[go: up one dir, main page]

CN218668695U - A wooden formwork early demolition independent support reinforcement system - Google Patents

A wooden formwork early demolition independent support reinforcement system Download PDF

Info

Publication number
CN218668695U
CN218668695U CN202120516071.2U CN202120516071U CN218668695U CN 218668695 U CN218668695 U CN 218668695U CN 202120516071 U CN202120516071 U CN 202120516071U CN 218668695 U CN218668695 U CN 218668695U
Authority
CN
China
Prior art keywords
seamless steel
independent support
steel pipe
formwork
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120516071.2U
Other languages
Chinese (zh)
Inventor
楼成龙
王斌
吴叶杨
潘先旭
刘云琼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN202120516071.2U priority Critical patent/CN218668695U/en
Application granted granted Critical
Publication of CN218668695U publication Critical patent/CN218668695U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

一种木模早拆独立支撑加固体系,包括独立支撑、设在独立支撑上方的模板条,独立支撑上设双拼方管,模板条设在双拼方管上,独立支撑包括无缝钢管、可调节杆件、支撑垫板,无缝钢管包括两组,可调节杆件设置在两组无缝钢管之间,支撑垫板设在无缝钢管底部,解决现有技术中拆模时间过长,不利于模板的周转,导致模板积压严重的问题。

Figure 202120516071

An independent support and reinforcement system for early demolition of wooden formwork, including independent support, formwork strips arranged above the independent support, double square pipes are arranged on the independent support, formwork strips are arranged on the double square pipes, the independent support includes seamless steel pipes, Adjustable rods, support pads, seamless steel pipes include two groups, the adjustable rods are set between the two sets of seamless steel pipes, and the support pads are set at the bottom of the seamless steel pipes, which solves the problem that the demolition time is too long in the prior art , It is not conducive to the turnover of templates, resulting in a serious backlog of templates.

Figure 202120516071

Description

一种木模早拆独立支撑加固体系A wooden formwork early demolition independent support reinforcement system

技术领域technical field

本实用新型涉及建筑工具领域,具体涉及一种木模早拆独立支撑加固体系。The utility model relates to the field of construction tools, in particular to an independent support and reinforcement system for early demolition of wooden formwork.

背景技术Background technique

木模支撑体系通常做法:采用扣件式钢管脚手架或轮扣式脚手架或盘扣式脚手架作为模板支撑架,模板拆除的时间需根据混凝土抗压强度报告值决定。通常梁、板跨度≤8m,模板拆除需待混凝土强度达到设计值的75%方可进行,混凝土浇筑完成通常养护7天可达到相应拆模强度;梁、板跨度>8m,模板拆除需待混凝土强度达到设计值的100%方可进行,混凝土浇筑完成通常养护30天甚至更久方可达到相应的拆模强度。The usual method of wood formwork support system: use fastener-type steel pipe scaffolding, wheel-buckle scaffolding or coil-buckle scaffolding as the formwork support frame, and the time for formwork removal should be determined according to the reported value of the concrete compressive strength. Usually the span of beams and slabs is ≤8m, and the removal of the formwork needs to be carried out after the concrete strength reaches 75% of the design value. After the concrete pouring is completed, the corresponding formwork removal strength can be reached after 7 days of curing; the span of beams and slabs is greater than 8m, and the removal of the formwork needs to be done after the concrete The strength can only be carried out when the strength reaches 100% of the design value. After the concrete pouring is completed, it usually takes 30 days or more to maintain the corresponding formwork removal strength.

现有技术的客观缺点:The objective shortcoming of prior art:

(1)拆模时间过长,不利于模板的周转,在地下室结构施工过程中尤为突显,周转率极低,导致模板浪费严重,模板材料成本投入过大。(1) The form removal time is too long, which is not conducive to the turnover of the formwork, especially in the construction process of the basement structure. The turnover rate is extremely low, resulting in serious waste of formwork and excessive investment in formwork materials.

(2)拆模时间过长,导致模板积压严重,无法及时拆除并周转用于其他施工区域,造成二次搬运非常困难,不仅增加人工费的投入,而且文明施工的成本也随之增加。(2) The form removal time is too long, resulting in a serious backlog of formwork, which cannot be removed in time and used in other construction areas, making secondary handling very difficult, which not only increases labor costs, but also increases the cost of civilized construction.

实用新型内容Utility model content

本实用新型目的是提供一种木模早拆独立支撑加固体系,解决现有技术中拆模时间过长,不利于模板的周转,导致模板积压严重的问题。The purpose of the utility model is to provide an independent support and reinforcement system for early demolition of wooden formwork, which solves the problem in the prior art that the formwork removal time is too long, which is not conducive to the turnover of formwork, resulting in a serious backlog of formwork.

为实现上述目的,本实用新型采用以下技术方案:To achieve the above object, the utility model adopts the following technical solutions:

一种木模早拆独立支撑加固体系,包括独立支撑、设在独立支撑上方的模板条,其特征在于,所述独立支撑上设双拼方管,模板条设在双拼方管上,独立支撑包括无缝钢管、可调节杆件、支撑垫板,无缝钢管包括两组,所述可调节杆件设置在两组无缝钢管之间,支撑垫板设在无缝钢管底部。An independent support and reinforcement system for early demolition of wooden formwork, comprising an independent support and formwork strips arranged above the independent support, characterized in that the independent support is provided with double square pipes, and the formwork strips are arranged on the double square pipes, independently The support includes seamless steel pipes, adjustable rods, and supporting pads. The seamless steel pipes include two groups. The adjustable rods are arranged between the two groups of seamless steel pipes, and the supporting pads are arranged at the bottom of the seamless steel pipes.

进一步的,无缝钢管包括上端无缝钢管、下端无缝钢管,所述支撑垫板设在下端无缝钢管底部。可调节杆件设置在上端无缝钢管和下端无缝钢管之间,便于调节独立支撑的高度。Further, the seamless steel pipe includes an upper seamless steel pipe and a lower seamless steel pipe, and the support plate is arranged at the bottom of the lower seamless steel pipe. The adjustable rod is arranged between the seamless steel pipe at the upper end and the seamless steel pipe at the lower end, so as to facilitate the adjustment of the height of the independent support.

进一步的,上端无缝钢管底部设正螺母。Further, a nut is set at the bottom of the seamless steel pipe at the upper end.

进一步的,下端无缝钢管上部设反螺母。Further, anti-nuts are arranged on the upper part of the seamless steel pipe at the lower end.

进一步的,所述可调节杆件包括丝杆、旋转杆件,所述旋转杆件套接在丝杆上。Further, the adjustable rod includes a screw and a rotating rod, and the rotating rod is sleeved on the screw.

进一步的,上端无缝钢管通过正螺母套接在丝杆上端,下端无缝钢管通过反螺母套接在丝杆下端。Further, the upper seamless steel pipe is socketed on the upper end of the screw rod through the positive nut, and the lower seamless steel pipe is socketed on the lower end of the screw rod through the reverse nut.

通过转动旋转杆件带动丝杆的转动,丝杆上的螺纹与正螺母内的螺纹以及反螺母内的螺纹相匹配,正螺母以及反螺母旋向相反,在丝杆转动的时候,带动上端无缝钢管以及下端无缝钢管同时靠近或者同时远离,起到调节独立支撑的高度的作用。By turning the rotating rod to drive the rotation of the screw, the thread on the screw matches the thread in the positive nut and the thread in the negative nut. The positive nut and the negative nut rotate in opposite directions. When the screw rotates, it drives the upper end without The seam steel pipe and the seamless steel pipe at the lower end are close to or far away from each other at the same time, so as to adjust the height of the independent support.

进一步的,所述上端无缝钢管顶部设U型托板,所述双拼方管设在U型托板内,防侧移滑脱。Further, a U-shaped supporting plate is arranged on the top of the seamless steel pipe at the upper end, and the double-jointed square pipe is arranged in the U-shaped supporting plate to prevent sideways slippage.

本实用新型相对于现有技术,具有以下有益效果:Compared with the prior art, the utility model has the following beneficial effects:

1、木模早拆独立支撑杆件为自制杆件,安装便捷,并可通过可调节杆件调节杆件高度,适用于不同层高的要求,通用性、实用性强。1. The early dismantling of the wooden formwork and the independent support rods are self-made rods, which are easy to install, and the height of the rods can be adjusted through adjustable rods, which are suitable for different storey height requirements, and have strong versatility and practicability.

2、在常规支模架的基础上,增加木模早拆独立支撑体系,可实现提前进行除木模早拆独立支撑体系以外区域的拆模作业,大大提高模板的周转率,大大降低模板的损耗率,减少文明施工的投入。2. On the basis of the conventional formwork frame, the independent support system for the early demolition of the wooden formwork is added, which can realize the demolition work in areas other than the independent support system for the early demolition of the wooden formwork in advance, greatly improving the turnover rate of the formwork and greatly reducing the cost of the formwork. Reduce the loss rate and reduce the investment in civilized construction.

3、通过增加木模早拆独立支撑加固体系,形成独立的受力支撑构件,可将梁、板原设计跨度缩减并控制在2米范围内,实现楼板模板提前拆除并周转使用。3. By adding an independent support and reinforcement system for early demolition of wooden formwork, an independent force-bearing support member can be formed, the original design span of beams and slabs can be reduced and controlled within 2 meters, and the floor formwork can be removed in advance and used in turnover.

附图说明Description of drawings

图1为本实用新型结构示意图。Fig. 1 is the structural representation of the utility model.

图2为本实用新型独立支撑结构图。Fig. 2 is an independent support structure diagram of the utility model.

图3为本实用新型可调节杆件结构图。Fig. 3 is a structural diagram of the adjustable rod of the utility model.

图中所示:1、模板条 2、双拼方管 3、独立支撑 4、可调节杆件 5、支撑垫板6、U型托板 7、无缝钢管 71、上端无缝钢管 72、下端无缝钢管 8、正螺母 9、反螺母10、丝杆 11、旋转杆件。As shown in the figure: 1. Formwork strip 2, double square tube 3, independent support 4, adjustable rod 5, support plate 6, U-shaped support plate 7, seamless steel pipe 71, upper seamless steel pipe 72, lower end Seamless steel pipe 8, positive nut 9, reverse nut 10, screw mandrel 11, rotating rod.

具体实施方式Detailed ways

下面结合附图1-3对本实用新型作进一步描述。Below in conjunction with accompanying drawing 1-3 the utility model is described further.

一种木模早拆独立支撑加固体系,包括独立支撑3、设在独立支撑3上方的模板条1,所述独立支撑3上设双拼方管2,模板条1设在双拼方管2上,具体的,独立支撑3包括无缝钢管7、可调节杆件4、支撑垫板5。An independent support and reinforcement system for early demolition of wooden formwork, comprising an independent support 3, a formwork bar 1 arranged above the independent support 3, a double square pipe 2 is arranged on the independent support 3, and the formwork strip 1 is arranged on the double square pipe 2 Specifically, the independent support 3 includes a seamless steel pipe 7 , an adjustable rod 4 , and a support pad 5 .

所述无缝钢管7包括两组,无缝钢管7包括上端无缝钢管71、下端无缝钢管72,所述可调节杆4设置在上端无缝钢管71和下端无缝钢管72之间,具体的,上端无缝钢管71底部设正螺母8。下端无缝钢管72上部设反螺母9。所述可调节杆件4包括丝杆10、旋转杆件11,所述旋转杆件11套接在丝杆10上。上端无缝钢管71通过正螺母8套接在丝杆10上端,下端无缝钢管72通过反螺母9套接在丝杆10下端。便于调节独立支撑3的高度,支撑垫板设下端无缝钢管72底部。The seamless steel pipe 7 includes two groups, the seamless steel pipe 7 includes an upper seamless steel pipe 71 and a lower seamless steel pipe 72, and the adjustable rod 4 is arranged between the upper seamless steel pipe 71 and the lower seamless steel pipe 72, specifically Yes, the bottom of the seamless steel pipe 71 at the upper end is provided with a positive nut 8. Anti-nut 9 is established on the bottom seamless steel pipe 72 tops. The adjustable rod 4 includes a screw 10 and a rotating rod 11 , and the rotating rod 11 is sleeved on the screw 10 . The upper seamless steel pipe 71 is sleeved on the upper end of the screw mandrel 10 through the positive nut 8 , and the lower end seamless steel tube 72 is sleeved on the lower end of the screw mandrel 10 through the reverse nut 9 . It is convenient to adjust the height of the independent support 3, and the bottom of the lower end seamless steel pipe 72 is established on the backing plate.

通过转动旋转杆件11带动丝杆10的转动,丝杆10上的螺纹与正螺母8内的螺纹以及反螺母9内的螺纹相匹配,正螺母8以及反螺母9旋向相反,在丝杆10转动的时候,带动上端无缝钢管71以及下端无缝钢管72同时靠近或者同时远离,起到调节独立支撑3的高度的作用。具体工作原理:依照本实用新型的技术设计做出产品之后,使用模板条1抵住浇筑未固定的混凝土,根据实际的施工浇筑高度,依靠可调节杆件4调节独立支撑3的高度,等到混凝土强度达到要求在进行拆卸收集,以备下次使用,具体的步骤过程如下:By turning the rotating rod 11 to drive the rotation of the screw 10, the thread on the screw 10 matches the thread in the positive nut 8 and the thread in the reverse nut 9, and the positive nut 8 and the reverse nut 9 rotate in the opposite direction. When 10 rotates, the seamless steel pipe 71 at the upper end and the seamless steel pipe 72 at the lower end are driven to approach or move away from at the same time, so as to adjust the height of the independent support 3 . Specific working principle: after making the product according to the technical design of the present utility model, use the formwork bar 1 to hold against pouring unfixed concrete, according to the actual construction pouring height, rely on the adjustable rod 4 to adjust the height of the independent support 3, and wait until the concrete When the strength meets the requirements, it is disassembled and collected for the next use. The specific steps are as follows:

步骤一:施工前利用CAD提前对独立支撑杆件位置进行合理排布,对楼板模板铺设尺寸及方向进行合理排布。Step 1: Before construction, use CAD to reasonably arrange the position of independent support members in advance, and arrange the laying size and direction of floor formwork reasonably.

步骤二:施工时根据深化设计图纸按常规脚手架施工过程搭设模板支撑架,支模架搭设过程中,应及时将独立支撑杆件依据排布图临时搁置在相应的支模架格子内,便于后续安装。Step 2: During construction, according to the detailed design drawings, set up the formwork support frame according to the conventional scaffolding construction process. During the erection process of the formwork frame, the independent support rods should be temporarily placed in the corresponding formwork frame grid according to the layout diagram, so as to facilitate the follow-up Install.

步骤三:按照常规模板工程安装顶板主、次龙骨,并依据独立支撑杆件排布图在对应位置安装双拼方管,双拼方管搁置在主龙骨上。Step 3: Install the main and secondary keels of the roof according to the conventional formwork engineering, and install the double square tubes at the corresponding positions according to the layout of the independent support rods, and the double square tubes are placed on the main keel.

步骤四:根据楼板模板排布图铺设模板以及独立支撑杆件位置对应的模板条。Step 4: Lay formwork and formwork strips corresponding to the positions of independent support members according to the floor formwork layout.

步骤五:安装独立支撑杆件,通过可调节杆件调节独立支撑杆件高度并设于双拼方管下方。Step 5: Install the independent support rod, adjust the height of the independent support rod through the adjustable rod and set it under the double square tube.

步骤六:独立支撑杆件安装完毕,检查验收合格后即可按常规绑扎钢筋、浇筑混凝土。Step 6: After the installation of the independent supporting rods is completed, the steel bars can be bound and the concrete poured according to the routine after the inspection and acceptance.

步骤七:楼板混凝土强度达到设计值的50%,即可进行除独立支撑加固体系以外支模区域的拆模作业,独立支撑加固体系需待混凝土强度达到设计值的100%方可进行拆除作业。Step 7: When the concrete strength of the floor slab reaches 50% of the design value, the formwork removal operation can be carried out in the formwork area except for the independent support and reinforcement system. The independent support and reinforcement system cannot be demolished until the concrete strength reaches 100% of the design value.

以上所述仅为本实用新型的优选实施例而已,所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,术语“设置”、“安装”、“连接”、“固定”等术语应做广义理解,对于本领域的技术人员来说,本实用新型可以有各种更改和变化。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above is only a preferred embodiment of the present utility model, and the orientation or positional relationship shown is only for the convenience of describing the present utility model and simplifying the description, and the terms "setting", "installing", "connecting" and "fixing" Such terms should be understood in a broad sense. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.

Claims (7)

1.一种木模早拆独立支撑加固体系,包括独立支撑、设在独立支撑上方的模板条,其特征在于,所述独立支撑上设双拼方管,模板条设在双拼方管上,独立支撑包括无缝钢管、可调节杆件、支撑垫板,无缝钢管包括两组,所述可调节杆件设置在两组无缝钢管之间,支撑垫板设在无缝钢管底部。1. A wooden formwork early demolition independent support reinforcement system, including independent support, formwork strips located on the top of the independent support, is characterized in that, the described independent support is provided with double square pipes, and the formwork strips are arranged on the double square pipes The independent support includes seamless steel pipes, adjustable rods, and support pads, the seamless steel pipes include two groups, the adjustable rods are arranged between the two groups of seamless steel pipes, and the support pads are arranged at the bottom of the seamless steel pipes. 2.如权利要求1所述的一种木模早拆独立支撑加固体系,其特征在于,无缝钢管包括上端无缝钢管、下端无缝钢管,所述支撑垫板设在下端无缝钢管底部。2. A kind of wooden formwork as claimed in claim 1 dismantles the independent support reinforcement system early, it is characterized in that, seamless steel pipe comprises upper end seamless steel pipe, lower end seamless steel pipe, and described support backing plate is located at the bottom of lower end seamless steel pipe . 3.如权利要求2所述的一种木模早拆独立支撑加固体系,其特征在于,上端无缝钢管底部设正螺母。3. A kind of wooden formwork as claimed in claim 2 is dismantled and independently supported and strengthened system, it is characterized in that, the bottom of the seamless steel pipe at the upper end is provided with positive nuts. 4.如权利要求3所述的一种木模早拆独立支撑加固体系,其特征在于,下端无缝钢管上部设反螺母。4. A wooden formwork early dismantled independent support reinforcement system as claimed in claim 3, characterized in that the upper part of the seamless steel pipe at the lower end is provided with anti-nuts. 5.如权利要求4所述的一种木模早拆独立支撑加固体系,其特征在于,所述可调节杆件包括丝杆、旋转杆件,所述旋转杆件套接在丝杆上。5. An independent support and reinforcement system for early dismantling of wooden formwork according to claim 4, wherein the adjustable rod includes a screw and a rotating rod, and the rotating rod is sleeved on the screw. 6.如权利要求5所述的一种木模早拆独立支撑加固体系,其特征在于,上端无缝钢管通过正螺母套接在丝杆上端,下端无缝钢管通过反螺母套接在丝杆下端。6. A wooden formwork early dismantling independent support and reinforcement system as claimed in claim 5, characterized in that the upper end seamless steel pipe is socketed on the upper end of the screw rod through a positive nut, and the lower end seamless steel pipe is socketed on the screw rod through a reverse nut lower end. 7.如权利要求2所述的一种木模早拆独立支撑加固体系,其特征在于,所述上端无缝钢管顶部设U型托板,所述双拼方管设在U型托板内。7. A wooden formwork early dismantling independent support and reinforcement system as claimed in claim 2, characterized in that a U-shaped pallet is arranged on the top of the seamless steel pipe at the upper end, and the double square tube is arranged in the U-shaped pallet .
CN202120516071.2U 2021-03-12 2021-03-12 A wooden formwork early demolition independent support reinforcement system Expired - Fee Related CN218668695U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120516071.2U CN218668695U (en) 2021-03-12 2021-03-12 A wooden formwork early demolition independent support reinforcement system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120516071.2U CN218668695U (en) 2021-03-12 2021-03-12 A wooden formwork early demolition independent support reinforcement system

Publications (1)

Publication Number Publication Date
CN218668695U true CN218668695U (en) 2023-03-21

Family

ID=85535124

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120516071.2U Expired - Fee Related CN218668695U (en) 2021-03-12 2021-03-12 A wooden formwork early demolition independent support reinforcement system

Country Status (1)

Country Link
CN (1) CN218668695U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112900922A (en) * 2021-03-12 2021-06-04 中天建设集团有限公司 Wood formwork early-dismantling independent support reinforcing system and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112900922A (en) * 2021-03-12 2021-06-04 中天建设集团有限公司 Wood formwork early-dismantling independent support reinforcing system and construction method thereof

Similar Documents

Publication Publication Date Title
CN204492168U (en) A kind of quick detach supporting member of early-dismantling formwork system
CN105735625B (en) A kind of side form support system for floor construction
CN215717187U (en) Adjustable independent steel pipe in post-cast strip supports construction tool
CN218668695U (en) A wooden formwork early demolition independent support reinforcement system
CN207048310U (en) A kind of alter-pouring strips mould plate support system
CN110593477A (en) A Construction Method of Cast-in-situ Reinforced Concrete Special-shaped Inclined Slab
CN110158949A (en) Early-dismantling system for support and matched aluminum mold and construction method thereof
CN110017141A (en) A kind of ultra-deep shaft concrete ring grid beam quick template supporting system and its construction method
CN206625553U (en) For pouring the formwork bracing system of high-low bay structure simultaneously
CN206418523U (en) A kind of liftable post-cast strip template structure and system
CN219080981U (en) Non-support fixing device for post-pouring strip of superimposed sheet
CN215907403U (en) Fine adjustment tool for supporting large steel formwork
CN210025768U (en) A operation platform system for caisson template installation
CN116290581A (en) A temporary support tool for column skeleton reinforcement and its application method
CN104018655B (en) A kind of assembly type monomer bracing frame
CN207863463U (en) A kind of fast disassembly type corbel for shuttering supporting
CN112900922A (en) Wood formwork early-dismantling independent support reinforcing system and construction method thereof
CN215291408U (en) A composite building aluminum formwork and wheel buckle frame combined formwork support structure
CN202108296U (en) Assembled segmental water tank tower
CN210828346U (en) Anti-bank reinforcing apparatus
CN209760607U (en) steel bar lapping connector
CN208105049U (en) A kind of carrier setting bolt hole precision positioning model
CN113266150A (en) Tool for realizing dismantling bottom die of beam slab in advance
CN210483024U (en) Be used for reinforced (rfd) scalable reinforcement ware of local concrete placement template
CN211058303U (en) Early-dismantling formwork structure of flat slab

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230321

CF01 Termination of patent right due to non-payment of annual fee