CN219583188U - Concrete prefabricated square pile forming device - Google Patents
Concrete prefabricated square pile forming device Download PDFInfo
- Publication number
- CN219583188U CN219583188U CN202320149264.8U CN202320149264U CN219583188U CN 219583188 U CN219583188 U CN 219583188U CN 202320149264 U CN202320149264 U CN 202320149264U CN 219583188 U CN219583188 U CN 219583188U
- Authority
- CN
- China
- Prior art keywords
- die box
- square pile
- mold box
- fixed
- lower die
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 21
- 238000010030 laminating Methods 0.000 claims 1
- 239000011178 precast concrete Substances 0.000 claims 1
- 229910001294 Reinforcing steel Inorganic materials 0.000 abstract 1
- 229910000831 Steel Inorganic materials 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 238000010276 construction Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000003197 gene knockdown Methods 0.000 description 1
- 238000009439 industrial construction Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000011513 prestressed concrete Substances 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及建筑工程的技术领域,具体为混凝土预制方桩成型装置。The utility model relates to the technical field of construction engineering, in particular to a concrete prefabricated square pile forming device.
背景技术Background technique
用混凝土与钢筋或钢丝制成的桩。具有节约木材和钢材、经久耐用、造价低廉等优点,已广泛使用于水工建筑、工业建筑、民用建筑和桥梁的基础工程,混凝土桩分为普通钢筋混凝土桩和预应力混凝土桩两类,桩的截面有方形、矩形、八角形、圆形和环形等,最常用的是方形截面桩和环形截面桩,混凝土预制方桩大多利用浇筑的方法制成,从而需要利用模具,但是当方桩制成后需要从模具中取出,但是有与方桩的体积比较大,从而想从模具内将方桩取出时就比较麻烦,这样就会影响工作人员的工作效率。A pile made of concrete and rebar or wire. It has the advantages of saving wood and steel, durable, and low cost. It has been widely used in the foundation engineering of hydraulic construction, industrial construction, civil construction and bridges. Concrete piles are divided into two types: ordinary reinforced concrete piles and prestressed concrete piles. The cross-sections are square, rectangular, octagonal, circular, and ring-shaped. The most commonly used ones are square-section piles and ring-shaped piles. Most of the concrete prefabricated square piles are made by pouring, which requires the use of molds. Finally, it needs to be taken out from the mold, but the volume of the square pile is relatively large, so it is more troublesome when the square pile is taken out from the mold, which will affect the work efficiency of the staff.
实用新型内容Utility model content
(一)解决的技术问题(1) Solved technical problems
针对现有技术的不足,本实用新型提供了混凝土预制方桩成型装置,具备可以方便用户从模具中取出方桩,从而可以提高工作人员的工作效率等优点,解决了当方桩制成后需要从模具中取出,但是有与方桩的体积比较大,从而想从模具内将方桩取出时就比较麻烦,这样就会影响工作人员的工作效率的问题。Aiming at the deficiencies of the prior art, the utility model provides a concrete prefabricated square pile forming device, which has the advantages of being convenient for the user to take out the square pile from the mould, thereby improving the working efficiency of the staff, and solving the problem that the square pile needs to be removed from the mold after the square pile is made. It is taken out from the mould, but it has a larger volume than the square pile, so it is more troublesome when you want to take the square pile out of the mold, which will affect the work efficiency of the staff.
(二)技术方案(2) Technical solution
为实现上述可以方便用户从模具中取出方桩,从而可以提高工作人员的工作效率目的,本实用新型提供如下技术方案:混凝土预制方桩成型装置,包括底座,底座上侧开设有若干个固定槽,每个固定槽内均固定安装有气缸,底座上侧固定安装有竖板,竖板上侧固定安装有固定板,竖板上设置有下模箱,下模箱下壁开设有滑槽,竖板与滑槽活动连接,固定板下侧与下模箱下内壁贴合,下模箱上侧设置有上模箱。In order to realize the above-mentioned purpose of making it convenient for the user to take out the square pile from the mold, thereby improving the working efficiency of the staff, the utility model provides the following technical proposal: the concrete prefabricated square pile forming device includes a base, and several fixing grooves are opened on the upper side of the base , a cylinder is fixedly installed in each fixing groove, a vertical plate is fixedly installed on the upper side of the base, a fixed plate is fixedly installed on the upper side of the vertical plate, a lower mold box is arranged on the vertical plate, and a chute is opened on the lower wall of the lower mold box, The vertical plate is movably connected with the chute, the lower side of the fixed plate is attached to the lower inner wall of the lower mold box, and an upper mold box is arranged on the upper side of the lower mold box.
优选的,所述下模箱下侧开设有若干个卡槽a,每个卡槽a内均活动连接有支撑板,底座上侧均开设有卡槽b,每个支撑板分别与每个卡槽b活动连接。Preferably, the lower side of the lower mold box is provided with several card slots a, each card slot a is movably connected with a support plate, and the upper side of the base is provided with a card slot b, and each support plate is respectively connected with each card Slot b active connection.
优选的,每个所述支撑板上均开设有指槽,每个气缸的竖槽轴上端均固定安装有圆板。Preferably, finger grooves are provided on each of the support plates, and a circular plate is fixedly installed on the upper end of the shaft of the vertical groove of each cylinder.
优选的,所述固定板上侧固定安装有两组固定块,每个固定块上侧均固定安装有固定柱,两组固定块分别与下模箱前后内壁贴合。Preferably, two sets of fixing blocks are fixedly installed on the upper side of the fixing plate, each fixing block is fixedly installed on the upper side of a fixing column, and the two sets of fixing blocks are attached to the front and rear inner walls of the lower mold box respectively.
优选的,所述固定板下侧开设有框形槽,框形槽内活动连接有固定框,固定框与下模箱下内壁固定连接。Preferably, a frame-shaped groove is opened on the lower side of the fixing plate, and a fixed frame is movably connected in the frame-shaped groove, and the fixed frame is fixedly connected with the lower inner wall of the lower mold box.
(三)有益效果(3) Beneficial effects
与现有技术相比,本实用新型提供了混凝土预制方桩成型装置,具备以下有益效果:Compared with the prior art, the utility model provides a concrete prefabricated square pile forming device, which has the following beneficial effects:
1、该混凝土预制方桩成型装置,通过打开上模箱后就可以将钢筋支架等放入下模箱内,然后合上上模箱后就可以向上模箱与下模箱内注入混凝土,当方桩成型后就可以打开上模箱,然后向下敲打下模箱,当下模箱向下移动露出方桩后,就可以方便用户进行取下方桩,取下方桩后可以通过气缸带动下模箱向上移动进行下侧浇筑,这样可以方便用户从模具中取出方桩,从而可以提高工作人员的工作效率。1. The concrete prefabricated square pile forming device can put the steel bar support into the lower mold box after opening the upper mold box, and then inject concrete into the upper mold box and the lower mold box after closing the upper mold box. After the pile is formed, the upper mold box can be opened, and then the lower mold box can be knocked downward. After the lower mold box moves downward to expose the square pile, it is convenient for the user to remove the lower pile. After removing the lower pile, the lower mold box can be driven upward by the cylinder. Move for lower side pouring, which can facilitate the user to take out the square pile from the mold, which can improve the work efficiency of the staff.
2、该混凝土预制方桩成型装置,通过气缸带动下模箱向上移动进行下侧浇筑后,可以将每个卡槽a与每个卡槽b内插入支撑板,这样就气缸的输出轴就可以向下收缩,这样就可以避免气缸长时间支撑下模箱导致负荷过高产生损伤,通过圆板可以提高气缸的输出轴上端的支撑面,通过固定块与固定柱可以在方桩浇筑完成后存在若干个槽口,从而可以倾斜方桩后利用钩子等工具插入槽口内将方桩吊起下料。2. The concrete prefabricated square pile forming device drives the lower mold box to move upward through the cylinder to carry out the lower side pouring, and can insert each card slot a and each card slot b into the support plate, so that the output shaft of the cylinder can be Shrink downward, so as to avoid damage caused by excessive load caused by the cylinder supporting the lower mold box for a long time. The support surface of the upper end of the output shaft of the cylinder can be improved through the circular plate, and the fixed block and the fixed column can be used after the square pile is poured. There are several notches, so that after the square pile can be tilted, tools such as hooks can be inserted into the notch to lift and unload the square pile.
附图说明Description of drawings
图1为本实用新型的剖视立体结构示意图;Fig. 1 is the sectional three-dimensional structure schematic diagram of the utility model;
图2为本实用新型图1中固定块的立体结构示意图。Fig. 2 is a schematic diagram of the three-dimensional structure of the fixed block in Fig. 1 of the present invention.
图中:1、底座;2、固定槽;3、圆板;4、卡槽b;5、指槽;6、支撑板;7、卡槽a;8、下模箱;9、上模箱;10、固定块;11、固定板;12、框形槽;13、固定框;14、滑槽;15、竖板;16、气缸;17、固定柱。In the figure: 1. base; 2. fixed slot; 3. circular plate; 4. slot b; 5. finger slot; 6. support plate; 7. slot a; 8. lower mold box; 9. upper mold box 10, fixed block; 11, fixed plate; 12, frame groove; 13, fixed frame; 14, chute;
具体实施方式Detailed ways
以下结合附图对本实用新型作进一步详细说明,其中相同的零部件用相同的附图标记表示,需要说明的是,下面描述中使用的词语“前”、“后”、“左”、“右”、“上”和“下”、“底面”和“顶面”指的是附图中的方向,词语“内”和“外”分别指的是朝向或远离特定部件几何中心的方向。The utility model will be described in further detail below in conjunction with the accompanying drawings, wherein the same components are represented by the same reference numerals. It should be noted that the words "front", "rear", "left" and "right" used in the following description ", "upper" and "lower", "bottom" and "top" refer to directions in the drawings, and the words "inner" and "outer" refer to directions toward or away from the geometric center of a particular component, respectively.
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
请参阅图1-图2,本实用新型提供技术方案:混凝土预制方桩成型装置,包括底座1,底座1上侧开设有若干个固定槽2,每个固定槽2内均固定安装有气缸16,底座1上侧固定安装有竖板15,竖板15上侧固定安装有固定板11,竖板15上设置有下模箱8,下模箱8下壁开设有滑槽14,竖板15与滑槽14活动连接,固定板11下侧与下模箱8下内壁贴合,下模箱8上侧设置有上模箱9,通过打开上模箱9后就可以将钢筋支架等放入下模箱8内,然后合上上模箱9后就可以向上模箱9与下模箱8内注入混凝土,当方桩成型后就可以打开上模箱9,然后向下敲打下模箱8,当下模箱8向下移动露出方桩后,就可以方便用户进行取下方桩,取下方桩后可以通过气缸16带动下模箱8向上移动进行下侧浇筑,这样可以方便用户从模具中取出方桩,从而可以提高工作人员的工作效率,下模箱8下侧开设有若干个卡槽a7,每个卡槽a7内均活动连接有支撑板6,底座1上侧均开设有卡槽b4,每个支撑板6分别与每个卡槽b4活动连接,每个支撑板6上均开设有指槽5,每个气缸16的竖槽轴上端均固定安装有圆板3,固定板11上侧固定安装有两组固定块10,每个固定块10上侧均固定安装有固定柱17,两组固定块10分别与下模箱8前后内壁贴合,固定板11下侧开设有框形槽12,框形槽12内活动连接有固定框13,固定框13与下模箱8下内壁固定连接,通过气缸16带动下模箱8向上移动进行下侧浇筑后,可以将每个卡槽a7与每个卡槽b4内插入支撑板6,这样就气缸16的输出轴就可以向下收缩,这样就可以避免气缸16长时间支撑下模箱8导致负荷过高产生损伤,通过圆板3可以提高气缸16的输出轴上端的支撑面,通过固定块10与固定柱17可以在方桩浇筑完成后存在若干个槽口,从而可以倾斜方桩后利用钩子等工具插入槽口内将方桩吊起下料。Please refer to Fig. 1-Fig. 2, the utility model provides the technical solution: the concrete prefabricated square pile forming device, including the base 1, and several fixing grooves 2 are opened on the upper side of the base 1, and a cylinder 16 is fixedly installed in each fixing groove 2 , the upper side of the base 1 is fixedly equipped with a riser 15, the upper side of the riser 15 is fixedly installed with a fixed plate 11, the riser 15 is provided with a lower mold box 8, the lower wall of the lower mold box 8 is provided with a chute 14, and the riser 15 It is movably connected with the chute 14, the lower side of the fixed plate 11 is attached to the lower inner wall of the lower mold box 8, and the upper side of the lower mold box 8 is provided with an upper mold box 9. After opening the upper mold box 9, the steel support, etc. can be put into the In the lower mold box 8, after closing the upper mold box 9, concrete can be poured into the upper mold box 9 and the lower mold box 8. After the square pile is formed, the upper mold box 9 can be opened, and then the lower mold box 8 can be knocked downwards. After the lower mold box 8 moves downward to expose the square piles, it is convenient for the user to remove the lower piles. After taking the lower piles, the lower mold box 8 can be driven upward by the cylinder 16 to carry out the lower side pouring, which can facilitate the user to take out the square piles from the mold. Pile, so as to improve the work efficiency of the staff, the lower side of the lower mold box 8 is provided with a number of card slots a7, each card slot a7 is movably connected with a support plate 6, and the upper side of the base 1 is provided with a card slot b4, Each support plate 6 is movably connected with each draw-in groove b4 respectively, and each support plate 6 is provided with a finger groove 5, and the upper end of the vertical groove shaft of each cylinder 16 is fixedly equipped with a circular plate 3, and the upper side of the fixed plate 11 Two sets of fixing blocks 10 are fixedly installed, and each fixing block 10 is fixedly installed with a fixing column 17 on the upper side, and the two sets of fixing blocks 10 are respectively attached to the front and rear inner walls of the lower mold box 8, and the lower side of the fixing plate 11 is provided with a frame-shaped groove 12. A fixed frame 13 is movably connected in the frame-shaped groove 12, and the fixed frame 13 is fixedly connected with the lower inner wall of the lower mold box 8. After the lower mold box 8 is moved upward by the cylinder 16 and the lower side is poured, each card slot a7 Insert the support plate 6 into each slot b4, so that the output shaft of the cylinder 16 can shrink downward, so as to avoid the damage caused by the excessive load caused by the cylinder 16 supporting the lower mold box 8 for a long time, and the circular plate 3 can Improve the supporting surface of the upper end of the output shaft of the cylinder 16, through the fixed block 10 and the fixed column 17, there are several notches after the square pile is poured, so that the square pile can be lifted by inserting a tool such as a hook into the notch after the square pile is tilted cutting.
通过打开上模箱9后就可以将钢筋支架等放入下模箱8内,然后合上上模箱9后就可以向上模箱9与下模箱8内注入混凝土,当方桩成型后就可以打开上模箱9,然后向下敲打下模箱8,当下模箱8向下移动露出方桩后,就可以方便用户进行取下方桩,取下方桩后可以通过气缸16带动下模箱8向上移动进行下侧浇筑,这样可以方便用户从模具中取出方桩,从而可以提高工作人员的工作效率,通过气缸16带动下模箱8向上移动进行下侧浇筑后,可以将每个卡槽a7与每个卡槽b4内插入支撑板6,这样就气缸16的输出轴就可以向下收缩,这样就可以避免气缸16长时间支撑下模箱8导致负荷过高产生损伤,通过圆板3可以提高气缸16的输出轴上端的支撑面,通过固定块10与固定柱17可以在方桩浇筑完成后存在若干个槽口,从而可以倾斜方桩后利用钩子等工具插入槽口内将方桩吊起下料。After opening the upper mold box 9, just can put steel support etc. in the lower mold box 8, then after closing the upper mold box 9, just can inject concrete in the upper mold box 9 and the lower mold box 8, after the square pile is formed, just can Open the upper mold box 9, and then knock down the lower mold box 8. After the lower mold box 8 moves downward to expose the square pile, it is convenient for the user to remove the lower pile. After the lower pile is taken, the lower mold box 8 can be driven upward by the cylinder 16. Move the lower side pouring, so that the user can take out the square pile from the mold conveniently, thereby improving the work efficiency of the staff. After the cylinder 16 drives the lower mold box 8 to move upwards to carry out the lower side pouring, each card slot a7 can be connected with A support plate 6 is inserted into each slot b4, so that the output shaft of the cylinder 16 can shrink downwards, so that the cylinder 16 can be prevented from supporting the lower mold box 8 for a long time and causing damage due to excessive load, and the circular plate 3 can improve The support surface at the upper end of the output shaft of the cylinder 16, through the fixed block 10 and the fixed column 17, there are several notches after the square pile is poured, so that after the square pile can be tilted, tools such as hooks can be inserted into the notch to lift the square pile. material.
在使用时,第一步:通过打开上模箱9后就可以将钢筋支架等放入下模箱8内,然后合上上模箱9后就可以向上模箱9与下模箱8内注入混凝土,当方桩成型后就可以打开上模箱9,然后向下敲打下模箱8,当下模箱8向下移动露出方桩后,就可以方便用户进行取下方桩,取下方桩后可以通过气缸16带动下模箱8向上移动进行下侧浇筑,这样可以方便用户从模具中取出方桩,从而可以提高工作人员的工作效率。When in use, the first step: after opening the upper mold box 9, the steel support can be put into the lower mold box 8, and then the upper mold box 9 and the lower mold box 8 can be injected after closing the upper mold box 9 Concrete, when the square pile is formed, the upper mold box 9 can be opened, and then the lower mold box 8 can be knocked downwards. After the lower mold box 8 moves downward to expose the square pile, it is convenient for the user to remove the lower pile. Cylinder 16 drives lower mold case 8 to move upwards and carry out downside pouring, can make things convenient for the user to take out square pile from mold like this, thereby can improve the working efficiency of the staff.
第二步:通过气缸16带动下模箱8向上移动进行下侧浇筑后,可以将每个卡槽a7与每个卡槽b4内插入支撑板6,这样就气缸16的输出轴就可以向下收缩,这样就可以避免气缸16长时间支撑下模箱8导致负荷过高产生损伤,通过圆板3可以提高气缸16的输出轴上端的支撑面,通过固定块10与固定柱17可以在方桩浇筑完成后存在若干个槽口,从而可以倾斜方桩后利用钩子等工具插入槽口内将方桩吊起下料。Step 2: After the cylinder 16 drives the lower mold box 8 to move upwards for lower side pouring, each slot a7 and each slot b4 can be inserted into the support plate 6, so that the output shaft of the cylinder 16 can be downward Shrink, so just can avoid that cylinder 16 supports lower formwork box 8 for a long time and causes damage caused by excessive load, can improve the support surface of the output shaft upper end of cylinder 16 through circular plate 3, can be fixed on square pile through fixed block 10 and fixed column 17 There are several notches after the pouring is completed, so that the square pile can be tilted and then tools such as hooks can be inserted into the notch to lift the square pile and unload it.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes and modifications can be made to these embodiments without departing from the principle and spirit of the present invention , replacements and modifications, the scope of the present utility model is defined by the appended claims and their equivalents.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320149264.8U CN219583188U (en) | 2023-02-06 | 2023-02-06 | Concrete prefabricated square pile forming device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320149264.8U CN219583188U (en) | 2023-02-06 | 2023-02-06 | Concrete prefabricated square pile forming device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219583188U true CN219583188U (en) | 2023-08-25 |
Family
ID=87667102
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320149264.8U Active CN219583188U (en) | 2023-02-06 | 2023-02-06 | Concrete prefabricated square pile forming device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219583188U (en) |
-
2023
- 2023-02-06 CN CN202320149264.8U patent/CN219583188U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106869493A (en) | One kind cheats new formwork system and its construction method in hole | |
CN109518960B (en) | Shaping mold capable of realizing turnover of reserved hole of cast-in-situ roof and construction method of shaping mold | |
CN112177025A (en) | Assembled integral reinforced concrete thin-wall tire mold component and construction method thereof | |
CN218170816U (en) | Concrete prestressing force square pile pours mould case | |
CN215969285U (en) | A mold for making concrete fence panels | |
CN219583188U (en) | Concrete prefabricated square pile forming device | |
CN103722613A (en) | Construction method for vertically casting and mounting four-foot hollow block in seawall wave resistance engineering | |
CN201401008Y (en) | Split-type cup core template | |
CN107214819B (en) | Building constructional column shaping moulding box | |
CN207846202U (en) | A kind of double steel cylinder temporary supports for precast beam installation | |
CN218138768U (en) | Portable assembled secondary structure injection mold | |
CN216067959U (en) | Forming device is used in production of assembly type structure wall body | |
CN213709804U (en) | Double-grate gutter inlet modularized aluminum alloy template | |
CN210562189U (en) | GRC cement board brick child mould structure | |
CN112160480A (en) | Assembly type combined box mold # -shaped hollow floor structure and construction method thereof | |
CN208266905U (en) | A kind of simple plate device in rim of a cup basis | |
CN216339635U (en) | Independent foundation slope-laying masonry mold | |
CN221834583U (en) | A spatially adjustable concrete mold | |
CN218522366U (en) | Bearing 2000T wine jar overhauls ditch | |
CN221682481U (en) | Quick dismantlement shear groove pre-buried device | |
CN217144295U (en) | Novel general mould of assembled building | |
CN221662450U (en) | A load-bearing seat for installing lifting equipment | |
CN222222953U (en) | Fully automatic detachable integrated cement house wall mold | |
CN219882773U (en) | Cement experiment piece mould | |
CN219686062U (en) | Quick demoulding device for ballast blocking blocks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |