[go: up one dir, main page]

CN218149599U - Municipal administration room building concrete placement workstation - Google Patents

Municipal administration room building concrete placement workstation Download PDF

Info

Publication number
CN218149599U
CN218149599U CN202221346623.0U CN202221346623U CN218149599U CN 218149599 U CN218149599 U CN 218149599U CN 202221346623 U CN202221346623 U CN 202221346623U CN 218149599 U CN218149599 U CN 218149599U
Authority
CN
China
Prior art keywords
groove
wall
fixedly connected
base
intubate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221346623.0U
Other languages
Chinese (zh)
Inventor
王晨
王多福
殷康盛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Zhenxing Construction Co ltd
Original Assignee
Anhui Zhenxing Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Zhenxing Construction Co ltd filed Critical Anhui Zhenxing Construction Co ltd
Priority to CN202221346623.0U priority Critical patent/CN218149599U/en
Application granted granted Critical
Publication of CN218149599U publication Critical patent/CN218149599U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The application discloses municipal house building concrete placement workstation relates to the relevant technical field of municipal house building, the on-line screen storage device comprises a base, logical groove has been seted up to the side of base, the inner wall sliding connection who leads to the groove has even the board, even the board is kept away from the one end fixedly connected with intubate that leads to the inslot wall, the side activity of intubate is pegged graft and is had two inserted bars, two the tail end of inserted bar all extends to inside and fixedly connected with splint of intubate, the side of inserted bar with the side of intubate is provided with the spring, the inner wall fixedly connected with safety rope of base. This application removes to both sides through two inserted bars of pulling and is convenient for the operator will pour the pipe and insert in the inserted bar, loosens two inserted bars along with it, makes the inserted bar reset and make splint and pour the pipe conflict through the spring this moment to pour the pipe and fix in the inserted bar, and then reduce and pour the pipe and produce the possibility of skew in position when pouring, consequently pour the pipe and can accurately pour.

Description

Municipal administration room building concrete placement workstation
Technical Field
The application relates to municipal room building related field especially relates to a municipal room building concrete placement workstation.
Background
The building is a general term of buildings and structures, and refers to houses or places where people perform production, life, residence or other activities, and a concrete pouring workbench for house construction is an auxiliary device for integral pouring in house construction work.
When concrete is poured, the impact force of the pouring pipe when sprayed concrete is poured is large, so that the position of the pouring pipe is prone to being deviated, and the pouring pipe is difficult to pour accurately.
Disclosure of Invention
In order to improve above-mentioned partial pouring pipe when carrying out concrete placement, because the impact force of pouring pipe when pouring the blowout concrete is great to lead to easily that the position of pouring pipe produces the skew, and lead to pouring the pipe and be difficult to the accurate problem of pouring, this application provides a municipal house concrete placement workstation.
The application provides a municipal administration room concrete placement workstation adopts following technical scheme:
the utility model provides a municipal administration room concrete placement workstation, includes the base, logical groove has been seted up to the side of base, the inner wall sliding connection who leads to the groove has even board, even the board is kept away from the one end fixedly connected with intubate that leads to the groove inner wall, the side activity of intubate is pegged graft and is had two inserted bars, two the tail end of inserted bar all extends to inside and the fixedly connected with splint of intubate, the side of inserted bar with the side of intubate is provided with the spring, the inner wall fixedly connected with safety rope of base, safety rope keeps away from the one end fixedly connected with safety ring of base inner wall.
Through above-mentioned technical scheme, be convenient for remove to both sides through two inserted bars of pulling and be convenient for the operator will pour the pipe and insert in the inserted bar, loosen two inserted bars thereupon, make the inserted bar reset and make splint and pour the pipe conflict through the spring this moment to will pour the pipe and fix in the inserted bar.
Optionally, in the above municipal building concrete pouring workbench, a groove is formed in the top surface of the connecting plate, a positioning rod is movably inserted into the inner wall of the groove, the upper end of the positioning rod is attached to the top surface of the inner wall of the through groove, a pressure spring is arranged at the lower end of the positioning rod and the inner wall of the groove, a winding disc is rotatably connected to the side surface of the connecting plate, a steel cable is fixedly connected to the side surface of the winding disc, and one end, away from the winding disc, of the steel cable extends to the inner wall of the groove and is fixedly connected with the lower end of the positioning rod.
Through above-mentioned technical scheme, be convenient for impel the locating lever to contradict with the inner wall that leads to the groove through the pressure spring to link the board and fix at logical inslot, and then reduce the possibility of the position automatic movement of linking the board.
Optionally, in the above municipal building concrete pouring workbench, the lower end of the connecting plate is fixedly connected with a sliding block, the sliding block is slidably connected to the inner wall of the through groove, a roller is arranged on the bottom surface of the sliding block, and the side surface of the roller is in rolling connection with the bottom surface of the inner wall of the through groove.
Through above-mentioned technical scheme, be convenient for convert the sliding friction power between slider and the logical groove into rolling friction power through the gyro wheel to reduce the pulling force that the operator need consume when removing even board.
Optionally, in the above municipal building concrete pouring workbench, a pull ring is fixedly connected to a side surface of the winding disc, and anti-skid cotton is bonded to the surface of the pull ring.
Through the technical scheme, the winding disc is convenient for an operator to rotate through the pull ring, and the operator can conveniently pull the winding disc to move together with the connecting plate.
Optionally, in the above municipal building concrete pouring workbench, the number of the rollers is several, and the several rollers are equidistantly and linearly distributed on the bottom surface of the slider.
Through above-mentioned technical scheme, the position of being convenient for the operator to even board through the cooperation of a plurality of gyro wheel removes.
Optionally, in the above-mentioned municipal building concrete placement workstation, the number of logical groove is four, four logical groove is seted up respectively in four sides of base.
Through above-mentioned technical scheme, through four logical grooves, four even boards and four intubate cooperations be convenient for the operator all-round pour.
Optionally, in the above municipal building concrete pouring workbench, the number of the safety ropes is four, the four safety ropes are annularly distributed on the side surface of the safety ring at equal intervals, and one ends of the four safety ropes far away from the safety ring are respectively fixedly connected with the four side surfaces of the inner wall of the base.
Through the technical scheme, the operators are protected conveniently through the cooperation of the four safety ropes and the safety ring.
In summary, the present application includes at least one of the following benefits: 1. the two inserting rods are pulled to move towards the two sides, so that an operator can insert the pouring pipe into the inserting pipes conveniently, the two inserting rods are loosened, the inserting rods are reset through the springs, the clamping plates are abutted against the pouring pipe, the pouring pipe is fixed in the inserting pipes, the possibility that the position of the pouring pipe deviates during pouring is reduced, and the pouring pipe can be poured accurately;
2. promote the locating lever to contradict with the inner wall that leads to the groove through the pressure spring to link the board to fix at logical inslot, and then reduce the possibility of linking the position automatic movement of board, when the position of board is moved to needs, through rotatory rolling dish to the cable wire rolling and make the locating lever move down and with lead to the groove separation, thereby the operator of being convenient for removes the position of linking the board.
Drawings
FIG. 1 is a perspective view of the present application;
FIG. 2 is a sectional view of a partial three-dimensional structure of the present application;
fig. 3 is a sectional view of a partially expanded perspective structure of the present application.
In the figure: 1. a base; 2. a through groove; 3. connecting plates; 4. inserting a tube; 5. inserting a rod; 6. a splint; 7. a spring; 8. a safety cord; 9. a safety ring; 10. a groove; 11. positioning a rod; 12. a pressure spring; 13. a winding disc; 14. a steel cord; 15. a slider; 16. a roller; 17. and (4) a pull ring.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
Referring to fig. 1, 2 and 3 of the drawings, the present application provides an embodiment: the utility model provides a municipal administration room concrete placement workstation, the on-line screen storage device comprises a base 1, be convenient for support the operator through base 1, logical groove 2 has been seted up to base 1's side, the inner wall sliding connection who leads to groove 2 has even board 3, be convenient for even board 3 removes in base 1 through leading to groove 2, even board 3 keeps away from the one end fixedly connected with intubate 4 that leads to groove 2 inner wall, be convenient for place the pipe of pouring through intubate 4, the quantity that leads to groove 2 is four, four lead to groove 2 and set up respectively in four sides of base 1, lead to groove 2 through four, four even board 3 and four 4 cooperations of intubate are convenient for the operator all-roundly pour.
The side activity of intubate 4 is pegged graft and is had two inserted bars 5, and the tail end of two inserted bars 5 all extends to 4 inside and fixedly connected with splint 6 of intubate, is convenient for carry out the centre gripping to pouring the pipe through 6 cooperations of two splint, thereby will pour the pipe and fix in intubate 4, the side of inserted bar 5 and the side of intubate 4 are provided with spring 7, make inserted bar 5 and splint 6 all the time with pour the pipe conflict through spring 7, thereby reduce the possibility of pouring pipe and 4 separations of intubate.
Inner wall fixedly connected with safety rope 8 of base 1, the one end fixedly connected with safety ring 9 of base 1 inner wall is kept away from to safety rope 8, the quantity of safety rope 8 is four, four safety rope 8 equidistance are the side that cyclic annular distributes at safety ring 9, four safety rope 8 keep away from the one end of safety ring 9 respectively with four side fixed connection of base 1 inner wall, be convenient for protect the operator through four safety rope 8 and the cooperation of safety ring 9, thereby reduce the possibility that the operator dropped down from base 1.
Referring to fig. 3 in the attached drawings of the specification, a groove 10 is formed in the top surface of the connecting plate 3, a positioning rod 11 is movably inserted into the inner wall of the groove 10, the upper end of the positioning rod 11 is attached to the top surface of the inner wall of the through groove 2, a pressure spring 12 is arranged between the lower end of the positioning rod 11 and the inner wall of the groove 10, a winding disc 13 is rotatably connected to the side surface of the connecting plate 3, a steel cable 14 is fixedly connected to the side surface of the winding disc 13, one end, away from the winding disc 13, of the steel cable 14 extends to the inner wall of the groove 10 and is fixedly connected with the lower end of the positioning rod 11, the positioning rod 11 is made to abut against the inner wall of the through groove 2 through the pressure spring 12, the connecting plate 3 is fixed in the through groove 2, the possibility of automatic position movement of the connecting plate 3 is reduced, when the position of the connecting plate 3 needs to be moved, the steel cable 14 is wound up through rotating the winding disc 13, the positioning rod 11 is made to be pulled to move downwards and be separated from the through groove 2, the connecting plate 3 at the moment, and the connecting plate 3 loses the position limitation, and an operator can move conveniently.
Referring to fig. 3 in the attached drawings of the specification, a slider 15 is fixedly connected to the lower end of the connecting plate 3, the slider 15 is slidably connected to the inner wall of the through groove 2, rollers 16 are arranged on the bottom surface of the slider 15, the side surfaces of the rollers 16 are in rolling connection with the bottom surface of the inner wall of the through groove 2, the rollers 16 are a plurality of rollers, the rollers 16 are linearly distributed on the bottom surface of the slider 15 at equal intervals, and sliding friction force between the slider 15 and the through groove 2 is converted into rolling friction force through cooperation of the rollers 16, so that pulling force required to be consumed when an operator moves the connecting plate 3 is reduced, and the operator can move the connecting plate 3 conveniently.
Referring to fig. 3 in the attached drawings of the specification, a pull ring 17 is fixedly connected to the side surface of the winding disc 13, anti-skid cotton is bonded to the surface of the pull ring 17, the winding disc 13 is convenient for an operator to rotate through the pull ring 17, the winding disc 13 and the connecting plate 3 are convenient for the operator to pull to move, and the anti-skid cotton is convenient for increasing the friction force on the surface of the pull ring 17 to prevent skidding.
The working principle is as follows: when using this municipal room concrete placement workstation, at first 9 covers the safety ring at operator's waist, and the operator of being convenient for protects through the cooperation of safety ring 9 and safety rope 8, removes to both sides through two inserted bars 5 of pulling and is convenient for the operator to pour the pipe and insert in intubate 4, loosens two inserted bars 5 thereupon, makes inserted bar 5 reset and makes splint 6 contradict with pouring the pipe through spring 7 this moment to fix pouring the pipe in intubate 4.
When the position of even board 3 needs to be removed, carry out the rolling to cable wire 14 through rotatory rolling dish 13 to impel cable wire 14 to pull locating lever 11 to move down and with logical groove 2 separation, even board 3 loses spacingly this moment, and then the operator of being convenient for removes the position of even board 3.
The above are preferred embodiments of the present application, and the scope of protection of the present application is not limited thereto, so: equivalent changes in structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (7)

1. The utility model provides a municipal administration room concrete placement workstation, includes base (1), its characterized in that: the utility model discloses a safety guard for the elevator car, including base (1), logical groove (2) have been seted up to the side of base (1), the inner wall sliding connection who leads to groove (2) has even board (3), even board (3) are kept away from one end fixedly connected with intubate (4) of leading to groove (2) inner wall, the side activity of intubate (4) is pegged graft and is had two inserted bars (5), two the tail end of inserted bar (5) all extends to intubate (4) inside and fixedly connected with splint (6), the side of inserted bar (5) with the side of intubate (4) is provided with spring (7), the inner wall fixedly connected with safety rope (8) of base (1), safety rope (8) are kept away from the one end fixedly connected with safety ring (9) of base (1) inner wall.
2. The municipal house concrete pouring workbench according to claim 1, wherein: the steel cable winding device is characterized in that a groove (10) is formed in the top surface of the connecting plate (3), a positioning rod (11) is movably inserted into the inner wall of the groove (10), the upper end of the positioning rod (11) is attached to the top surface of the inner wall of the through groove (2), a pressure spring (12) is arranged between the lower end of the positioning rod (11) and the inner wall of the groove (10), a winding disc (13) is rotatably connected to the side surface of the connecting plate (3), a steel cable (14) is fixedly connected to the side surface of the winding disc (13), and one end, away from the winding disc (13), of the steel cable (14) extends to the inner wall of the groove (10) and is fixedly connected with the lower end of the positioning rod (11).
3. The municipal house concrete pouring workbench according to claim 1, wherein: the lower extreme fixedly connected with slider (15) of even board (3), slider (15) sliding connection be in lead to the inner wall of groove (2), the bottom surface of slider (15) is provided with gyro wheel (16), the side of gyro wheel (16) with lead to the bottom surface roll connection of groove (2) inner wall.
4. The municipal house concrete pouring workbench according to claim 2, wherein: the side face of the winding disc (13) is fixedly connected with a pull ring (17), and anti-skid cotton is bonded on the surface of the pull ring (17).
5. The municipal room concrete pouring workbench according to claim 3, wherein: the number of the rollers (16) is a plurality, and the rollers (16) are equidistantly and linearly distributed on the bottom surface of the sliding block (15).
6. The municipal house concrete pouring workbench according to claim 1, wherein: the number of the through grooves (2) is four, and the four through grooves (2) are respectively arranged on four side faces of the base (1).
7. The municipal house concrete pouring workbench according to claim 1, wherein: the number of the safety ropes (8) is four, the safety ropes (8) are distributed on the side face of the safety ring (9) in an annular mode at equal intervals, and one ends, far away from the safety ring (9), of the four safety ropes (8) are fixedly connected with the four side faces of the inner wall of the base (1) respectively.
CN202221346623.0U 2022-05-31 2022-05-31 Municipal administration room building concrete placement workstation Active CN218149599U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221346623.0U CN218149599U (en) 2022-05-31 2022-05-31 Municipal administration room building concrete placement workstation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221346623.0U CN218149599U (en) 2022-05-31 2022-05-31 Municipal administration room building concrete placement workstation

Publications (1)

Publication Number Publication Date
CN218149599U true CN218149599U (en) 2022-12-27

Family

ID=84575284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221346623.0U Active CN218149599U (en) 2022-05-31 2022-05-31 Municipal administration room building concrete placement workstation

Country Status (1)

Country Link
CN (1) CN218149599U (en)

Similar Documents

Publication Publication Date Title
CN110980396A (en) Unwinding device is used in installation of ground heating coil
CN218149599U (en) Municipal administration room building concrete placement workstation
CN212317444U (en) Anti-toppling scaffold device for bridge construction
CN215101506U (en) Hoist device that intelligence building was used
CN113356547B (en) Safe and stable supervision platform device and supervision method through same
CN210622165U (en) External corner section bar
CN210594945U (en) Movable hoisting operation frame for bridge floor wet joint construction
CN216476416U (en) Building engineering platform of unloading
CN213038819U (en) Protector for construction
CN108092190A (en) One kind wears cable down-lead device automatically
CN114102641A (en) Friction type gripping device for steel pipe transportation
CN209780200U (en) Operation platform for construction of steel structure roof suspended ceiling plate
CN215553355U (en) House building brickwork construction handling device
CN216841405U (en) Vertical ladder auxiliary supporting device for overhauling operation
CN113092474A (en) Bridge steel strand detection and marking integrated device and use method thereof
CN218060306U (en) Prefabricated square pile pulling-out mechanism
CN218117176U (en) Scaffold frame safety protective guard
CN218624033U (en) Power supply station power overhaul ladder
CN219921976U (en) Portable self-clamping tower climbing device for overhead transmission line pole tower
CN215160196U (en) Prefabricated component hoisting device with adjustable hoisting position and combined hoisting device
CN212246024U (en) Hydraulic and hydroelectric engineering construction lifting equipment
CN111186776B (en) Mobile hoisting equipment for building
CN214520250U (en) Arch bogie and grating arch grabbing manipulator thereof
CN218786446U (en) Mine machinery cable moving and bearing device
CN221479265U (en) Various steel tile hoist and mount draw gear

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant