钢平台。The utility model relates to the technical field of steel platforms, specifically a jacking steel platform for super-high-rise office building projects.

背景技术Background technique

随着超高层办公楼项目的增多,顶模体系作为塔楼核心筒施工的关键,其中液压顶升钢平台模架体系的应用也越来越广泛,通过使用液压顶升钢平台可以实现在建筑楼层后自动爬升,极大程度的缩短的建筑施工。With the increase in super high-rise office building projects, the top formwork system is the key to the construction of the core tube of the tower. Among them, the application of the hydraulic jacking steel platform formwork system is becoming more and more widespread. By using the hydraulic jacking steel platform, it can be realized on the building floor. Then it automatically climbs, greatly shortening the construction work.

根据中国专利CN113833251A一种超高层办公楼工程使用的顶升钢平台中具备的,顶升钢平台的底面开设收纳槽收纳滑轮,旋拧转动柄后,螺纹套管沿着螺接丝杆垂直移动,此时升降板沿着限位柱下滑至被挡环遮挡,此时滑轮突出收纳槽开口,多组滑轮均调整后,便于推行钢平台本体转移。According to Chinese patent CN113833251A, a lifting steel platform used in super high-rise office building projects has a storage groove on the bottom surface of the lifting steel platform to accommodate the pulley. After the rotating handle is rotated, the threaded sleeve moves vertically along the threaded screw rod. , at this time, the lifting plate slides along the limiting column until it is blocked by the blocking ring. At this time, the pulley protrudes from the opening of the storage slot. After multiple sets of pulleys are adjusted, it is convenient to transfer the steel platform body.

上述该装置中在对钢平台进行移动时,采用手动转动柄带动丝杆杆旋转,使得螺纹套筒向下移动,从而让滑轮移出钢平台的内部,该方式在高层使用时工作效率较慢,且手动旋转多组滑轮使得在对钢平台进行移动时,工作人员劳动强度增加,装置的实用性降低。故而提出一种超高层办公楼工程的顶升钢平台来解决上述问题。In the above-mentioned device, when moving the steel platform, a manual rotating handle is used to drive the screw rod to rotate, causing the threaded sleeve to move downward, thereby allowing the pulley to move out of the steel platform. This method is less efficient when used in high-rise buildings. Moreover, manually rotating multiple sets of pulleys increases the labor intensity of workers and reduces the practicality of the device when moving the steel platform. Therefore, a jacking steel platform for super high-rise office building projects is proposed to solve the above problems.

实用新型内容Utility model content

针对现有技术的不足,本实用新型提供了一种超高层办公楼工程的顶升钢平台,具备钢平台在移动时自动升降滚轮,降低工作人员劳动强度,提高钢平台移动时的准备效率等优点,解决了现有钢平台在移动时,采用手动调节的方式,工作人员劳动强度增加,进而导致钢平台移动时的准备工作时间延长的问题。In view of the shortcomings of the existing technology, this utility model provides a jacking steel platform for super high-rise office building projects, which is equipped with automatic lifting rollers when the steel platform moves, reducing the labor intensity of the staff, and improving the preparation efficiency when the steel platform moves, etc. Advantages: It solves the problem that the existing steel platform uses manual adjustment when moving, which increases the labor intensity of the staff, thereby prolonging the preparation time for moving the steel platform.

为实现上述目的,本实用新型提供如下技术方案:一种超高层办公楼工程的顶升钢平台,包括钢平台,所述钢平台的顶部固定连接围栏,所述钢平台的底部固定连接有安装箱,所述安装箱的右侧固定连接有电机,所述电机输出轴的一端固定连接有双向螺纹杆,所述双向螺纹杆远离电机的一端与安装箱的内壁转动连接,所述双向螺纹杆的外表面螺纹连接有数量为两个的活动板,两个所述活动板的底部均固定连接有滑动块,所述安装箱的内部固定连接有数量为两个的导向杆,两个所述导向杆的外表面滑动连接有同一承载板,所述承载板的顶部固定连接有数量为两个的斜块,所述安装箱的两侧内壁均固定连接有固定块,两个所述固定块的底部均固定连接有弹簧,两个所述弹簧的底部均与承载板的顶部固定连接,所述承载板的底部固定连接有数量为两个的滚轮。In order to achieve the above purpose, the utility model provides the following technical solution: a jacking steel platform for a super high-rise office building project, including a steel platform, the top of the steel platform is fixedly connected to a fence, and the bottom of the steel platform is fixedly connected to an installation box, a motor is fixedly connected to the right side of the installation box, and a bidirectional threaded rod is fixedly connected to one end of the motor output shaft. The end of the bidirectional threaded rod away from the motor is rotationally connected to the inner wall of the installation box. The bidirectional threaded rod There are two movable plates threadedly connected to the outer surface of the movable plate. The bottoms of the two movable plates are fixedly connected with sliding blocks. There are two guide rods fixedly connected to the inside of the installation box. The two movable plates are fixedly connected to the outer surface of the installation box. The outer surface of the guide rod is slidingly connected to the same load-bearing plate, and the top of the load-bearing plate is fixedly connected with two inclined blocks. The inner walls of both sides of the installation box are fixedly connected with fixing blocks, and the two fixing blocks are fixedly connected. The bottoms of the two springs are fixedly connected to springs, and the bottoms of the two springs are fixedly connected to the top of the load-bearing plate. There are two rollers fixedly connected to the bottom of the load-bearing plate.

进一步,所述钢平台的顶部固定连接有固定杆,所述围栏通过紧固螺栓与固定杆连接。Further, a fixed rod is fixedly connected to the top of the steel platform, and the fence is connected to the fixed rod through fastening bolts.

进一步,所述安装箱的内部开设有传动轴孔,所述双向螺纹杆的右侧通过传动轴孔在安装箱的内部旋转传动,所述安装箱的左侧内壁设置有转动轴承,所述双向螺纹杆的远离电机的一端与转动轴承的内环固定连接,并通过转动轴承与安装箱转动连接。Further, a transmission shaft hole is provided inside the installation box, and the right side of the two-way threaded rod is rotated and driven inside the installation box through the transmission shaft hole. A rotation bearing is provided on the left inner wall of the installation box, and the two-way threaded rod rotates through the transmission shaft hole. One end of the threaded rod away from the motor is fixedly connected to the inner ring of the rotating bearing, and is rotationally connected to the installation box through the rotating bearing.

进一步,所述安装箱的内部开设有滑动槽,两个所述活动板的顶部均通过滑动槽在安装箱的内顶壁中滑动,两个所述活动板的形状均为方形板。Further, a sliding groove is provided inside the installation box, and the tops of the two movable plates slide in the inner top wall of the installation box through the sliding grooves. The shapes of the two movable plates are both square plates.

进一步,两个所述滑动块的形状均为长方形板,两个所述滑动块底部开设有斜面。Furthermore, the two sliding blocks are both in the shape of rectangular plates, and the bottoms of the two sliding blocks are provided with inclined surfaces.

进一步,所述承载板的内部开设有导向杆孔,所述承载板通过两个导向杆孔与两个导向杆滑动连接,两个所述固定块的形状均为长方形块,所述承载板通过两个弹簧与两个固定块弹性连接。Further, a guide rod hole is provided inside the load-bearing plate. The load-bearing plate is slidably connected to the two guide rods through the two guide rod holes. The shape of the two fixed blocks is a rectangular block. The load-bearing plate passes through The two springs are elastically connected to the two fixed blocks.

与现有技术相比,本申请的技术方案具备以下有益效果:Compared with the existing technology, the technical solution of this application has the following beneficial effects:

1、该超高层办公楼工程的顶升钢平台,当钢平台在需要移动时候,通过启动电机带动双向螺纹杆在安装箱的内部旋转,使得两个活动板在有滑动槽的情况下相离一端,带动两个滑动块挤压形块,使得承载板在斜块的挤压下,承载板沿着导向杆向下移动,从而让滚轮移到安装箱的外面,此时推动钢平台进行移动即可,达到快速调节滚轮的效果。1. For the lifting steel platform of this super high-rise office building project, when the steel platform needs to be moved, the starting motor drives the two-way threaded rod to rotate inside the installation box, so that the two movable plates are separated from each other with sliding grooves. At one end, the two sliding blocks are driven to squeeze the shaped block, so that the load-bearing plate is squeezed by the inclined block, and the load-bearing plate moves downward along the guide rod, allowing the roller to move outside the installation box, and at this time, the steel platform is pushed to move That’s it, to achieve the effect of quickly adjusting the roller.

2、该超高层办公楼工程的顶升钢平台,通过安装箱的内部设置两个固定块与两个弹簧,使得两个滚轮在收缩到安装箱的内部时,承载板可以在弹簧的作用下向上移动,尽量避免承载板掉落到安装箱內底壁的情况发生。通过在承载板的内部开设两个导向杆孔,使得承载板在上下移动时,导向杆孔可以起到引导的作用,使得装置的稳定性更强。2. The lifting steel platform of this super high-rise office building project is equipped with two fixed blocks and two springs inside the installation box, so that when the two rollers shrink to the inside of the installation box, the load-bearing plate can be lifted under the action of the springs Move upward to avoid the load-bearing plate from falling to the bottom wall of the installation box. By opening two guide rod holes inside the load-bearing plate, the guide rod holes can play a guiding role when the load-bearing plate moves up and down, making the device more stable.

附图说明Description of the drawings

图1为本实用新型结构主剖视图;Figure 1 is a main cross-sectional view of the structure of the present utility model;

图2为本实用新型结构A处局部放大图。Figure 2 is a partial enlarged view of part A of the structure of the present utility model.

图中:1钢平台、2围栏、3安装箱、4滑动槽、5电机、6双向螺纹杆、7活动板、8滑动块、9导向杆、10承载板、11斜块、12固定块、13弹簧、14滚轮。In the picture: 1 steel platform, 2 fence, 3 installation box, 4 sliding groove, 5 motor, 6 two-way threaded rod, 7 movable plate, 8 sliding block, 9 guide rod, 10 bearing plate, 11 inclined block, 12 fixed block, 13 springs, 14 rollers.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present utility model.

请参阅图1-2,本实施例中的一种超高层办公楼工程的顶升钢平台,包括钢平台1,钢平台1的顶部固定连接围栏2,钢平台1的顶部固定连接有固定杆,围栏2通过紧固螺栓与固定杆连接。Please refer to Figure 1-2. In this embodiment, a lifting steel platform for a super high-rise office building project includes a steel platform 1. The top of the steel platform 1 is fixedly connected to the fence 2, and the top of the steel platform 1 is fixedly connected to a fixed rod. , the fence 2 is connected to the fixed rod through fastening bolts.

钢平台1的底部固定连接有安装箱3,安装箱3的右侧固定连接有电机5,电机5输出轴的一端固定连接有双向螺纹杆6,安装箱3的左侧内壁设置有转动轴承,双向螺纹杆6的远离电机5的一端与转动轴承的内环固定连接,并通过转动轴承与安装箱3转动连接。The bottom of the steel platform 1 is fixedly connected with an installation box 3. The right side of the installation box 3 is fixedly connected with a motor 5. One end of the output shaft of the motor 5 is fixedly connected with a bidirectional threaded rod 6. The left inner wall of the installation box 3 is provided with a rotating bearing. One end of the bidirectional threaded rod 6 away from the motor 5 is fixedly connected to the inner ring of the rotating bearing, and is rotationally connected to the installation box 3 through the rotating bearing.

安装箱3的内部开设有传动轴孔,双向螺纹杆6的右侧通过传动轴孔在安装箱3的内部旋转传动。A transmission shaft hole is provided inside the installation box 3, and the right side of the two-way threaded rod 6 is rotated and transmitted inside the installation box 3 through the transmission shaft hole.

双向螺纹杆6远离电机5的一端与安装箱3的内壁转动连接,双向螺纹杆6的外表面螺纹连接有数量为两个的活动板7,安装箱3的内部开设有滑动槽4,两个活动板7的顶部均通过滑动槽4在安装箱3的内顶壁中滑动,两个活动板7的形状均为方形板。One end of the two-way threaded rod 6 away from the motor 5 is rotationally connected to the inner wall of the installation box 3. The outer surface of the two-way threaded rod 6 is threadedly connected with two movable plates 7. There are sliding grooves 4 inside the installation box 3. Two sliding grooves 4 are provided inside the installation box 3. The tops of the movable plates 7 slide in the inner top wall of the installation box 3 through the sliding grooves 4, and the shapes of the two movable plates 7 are both square plates.

两个活动板7的底部均固定连接有滑动块8,两个滑动块8的形状均为长方形板,两个滑动块8底部开设有斜面。The bottoms of the two movable plates 7 are fixedly connected with sliding blocks 8. The shapes of the two sliding blocks 8 are both rectangular plates, and the bottoms of the two sliding blocks 8 are provided with inclined surfaces.

安装箱3的内部固定连接有数量为两个的导向杆9,两个导向杆9的外表面滑动连接有同一承载板10,承载板10的内部开设有导向杆孔,承载板10通过两个导向杆孔与两个导向杆9滑动连接。There are two guide rods 9 fixedly connected to the interior of the installation box 3. The outer surfaces of the two guide rods 9 are slidingly connected to the same load-bearing plate 10. The load-bearing plate 10 has guide rod holes inside, and the load-bearing plate 10 passes through two The guide rod hole is slidingly connected to the two guide rods 9.

承载板10的顶部固定连接有数量为两个的斜块11,安装箱3的两侧内壁均固定连接有固定块12,两个固定块12的底部均固定连接有弹簧13,两个固定块12的形状均为长方形块,承载板10通过两个弹簧13与两个固定块12弹性连接,两个弹簧13的底部均与承载板10的顶部固定连接,承载板10的底部固定连接有数量为两个的滚轮14。There are two inclined blocks 11 fixedly connected to the top of the load-bearing plate 10, fixed blocks 12 are fixedly connected to the inner walls of both sides of the installation box 3, and springs 13 are fixedly connected to the bottoms of the two fixed blocks 12. The two fixed blocks The shapes of 12 are all rectangular blocks. The load-bearing plate 10 is elastically connected to the two fixed blocks 12 through two springs 13. The bottoms of the two springs 13 are fixedly connected to the top of the load-bearing plate 10. The bottom of the load-bearing plate 10 is fixedly connected with a number. There are two rollers 14.

本实施例中,通过安装箱3的内部设置两个固定块12与两个弹簧13,使得两个滚轮14在收缩到安装箱3的内部时,承载板10可以在弹簧13的作用下向上移动,尽量避免承载板10掉落到安装箱3內底壁的情况发生。In this embodiment, two fixed blocks 12 and two springs 13 are provided inside the installation box 3, so that when the two rollers 14 are retracted into the inside of the installation box 3, the load-bearing plate 10 can move upward under the action of the springs 13. , try to avoid the situation where the load-bearing plate 10 falls to the inner bottom wall of the installation box 3 .

本实施例中,通过在承载板10的内部开设两个导向杆孔,使得承载板10在上下移动时,导向杆孔可以起到引导的作用,使得装置的稳定性更强。In this embodiment, two guide rod holes are opened inside the load-bearing plate 10 so that when the load-bearing plate 10 moves up and down, the guide rod holes can play a guiding role, making the device more stable.

需要说明的,本装置中的调节机构总数可以依据实际情况来决定,滚轮14并非只有两个,而本说明书是只针对一个调节装置来叙述的。It should be noted that the total number of adjustment mechanisms in this device can be determined according to the actual situation. There are not only two rollers 14, but this specification only describes one adjustment device.

上述实施例的工作原理为:The working principle of the above embodiment is:

该超高层办公楼工程的顶升钢平台,当钢平台1在需要移动时候,通过启动电机5带动双向螺纹杆6在安装箱3的内部旋转,使得两个活动板7在有滑动槽4的情况下相离一端,带动两个滑动块8挤压形块11,使得承载板10在斜块11的挤压下,承载板10沿着导向杆9向下移动,从而让滚轮14移到安装箱3的外面,此时推动钢平台1进行移动即可,达到快速调节滚轮14的效果。When the steel platform 1 of this super high-rise office building project needs to be moved, the starting motor 5 drives the two-way threaded rod 6 to rotate inside the installation box 3, so that the two movable plates 7 are in the position with the sliding groove 4. When the case is separated from one end, the two sliding blocks 8 are driven to squeeze the shaped block 11, so that the load-bearing plate 10 is squeezed by the inclined block 11, and the load-bearing plate 10 moves downward along the guide rod 9, thereby allowing the roller 14 to move to the installation Outside the box 3, just push the steel platform 1 to move at this time to achieve the effect of quickly adjusting the roller 14.

需要说明的是,申请中使用到的标准零件均可以从市场上购买,异形件根据说明书的和附图的记载均可以进行订制,各个零件的具体连接方式均采用现有技术中成熟的螺栓、铆钉、焊接等,常规手段,机械、零件和设备均采用现有技术中,常规的型号;加上电路连接采用现有技术中常规的连接方式,在此不再详述,本说明书中未作详细描述的内容属于本领域专业技术人员公知的现有技术。It should be noted that the standard parts used in the application can be purchased from the market, and the special-shaped parts can be customized according to the instructions and drawings. The specific connection methods of each part are all mature bolts in the existing technology. , rivets, welding, etc., conventional means, machinery, parts and equipment all adopt conventional models in the prior art; in addition, circuit connections adopt conventional connection methods in the prior art, which will not be described in detail here. The contents described in detail belong to the prior art known to those skilled in the art.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that these entities or operations are mutually exclusive. any such actual relationship or sequence exists between them. Furthermore, the terms "comprises," "comprises," or any other variations thereof are intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus that includes a list of elements includes not only those elements, but also those not expressly listed other elements, or elements inherent to the process, method, article or equipment. Without further limitation, an element defined by the statement "comprises a..." does not exclude the presence of additional identical elements in a process, method, article, or apparatus that includes the stated element.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those of ordinary skill in the art will understand that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention. , substitutions and modifications, the scope of the present invention is defined by the appended claims and their equivalents.

Claims (6)

1. The utility model provides a jacking steel platform of super high-rise office building engineering, includes steel platform (1), its characterized in that: the utility model provides a steel platform (1) top fixed connection rail (2), the bottom fixedly connected with install bin (3) of steel platform (1), the right side fixedly connected with motor (5) of install bin (3), the one end fixedly connected with two-way threaded rod (6) of motor (5) output shaft, the one end and the inner wall rotation of install bin (3) of motor (5) are kept away from to two-way threaded rod (6), the surface threaded connection of two movable plates (7) of two-in quantity of two-way threaded rod (6), two the equal fixedly connected with sliding block (8) in bottom of movable plate (7), the inside fixedly connected with of install bin (3) is guide bar (9) of two-in quantity, two the surface sliding connection of guide bar (9) has same loading board (10), the top fixedly connected with of loading board (10) is two-in quantity sloping block (11), the equal fixedly connected with fixed block (12) of both sides inner wall of install bin (3), two the bottom fixedly connected with spring (13) of fixed block (12) is two-in quantity of loading board (13), the bottom of two-in quantity of spring (13) is fixed connection with top (10).
2. The jacking steel platform for super high-rise office building engineering according to claim 1, wherein: the top of the steel platform (1) is fixedly connected with a fixed rod, and the fence (2) is connected with the fixed rod through a fastening bolt.
3. The jacking steel platform for super high-rise office building engineering according to claim 1, wherein: the inside of mounting box (3) has been seted up the drive shaft hole, the right side of two-way threaded rod (6) is through the inside rotatory transmission of drive shaft hole at mounting box (3), the left side inner wall of mounting box (3) is provided with rolling bearing, the one end that keeps away from motor (5) of two-way threaded rod (6) and rolling bearing's inner ring fixed connection to rotate with mounting box (3) through rolling bearing.
4. The jacking steel platform for super high-rise office building engineering according to claim 1, wherein: the inside of install bin (3) has seted up sliding tray (4), two the top of fly leaf (7) is all through sliding tray (4) slip in the interior roof of install bin (3), and two the shape of fly leaf (7) is square board.
5. The jacking steel platform for super high-rise office building engineering according to claim 1, wherein: the two sliding blocks (8) are rectangular plates, and inclined planes are formed in the bottoms of the two sliding blocks (8).
6. The jacking steel platform for super high-rise office building engineering according to claim 1, wherein: the inside of loading board (10) has offered the guide bar hole, loading board (10) are through two guide bar holes and two guide bar (9) sliding connection, two the shape of fixed block (12) is the rectangle piece, loading board (10) are through two spring (13) and two fixed block (12) elastic connection.
CN202321161631.2U 2023-05-15 2023-05-15 Jacking steel platform of super high-rise office building engineering Expired - Fee Related CN220117713U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202321161631.2U CN220117713U (en) 2023-05-15 2023-05-15 Jacking steel platform of super high-rise office building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202321161631.2U CN220117713U (en) 2023-05-15 2023-05-15 Jacking steel platform of super high-rise office building engineering

Publications (1)

Publication Number Publication Date
CN220117713U true CN220117713U (en) 2023-12-01

Family

ID=88888855

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202321161631.2U Expired - Fee Related CN220117713U (en) 2023-05-15 2023-05-15 Jacking steel platform of super high-rise office building engineering

Country Status (1)

Country Link
CN (1) CN220117713U (en)

Similar Documents

Publication Publication Date Title
CN207048460U (en) A kind of building enclosing being easily installed
CN111502219A (en) Bearing frame for building construction
CN115584862A (en) Auxiliary installation equipment for prefabricated building wall panels
CN220117713U (en) Jacking steel platform of super high-rise office building engineering
CN209780277U (en) A New Type of Lightweight Partition Panel Installation Cart
CN206360316U (en) A kind of high lift Architectural Equipment of stability
CN209353658U (en) A kind of scaffold for building
CN114560416B (en) Vertical transportation equipment for assembled building
CN115788078B (en) High-altitude roller sliding device of long-span steel structure truss
CN217054488U (en) Fixed support device for residential prefabricated construction
CN212734228U (en) Steel construction drilling equipment
CN209780187U (en) Building and decoration integrated operation platform under frame bent structure system
CN220978720U (en) Construction platform convenient to go up and down
CN111576859A (en) Floor laying-out opening template supporting structure
CN220353356U (en) A kind of steel structure scaffolding for construction engineering
CN219931566U (en) Climbing frame lifting mechanism
CN220118056U (en) Positioning stable building decoration telescopic ladder
CN217326357U (en) Novel be applied to equipment of reforming transform reinforcement engineering
CN220451371U (en) Scaffold for steel structure factory building
CN212388977U (en) Floor laying-out opening template supporting structure
CN220725758U (en) Auxiliary connection assembly of roof beam template
CN221741306U (en) A building anti-collapse support structure
CN220487046U (en) Scaffold for building construction
CN222333202U (en) Wall leveling tool
CN220414191U (en) A kind of foundation reinforcement device for construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20231201

CF01 Termination of patent right due to non-payment of annual fee