CN218291459U - Combined ground rail for workshop - Google Patents
Combined ground rail for workshop Download PDFInfo
- Publication number
- CN218291459U CN218291459U CN202222196191.6U CN202222196191U CN218291459U CN 218291459 U CN218291459 U CN 218291459U CN 202222196191 U CN202222196191 U CN 202222196191U CN 218291459 U CN218291459 U CN 218291459U
- Authority
- CN
- China
- Prior art keywords
- track
- groove
- fixture block
- draw
- gomphosis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 abstract description 12
- 238000000034 method Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
Images
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses a combination formula ground track that workshop was used, including first track and second track, the connecting plate is all installed to first track and second track one end, the equal fixed mounting in connecting plate top has first fixture block, first track and second track other end bottom all set up flutedly, the inside second draw-in groove of having seted up of recess, first fixture block gomphosis is installed inside the second draw-in groove, first draw-in groove has been seted up to first track and the equal symmetry of second track outer wall, the spill fixture block is installed to the inside gomphosis of first draw-in groove, installs the connecting plate gomphosis inside the recess, installs the second draw-in groove inside with first fixture block gomphosis simultaneously, then installs the first draw-in groove that the track outer wall set up inside with the both ends gomphosis of spill fixture block, so not only can increase the stability of connecting between the track, can also avoid the track to take place crooked condition when the installation simultaneously, and the mounting means is comparatively simple, has promoted the installation effectiveness effectively.
Description
Technical Field
The utility model relates to the technical field of the track, specifically be a combination formula ground track that workshop was used.
Background
The existing ground tracks are generally laid one section by one section in the actual use process, and the existing ground tracks cannot be effectively connected in the laying process, so that the tracks are inclined, and meanwhile, the combination is troublesome, and meanwhile, the connection is not firm.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a combination formula ground track that workshop was used has solved current ground track and can not connect effectively at the in-process of laying, will lead to orbital crooked like this, and it is comparatively troublesome when the combination simultaneously, has the problem of connecting the insecure condition simultaneously.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a combination formula ground track that workshop was used, includes first track and second track, the connecting plate is all installed to first track and second track one end, the equal fixed mounting in connecting plate top has first fixture block, first track and second track other end bottom all set up flutedly, the inside second draw-in groove of having seted up of recess, first fixture block gomphosis is installed inside the second draw-in groove.
Preferably, first clamping grooves are symmetrically formed in the outer walls of the first rail and the second rail, and concave clamping blocks are installed in the first clamping grooves in an embedded mode.
Preferably, the outer walls of the two sides of the first track and the second track are welded with positioning plates, the positioning plates are transversely distributed on the two sides of the first track and the two sides of the second track, three positioning plates are arranged on one sides of the first track and the second track, and the positioning plates are in threaded connection with fixing bolts.
Preferably, the first track and the second track are symmetrically laid on the ground, and mounting grooves are formed in the outer wall of one side of each of the first track and the second track.
Preferably, a connecting rod is installed between the first rails, second clamping blocks are fixedly installed at two ends of the connecting rod, and the second clamping blocks are installed inside the installation grooves in an embedded mode.
(III) advantageous effects
The utility model provides a combination formula ground track that workshop was used. The method has the following beneficial effects:
this combination formula ground track, through the connecting plate, first fixture block, first draw-in groove, the spill fixture block, a groove, and the setting of second draw-in groove has solved traditional ground track effectively and can not connect effectively at the in-process of laying, will lead to orbital skew like this, it is comparatively troublesome when the combination simultaneously, there is the condition of connecting insecurely simultaneously, the one end orientation that installs connecting plate and first fixture block with track one end when the installation is fluted and the one end of second draw-in groove, with the connecting plate gomphosis inside the recess, install inside the second draw-in groove with first fixture block gomphosis simultaneously, then install the first draw-in groove that the track outer wall set up with the both ends gomphosis of spill fixture block inside, so not only can increase the stability of connecting between the track, can also avoid the track to take place crooked condition when the installation simultaneously, the mounting means is comparatively simple, and effectively improved the installation effectiveness.
Drawings
Fig. 1 is a schematic overall structure diagram of the present invention;
FIG. 2 is a schematic view of the bottom structure of the first rail of the present invention;
FIG. 3 is an enlarged view of FIG. 2A according to the present invention;
fig. 4 is a schematic view of the structure of the connecting rod of the present invention.
In the figure, 1, a first track; 2. a connecting plate; 3. a first clamping block; 4. a first card slot; 5. a connecting rod; 6. a second track; 7. a concave fixture block; 8. a groove; 9. a second card slot; 10. positioning a plate; 11. fixing the bolt; 12. mounting grooves; 13. and a second clamping block.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, an embodiment of the present invention provides a technical solution: the utility model provides a combination formula ground track that workshop was used, includes first track 1 and second track 6, connecting plate 2 is all installed to first track 1 and 6 one ends of second track, the equal fixed mounting in 2 tops of connecting plate has first fixture block 3, first track 1 and the 6 other end bottoms of second track all set up fluted 8, second draw-in groove 9 has been seted up to recess 8 inside, the gomphosis of first fixture block 3 is installed inside second draw-in groove 9, and recess 8 sets up the setting that has made things convenient for second draw-in groove 9, and setting up of second draw-in groove 9 has made things convenient for the installation and the fixing of first fixture block 3 simultaneously, can increase the stability of connecting between the track like this.
First draw-in groove 4 has all been seted up to first track 1 and the equal symmetry of second track 6 outer wall, concave fixture block 7 is installed to the inside gomphosis of first draw-in groove 4, and concave fixture block 7 set up can play a fixed and spacing effect to first track 1 and second track 6, takes place crooked condition when avoiding installing.
Locating plate 10 has all been welded to first track 1 and the 6 both sides outer wall of second track, locating plate 10 transverse distribution is in first track 1 and the 6 both sides of second track, first track 1 and 6 one side of second track all are equipped with three locating plate 10, the equal threaded connection fixing bolt 11 of locating plate 10, locating plate 10 and fixing bolt 11 set up and can play a fixed effect to the track, and the track installation can avoid taking place crooked condition when subaerial like this.
Install connecting rod 5 between the first track 1, the equal fixed mounting in connecting rod 5 both ends has second fixture block 13, inside second fixture block 13 gomphosis was installed at mounting groove 12, connecting rod 5 set up can play a limited effect to the distance between the track, the condition that the width differs when can avoiding the track installation like this.
The working principle is as follows: during installation, the one end of installing connecting plate 2 and first fixture block 3 with first track 1 one end is towards the one end of recess 8 and second draw-in groove 9 second track 6, with connecting plate 2 gomphosis inside recess 8, install first fixture block 3 gomphosis inside second draw-in groove 9 simultaneously, then install the both ends gomphosis of spill fixture block 7 inside first draw-in groove 4 that first track 1 and second track 6 outer wall set up, so not only can increase the stability of connecting between the track, can also avoid the track to take place crooked condition when the installation simultaneously, then pass locating plate 10 with fixing bolt 11, drive underground fixing bolt 11, can ensure the subaerial stability of track like this.
The utility model 1, a first track; 2. a connecting plate; 3. a first clamping block; 4. a first card slot; 5. a connecting rod; 6. a second track; 7. a concave fixture block; 8. a groove; 9. a second card slot; 10. positioning a plate; 11. fixing the bolt; 12. mounting grooves; 13. the second latch, the component, is a universal standard component or a component known to those skilled in the art, and the structure and principle thereof can be known to those skilled in the art through technical manuals or through routine experimentation.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present specification describes embodiments, not every embodiment includes only a single embodiment, and such description is for clarity purposes only, and it is to be understood that all embodiments may be combined as appropriate by one of ordinary skill in the art to form other embodiments as will be apparent to those of skill in the art from the description herein.
Claims (5)
1. The utility model provides a combination formula ground track that workshop was used which characterized in that: including first track (1) and second track (6), connecting plate (2) are all installed to first track (1) and second track (6) one end, the equal fixed mounting in connecting plate (2) top has first fixture block (3), first track (1) and second track (6) other end bottom all are seted up fluted (8), second draw-in groove (9) have been seted up to recess (8) inside, first fixture block (3) gomphosis is installed inside second draw-in groove (9).
2. The modular floor track for a plant according to claim 1, wherein: first draw-in groove (4) have all been seted up to first track (1) and second track (6) outer wall symmetry, concave fixture block (7) are installed to inside gomphosis of first draw-in groove (4).
3. The modular floor track for a plant according to claim 1, wherein: locating plate (10) have all been welded to first track (1) and second track (6) both sides outer wall, locating plate (10) transverse distribution is in first track (1) and second track (6) both sides, first track (1) and second track (6) one side all are equipped with three locating plate (10), equal threaded connection fixing bolt (11) in locating plate (10).
4. The modular floor track for a plant according to claim 1, wherein: first track (1) and second track (6) symmetry are laid on ground, mounting groove (12) have all been seted up to first track (1) and second track (6) one side outer wall.
5. The modular floor track for a plant according to claim 1, wherein: install connecting rod (5) between first track (1), the equal fixed mounting in connecting rod (5) both ends has second fixture block (13), second fixture block (13) gomphosis is installed inside mounting groove (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222196191.6U CN218291459U (en) | 2022-08-19 | 2022-08-19 | Combined ground rail for workshop |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222196191.6U CN218291459U (en) | 2022-08-19 | 2022-08-19 | Combined ground rail for workshop |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218291459U true CN218291459U (en) | 2023-01-13 |
Family
ID=84796747
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222196191.6U Active CN218291459U (en) | 2022-08-19 | 2022-08-19 | Combined ground rail for workshop |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218291459U (en) |
-
2022
- 2022-08-19 CN CN202222196191.6U patent/CN218291459U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218291459U (en) | Combined ground rail for workshop | |
CN113530045B (en) | Mounting support for curtain wall | |
CN214089906U (en) | Firm type pipeline underground structure | |
CN208289755U (en) | A kind of adjustable steel channel beam fixing clamp | |
CN221250746U (en) | Composite current-teaching four-rail system insulating support | |
CN217710816U (en) | Installation foundation platform device for railway track signal equipment | |
CN209874303U (en) | Composite microlite dry-hanging panel | |
CN206607792U (en) | A kind of bright frame plate fastening frame | |
CN206663037U (en) | A kind of railway track displacement monitoring fixture | |
CN217063149U (en) | Power cable bridge | |
CN205791413U (en) | Novel railway groove cable bearer | |
CN211007942U (en) | Road and bridge engineering construction sound barrier facility | |
CN212772467U (en) | Corrugated Steel Structure | |
CN219909362U (en) | Can improve overall stability's of PC component mosaic structure | |
CN114855825B (en) | Deep foundation pit structure and construction method thereof | |
CN221218821U (en) | Foundation pit supporting protection device | |
CN221263234U (en) | Cable support that power engineering used | |
CN222147086U (en) | Bolt-free bridge frame connecting piece | |
CN214369964U (en) | Lamp pole of convenient equipment with a plurality of mounting bases | |
CN218977011U (en) | Pipeline protection device | |
CN219576906U (en) | Photovoltaic support fixed knot constructs | |
CN219992987U (en) | Support and seal integrated device for discharge flue joint | |
CN220354219U (en) | Aluminum alloy track connecting system | |
CN212104155U (en) | A prefabricated foundation for construction engineering | |
CN219874986U (en) | Cable protection tube convenient to install |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |