CN219885403U - A counterweight rope winding device - Google Patents
A counterweight rope winding device Download PDFInfo
- Publication number
- CN219885403U CN219885403U CN202321559971.0U CN202321559971U CN219885403U CN 219885403 U CN219885403 U CN 219885403U CN 202321559971 U CN202321559971 U CN 202321559971U CN 219885403 U CN219885403 U CN 219885403U
- Authority
- CN
- China
- Prior art keywords
- counterweight
- car
- pulleys
- fixed
- side guide
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004804 winding Methods 0.000 title claims abstract description 22
- 239000011159 matrix material Substances 0.000 claims description 3
- 206010017577 Gait disturbance Diseases 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000006467 substitution reaction Methods 0.000 description 2
- 230000001360 synchronised effect Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
本实用新型公开了一种对重绕绳装置,包括井道、曳引机和曳引轮,井道内设有轿厢和对重,且对重位于轿厢的一侧,轿厢设有轿厢动滑轮组,对重设有对重动滑轮组,井道设有轿厢定滑轮组以及对重定滑轮组,对重定滑轮组包括2个第一定滑轮和若干第二定滑轮,对重动滑轮组包括第一动滑轮、第二动滑轮和若干中间动滑轮,曳引轮上设有曳引绳,曳引绳的一端依次绕过第一动滑轮、2个第一定滑轮和第二动滑轮后交替绕过若干第二定滑轮和若干中间动滑轮,曳引绳的另一端交替绕过轿厢动滑轮组和轿厢定滑轮组,且末端通过绳头板固定。本实用新型提供的对重绕绳装置,旨在缩短位于对重两侧的动滑轮的启动时间差,避免电梯启动时对重存在顿挫及左右摆动的现象。
The utility model discloses a counterweight rope winding device, which includes a hoistway, a traction machine and a traction wheel. A car and a counterweight are provided in the hoistway, and the counterweight is located on one side of the car. The car is provided with a car. The counterweight is equipped with a counterweight movable pulley set. The hoistway is equipped with a car fixed pulley set and a counterweight fixed pulley set. The counterweight fixed pulley set includes two first fixed pulleys and a number of second fixed pulleys. The counterweight movable pulley set includes a first movable pulley, The second movable pulley and a number of intermediate movable pulleys are equipped with a traction rope. One end of the traction rope goes around the first movable pulley, the two first fixed pulleys and the second movable pulley in turn, and then alternately goes around a number of second fixed pulleys and There are several intermediate movable pulleys, and the other end of the traction rope alternately bypasses the car movable pulley set and the car fixed pulley set, and the end is fixed by the rope head plate. The counterweight rope winding device provided by the utility model is designed to shorten the starting time difference of the movable pulleys located on both sides of the counterweight and avoid the phenomenon of the counterweight stumbling and swinging left and right when the elevator starts.
Description
技术领域Technical field
本实用新型涉及到电梯机房布局技术领域,特别涉及一种对重绕绳装置。The utility model relates to the technical field of elevator machine room layout, and in particular to a counterweight rope winding device.
背景技术Background technique
随着自动化水平的提高,电梯所需运载的货物越来越多,传动的2:1及4:1的曳引电梯已无法满足载重的要求,其中n:1称为曳引比,又称为绕绳比,即有n路曳引绳吊着轿厢或对重,n为大于1的正整数。现阶段,如图5所示,大吨位的曳引电梯采用曳引绳依次交替绕过对重定滑轮组和对重动滑轮组的绕绳方式,然而,曳引绳为钢丝绳,存在弹性延伸的特性,在电梯启动时,因曳引绳的弹性延伸使得对重的最左侧动滑轮与最右侧的动滑轮存在启动时间差,从而造成对重对存在顿挫及左右摆动的现象,各部件磨损大。With the improvement of automation level, elevators need to carry more and more goods. The 2:1 and 4:1 traction elevators with transmission can no longer meet the load requirements. Among them, n:1 is called the traction ratio, also known as is the rope winding ratio, that is, there are n traction ropes hanging the car or counterweight, and n is a positive integer greater than 1. At present, as shown in Figure 5, large-tonnage traction elevators use a roping method in which the traction rope alternately bypasses the counterweighted pulley block and the counterweighted pulley block. However, the traction rope is a steel wire rope and has elastic extension characteristics. When the elevator starts, due to the elastic extension of the traction rope, there is a start-up time difference between the leftmost movable pulley and the rightmost movable pulley of the counterweight, resulting in the counterweight pair stumbling and swinging left and right, and the various components wear out.
可见,现有技术还有待改进和提高。It can be seen that the existing technology still needs to be improved and improved.
实用新型内容Utility model content
鉴于上述现有技术的不足之处,本实用新型的目的在于提供一种对重绕绳装置,旨在缩短位于对重两侧的动滑轮的启动时间差,避免电梯启动时对重存在顿挫及左右摆动的现象。In view of the shortcomings of the above-mentioned prior art, the purpose of this utility model is to provide a counterweight rope winding device, which is designed to shorten the starting time difference of the movable pulleys located on both sides of the counterweight and avoid the counterweight from stumbling and swinging left and right when the elevator starts. The phenomenon.
为了达到上述目的,本实用新型采取了以下技术方案:In order to achieve the above purpose, the present utility model adopts the following technical solutions:
一种对重绕绳装置,包括井道、安装在井道顶部的曳引机和安装在曳引机输出端的曳引轮,井道内滑动连接有轿厢和对重,且对重位于轿厢的一侧,轿厢的顶部设有轿厢动滑轮组,对重的顶部设有对重动滑轮组,井道的顶部设有与轿厢动滑轮组对应的轿厢定滑轮组以及与对重动滑轮组对应的对重定滑轮组,所述对重定滑轮组包括2个第一定滑轮和若干位于第一定滑轮下方的第二定滑轮,所述对重动滑轮组包括靠近曳引机正下方位置设置的第一动滑轮、远离曳引机正下方位置设置的第二动滑轮和若干位于第一动滑轮和第二动滑轮之间的中间动滑轮,曳引轮上设有曳引绳,曳引绳的一端依次绕过第一动滑轮、2个第一定滑轮和第二动滑轮后交替绕过若干第二定滑轮和若干中间动滑轮,曳引绳的另一端交替绕过轿厢动滑轮组和轿厢定滑轮组,曳引绳的两末端均通过绳头板与井道的顶部固定。A counterweight rope winding device includes a hoistway, a traction machine installed at the top of the hoistway, and a traction sheave installed at the output end of the traction machine. A car and a counterweight are slidingly connected in the hoistway, and the counterweight is located on one side of the car. On the side, there is a car movable pulley set on the top of the car, a counterweight movable pulley set on the top of the counterweight, and a car fixed pulley set corresponding to the car movable pulley set and a counterweight fixed pulley set corresponding to the counterweight movable pulley set on the top of the hoistway. Pulley set, the counterweighted fixed pulley set includes two first fixed pulleys and a number of second fixed pulleys located below the first fixed pulleys. The counterweighted fixed pulley set includes a first movable pulley set close to the position directly below the traction machine, and a first movable pulley set away from the traction machine. There is a second movable pulley just below the traction machine and a number of intermediate movable pulleys between the first movable pulley and the second movable pulley. There is a traction rope on the traction pulley. One end of the traction rope goes around the first movable pulley and two The first fixed pulley and the second movable pulley alternately go around a number of second fixed pulleys and a number of intermediate movable pulleys. The other end of the traction rope alternately goes around the car movable pulley set and the car fixed pulley set. Both ends of the traction rope pass through the rope. The head plate is fixed to the top of the hoistway.
所述曳引绳的绕绳比为2n:1,n为大于等于3的整数,所述第二定滑轮的数量为n-2个,中间动滑轮的数量为n-2个,所述轿厢动滑轮组设有n个第三动滑轮。The roping ratio of the traction rope is 2n:1, n is an integer greater than or equal to 3, the number of the second fixed pulleys is n-2, the number of the intermediate movable pulleys is n-2, and the car The moving pulley block is provided with n third moving pulleys.
所述井道顶部设有第一承重梁和第二承重梁,第一承重梁和第二承重梁之间设有垫梁,2个第一定滑轮与第二承重梁转动连接,若干第二定滑轮与第一承重梁转动连接,且位于2个第一定滑轮之间的下方。The top of the hoistway is provided with a first load-bearing beam and a second load-bearing beam. There is a pad beam between the first load-bearing beam and the second load-bearing beam. Two first fixed pulleys are rotationally connected to the second load-bearing beam, and a number of second fixed pulleys are connected to the second load-bearing beam. The pulley is rotationally connected to the first load-bearing beam and is located below between the two first fixed pulleys.
所述曳引绳的绕绳比为6:1,所述第二定滑轮的数量为1个,中间动滑轮的数量为1个,所述轿厢动滑轮组设有3个第三动滑轮。The roping ratio of the traction rope is 6:1, the number of the second fixed pulley is 1, the number of the intermediate movable pulley is 1, and the car movable pulley set is provided with 3 third movable pulleys.
所述曳引绳的绕绳比为8:1,所述第二定滑轮的数量为2个,中间动滑轮的数量为2个,所述轿厢动滑轮组设有4个第三动滑轮。The roping ratio of the traction rope is 8:1, the number of the second fixed pulleys is 2, the number of the intermediate movable pulleys is 2, and the car movable pulley set is provided with 4 third movable pulleys.
3个等间距设置的所述第三动滑轮设于所述轿厢的顶部,所述轿厢定滑轮组包括2个第三定滑轮,所述井道上设有第三承重梁,2个第三定滑轮与第三承重梁转动连接,且位于第三动滑轮的正上方。Three third movable pulleys arranged at equal intervals are provided on the top of the car. The fixed pulley set of the car includes two third fixed pulleys. A third load-bearing beam is provided on the hoistway, and two third fixed pulleys are provided on the hoistway. The pulley is rotationally connected to the third load-bearing beam and is located directly above the third movable pulley.
4个所述第三动滑轮以矩阵排列方式设于所述轿厢的顶部,所述井道上设有对称设置的第四承重梁和第五承重梁,所述轿厢定滑轮组包括第一侧导轮、第二侧导轮、第三侧导轮、第四侧导轮、第五侧导轮和第六侧导轮,第一侧导轮、第二侧导轮和第三侧导轮均与第四承重梁转动连接,且第一侧导轮的轴心线和第二侧导轮的轴心线均与第三侧导轮的轴心线垂直,第四侧导轮、第五侧导轮和第六侧导轮均与第五承重梁转动连接,且第四侧导轮的轴心线和第五侧导轮的轴心线均与第六侧导轮的轴心线垂直,第三侧导轮和第六侧导轮对应设置。The four third movable pulleys are arranged in a matrix on the top of the car. There are symmetrically arranged fourth load-bearing beams and fifth load-bearing beams on the hoistway. The fixed pulley set of the car includes a first side guide. wheel, second side guide wheel, third side guide wheel, fourth side guide wheel, fifth side guide wheel and sixth side guide wheel, the first side guide wheel, second side guide wheel and third side guide wheel are all Rotally connected to the fourth load-bearing beam, and the axis line of the first side guide wheel and the axis line of the second side guide wheel are both perpendicular to the axis line of the third side guide wheel, the fourth side guide wheel, the fifth side guide wheel The guide wheel and the sixth side guide wheel are both rotationally connected to the fifth load-bearing beam, and the axis line of the fourth side guide wheel and the axis line of the fifth side guide wheel are both perpendicular to the axis line of the sixth side guide wheel. The third side guide wheel and the sixth side guide wheel are arranged correspondingly.
有益效果:Beneficial effects:
通过设置轿厢动滑轮组和轿厢定滑轮组,曳引绳绕过曳引轮后,其一端交替绕过轿厢动滑轮组和轿厢定滑轮组实现对轿厢的提拉;以及通过设置对重动滑轮组和对重定滑轮组,且对重动滑轮组包括第一动滑轮、第二动滑轮和若干中间动滑轮,对重定滑轮组包括2个第一定滑轮和若干位于第一定滑轮下方的第二定滑轮,使得曳引绳的另一端依次绕过第一动滑轮、2个第一定滑轮、第二动滑轮后交替绕过若干第二定滑轮和若干中间动滑轮,实现对对重的提拉,且在2个第一定滑轮的作用下,缩短了绕过第一动滑轮和第二动滑轮之间的曳引绳的长度,进而缩短了第一动滑轮和第二动滑轮的启动时间差,避免了电梯启动时对重存在顿挫及左右摆动的现象,延长各部件的使用寿命。By setting up the car movable pulley set and the car fixed pulley set, after the traction rope bypasses the traction sheave, one end of the traction rope alternately bypasses the car movable pulley set and the car fixed pulley set to lift the car; and by setting up a counterweight Pulley block and counterweight fixed pulley block, and the counterweight fixed pulley block includes a first movable pulley, a second movable pulley and a number of intermediate movable pulleys, and the counterweight fixed pulley block includes 2 first fixed pulleys and a number of second fixed pulleys located below the first fixed pulley, so that the trolley The other end of the lead rope goes around the first movable pulley, the two first fixed pulleys, the second movable pulley, and then alternately goes around a number of second fixed pulleys and a number of intermediate movable pulleys to achieve the lifting of the counterweight. Under the action of the fixed pulley, the length of the traction rope bypassing the first movable pulley and the second movable pulley is shortened, thereby shortening the starting time difference between the first movable pulley and the second movable pulley, and avoiding the counterweight failure and failure when the elevator starts. The phenomenon of left and right swing extends the service life of each component.
附图说明Description of the drawings
图1为本实用新型提供的对重绕绳装置中第一种实施方式的绕绳展开示意图。Figure 1 is a schematic diagram of the rope winding deployment of the first embodiment of the counterweight rope winding device provided by the present invention.
图2为本实用新型提供的对重绕绳装置中井道的第一种实施方式的俯视图。Figure 2 is a top view of the first embodiment of the hoistway in the counterweight rope winding device provided by the present invention.
图3为本实用新型提供的对重绕绳装置中第二种实施方式的绕绳展开示意图。Figure 3 is a schematic diagram of the rope winding unfolding in the second embodiment of the counterweight rope winding device provided by the present invention.
图4为本实用新型提供的对重绕绳装置中井道的第二种实施方式的俯视图。Figure 4 is a top view of the second embodiment of the hoistway in the counterweight rope winding device provided by the present invention.
图5为现有的大吨位曳引电梯的对重绕绳展开示意图。Figure 5 is a schematic diagram of the counterweight rope deployment of an existing large-tonnage traction elevator.
主要元件符号说明:1、井道;11、第一承重梁;12、第二承重梁;13、垫梁;14、第三承重梁;15、第四承重梁;16、第五承重梁;2、曳引机;21、曳引轮;3、轿厢;4、对重;5、第三动滑轮;6、对重动滑轮组;61、第一动滑轮;62、第二动滑轮;63、中间动滑轮;7、轿厢定滑轮组;71、第三定滑轮;72、第一侧导轮;73、第二侧导轮;74、第三侧导轮;75、第四侧导轮;76、第五侧导轮;77、第六侧导轮;8、对重定滑轮组;81、第一定滑轮;82、第二定滑轮;9、曳引绳;10、绳头板。Main component symbol description: 1. Hoistway; 11. First load-bearing beam; 12. Second load-bearing beam; 13. Pad beam; 14. Third load-bearing beam; 15. Fourth load-bearing beam; 16. Fifth load-bearing beam; 2 , Traction machine; 21. Traction pulley; 3. Car; 4. Counterweight; 5. Third moving pulley; 6. Counterweight moving pulley group; 61. First moving pulley; 62. Second moving pulley; 63. Middle moving pulley ;7. Car fixed pulley set; 71. Third fixed pulley; 72. First side guide pulley; 73. Second side guide pulley; 74. Third side guide pulley; 75. Fourth side guide pulley; 76. No. Five side guide pulleys; 77. Sixth side guide pulley; 8. Counterweight fixed pulley group; 81. First fixed pulley; 82. Second fixed pulley; 9. Traction rope; 10. Rope head plate.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only part of the embodiments of the present utility model, not all implementations. example. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present utility model.
在本实用新型中,术语“上”、“下”、“左”、“右”、“顶”等指示的方位或位置关系为基于附图所示的方位或位置关系。这些术语主要是为了更好地描述本实用新型及其实施例,并非用于限定所指示的装置、元件或组成部分必须具有特定方位,或以特定方位进行构造和操作。In the present invention, the orientation or positional relationship indicated by the terms "upper", "lower", "left", "right", "top", etc. is based on the orientation or positional relationship shown in the drawings. These terms are mainly used to better describe the present invention and its embodiments, and are not used to limit the indicated device, element or component to have a specific orientation, or to be constructed and operated in a specific orientation.
并且,上述部分术语除了可以用于表示方位或位置关系以外,还可能用于表示其他含义,例如术语“上”在某些情况下也可能用于表示某种依附关系或连接关系。对于本领域普通技术人员而言,可以根据具体情况理解这些术语在本实用新型中的具体含义。Moreover, some of the above terms may also be used to express other meanings in addition to indicating orientation or positional relationships. For example, the term "upper" may also be used to express a certain dependence relationship or connection relationship in some cases. For those of ordinary skill in the art, the specific meanings of these terms in the present invention can be understood according to specific circumstances.
此外,术语“第一”、“第二”等主要是用于区分不同的装置、元件或组成部分(具体的种类和构造可能相同也可能不同),并非用于表明或暗示所指示装置、元件或组成部分的相对重要性和数量。In addition, the terms "first", "second", etc. are mainly used to distinguish different devices, components or components (the specific types and structures may be the same or different), and are not used to indicate or imply that the indicated devices, components or the relative importance and number of components.
下面将结合实施例和附图对本实用新型的技术方案作进一步的说明。The technical solution of the present invention will be further described below with reference to the embodiments and drawings.
实施例Example
请参阅图1-4,本实用新型提供了一种对重绕绳装置,包括井道1、安装在井道1顶部的曳引机2和安装在曳引机2输出端的曳引轮21,井道1内滑动连接有轿厢3和对重4,且对重4位于轿厢3的一侧,轿厢3的顶部设有轿厢动滑轮组,对重4的顶部设有对重动滑轮组6,井道1的顶部设有与轿厢动滑轮组对应的轿厢定滑轮组7以及与对重动滑轮组6对应的对重定滑轮组8,所述对重定滑轮组8包括2个第一定滑轮81和若干位于第一定滑轮81下方的第二定滑轮82,所述对重动滑轮组6包括靠近曳引机2正下方位置设置的第一动滑轮61、远离曳引机2正下方设置的第二动滑轮62和若干位于第一动滑轮61和第二动滑轮62之间的中间动滑轮63,曳引轮21上设有曳引绳9,曳引绳9的一端依次绕过第一动滑轮61、2个第一定滑轮81和第二动滑轮62后交替绕过若干第二定滑轮82和若干中间动滑轮63,曳引绳9的另一端交替绕过轿厢动滑轮组和轿厢定滑轮组7,曳引绳9的两末端均通过绳头板10与井道1的顶部固定。Please refer to Figures 1-4. The utility model provides a counterweight rope winding device, which includes a hoistway 1, a traction machine 2 installed at the top of the hoistway 1, and a traction wheel 21 installed at the output end of the traction machine 2. The hoistway 1 There is a car 3 and a counterweight 4 slidingly connected inside, and the counterweight 4 is located on one side of the car 3. The top of the car 3 is equipped with a car movable pulley set, and the top of the counterweight 4 is provided with a counterweight movable pulley set 6. The hoistway The top of 1 is provided with a car fixed pulley set 7 corresponding to the car movable pulley set and a counterweight fixed pulley set 8 corresponding to the counterweight movable pulley set 6. The counterweight fixed pulley set 8 includes 2 first fixed pulleys 81 and a number of first fixed pulleys 81. The second fixed pulley 82 is located below the fixed pulley 81. The counterweight pulley group 6 includes a first movable pulley 61 located close to the position directly below the traction machine 2, a second movable pulley 62 located away from the position directly below the traction machine 2, and a number of The intermediate movable pulley 63 between the first movable pulley 61 and the second movable pulley 62 is provided with a traction rope 9 on the traction pulley 21. One end of the traction rope 9 sequentially goes around the first movable pulley 61, the two first fixed pulleys 81 and The second movable pulley 62 alternately bypasses a number of second fixed pulleys 82 and a number of intermediate movable pulleys 63. The other end of the traction rope 9 alternately bypasses the car movable pulley set and the car fixed pulley set 7. Both ends of the traction rope 9 pass through The rope head plate 10 is fixed to the top of the hoistway 1.
使用时,曳引绳9的中部绕过曳引轮21,曳引绳9的一端依次绕过第一动滑轮61、2个第一定滑轮81、第二动滑轮62和第二动滑轮62后交替绕过若干第二定滑轮82和若干中间动滑轮63,曳引绳9的另一端交替绕过轿厢动滑轮组和轿厢定滑轮组7,使得曳引绳9在轿厢3和对重4的重力作用下始终压紧在曳引轮21上,曳引轮21与曳引绳9利用二者之间的摩擦力,使得曳引轮21在曳引机2驱动转动时,能够驱动曳引绳9拖动轿厢3和对重4作相对运动,轿厢3上升时,对重4下降;对重4上升时,轿厢3下降。相比于现有技术,能够缩小第一动滑轮61和第二动滑轮62之间的启动时间差,避免电梯启动时对重4存在顿挫及左右摆动的现象,延长各部件的使用寿命。When in use, the middle part of the traction rope 9 goes around the traction pulley 21, and one end of the traction rope 9 goes around the first movable pulley 61, the two first fixed pulleys 81, the second movable pulley 62 and the second movable pulley 62 in turn and then alternately. Passing through a number of second fixed pulleys 82 and a number of intermediate movable pulleys 63, the other end of the traction rope 9 alternately bypasses the car movable pulley set and the car fixed pulley set 7, so that the traction rope 9 acts under the gravity of the car 3 and the counterweight 4 The bottom is always pressed on the traction sheave 21. The friction between the traction sheave 21 and the traction rope 9 is used so that the traction sheave 21 can drive the traction rope 9 to drag when the traction machine 2 drives and rotates. The moving car 3 and the counterweight 4 move relative to each other. When the car 3 rises, the counterweight 4 falls; when the counterweight 4 rises, the car 3 falls. Compared with the existing technology, the start-up time difference between the first movable pulley 61 and the second movable pulley 62 can be reduced, preventing the counterweight 4 from stumbling and swinging left and right when the elevator starts, and extending the service life of each component.
本实施例中,所述曳引绳9的绕绳比为2n:1,n为大于等于3的整数,所述第二定滑轮82的数量为n-2个,中间动滑轮63的数量为n-2个,所述轿厢动滑轮组内设有n个第三动滑轮5。In this embodiment, the roping ratio of the traction rope 9 is 2n:1, n is an integer greater than or equal to 3, the number of the second fixed pulleys 82 is n-2, and the number of the intermediate movable pulleys 63 is n -2, n third movable pulleys 5 are provided in the movable pulley set of the car.
在一种实施方式中,参阅图1、2,n=3,即曳引绳9的绕绳比为6:1,本实施方式中,有6路曳引绳9吊着轿厢3或对重4。所述第二定滑轮82的数量为1个,中间动滑轮63的数量为1个,所述轿厢动滑轮组设有3个第三动滑轮5。In one embodiment, referring to Figures 1 and 2, n=3, that is, the roping ratio of the traction rope 9 is 6:1. In this embodiment, there are 6 traction ropes 9 hanging the car 3 or the pair. Heavy 4. The number of the second fixed pulley 82 is one, the number of the intermediate movable pulley 63 is one, and the car movable pulley set is provided with three third movable pulleys 5 .
进一步地,所述井道1顶部设有第一承重梁11和第二承重梁12,第一承重梁11和第二承重梁12之间设有垫梁13,2个第一定滑轮81与第二承重梁12转动连接,1个第二定滑轮82与第一承重梁11转动连接,且位于2个第一定滑轮81之间的下方。曳引绳9的一端在曳引轮21绕出后,依次绕过第一动滑轮61、2个第一定滑轮81和第二动滑轮62、第二定滑轮82和中间动滑轮63,最后末端由承头板固定。由于第一动滑轮61靠近曳引机2的正下方位置设置,第二动滑轮62远离曳引机2的正下方位置设置,并在2个第一定滑轮81的作用下,缩短了绕过第一动滑轮61和第二动滑轮62之间的曳引绳9的长度,即缩短了第一动滑轮61和第二动滑轮62的启动时间差,以使对重4左右两侧被提拉时接近同步,保证了对重4的平稳运行。Further, a first load-bearing beam 11 and a second load-bearing beam 12 are provided at the top of the hoistway 1. A pad beam 13 is provided between the first load-bearing beam 11 and the second load-bearing beam 12. The two first fixed pulleys 81 and the second The two load-bearing beams 12 are rotationally connected, and a second fixed pulley 82 is rotationally connected to the first load-bearing beam 11 and is located below the two first fixed pulleys 81 . After one end of the traction rope 9 is wound out of the traction pulley 21, it sequentially goes around the first movable pulley 61, the two first fixed pulleys 81 and the second movable pulley 62, the second fixed pulley 82 and the intermediate movable pulley 63, and the final end is supported by the supporting pulley 61. Head plate fixed. Since the first movable pulley 61 is disposed close to the position directly below the traction machine 2, and the second movable pulley 62 is disposed away from the position directly below the traction machine 2, and under the action of the two first fixed pulleys 81, the length of the bypass around the first fixed pulley 62 is shortened. The length of the traction rope 9 between the movable pulley 61 and the second movable pulley 62 shortens the starting time difference between the first movable pulley 61 and the second movable pulley 62, so that the left and right sides of the counterweight 4 are nearly synchronized when they are pulled, ensuring that Counterweight 4 for smooth operation.
更进一步地,3个等间距设置的所述第三动滑轮5设于所述轿厢3的顶部,所述轿厢定滑轮组7包括2个第三定滑轮71,所述井道1上设有第三承重梁14,2个第三定滑轮71与第三承重梁14转动连接,且位于第三动滑轮5的正上方。曳引绳9的另一端在曳引轮21绕出后,依次交替绕过3个第三动滑轮5和2个第三定滑轮71,最后末端由承头板固定,以达到通过曳引绳9作用在轿厢定滑轮组7和轿厢动滑轮组来提拉轿厢3,实现驱动轿厢3上升或下降。Furthermore, three equally spaced third movable pulleys 5 are provided on the top of the car 3 , the car fixed pulley set 7 includes two third fixed pulleys 71 , and the hoistway 1 is provided with a third movable pulley 5 . The three load-bearing beams 14 and the two third fixed pulleys 71 are rotationally connected to the third load-bearing beam 14 and are located directly above the third movable pulley 5 . After the other end of the traction rope 9 is wound out of the traction wheel 21, it alternately goes around three third movable pulleys 5 and two third fixed pulleys 71, and the last end is fixed by the head plate to achieve the purpose of passing through the traction rope 9 It acts on the car fixed pulley set 7 and the car movable pulley set to lift the car 3 and drive the car 3 up or down.
在另一中实施例中,参阅图3、4,n=4,即曳引绳9的绕绳比为8:1,本实施方式中,有8路曳引绳9吊着轿厢3或对重4。所述第二定滑轮82的数量为2个,中间动滑轮63的数量为2个,所述轿厢动滑轮组设有4个第三动滑轮5。In another embodiment, refer to Figures 3 and 4, n=4, that is, the roping ratio of the traction rope 9 is 8:1. In this embodiment, there are 8 traction ropes 9 hanging the car 3 or Counterweight 4. The number of the second fixed pulleys 82 is 2, the number of the intermediate movable pulleys 63 is 2, and the car movable pulley set is provided with four third movable pulleys 5 .
进一步地,所述井道1顶部设有第一承重梁11和第二承重梁12,第一承重梁11和第二承重梁12之间设有垫梁13,2个第一定滑轮81与第二承重梁12转动连接,2个第二定滑轮82与第一承重梁11转动连接,且位于2个第一定滑轮81之间的下方。曳引绳9的一端在曳引轮21绕出后,依次绕过第一动滑轮61、2个第一定滑轮81和第二动滑轮62、位于左侧的第二定滑轮82、位于左侧的的中间动滑轮63、位于右侧的第二定滑轮82和位于右侧的中间动滑轮63,最后末端由承头板固定。由于第一动滑轮61靠近曳引机2的正下方位置设置,第二动滑轮62远离曳引机2的正下方设置,并在2个第一定滑轮81的作用下,缩短了绕过第一动滑轮61和第二动滑轮62之间的曳引绳9的长度,即缩短了第一动滑轮61和第二动滑轮62的启动时间差,以使对重4左右两侧被提拉时接近同步,保证了对重4的平稳运行。Further, a first load-bearing beam 11 and a second load-bearing beam 12 are provided at the top of the hoistway 1. A pad beam 13 is provided between the first load-bearing beam 11 and the second load-bearing beam 12. The two first fixed pulleys 81 and the second The two load-bearing beams 12 are rotationally connected, and the two second fixed pulleys 82 are rotationally connected with the first load-bearing beam 11 and are located below the two first fixed pulleys 81 . After one end of the traction rope 9 is wound out of the traction pulley 21, it sequentially goes around the first movable pulley 61, the two first fixed pulleys 81 and the second movable pulley 62, the second fixed pulley 82 on the left, and the second fixed pulley 82 on the left. The middle movable pulley 63, the second fixed pulley 82 on the right side and the middle movable pulley 63 on the right side are finally fixed by the head plate. Since the first movable pulley 61 is disposed close to the position directly below the traction machine 2, the second movable pulley 62 is disposed away from the position directly below the traction machine 2, and under the action of the two first fixed pulleys 81, the length around the first movable pulley is shortened. The length of the traction rope 9 between 61 and the second movable pulley 62 shortens the starting time difference between the first movable pulley 61 and the second movable pulley 62, so that the left and right sides of the counterweight 4 are nearly synchronized when they are pulled, ensuring that the counterweight 4 is pulled simultaneously. Heavy 4 for smooth operation.
更进一步地,4个所述第三动滑轮5以矩阵排列方式设于所述轿厢3的顶部,即4个第三动滑轮5均布在轿厢3的顶部,使得轿厢3在运行中受力均匀,有利于电梯平稳地运行。所述井道1上设有对称设置的第四承重梁15和第五承重梁16,所述轿厢定滑轮组7包括第一侧导轮72、第二侧导轮73、第三侧导轮74、第四侧导轮75、第五侧导轮76和第六侧导轮77,第一侧导轮72、第二侧导轮73和第三侧导轮74均与第四承重梁15转动连接,且第一侧导轮72的轴心线和第二侧导轮73的轴心线均与第三侧导轮74的轴心线垂直,第四侧导轮75、第五侧导轮76和第六侧导轮77均与第五承重梁16转动连接,且第四侧导轮75的轴心线和第五侧导轮76的轴心线均与第六侧导轮77的轴心线垂直,第三侧导轮74和第六侧导轮77在同一水平面内。曳引绳9的另一端在曳引轮21绕出后,所述曳引绳9的一端依次绕过1个第三动滑轮5、第一侧导轮72、第二侧导轮73、1个第三动滑轮5、第三侧导轮74、第四侧导轮75、第三动滑轮5、第五侧导轮76、第六侧导轮77和1个第三动滑轮5,最后末端固定在承头板上,以达到通过曳引绳9作用在轿厢定滑轮组7和轿厢动滑轮组来提拉轿厢3,实现驱动轿厢3上升或下降。Furthermore, the four third movable pulleys 5 are arranged in a matrix arrangement on the top of the car 3, that is, the four third movable pulleys 5 are evenly distributed on the top of the car 3, so that the car 3 is affected by the impact during operation. The force is uniform, which is conducive to the smooth operation of the elevator. The hoistway 1 is provided with a symmetrically arranged fourth load-bearing beam 15 and a fifth load-bearing beam 16. The car fixed pulley set 7 includes a first side guide pulley 72, a second side guide pulley 73, and a third side guide pulley 74. , the fourth side guide wheel 75 , the fifth side guide wheel 76 and the sixth side guide wheel 77 , the first side guide wheel 72 , the second side guide wheel 73 and the third side guide wheel 74 all rotate with the fourth load-bearing beam 15 connected, and the axis line of the first side guide wheel 72 and the axis line of the second side guide wheel 73 are both perpendicular to the axis line of the third side guide wheel 74, the fourth side guide wheel 75, the fifth side guide wheel 75 76 and the sixth side guide wheel 77 are both rotationally connected with the fifth load-bearing beam 16, and the axis of the fourth side guide wheel 75 and the axis of the fifth side guide wheel 76 are both connected with the axis of the sixth side guide wheel 77. The center line is vertical, and the third side guide wheel 74 and the sixth side guide wheel 77 are in the same horizontal plane. After the other end of the traction rope 9 is wound out of the traction pulley 21, one end of the traction rope 9 sequentially goes around a third moving pulley 5, a first side guide pulley 72, a second side guide pulley 73, and a third movable pulley 5. The third movable pulley 5, the third side guide pulley 74, the fourth side guide pulley 75, the third movable pulley 5, the fifth side guide pulley 76, the sixth side guide pulley 77 and a third movable pulley 5, the last end is fixed on the bearing On the head board, the traction rope 9 acts on the car fixed pulley group 7 and the car movable pulley group to lift the car 3 and drive the car 3 up or down.
可以理解的是,对本领域普通技术人员来说,可以根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,而所有这些改变或替换都应属于本实用新型的保护范围。It can be understood that those of ordinary skill in the art can make equivalent substitutions or changes based on the technical solutions of the present utility model and its utility model concepts, and all such changes or substitutions should fall within the protection scope of the present utility model.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321559971.0U CN219885403U (en) | 2023-06-16 | 2023-06-16 | A counterweight rope winding device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321559971.0U CN219885403U (en) | 2023-06-16 | 2023-06-16 | A counterweight rope winding device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219885403U true CN219885403U (en) | 2023-10-24 |
Family
ID=88407839
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321559971.0U Active CN219885403U (en) | 2023-06-16 | 2023-06-16 | A counterweight rope winding device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219885403U (en) |
-
2023
- 2023-06-16 CN CN202321559971.0U patent/CN219885403U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104066670B (en) | Method and elevator arrangement | |
CN105939955B (en) | Low structure trolley for steel cable elevator | |
JP2012246116A (en) | Elevator device, and emergency stop test method thereof | |
TWM258089U (en) | Elevator inspection device arrangement | |
CN205855679U (en) | A kind of Elevator weight sensor compensation device | |
CN201002908Y (en) | Rope-wheel type elevator without machinery room traction | |
CN113653376A (en) | Stage elevating platform | |
CN108584591A (en) | A kind of elevator brake performance no-load test method | |
CN219885403U (en) | A counterweight rope winding device | |
CN104176668A (en) | Double-connection double-reel rope winding system | |
CN106494974A (en) | One kind drives elevator from traction | |
CN112499440B (en) | Machine-room-free elevator transformation method and machine-room-free elevator | |
CN101426709A (en) | Elevator device | |
KR101847083B1 (en) | Roping system for elevator | |
CN102305705B (en) | Multiproject electric hoist test bed | |
CN110902523B (en) | Elevator traction system | |
CN108996365A (en) | A kind of steel wire rope tension self balancing device and its self-balance method | |
CN204057812U (en) | The two reel wiring system of duplex | |
CN210286532U (en) | Hydraulic dragging lifting type double-beam steel wire rope crane | |
CN211393460U (en) | Elevator traction system | |
CN209023976U (en) | A kind of Novel counterweight diversion sheave device | |
CN108946387B (en) | Lever type elevator compensation chain balance mechanism | |
CN109952262B (en) | Method for inspecting emergency stop device of elevator | |
CN1657395A (en) | Method for preventing hanging beam and steel plate from swinging when electromagnetic hanging beam crane starts and brakes | |
JP4750104B2 (en) | Elevator equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: No. 1-3 Changchun Road, Yangmei, Yanghe Town, Gaoming District, Foshan City, Guangdong Province (Address Declaration) Patentee after: Zhufu Elevator Technology Co.,Ltd. Country or region after: China Address before: No. 1-3 Changchun Road, Yangmei Town, Gaoming District, Foshan City, Guangdong Province Patentee before: HOMEFRIEND & FUJI ELEVATOR Co.,Ltd. Country or region before: China |