CN218088592U - A hoisting and positioning device for prefabricated laminated panels for green building construction - Google Patents

A hoisting and positioning device for prefabricated laminated panels for green building construction Download PDF

Info

Publication number
CN218088592U
CN218088592U CN202220944345.2U CN202220944345U CN218088592U CN 218088592 U CN218088592 U CN 218088592U CN 202220944345 U CN202220944345 U CN 202220944345U CN 218088592 U CN218088592 U CN 218088592U
Authority
CN
China
Prior art keywords
spool
hoisting
hoist
support frame
load board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220944345.2U
Other languages
Chinese (zh)
Inventor
姬鹏飞
高强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Construction Engineering Group Co Ltd
Original Assignee
Shaanxi Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Construction Engineering Group Co Ltd filed Critical Shaanxi Construction Engineering Group Co Ltd
Priority to CN202220944345.2U priority Critical patent/CN218088592U/en
Application granted granted Critical
Publication of CN218088592U publication Critical patent/CN218088592U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a green house construction is with assembled superimposed sheet hoist and mount positioner for construction, including the load board, load board lower surface bilateral symmetry joint has the support frame, the welding of support frame bottom has the bearing plate, the bearing plate outward appearance wall is fixed with the crash bar, the bearing plate bottom rotates and is connected with wheel hub, the bilateral symmetry welding of load board upper surface has the protection casing, load board upper surface center department is fixed with the spool, the spool bottom passes the threading pipe and the spool of load board lower surface through the cable wire is connected, and the spool both sides are connected with hoist and mount board hinge through the lifting rope, hoist and mount board bilateral symmetry and be fixed with auxiliary strut, and the spout sliding connection of pulley and support frame internal surface is passed through in the auxiliary strut outside, hoist and mount board bottom joint has the couple. The utility model discloses in, this hoist device overall structure design is simple reasonable, connects stably between the spare part, and the removal transportation operation of the device of being convenient for simultaneously has stronger practicality.

Description

一种绿色房屋建筑施工用装配式叠合板吊装定位装置A hoisting and positioning device for prefabricated laminated panels for green building construction

技术领域technical field

本实用新型涉及建筑机械技术领域,尤其涉及一种绿色房屋建筑施工用装配式叠合板吊装定位装置。The utility model relates to the technical field of construction machinery, in particular to a hoisting and positioning device for assembled laminated panels used in green house construction.

背景技术Background technique

吊装是指吊车或者起升机构对设备的安装、就位的统称,在检修或维修过程中利用各种吊装机具将设备、工件、器具、材料等吊起,使其发生位置变化,在架体上或建筑物上安装设备时,其强度和稳定性要达到安装条件的要求,在设备安装定位后要按图纸的要求连接紧固或焊接,满足了设计要求的强度和具有稳固性后,才能脱钩,否则要进行临时固定,在现代的建筑工程施工中,需要通过吊装装置对建筑机械进行吊装,从而满足建筑工程的施工需求。Hoisting refers to the general term for the installation and positioning of equipment by a crane or a lifting mechanism. During the maintenance or maintenance process, various hoisting tools are used to lift equipment, workpieces, appliances, materials, etc., so that their positions change. When installing the equipment on the ground or on the building, its strength and stability must meet the requirements of the installation conditions. After the equipment is installed and positioned, it must be connected and fastened or welded according to the requirements of the drawing. Decoupling, otherwise it needs to be temporarily fixed. In the construction of modern construction projects, it is necessary to hoist the construction machinery through the hoisting device, so as to meet the construction requirements of the construction project.

然而现有的建筑工程的吊装装置在使用过程中存在着一些不足之处,对于吊装机构的起吊过程不够安全稳定,容易发生左右晃动的现象,降低了吊装装置的实用性。Yet the hoisting device of existing construction project has some deficiencies in use process, is not safe and stable enough for the hoisting process of hoisting mechanism, the phenomenon of shaking from side to side easily takes place, has reduced the practicability of hoisting device.

实用新型内容Utility model content

本实用新型的目的是为了解决现有技术中存在的缺点,而提出的一种绿色房屋建筑施工用装配式叠合板吊装定位装置。The purpose of the utility model is to solve the shortcomings in the prior art, and propose a kind of assembly-type laminated board hoisting and positioning device for green building construction.

为了实现上述目的,本实用新型采用了如下技术方案:一种绿色房屋建筑施工用装配式叠合板吊装定位装置,包括载重板,所述载重板下表面两侧对称卡接有支撑架,所述支撑架底部焊接有承压板,所述承压板外表壁固定有防撞杆,所述承压板底部转动连接有轮毂,所述载重板上表面两侧对称焊接有防护罩,所述载重板上表面中心处固定有绕线轴,所述绕线轴一侧通过转轴与电机传动连接,所述绕线轴底部通过钢索穿过载重板下表面的穿线管与绕线环连接,且绕线环两侧通过吊绳与吊装板铰链连接,所述吊装板两侧对称固定有辅助支杆,且辅助支杆外侧通过滑轮与支撑架内表面的滑槽滑动连接,所述吊装板底部卡接有挂钩。In order to achieve the above purpose, the utility model adopts the following technical scheme: an assembly-type laminated panel hoisting and positioning device for green building construction, including a load plate, and a support frame is symmetrically clamped on both sides of the lower surface of the load plate. The bottom of the support frame is welded with a pressure plate, and the outer wall of the pressure plate is fixed with an anti-collision bar. A winding shaft is fixed at the center of the upper surface of the board. One side of the winding shaft is connected to the motor through a rotating shaft. The two sides are hinged to the hoisting plate through slings. Auxiliary poles are symmetrically fixed on both sides of the hoisting plate, and the outer side of the auxiliary pole is slidingly connected to the chute on the inner surface of the support frame through pulleys. The bottom of the hoisting plate is clamped with hook up.

作为上述技术方案的进一步描述:As a further description of the above technical solution:

所述支撑架的横截面为外倾式对称结构。The cross section of the support frame is a flared symmetrical structure.

作为上述技术方案的进一步描述:As a further description of the above technical solution:

所述辅助支杆的内部设置有用于缓冲的弹性杆。An elastic rod for buffering is arranged inside the auxiliary strut.

作为上述技术方案的进一步描述:As a further description of the above technical solution:

所述绕线轴两侧上表面对称固定有防护板,且防护板的横截面为外倾式结构。The upper surfaces on both sides of the winding shaft are symmetrically fixed with protective plates, and the cross-section of the protective plates is a flared structure.

作为上述技术方案的进一步描述:As a further description of the above technical solution:

所述吊绳共安装有四个,且四个吊绳两两之间相互对称。There are four hanging ropes installed in total, and the four hanging ropes are symmetrical to each other.

本实用新型中,首先通过设置的辅助支杆,能够在吊装板向上起吊时,使得滑轮在支撑架内表壁的滑动中滑动,并且将弹性杆挤压压缩,从而对吊装板的两侧起到稳定的夹持固定作用,避免吊装板在起吊过程中发生左右偏移的现象,提高了吊装装置的吊装稳定性,其次通过设置的挂钩,可以悬挂其他的建筑工程设备,从而避免了吊装板单一的吊装方式,增强了吊装装置的适用范围,另一方面该吊装装置整体结构设计简单合理,零部件之间连接稳定,同时便于装置的移动运输操作,具有较强的实用性。In the utility model, firstly, through the set auxiliary pole, when the hoisting plate is hoisted upwards, the pulley can slide in the sliding of the inner surface wall of the support frame, and the elastic rod can be squeezed and compressed, thereby lifting the two sides of the hoisting plate. To achieve a stable clamping and fixing effect, avoid the left and right deviation of the hoisting plate during the hoisting process, and improve the hoisting stability of the hoisting device. Secondly, through the set hook, other construction engineering equipment can be hung, thus avoiding the lifting of the hoisting plate. The single hoisting method enhances the scope of application of the hoisting device. On the other hand, the overall structure design of the hoisting device is simple and reasonable, the connection between parts is stable, and it is convenient for the mobile transportation operation of the device, which has strong practicability.

附图说明Description of drawings

图1为本实用新型提出的一种绿色房屋建筑施工用装配式叠合板吊装定位装置的结构示意图;Fig. 1 is the structural schematic diagram of the hoisting and positioning device of a kind of green building construction that the utility model proposes with the prefabricated laminated board;

图2为本实用新型辅助支杆的结构示意图;Fig. 2 is the structural representation of the utility model auxiliary strut;

图3为本实用新型吊装机构的结构示意图。Fig. 3 is a structural schematic diagram of the hoisting mechanism of the present invention.

图例说明:illustration:

1-防护罩、2-载重板、3-支撑架、4-辅助支杆、5-承压板、6-防撞杆、7-轮毂、8-吊装板、9-绕线环、10-穿线管、11-绕线轴、12-电机、13-滑轮、14-弹性杆、15-钢索、16-吊绳、17-挂钩。1-Protective cover, 2-Load plate, 3-Support frame, 4-Auxiliary support rod, 5-Pressure plate, 6-Anti-collision bar, 7-Wheel hub, 8-Elevating plate, 9-Winding ring, 10- Threading pipe, 11-spool, 12-motor, 13-pulley, 14-elastic bar, 15-steel cable, 16-sling, 17-hook.

具体实施方式detailed description

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example.

参照图1-3,一种绿色房屋建筑施工用装配式叠合板吊装定位装置,包括载重板2,载重板2下表面两侧对称卡接有支撑架3,支撑架3底部焊接有承压板5,承压板5外表壁固定有防撞杆6,承压板5底部转动连接有轮毂7,载重板2上表面两侧对称焊接有防护罩1,载重板2上表面中心处固定有绕线轴11,绕线轴11一侧通过转轴与电机12传动连接,绕线轴11底部通过钢索15穿过载重板2下表面的穿线管10与绕线环9连接,且绕线环9两侧通过吊绳16与吊装板6铰链连接,吊装板8两侧对称固定有辅助支杆4,且辅助支杆4外侧通过滑轮13与支撑架3内表面的滑槽滑动连接,吊装板8底部卡接有挂钩17。Referring to Figures 1-3, a hoisting and positioning device for prefabricated laminated panels for green building construction, including a load plate 2, a support frame 3 is symmetrically clamped on both sides of the lower surface of the load plate 2, and a pressure bearing plate is welded at the bottom of the support frame 3 5. The outer wall of the pressure bearing plate 5 is fixed with an anti-collision bar 6, the bottom of the pressure bearing plate 5 is connected with the wheel hub 7, the upper surface of the load plate 2 is symmetrically welded with a protective cover 1 on both sides, and the center of the upper surface of the load plate 2 is fixed with a winding The bobbin 11, one side of the bobbin 11 is connected to the motor 12 through the rotating shaft, the bottom of the bobbin 11 passes through the threading pipe 10 on the lower surface of the load plate 2 through the steel cable 15 and is connected to the winding ring 9, and the two sides of the winding ring 9 pass through The suspension rope 16 is hingedly connected with the hoisting plate 6, and the auxiliary poles 4 are symmetrically fixed on both sides of the hoisting plate 8, and the outer side of the auxiliary pole 4 is slidingly connected with the chute on the inner surface of the support frame 3 through the pulley 13, and the bottom of the hoisting plate 8 is clamped. There are 17 hooks.

支撑架3的横截面为外倾式对称结构,增大了吊装装置的支撑稳定性,不会发生晃动或者偏移的现象,辅助支杆4的内部设置有用于缓冲的弹性杆14,绕线轴11两侧上表面对称固定有防护板,且防护板11的横截面为外倾式结构,吊绳16共安装有四个,且四个吊绳16两两之间相互对称,能够对吊装板8的四个拐角进行均匀稳定的额固定作用,避免吊装板8受力不均匀。The cross-section of the support frame 3 is an outwardly tilted symmetrical structure, which increases the support stability of the hoisting device, and does not shake or shift. The inside of the auxiliary support rod 4 is provided with an elastic rod 14 for buffering, and the winding shaft The upper surfaces of both sides of 11 are symmetrically fixed with protective plates, and the cross-section of the protective plate 11 is an outwardly tilted structure. Four suspension ropes 16 are installed in total, and the four suspension ropes 16 are symmetrical to each other in pairs, so that the suspension plate can The four corners of the 8 perform uniform and stable fixed action to avoid uneven stress on the hoisting plate 8.

工作原理:使用时,通过轮毂7将吊装装置移动到工作地点,防撞杆6能够对承压板5起到防撞保护的作用,然后根据实际吊装的需求,通过挂钩17和吊装板8对叠合板进行悬挂吊装,之后电机12起到,电机12通过转轴带动绕线轴11旋转,使得绕线轴11通过钢索15穿过穿线管10之后将吊装板8向上吊起,而在吊装板8向上起吊时,辅助支杆4上的滑轮13会沿着支撑架3内表壁的滑槽内向上移动,与此同时,弹性杆14会被压缩变形,从而确保了吊装板8能够均匀稳定的被吊起。Working principle: When in use, move the hoisting device to the working place through the hub 7, and the anti-collision bar 6 can protect the pressure plate 5 from collision, and then according to the actual hoisting requirements, through the hook 17 and the 8 pairs of hoisting plates The laminated plate is suspended and hoisted, and then the motor 12 is activated, and the motor 12 drives the winding shaft 11 to rotate through the rotating shaft, so that the winding shaft 11 passes through the threading pipe 10 through the steel cable 15 and lifts the lifting plate 8 upwards, while the lifting plate 8 is upwards. When hoisting, the pulley 13 on the auxiliary pole 4 will move upward along the chute on the inner surface wall of the support frame 3. At the same time, the elastic rod 14 will be compressed and deformed, thereby ensuring that the hoisting plate 8 can be evenly and stably lifted. hoist.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above is only a preferred embodiment of the utility model, but the scope of protection of the utility model is not limited thereto. Any equivalent replacement or change of the new technical solution and the concept of the utility model shall be covered by the protection scope of the utility model.

Claims (5)

1. The utility model provides a green house construction is with assembled superimposed sheet hoist and mount positioner, includes load board (2), its characterized in that, load board (2) lower surface bilateral symmetry joint has support frame (3), support frame (3) bottom welding has bearing plate (5), bearing plate (5) outward appearance wall is fixed with crash bar (6), bearing plate (5) bottom is rotated and is connected with wheel hub (7), load board (2) upper surface bilateral symmetry welding has protection casing (1), load board (2) upper surface center department is fixed with spool (11), spool (11) one side is connected through pivot and motor (12) transmission, spool (11) bottom is connected with spool (9) through cable wire (15) threading pipe (10) that pass load board (2) lower surface, and spool (9) both sides are connected with hoist and mount board (8) hinged joint through lifting rope (16), hoist and mount board (8) bilateral symmetry is fixed with supplementary branch (4), and supplementary branch (4) outside pass through pulley (13) and support frame (3) sliding connection spout (17) bottom the joint has supplementary branch (8).
2. The assembly type superimposed sheet hoisting and positioning device for green house building construction according to claim 1, wherein the cross section of the support frame (3) is of an outwards-inclined symmetrical structure.
3. The fabricated composite slab hoisting and positioning device for green house building construction as claimed in claim 1, wherein the auxiliary supporting rod (4) is internally provided with an elastic rod (14) for buffering.
4. The assembly type superimposed sheet hoisting and positioning device for green house building construction as claimed in claim 1, wherein the upper surfaces of both sides of the winding shaft (11) are symmetrically fixed with protection plates, and the cross sections of the protection plates are of an outward-inclining structure.
5. The assembly type composite slab hoisting and positioning device for green house building construction as claimed in claim 1, wherein four lifting ropes (16) are installed, and the four lifting ropes (16) are symmetrical to each other.
CN202220944345.2U 2022-04-22 2022-04-22 A hoisting and positioning device for prefabricated laminated panels for green building construction Expired - Fee Related CN218088592U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220944345.2U CN218088592U (en) 2022-04-22 2022-04-22 A hoisting and positioning device for prefabricated laminated panels for green building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220944345.2U CN218088592U (en) 2022-04-22 2022-04-22 A hoisting and positioning device for prefabricated laminated panels for green building construction

Publications (1)

Publication Number Publication Date
CN218088592U true CN218088592U (en) 2022-12-20

Family

ID=84459935

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220944345.2U Expired - Fee Related CN218088592U (en) 2022-04-22 2022-04-22 A hoisting and positioning device for prefabricated laminated panels for green building construction

Country Status (1)

Country Link
CN (1) CN218088592U (en)

Similar Documents

Publication Publication Date Title
WO2022252633A1 (en) Method for arranging upside-down hoisting power device in attached lifting scaffold
CN103420281B (en) The attaching/detaching apparatus of hoisting crane and accessory structure thereof, method for dismounting and installation method
CN115973926A (en) Boom structure of construction elevator
CN218088592U (en) A hoisting and positioning device for prefabricated laminated panels for green building construction
CN113023590A (en) Railway box wagon
CN210340141U (en) House building engineering lifting device
CN217376990U (en) Hoisting equipment for large steel structural part
CN203728448U (en) Light mounting and dismounting frame for tower crane
WO2022233156A1 (en) Method for disposing lifting power apparatus in attached lifting/lowering scaffold
CN112279121A (en) Method for dismantling tower crane
CN107386609B (en) A dry hanging device for exterior wall decoration stone and its application
CN214087457U (en) Movable steel frame type small steel column and steel beam hoisting tool
CN109244946A (en) A kind of electric integrated apparatus for examination and repair
CN212174337U (en) A safe hanging flower basket for construction of industrial factory building steel construction
CN201380286Y (en) Special lifting tool for entirely hoisting bale rotary table
CN207108239U (en) A kind of Novel steel profile hoisting device
CN207209840U (en) A kind of Multifunctional suspension bracket
CN210529812U (en) Special support for lifting large-scale component of excavator
CN208684254U (en) A kind of steel reinforcement cage lowering equipment investing long spire stake machine fuselage
CN104692241A (en) Multipurpose gantry crane rapidly-replaced hook group
CN214935363U (en) Suspension device for building steel structure frame
CN206511798U (en) The special hanger of large-scale component pallet
CN205419582U (en) Floor hoist
CN108238552B (en) A kind of multi-functional bar of lying prone of the assembled being connect with structure
CN216997302U (en) Lifting hook device for lifting generator stator with lifting weight

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221220

CF01 Termination of patent right due to non-payment of annual fee