[go: up one dir, main page]

CN219828219U - a surveying and mapping device - Google Patents

a surveying and mapping device Download PDF

Info

Publication number
CN219828219U
CN219828219U CN202320369011.1U CN202320369011U CN219828219U CN 219828219 U CN219828219 U CN 219828219U CN 202320369011 U CN202320369011 U CN 202320369011U CN 219828219 U CN219828219 U CN 219828219U
Authority
CN
China
Prior art keywords
connecting plate
surveying
plate
supporting leg
mapping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202320369011.1U
Other languages
Chinese (zh)
Inventor
牛守富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yanggao County Natural Resources Bureau
Original Assignee
Yanggao County Natural Resources Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yanggao County Natural Resources Bureau filed Critical Yanggao County Natural Resources Bureau
Priority to CN202320369011.1U priority Critical patent/CN219828219U/en
Application granted granted Critical
Publication of CN219828219U publication Critical patent/CN219828219U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A90/00Technologies having an indirect contribution to adaptation to climate change
    • Y02A90/30Assessment of water resources

Landscapes

  • Position Fixing By Use Of Radio Waves (AREA)

Abstract

The utility model discloses a mapping device which comprises a mounting plate, wherein mounting grooves are formed in four sides of the mounting plate, a connecting rod is fixedly connected to the lower position in the mounting grooves, a first supporting leg is rotatably connected to the connecting rod, and a second supporting leg is movably sleeved on the outer ring of the bottom of the first supporting leg. The first supporting legs of the device are rotated to the upper part and the lower part of the device by arranging the first supporting legs and the connecting rods, then the distance between the first supporting legs is fixed by the first fixing component and the second fixing component which are connected with the first supporting legs, and the first supporting legs play a relative protection role on the surveying instrument after being fixed upwards; through setting up second supporting leg, hold-down bolt and water droplet spirit level, can place the device earlier on the road surface through the horizontal condition of two water droplet spirit level viewing device for make the device can both keep the level in different construction sites, prevent at work because the loss that the mapping device caused.

Description

一种测绘装置a surveying and mapping device

技术领域Technical field

本实用新型涉及一种测绘装置,属于测绘技术领域。The utility model relates to a surveying and mapping device, belonging to the technical field of surveying and mapping.

背景技术Background technique

测绘装置是为测绘作业设计制造的数据采集、处理、输出等的装置。在工程建设的规划设计、施工及经营管理等阶段中,测绘装置进行测量工作所需的各种定向、测距、测角、测高、测图以及摄影测量等。Surveying and mapping devices are devices designed and manufactured for data collection, processing, and output for surveying and mapping operations. In the planning and design, construction and operation and management stages of engineering construction, surveying and mapping devices carry out various orientation, distance measurement, angle measurement, height measurement, mapping and photogrammetry required for measurement work.

现有技术中,如中国专利号为:CN217875043U的“一种测绘装置”,包括支撑腿,所述支撑腿的顶部转动连接有承载盒,承载盒的上方设置有经纬仪,经纬仪底部固定连接有承载盘,承载盘的底部固定连接有支撑杆,支撑杆的下下端固定连接定位盘,承载盒包括承载盖和承载壳,承载盒的内部设置有连接机构。其有益效果是,该测绘装置,通过连接机构的设置,在对经纬仪进行固定时,工作人员只需要将连接杆插入承载盒中,转动螺纹套即可快速完成对经纬仪的固定和定位,操作简单方便,提高了工作人员对经纬仪与支撑腿之间的连接效率,且保证了经纬仪位于支撑腿的中心部位,从而保证了经纬仪对建筑环境测量的精准度,从而保证了工作人员对后续工程报价计算和预测的准确性。In the prior art, for example, Chinese Patent No.: CN217875043U "A Surveying and Mapping Device" includes a support leg, the top of the support leg is rotatably connected to a bearing box, a theodolite is arranged above the bearing box, and the bottom of the theodolite is fixedly connected to a bearing box. The bottom of the bearing plate is fixedly connected with a support rod, and the lower end of the support rod is fixedly connected with the positioning plate. The bearing box includes a bearing cover and a bearing shell, and a connecting mechanism is provided inside the bearing box. The beneficial effect is that, through the setting of the connecting mechanism of this surveying and mapping device, when fixing the theodolite, the staff only need to insert the connecting rod into the carrying box and turn the threaded sleeve to quickly complete the fixing and positioning of the theodolite, which is simple to operate. Convenient, it improves the efficiency of the connection between the theodolite and the support leg, and ensures that the theodolite is located in the center of the support leg, thereby ensuring the accuracy of the theodolite's measurement of the building environment, thereby ensuring the staff's calculation of quotations for subsequent projects. and forecast accuracy.

但现有技术中,需要测绘的视时候,通常都是将测绘装置和支架分离开运输,到达现场之后通过螺母进行固定,浪费了时间,同时在进行找平的时候,通常都都是利用相同长度的支架腿,直接放置进行找平,如果碰到坑洼的地面会导致装置无法通过相同长度的支撑腿进行找平影响测绘装置的工作效率。However, in the existing technology, when surveying and mapping are required, the surveying and mapping device and the bracket are usually transported separately and fixed with nuts after arriving at the site, which wastes time. At the same time, when leveling, the same length is usually used. The support legs are directly placed for leveling. If it hits the potty ground, the device cannot be leveled by the support legs of the same length, affecting the working efficiency of the surveying and mapping device.

实用新型内容Utility model content

本实用新型的目的是针对现有技术存在的上述问题,克服现有技术的不足之处,设计一种能够快速对装置进行安装和拆卸,且能够在坑洼路面进行找平的测绘装置。The purpose of this utility model is to address the above-mentioned problems existing in the prior art, overcome the shortcomings of the prior art, and design a surveying and mapping device that can quickly install and disassemble the device and can level the pothole road surface.

为了实现上述目的,本实用新型的技术方案是:In order to achieve the above objects, the technical solution of the present utility model is:

一种测绘装置,包括安装板,所述安装板的四边均开设有安装槽,所述安装槽中靠下的位置固定连接有连接杆,所述连接杆上转动连接有第一支撑腿,所述第一支撑腿的底部外圈活动套设有第二支撑腿,所述第二支撑腿的顶部一侧开设有螺纹孔,所述螺纹孔中螺纹连接有压紧螺栓,两个所述第一支撑腿上安装有第一固定组件,另外两个所述第一支撑腿上位于第一固定组件的下方安装有第二固定组件,所述安装板的顶部中心固定连接有固定板,所述固定板的顶部通过转轴一转动连接有转板,所述转板的上方安装有测绘仪。A surveying and mapping device includes a mounting plate. Mounting slots are provided on four sides of the mounting plate. A connecting rod is fixedly connected to a lower position in the mounting slot. A first supporting leg is rotatably connected to the connecting rod. The bottom outer ring of the first supporting leg is movable with a second supporting leg, and a threaded hole is provided on the top side of the second supporting leg. A compression bolt is threadedly connected in the threaded hole, and the two second supporting legs are A first fixing component is installed on one supporting leg, and a second fixing component is installed on the other two first supporting legs below the first fixing component. A fixing plate is fixedly connected to the top center of the mounting plate, and the The top of the fixed plate is connected to a rotating plate through the rotation of the rotating shaft, and a surveying instrument is installed above the rotating plate.

优选的,所述转板的顶部中心固定连接有连接座,所述连接座的顶部安装有测绘仪,所述转板的顶部固定连接有外罩,所述外罩的顶部安装有把手,所述转板的顶部位于外罩的两侧均安装有水滴水平仪。Preferably, a connecting seat is fixedly connected to the top center of the rotating plate, a surveyor is installed on the top of the connecting seat, an outer cover is fixedly connected to the top of the rotating plate, and a handle is installed on the top of the outer cover. Water drop levels are installed on both sides of the cover on the top of the board.

优选的,所述固定板的顶部开设有若干个均匀的插孔三,所述转板上开设有与插孔三相匹配的一个通孔,所述通孔中安装有插销三。Preferably, the top of the fixed plate is provided with several uniform jack holes 3, the rotating plate is provided with a through hole matching the jack holes 3, and the plug pin 3 is installed in the through hole.

优选的,所述第一固定组件包括与两个第一支撑腿固定连接的固定杆一,一个所述固定杆一上通过轴承一转动连接有连接板一,另一个固定杆一通过轴承二转动连接有连接板二,所述连接板一和连接板二的一端中心处于同一轴线上。Preferably, the first fixing component includes a fixing rod 1 that is fixedly connected to the two first supporting legs. One of the fixing rods is rotatably connected to a connecting plate 1 through a bearing 1, and the other fixed rod 1 is rotated through a bearing 2. A connecting plate 2 is connected, and the centers of one ends of the connecting plate 1 and the connecting plate 2 are on the same axis.

优选的,所述连接板一和连接板二重叠的部分开设有若干个均匀的插孔一,位于中心的插孔一中设置有螺栓一,一个周围的插孔一中设置有插销一,所述螺栓一和插销一通过弹性绳一相连接。Preferably, a number of uniform jack holes are provided in the overlapping portions of connecting plate one and connecting plate two. A bolt is provided in the central jack hole, and a latch is provided in one of the surrounding jack holes. The bolt one and the latch one are connected by an elastic rope one.

优选的,所述第二固定组件包括与剩余两个第一支撑腿固定连接的固定杆二,一个所述固定杆二上通过轴承三转动连接有连接板三,另一个固定杆二通过轴承四转动连接有连接板四,所述连接板三和连接板四的一端中心处于同一轴线上。Preferably, the second fixing component includes a fixing rod 2 that is fixedly connected to the remaining two first supporting legs. One of the fixing rods 2 is rotatably connected to a connecting plate 3 through a bearing 3, and the other fixed rod 2 passes through a bearing 4. A connecting plate 4 is rotatably connected, and the center of one end of the connecting plate 3 and the connecting plate 4 is on the same axis.

优选的,所述连接板三和连接板四重叠的部分开设有若干个均匀的插孔二,位于中心的插孔二中设置有螺栓二,一个周围的插孔二中设置有插销二,所述螺栓二和插销二通过弹性绳二相连接。Preferably, a number of uniform jack holes 2 are provided in the overlapping portions of the connecting plate 3 and the connecting plate 4. The jack hole 2 in the center is provided with bolts 2, and the surrounding jack 2 is provided with a latch 2, so Said bolt two and latch two are connected through elastic rope two.

本实用新型所达到的有益效果:The beneficial effects achieved by this utility model are:

1、通过设置第一支撑腿和连接杆,将第一支撑腿通过连接杆进行旋转,实现将装置的第一支撑腿转动到装置上方和下方,然后通过与第一支撑腿连接的第一固定组件和第二固定组件对第一支撑腿之间的距离进行固定,避免了将第一支撑腿分离开在进行运输,同时第一支撑腿向上固定之后对测绘仪也起到了一个相对的保护作用;1. By setting the first supporting leg and the connecting rod, the first supporting leg is rotated through the connecting rod to rotate the first supporting leg of the device above and below the device, and then through the first fixation connected to the first supporting leg The component and the second fixing component fix the distance between the first support legs, avoiding the need to separate the first support legs for transportation. At the same time, after the first support legs are fixed upward, they also play a relative protection role for the surveyor. ;

2、通过设置第二支撑腿、压紧螺栓和水滴水平仪,能够先将装置放置在路面上通过两个水滴水平仪观察装置的水平情况,如果装置处于倾斜状态,转动压紧螺栓,能够将第二支撑腿向下或者向上进行移动,用来使装置在不同施工地点都能够保持水平,防止在工作中因为测绘装置造成的损失。2. By setting up the second support leg, the compression bolt and the water drop level, you can first place the device on the road and observe the level of the device through the two water drop levels. If the device is in a tilted state, turn the compression bolt and the second The support legs move downward or upward to keep the device level at different construction sites to prevent losses caused by the surveying and mapping device during work.

附图说明Description of the drawings

图1给出本实用新型一种实施例的立体结构示意图;Figure 1 shows a schematic three-dimensional structural diagram of an embodiment of the present utility model;

图2为图1的立体结构示意图;Figure 2 is a schematic diagram of the three-dimensional structure of Figure 1;

图3为图1的立体结构示意图;Figure 3 is a schematic diagram of the three-dimensional structure of Figure 1;

图4为图1所示第一固定组件的立体结构示意图;Figure 4 is a schematic three-dimensional structural view of the first fixing component shown in Figure 1;

图5为图1所示第二固定组件的立体结构示意图。FIG. 5 is a schematic three-dimensional structural view of the second fixing component shown in FIG. 1 .

附图标记:1、安装板;2、安装槽;3、连接杆;4、第一支撑腿;5、第二支撑腿;6、螺纹孔;7、压紧螺栓;8、第一固定组件;81、固定杆一;82、连接板一;83、连接板二;84、插孔一;85、螺栓一;86、插销一;87、弹性绳一;9、第二固定组件;91、固定杆二;92、连接板三;93、连接板四;94、插孔二;95、螺栓二;96、插销二;97、弹性绳二;10、固定板;11、转板;12、外罩;13、把手;14、连接座;15、测绘仪;16、水滴水平仪;17、插孔三;18、通孔;19、插销三。Reference signs: 1. Installation plate; 2. Installation slot; 3. Connecting rod; 4. First support leg; 5. Second support leg; 6. Threaded hole; 7. Pressure bolt; 8. First fixing component ; 81. Fixed rod one; 82. Connecting plate one; 83. Connecting plate two; 84. Jack hole one; 85. Bolt one; 86. Latch one; 87. Elastic cord one; 9. Second fixing component; 91. Fixed rod two; 92, connecting plate three; 93, connecting plate four; 94, jack two; 95, bolt two; 96, latch two; 97, elastic rope two; 10, fixed plate; 11, rotating plate; 12. Outer cover; 13. Handle; 14. Connecting seat; 15. Surveying instrument; 16. Water drop level; 17. Jack three; 18. Through hole; 19. Latch three.

具体实施方式Detailed ways

下面结合附图对本实用新型作进一步描述。以下实施例仅用于更加清楚地说明本实用新型的技术方案,而不能以此来限制本实用新型的保护范围。The utility model will be further described below in conjunction with the accompanying drawings. The following examples are only used to illustrate the technical solutions of the present invention more clearly, but cannot be used to limit the scope of protection of the present invention.

实施例1Example 1

如图1、图2和图3所示,本实用新型提出的一种测绘装置,包括安装板1,安装板1的四边均开设有安装槽2,安装槽2中靠下的位置固定连接有连接杆3,连接杆3上转动连接有第一支撑腿4,第一支撑腿4的底部外圈活动套设有第二支撑腿5,第二支撑腿5的顶部一侧开设有螺纹孔6,螺纹孔6中螺纹连接有压紧螺栓7,两个第一支撑腿4上安装有第一固定组件8,另外两个第一支撑腿4上位于第一固定组件8的下方安装有第二固定组件9,安装板1的顶部中心固定连接有固定板10,固定板10的顶部通过转轴一转动连接有转板11,转板11的上方安装有测绘仪15,转板11的顶部中心固定连接有连接座14,连接座14的顶部安装有测绘仪15,转板11的顶部固定连接有外罩12,外罩12的顶部安装有把手13,转板11的顶部位于外罩12的两侧均安装有水滴水平仪16,固定板10的顶部开设有若干个均匀的插孔三17,转板11上开设有与插孔三17相匹配的一个通孔18,通孔18中安装有插销三19。As shown in Figures 1, 2 and 3, the utility model proposes a surveying and mapping device, which includes a mounting plate 1. Mounting slots 2 are provided on all four sides of the mounting plate 1. The lower position of the mounting slot 2 is fixedly connected with Connecting rod 3. A first supporting leg 4 is rotatably connected to the connecting rod 3. The bottom outer ring of the first supporting leg 4 is movable with a second supporting leg 5. The top side of the second supporting leg 5 is provided with a threaded hole 6. , a compression bolt 7 is threadedly connected in the threaded hole 6, a first fixing component 8 is installed on the two first supporting legs 4, and a second fixing component 8 is installed on the other two first supporting legs 4 below the first fixing component 8. Fixed component 9, the top center of the mounting plate 1 is fixedly connected to the fixed plate 10, the top of the fixed plate 10 is connected to the rotating plate 11 through the rotation of the rotating shaft, the surveyor 15 is installed above the rotating plate 11, and the top center of the rotating plate 11 is fixed A connecting base 14 is connected. A surveyor 15 is installed on the top of the connecting base 14. An outer cover 12 is fixedly connected to the top of the rotating plate 11. A handle 13 is installed on the top of the outer cover 12. The top of the rotating plate 11 is installed on both sides of the outer cover 12. There is a water drop level 16, a number of uniform jack holes 17 are provided on the top of the fixed plate 10, a through hole 18 matching the jack holes 17 is provided on the rotating plate 11, and a latch 3 19 is installed in the through hole 18.

本实施例中,安装槽2的设置是为了能够方便将第一支撑腿4进行旋转,同时连接杆3放置在安装槽2中靠下的位置,是为了方便对第一支撑腿4进行旋转,在固定板10和转板11中间设置转轴一,是为了方便测绘仪15进行转动,放置测绘不同方向的时候还要进行移动整个装置,通过设置通孔18和插孔三17,方便了将方便将转板11固定在固定板10上,防止转动到合适的角度制后,转板11会自己发生转动,导致浪费测绘的时间,外罩12能够对测绘仪15进行一个保护的作用,防止在室外测绘的时遇到阴雨天气,同时把手13是为了方便在测绘过程中对装置进行移动位置,设置压紧螺栓7是为了能够对第二支撑腿5进行控制伸缩,能够配合水滴水平仪16进行水平调节,水滴水平仪16是为两个方向上的测水平的仪器。In this embodiment, the installation groove 2 is provided to facilitate the rotation of the first support leg 4, and the connecting rod 3 is placed at a lower position in the installation groove 2 to facilitate the rotation of the first support leg 4. The rotating shaft 1 is provided between the fixed plate 10 and the rotating plate 11 to facilitate the rotation of the surveying and mapping instrument 15. When placing the surveying and mapping in different directions, the entire device needs to be moved. By arranging the through hole 18 and the jack 3 17, it is convenient to Fix the rotating plate 11 on the fixed plate 10 to prevent the rotating plate 11 from rotating by itself after rotating to a suitable angle, resulting in a waste of surveying and mapping time. The outer cover 12 can protect the surveying instrument 15 from being used outdoors. When encountering rainy weather during surveying and mapping, the handle 13 is to facilitate the movement of the device during the surveying and mapping process. The compression bolt 7 is provided to control the expansion and contraction of the second support leg 5 and to cooperate with the water drop level 16 for horizontal adjustment. , The water drop level 16 is an instrument for measuring levels in two directions.

实施例2Example 2

如图4和图5示,本实用新型提出的一种测绘装置,相较于实施例1,本实施例还包括第一固定组件8和第二固定组件9,第一固定组件8包括与两个第一支撑腿4固定连接的固定杆一81,一个固定杆一81上通过轴承一转动连接有连接板一82,另一个固定杆一81通过轴承二转动连接有连接板二83,连接板一82和连接板二83的一端中心处于同一轴线上,连接板一82和连接板二83重叠的部分开设有若干个均匀的插孔一84,位于中心的插孔一84中设置有螺栓一85,一个周围的插孔一84中设置有插销一86,螺栓一85和插销一86通过弹性绳一87相连接,第二固定组件9包括与剩余两个第一支撑腿4固定连接的固定杆二91,一个固定杆二91上通过轴承三转动连接有连接板三92,另一个固定杆二91通过轴承四转动连接有连接板四93,连接板三92和连接板四93的一端中心处于同一轴线上,连接板三92和连接板四93重叠的部分开设有若干个均匀的插孔二94,位于中心的插孔二94中设置有螺栓二95,一个周围的插孔二94中设置有插销二96,螺栓二95和插销二96通过弹性绳二97相连接。As shown in Figures 4 and 5, the utility model proposes a surveying and mapping device. Compared with Embodiment 1, this embodiment also includes a first fixing component 8 and a second fixing component 9. The first fixing component 8 includes two A fixed rod 81 is fixedly connected to the first supporting leg 4. One fixed rod 81 is rotatably connected to a connecting plate 82 through a bearing 1, and the other fixed rod 81 is rotatably connected to a connecting plate 83 through a bearing 2. The connecting plate The centers of one end of connecting plate one 82 and connecting plate two 83 are on the same axis. The overlapping portions of connecting plate one 82 and connecting plate two 83 are provided with several uniform jack holes 84. A bolt is provided in the central jack hole 84. 85, a surrounding socket 84 is provided with a latch 86, the bolt 85 and the latch 86 are connected by an elastic rope 87, the second fixing component 9 includes a fixing device that is fixedly connected to the remaining two first support legs 4 Rod two 91, one fixed rod two 91 is rotatably connected to a connecting plate three 92 through bearing three, and the other fixed rod two 91 is rotatably connected to a connecting plate four 93 through bearing four. The center of one end of connecting plate three 92 and connecting plate four 93 On the same axis, the overlapping portions of connecting plate three 92 and connecting plate four 93 are provided with several uniform jack holes 94 . Bolts 95 are provided in the jack two 94 in the center, and one of the surrounding jack holes 94 is provided with two bolts 95 . A second bolt 96 is provided, and the second bolt 95 and the second bolt 96 are connected by an elastic rope 97 .

本实施例中,四个第一支撑腿4,对位的第一支撑腿4为一组分为两组,一组上安装有第一固定组件8,一组上安装有第二固定组件9,连接板一82和连接板二83分别通过轴承一和轴承二与固定杆一81进行连接,且设置在第一支撑腿4的一侧,是为了方便对连接板一82和连接板二83进行旋转,使得能够通过螺栓一85对连接板一82和连接板二83进行连接,螺栓一85为可拆卸的,然偶通过插销一86插入周围的插孔一84中对连接板一82和连接板二83之间的角度进行固定,弹性绳一87和弹性绳二97的作用就是为了能够将螺栓一85和插销一86、螺栓二95和插销二96进行连接,第二固定组件9与第一固定组件8的过程相同。In this embodiment, the four first supporting legs 4 are divided into two groups. One group is equipped with the first fixing component 8, and the other group is installed with the second fixing component 9. , the connecting plate one 82 and the connecting plate two 83 are connected to the fixed rod one 81 through the bearing one and the bearing two respectively, and are arranged on one side of the first support leg 4 to facilitate the connection of the connecting plate one 82 and the connecting plate two 83 Rotate so that the connecting plate one 82 and the connecting plate two 83 can be connected through the bolt one 85. The bolt one 85 is detachable and can be inserted into the surrounding jack hole one 84 through the latch one 86 to connect the connecting plate one 82 and the connecting plate two 83. The angle between the connecting plates 83 is fixed. The function of the elastic cord 87 and the elastic cord 2 97 is to connect the bolt 85 and the latch 86, the bolt 95 and the latch 2 96. The second fixing component 9 and The process for the first fixation component 8 is the same.

工作原理:本实用新型提出的一种测绘装置,图1中的状态为打开状态,需要对装置进行收取的时候,首先将插销三19拔出,将测绘仪15转动至与安装板1的一侧水平,然后停止转动,将插销三19通过通孔18插入到插孔三17中,将转板11进行固定,然后通过转动压紧螺栓7,压紧螺栓7转动会使得压紧螺栓7向外进行移动,当压紧螺栓7转的动到合适的位置的时候,将第二支撑腿5向上移动的四个相同的合适的位置,然后反向转动压紧螺栓7,此时压紧螺栓7会向内部进行移动对第一支撑腿4进行挤压,将第二支撑腿5固定在第一支撑腿4上,然后将插销一86和插销二96分别从插孔一84和插孔二94中拔出,再将螺栓一85和螺栓二95拔出,全部拔出之后,分别转动第一支撑腿4,将第一支撑腿4转动至朝向上方的位置,四个第一支撑腿4全部转动完成之后,通过固定杆一81和固定杆二91分别转动连接板一82、连接板二83、连接板三92和连接板四93,转动到外罩12上方的时候,停止转动,然后将插孔一84和插孔二94对齐,将螺栓一85和螺栓二95分别插入到中间的插孔一84和插孔二94中,然后选择合适的角度将插销一86喝插销二96分别插入到周围的一个插孔一84和插孔二94中,对装置完成收取,使用的时候按照收取的步骤进行反向操作,同时在安装好支架的时候需要进行找平的时候,首先将装置放置在地面上,观察两个水滴水平仪16然后通过水滴水平仪16上面的显示,拧动压紧螺栓7,将第二支撑腿5向上或者向下进行移动,完成之后将压紧螺栓7拧入螺纹孔6中,将第二支撑腿5进行固定,完成找平。Working principle: The utility model proposes a surveying and mapping device. The state in Figure 1 is an open state. When the device needs to be collected, first pull out the pin 319 and rotate the surveying and mapping instrument 15 to be in line with the installation plate 1. level, then stop rotating, insert pin three 19 into jack three 17 through through hole 18, fix the rotating plate 11, and then rotate the compression bolt 7. The rotation of the compression bolt 7 will cause the compression bolt 7 to move toward When the compression bolt 7 rotates to the appropriate position, move the second support leg 5 upward to the same four appropriate positions, and then rotate the compression bolt 7 in the opposite direction. At this time, the compression bolt 7 will move inward to squeeze the first supporting leg 4, fix the second supporting leg 5 on the first supporting leg 4, and then remove the latch one 86 and the latch two 96 from the jack one 84 and the jack two respectively. 94, and then pull out bolt one 85 and bolt two 95. After they are all pulled out, rotate the first supporting legs 4 respectively to the upward position. The four first supporting legs 4 After all rotations are completed, rotate connecting plate one 82, connecting plate two 83, connecting plate three 92 and connecting plate four 93 respectively through fixed rod one 81 and fixed rod two 91. When it reaches above the outer cover 12, stop rotating, and then Align jack one 84 and jack two 94, insert bolt one 85 and bolt two 95 into the middle jack one 84 and jack two 94 respectively, then select the appropriate angle to insert pin one 86 and pin two 96 respectively. Go to one of the surrounding jacks 84 and 94, and collect the device. When using it, follow the steps in reverse. At the same time, when you need to level the bracket after installing it, first place the device on On the ground, observe the two water drop levels 16 and then use the display on the water drop level 16 to twist the compression bolt 7 and move the second support leg 5 upward or downward. After completion, screw the compression bolt 7 into the threaded hole 6. , fix the second supporting leg 5 to complete leveling.

以上仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型技术原理的前提下,还可以做出若干改进和变形,这些改进和变形也应视为本实用新型的保护范围。The above are only the preferred embodiments of the present utility model. It should be pointed out that those of ordinary skill in the art can also make several improvements and deformations without departing from the technical principles of the present utility model. These improvements and deformations can It should also be regarded as the protection scope of the present utility model.

Claims (7)

1. The utility model provides a mapping device, its characterized in that, including mounting panel (1), mounting groove (2) have all been seted up to the four sides of mounting panel (1), position fixedly connected with connecting rod (3) down in mounting groove (2), rotate on connecting rod (3) and be connected with first supporting leg (4), the bottom outer lane movable sleeve of first supporting leg (4) is equipped with second supporting leg (5), screw hole (6) have been seted up on top one side of second supporting leg (5), threaded connection has hold-down bolt (7) in screw hole (6), two install first fixed subassembly (8) on first supporting leg (4), and two in addition second fixed subassembly (9) are installed to the below that is located first fixed subassembly (8) on first supporting leg (4), the top center fixedly connected with fixed plate (10) of mounting panel (1), the top of fixed plate (10) is connected with through pivot rotation and is turned round board (11), mapping appearance (15) are installed to the top of turned round board (11).
2. A surveying and mapping device according to claim 1, characterized in that the top center of the rotating plate (11) is fixedly connected with a connecting seat (14), a surveying and mapping instrument (15) is installed at the top of the connecting seat (14), an outer cover (12) is fixedly connected to the top of the rotating plate (11), a handle (13) is installed at the top of the outer cover (12), and water drop level gauges (16) are installed at the two sides of the top of the rotating plate (11) located on the outer cover (12).
3. A surveying and mapping device according to claim 1, wherein the top of the fixed plate (10) is provided with a plurality of uniform jack three (17), the rotating plate (11) is provided with a through hole (18) matched with the jack three (17), and the through hole (18) is provided with a bolt three (19).
4. A surveying and mapping apparatus according to claim 1, wherein the first fixing assembly (8) comprises a first fixing rod (81) fixedly connected to the two first supporting legs (4), one fixing rod (81) is rotatably connected to a first connecting plate (82) through a bearing, the other fixing rod (81) is rotatably connected to a second connecting plate (83) through a second bearing, and one end centers of the first connecting plate (82) and the second connecting plate (83) are on the same axis.
5. A surveying and mapping apparatus according to claim 4, wherein the overlapping parts of the first connecting plate (82) and the second connecting plate (83) are provided with a plurality of uniform first insertion holes (84), first bolts (85) are arranged in the first insertion holes (84) positioned at the center, first bolts (86) are arranged in the first insertion holes (84) positioned at the periphery, and the first bolts (85) and the first bolts (86) are connected through first elastic ropes (87).
6. A surveying and mapping apparatus according to claim 1, wherein the second fixing assembly (9) comprises a second fixing rod (91) fixedly connected to the remaining two first supporting legs (4), one second fixing rod (91) is rotatably connected to a third connecting plate (92) through a third bearing, the other second fixing rod (91) is rotatably connected to a fourth connecting plate (93) through a fourth bearing, and one end centers of the third connecting plate (92) and the fourth connecting plate (93) are on the same axis.
7. The surveying and mapping device according to claim 6, wherein a plurality of uniform second insertion holes (94) are formed in the overlapping portion of the third connection plate (92) and the fourth connection plate (93), second bolts (95) are arranged in the second insertion holes (94) located in the center, second bolts (96) are arranged in the second insertion holes (94) located in the periphery, and the second bolts (95) and the second bolts (96) are connected through second elastic ropes (97).
CN202320369011.1U 2023-03-02 2023-03-02 a surveying and mapping device Expired - Fee Related CN219828219U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320369011.1U CN219828219U (en) 2023-03-02 2023-03-02 a surveying and mapping device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320369011.1U CN219828219U (en) 2023-03-02 2023-03-02 a surveying and mapping device

Publications (1)

Publication Number Publication Date
CN219828219U true CN219828219U (en) 2023-10-13

Family

ID=88245802

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320369011.1U Expired - Fee Related CN219828219U (en) 2023-03-02 2023-03-02 a surveying and mapping device

Country Status (1)

Country Link
CN (1) CN219828219U (en)

Similar Documents

Publication Publication Date Title
CN219828219U (en) a surveying and mapping device
WO2017157256A1 (en) Ground-installed, vertical rod fixing apparatus
CN112762320B (en) A fixed benchmark for surveying and mapping engineering
CN210221089U (en) A support frame for surveying instrument
CN218935901U (en) Site survey device for building design
CN203965295U (en) Metal atmospheric corrosion light exposure test frame
CN115405830A (en) Leveling device for foundation construction of wind power fan
CN219912508U (en) Site mapping device
CN220523776U (en) Measuring device for municipal works
CN209745281U (en) Surveying and mapping tool table
CN220355055U (en) A fixed bracket for theodolite
CN217930301U (en) Accurate mapping device for engineering survey
CN215000566U (en) Bridge engineering bridge surveying equipment
CN209277633U (en) A kind of mobile communication base station
CN221593881U (en) Auxiliary mapping device for mapping engineering
CN210800590U (en) Portable measuring instrument
CN222209817U (en) Telescopic bracket
CN212543339U (en) Glass fiber reinforced plastic lightning rod base capable of being placed down
CN220853650U (en) Building engineering environment check out test set
CN221959521U (en) Leveling instrument adjusting mechanism
CN217456893U (en) A cost surveying and mapping equipment for building construction
CN221858201U (en) Construction measuring device
CN211902238U (en) A on-spot mapping device for real estate survey and drawing
CN216523958U (en) Mapping device for land engineering
CN212779556U (en) House construction ground noise detection device convenient to installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20231013

CF01 Termination of patent right due to non-payment of annual fee