CN218861995U - Hang wall fossil fragments with wall leveling structure - Google Patents
Hang wall fossil fragments with wall leveling structure Download PDFInfo
- Publication number
- CN218861995U CN218861995U CN202223212746.8U CN202223212746U CN218861995U CN 218861995 U CN218861995 U CN 218861995U CN 202223212746 U CN202223212746 U CN 202223212746U CN 218861995 U CN218861995 U CN 218861995U
- Authority
- CN
- China
- Prior art keywords
- adjusting screw
- fossil fragments
- wall
- fixing bolt
- nut
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to an assembled fitment technical field discloses a hang wall fossil fragments with wall leveling structure, including fossil fragments, the inside of fossil fragments runs through and installs adjusting screw, adjusting screw's surface threaded connection has positioning nut and fixation nut, positioning nut with fixation nut do not be in the both sides of fossil fragments, adjusting screw's medial extremity threaded connection has fixing bolt, fixing bolt's left side cover is equipped with the expansion pipe. Set up adjusting screw, can make level through installing in the positioning nut on adjusting screw surface, then fix fossil fragments through fixation nut to accomplish making level of fossil fragments, and set up the adjustment tank through the outside end at adjusting screw, can also be with adjusting screw in fixing bolt's inside, also can unscrew adjusting screw from fixing bolt's inside, be convenient for dismantle fossil fragments and each subassembly, the secondary of being convenient for uses reduce cost, and the dismouting is easy and simple to handle, easy to carry out.
Description
Technical Field
The utility model relates to an assembled fitment technical field specifically is a hang wall fossil fragments with wall leveling structure.
Background
The traditional wall surface leveling technology for decoration is that materials such as putty and cement mortar are generally used for filling and leveling sunken parts on a wall surface, the wet leveling mode has long construction period and high technical requirements on constructors, and the site construction environment is dirty, messy and poor. With the continuous improvement of the living standard of people and the continuous upgrading of novel materials, structures and processes, people have higher requirements on indoor decoration leveling operation, and the dry construction method for assembly type decoration can overcome the problem which cannot be solved by the traditional wet leveling method.
At present, the common basic level leveling mode is to level the decorative basic level by adopting wood materials such as wood keels and blockboards, however, on one hand, the wood leveling materials are easy to change under the influence of factors such as moisture and environment, and the leveling precision is reduced; on the other hand, the wood base plate needs to be subjected to on-site secondary processing according to actual conditions, so that waste materials and construction waste are easily formed, and the environment of a construction site is influenced; but also generates a great deal of decoration noise and dust pollution. In addition, the subassembly of making level through light gauge steel still realizes making level of wall on the market at present, but the subassembly of making level of light gauge steel mainly is the fossil fragments of making level of groove configuration, directly fixes fossil fragments on the wall through the steel nail, and this kind of mounting means need once install in place, can not realize the secondary and adjust, causes manpower installation cost time long, and the cost is higher, and this kind can't satisfy the wall of all areas.
Chinese patent discloses an assembled wall subassembly of making level, and the grant bulletin number is CN212154047U, and this patent includes locating plate, connecting screw and set screw, and connecting screw is connected integratively with the locating plate, and the last cover of connecting screw is equipped with adjusting nut, is equipped with the location shoulder on the locating plate up end, and connecting screw upper portion is equipped with the connecting hole, and the open slot has been seted up to the connecting screw lower part, and set screw lower extreme extensible to open slot department. This device realizes the three point location of the fossil fragments of making level through the step face and the set screw that the location of locating plate up end formed, and the fossil fragments of being convenient for make level are connected with the locating plate and are firm, avoid secondary control. Meanwhile, the distance between the leveling keel and the wall surface can be adjusted by screwing the adjusting nut, and the leveling of the decorative wall surface is realized. In the installation process, the wall leveling assembly is fixed by driving the lengthened screws of the fixing keels into the wall leveling assembly, so that the connecting screw rods expand at the grooves, and the fixing and firm effect is achieved. Its screw rod also adopts plastics material, this just means if the roughness deviation appears, when needing to adjust the fossil fragments that make level, its original material can not reuse again almost, and the operation can be very complicated moreover, and the theory of "fast-assembling quick detach" with assembled technique is on the contrary.
Accordingly, one skilled in the art has provided a wall-hanging keel having a wall-leveling structure to solve the above-mentioned problems occurring in the background art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a hang wall fossil fragments with wall leveling structure to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a hang wall fossil fragments with wall leveling structure, includes fossil fragments, the inside of fossil fragments is run through and is installed adjusting screw, adjusting screw's surperficial threaded connection has positioning nut and fixation nut, positioning nut with fixation nut do not be in the both sides of fossil fragments, adjusting screw's medial extremity threaded connection has fixing bolt, just adjusting screw's medial extremity extends to fixing bolt's inside, fixing bolt's left side cover is equipped with the expansion pipe, just the expansion pipe is buried underground inside the mounting hole of wall.
As the utility model discloses further scheme again: adjusting screw's surface cover is equipped with first gasket and second gasket, first gasket with the second gasket is located respectively the inside and outside both sides of fossil fragments, just first gasket with the second gasket is located the positioning nut with between the fixation nut.
As a further aspect of the present invention: the adjusting screw is a full-thread stud, an adjusting groove is formed in the outer side end of the adjusting screw, and the adjusting groove is a straight knife edge or a cross knife edge.
As the utility model discloses further scheme again: and the fixing bolt is in threaded connection with the expansion pipe.
Compared with the prior art, the beneficial effects of the utility model are that:
set up adjusting screw, can make level through installing in the positioning nut on adjusting screw surface, then fix fossil fragments through fixation nut, thereby accomplish making level of fossil fragments, and set up the adjustment tank through the outside end at adjusting screw, can be with adjusting screw in fixing bolt's inside, also can unscrew adjusting screw from fixing bolt's inside, be convenient for dismantle fossil fragments and each subassembly, the secondary of being convenient for uses, and the cost is reduced, and the dismouting is easy and simple to handle, easy to carry out, accord with the theory of assembled technique fast-assembling quick detach.
Drawings
Fig. 1 is a schematic front structural view of a wall hanging keel with a wall surface leveling structure;
FIG. 2 is a schematic view of the internal structure of a wall-hanging keel with a wall leveling structure;
fig. 3 is an exploded view of a wall stud with wall leveling structure.
In the figure: 1. a keel; 2. an expansion tube; 3. fixing the bolt; 4. adjusting the screw rod; 5. adjusting the position of the nut; 6. a first gasket; 7. a second gasket; 8. fixing a nut; 9. and (4) adjusting the groove.
Detailed Description
Please refer to fig. 1-3, in the embodiment of the utility model, a hang wall fossil fragments with wall leveling structure, including fossil fragments 1, fossil fragments 1's inside is run through and is installed adjusting screw 4, adjusting screw 4's surface threaded connection has positioning nut 5 and fixation nut 8, positioning nut 5 and fixation nut 8 are respectively in fossil fragments 1's both sides, adjusting screw 4's medial extremity threaded connection has fixing bolt 3, and adjusting screw 4's medial extremity extends to fixing bolt 3's inside, fixing bolt 3's left side cover is equipped with expansion pipe 2, threaded connection between fixing bolt 3 and the expansion pipe 2, and expansion pipe 2 buries underground inside the mounting hole of wall.
Preferably, adjusting screw 4's surface cover is equipped with first gasket 6 and second gasket 7, and first gasket 6 and second gasket 7 are located fossil fragments 1 inside and outside both sides respectively, and just first gasket 6 and second gasket 7 are located between positioning nut 5 and the fixation nut 8 for increase lifting surface area, the edge of avoiding fossil fragments 1 inside hole is receiving positioning nut 5 and 8 extrusion and harms the use that influences fossil fragments 1.
Preferably, the adjusting screw 4 is a full-thread stud, so that the adjusting screw 4 can be mounted inside the fixing bolt 3, the adjusting nut 5 and the fixing nut 8 can be mounted on the other side of the adjusting screw 4, the outer side end of the adjusting screw 4 is provided with an adjusting groove 9, the adjusting groove 9 is a straight knife edge or a cross knife edge, and the adjusting screw 4 can be conveniently screwed into the fixing bolt 3 through a screwdriver.
The utility model discloses a theory of operation is: when the keel 1 is used, the keel 1 needs to be adjusted according to whether the wall is smooth or not, hole grooves are formed in the wall through wall hole forming equipment such as an electric hand drill and the like, the expansion pipe 2 is nailed into the wall surface hole grooves, then the fixing bolt 3 is screwed into the expansion pipe 2, the inner side end of the expansion pipe 2 is expanded, fixing of the expansion pipe 2 and the fixing bolt 3 on the wall is completed, then the adjusting screw 4 is screwed into the fixing bolt 3 through the clamping of a tool bit of a straight screwdriver into the adjusting groove 9, the adjusting screw 4 is screwed into the adjusting nut 5 on the surface of the adjusting screw 4, the first gasket 6, the keel 1 and the second gasket 7 are sequentially sleeved, the fixing nut 8 is screwed in, the position of the adjusting nut 5 on the surface of the adjusting screw 4 is measured according to the level, the position of the adjusting nut 5 on the surface of the level ruler or the level gauge and the like, the position of the adjusting nut 5 is adjusted and fixed, the position of the fixing nut 8 is adjusted, the fixing nut 8 and the adjusting screw 4 can extrude and fix the first gasket 6, the second gasket 7, and the keel is fixed, and the keel is fastened and accordingly the keel 1 is operated.
The above-mentioned, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (4)
1. The utility model provides a hang wall fossil fragments with wall leveling structure, includes fossil fragments (1), its characterized in that: the inside of fossil fragments (1) runs through and installs adjusting screw (4), the surperficial threaded connection of adjusting screw (4) has positioning nut (5) and fixation nut (8), positioning nut (5) with fixation nut (8) do not be in the both sides of fossil fragments (1), the medial extremity threaded connection of adjusting screw (4) has fixing bolt (3), just the medial extremity of adjusting screw (4) extends to the inside of fixing bolt (3), the left side cover of fixing bolt (3) is equipped with expansion pipe (2), just expansion pipe (2) are buried underground inside the mounting hole of wall.
2. The wall-hung keel with the wall leveling structure as claimed in claim 1, is characterized in that: the surface cover of adjusting screw (4) is equipped with first gasket (6) and second gasket (7), first gasket (6) with second gasket (7) are located respectively fossil fragments (1) inside and outside both sides, just first gasket (6) with second gasket (7) are located positioning nut (5) with between fixation nut (8).
3. The wall-hung keel with the wall leveling structure as claimed in claim 1, is characterized in that: the adjusting screw rod (4) is a full-thread stud, an adjusting groove (9) is formed in the outer side end of the adjusting screw rod (4), and the adjusting groove (9) is a straight knife edge or a cross knife edge.
4. The wall-hung keel with the wall leveling structure as claimed in claim 1, is characterized in that: the fixing bolt (3) is in threaded connection with the expansion pipe (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223212746.8U CN218861995U (en) | 2022-12-02 | 2022-12-02 | Hang wall fossil fragments with wall leveling structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223212746.8U CN218861995U (en) | 2022-12-02 | 2022-12-02 | Hang wall fossil fragments with wall leveling structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218861995U true CN218861995U (en) | 2023-04-14 |
Family
ID=87367671
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202223212746.8U Active CN218861995U (en) | 2022-12-02 | 2022-12-02 | Hang wall fossil fragments with wall leveling structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218861995U (en) |
-
2022
- 2022-12-02 CN CN202223212746.8U patent/CN218861995U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101363244A (en) | Inner wall board system and mounting method thereof | |
CN100570099C (en) | A kind of building plastering leveling method and construction wall thereof | |
CN104018650B (en) | Wall plastering plane rushes muscle bar and using method thereof | |
CN218861995U (en) | Hang wall fossil fragments with wall leveling structure | |
CN211396423U (en) | Leveling structure | |
CN212224513U (en) | Assembled fitment wall top surface T type levelling device | |
CN107965124A (en) | A kind of adjustable resin connector and its construction method | |
CN110607888A (en) | Wall keel wall surface connecting and leveling device for ceramic tile concrete integrated plate | |
CN214834238U (en) | Stone-plastic or wood-plastic assembled simple leveling integrated wallboard | |
CN217326243U (en) | Wall leveling structure | |
CN215670752U (en) | Wallboard installation kit free of detachable bottom plate | |
CN216587494U (en) | Keel mounting system for decorative wallboard | |
CN217711505U (en) | Accurate installation leveling structure of wall | |
CN209509407U (en) | The snap-type steel skirting of bright bolt decoration | |
CN104612358B (en) | A kind of hanging method of wall decoration building materials | |
CN112211296B (en) | Assembling and connecting method of ALC (autoclaved lightweight concrete) plate and curtain wall | |
CN210798218U (en) | Exterior wall cladding installation appurtenance | |
CN211172857U (en) | Wall keel wall surface connecting and leveling device for ceramic tile concrete integrated plate | |
CN210217179U (en) | Exposed Bolted Steel Baseboards | |
CN219386974U (en) | Keel mounting structure of wallboard assembly type | |
CN218990787U (en) | Assembled composite gypsum line structure | |
CN113530135A (en) | A baseboard-free and detachable wall panel installation kit and installation method | |
CN211172850U (en) | Keel assembly with leveling device | |
CN217704080U (en) | Adjustable interval of wall positioning tool that punches | |
CN214834326U (en) | Integrated wallboard is decorated to simple and easy leveling of assembled |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 242000 Cai Jia Qiao Zhen Gao Xi Cun, Jingde County, Xuancheng City, Anhui Province Patentee after: Kezhu Assembly Technology (Anhui) Co.,Ltd. Country or region after: China Address before: 242600 Gaoxi Village, Caijiaqiao Town, Jingde County, Xuancheng City, Anhui Province Patentee before: Anhui Kexun New Material Co.,Ltd. Country or region before: China |
|
CP03 | Change of name, title or address |