Flue gas introducing device for boiler Download PDF

Info

Publication number
CN217604135U
CN217604135U CN202220059318.7U CN202220059318U CN217604135U CN 217604135 U CN217604135 U CN 217604135U CN 202220059318 U CN202220059318 U CN 202220059318U CN 217604135 U CN217604135 U CN 217604135U
Authority
CN
China
Prior art keywords
fixedly connected
flue gas
boiler
plate
boiler body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220059318.7U
Other languages
Chinese (zh)
Inventor
孙福文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Changda New Energy Co ltd
Original Assignee
Jilin Changda New Energy Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jilin Changda New Energy Co ltd filed Critical Jilin Changda New Energy Co ltd
Priority to CN202220059318.7U priority Critical patent/CN217604135U/en
Application granted granted Critical
Publication of CN217604135U publication Critical patent/CN217604135U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E20/00Combustion technologies with mitigation potential
    • Y02E20/30Technologies for a more efficient combustion or heat usage

Landscapes

  • Treating Waste Gases (AREA)

Abstract

本实用新型公开了一种锅炉用烟气引入装置,涉及锅炉技术领域,针对现有的锅炉用烟气引入装置,功能单一,不便对杂质过滤板进行拆卸清洗,久而久之过滤板上灰尘堆积过多影响杂质吸附效率,使用效果差,工作效率低的问题,现提出如下方案,包括锅炉本体与引入箱,所述锅炉本体与所述引入箱相互靠近的一侧固定连通有同一个连接管,所述锅炉本体的一侧固定连通有混合进气管,所述引入箱的顶部固定连通有排气管,所述引入箱靠近所述锅炉本体的一侧固定安装有抽气泵。本实用新型结构设计合理,操作简单,可以对过滤网板进行快速拆卸清理,提高了烟气内杂质的吸附效率,使用效果好,工作效率高。

Figure 202220059318

The utility model discloses a flue gas introduction device for boilers, which relates to the technical field of boilers. In view of the existing flue gas introduction device for boilers, the function is single, it is inconvenient to disassemble and clean the impurity filter plate, and the dust on the filter plate accumulates too much over time. The problems of affecting the impurity adsorption efficiency, poor use effect and low work efficiency are proposed as follows, including the boiler body and the introduction box, the boiler body and the introduction box are fixedly connected to each other with the same connecting pipe, so One side of the boiler body is fixedly connected with a mixed air intake pipe, the top of the introduction box is fixedly connected with an exhaust pipe, and a side of the introduction box close to the boiler body is fixedly installed with an air pump. The utility model has reasonable structure design and simple operation, can quickly disassemble and clean the filter screen plate, improves the adsorption efficiency of impurities in the flue gas, has good use effect and high work efficiency.

Figure 202220059318

Description

一种锅炉用烟气引入装置A boiler flue gas introduction device

技术领域technical field

本实用新型涉及锅炉技术领域,尤其涉及一种锅炉用烟气引入装置。The utility model relates to the technical field of boilers, in particular to a flue gas introduction device for boilers.

背景技术Background technique

锅炉是一种能量转换设备,向锅炉输入的能量有燃料中的化学能、电能,锅炉输出具有一定热能的蒸汽、高温水或有机热载体,锅的原义指在火上加热的盛水容器,炉指燃烧燃料的场所,锅炉包括锅和炉两大部分,锅炉中产生的热水或蒸汽可直接为工业生产和人民生活提供所需热能,也可通过蒸汽动力装置转换为机械能,或再通过发电机将机械能转换为电能,提供热水的锅炉称为热水锅炉,主要用于生活,工业生产中也有少量应用产生蒸汽的锅炉称为蒸汽锅炉,常简称为锅炉,多用于火电站、船舶、机车和工矿企业,由锅和炉组成的,上面的盛水部件为锅,下面的加热部分为炉,锅和炉的一体化设计称为锅炉;锅炉是一种能量转换器,它是利用燃料燃烧释放的热能或其他热能将工质水或其他流体加热到一定参数的设备,烟气往往具有较高的温度,为实现热量的再利用,所以亟需一种锅炉用烟气引入装置。The boiler is an energy conversion device. The energy input to the boiler includes chemical energy and electrical energy in the fuel. The boiler outputs steam, high-temperature water or organic heat carrier with certain thermal energy. The original meaning of the boiler refers to a water container heated on a fire. , The furnace refers to the place where fuel is burned. The boiler includes two parts: the boiler and the furnace. The hot water or steam generated in the boiler can directly provide the required thermal energy for industrial production and people's life, and can also be converted into mechanical energy through a steam power device, or regenerated. The boiler that converts mechanical energy into electrical energy through a generator and provides hot water is called a hot water boiler, which is mainly used in life. There are also a small number of boilers that generate steam in industrial production. Ships, locomotives and industrial and mining enterprises are composed of boilers and furnaces. The upper water-containing part is the boiler, and the lower heating part is the furnace. The integrated design of the boiler and the furnace is called the boiler; the boiler is an energy converter, which is a Equipment that uses the heat energy or other heat energy released by fuel combustion to heat working water or other fluids to certain parameters. The flue gas often has a high temperature. In order to realize the reuse of heat, a flue gas introduction device for boilers is urgently needed. .

但是,现有的锅炉用烟气引入装置,功能单一,不便对杂质过滤板进行拆卸清洗,久而久之过滤板上灰尘堆积过多影响杂质吸附效率,使用效果差,工作效率低。However, the existing boiler flue gas introduction device has a single function, and it is inconvenient to disassemble and clean the impurity filter plate. Over time, excessive dust accumulation on the filter plate affects the impurity adsorption efficiency, and the use effect is poor and the work efficiency is low.

实用新型内容Utility model content

本实用新型的目的是为了解决现有的锅炉用烟气引入装置,功能单一,不便对杂质过滤板进行拆卸清洗,久而久之过滤板上灰尘堆积过多影响杂质吸附效率,使用效果差,工作效率低的缺点,而提出的一种锅炉用烟气引入装置。The purpose of the utility model is to solve the problem that the existing flue gas introduction device for boilers has a single function, and it is inconvenient to disassemble and clean the impurity filter plate. Over time, the accumulation of dust on the filter plate affects the impurity adsorption efficiency, the use effect is poor, and the work efficiency is low. However, a flue gas introduction device for boilers is proposed.

为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above-mentioned purpose, the utility model adopts the following technical solutions:

一种锅炉用烟气引入装置,包括锅炉本体与引入箱,所述锅炉本体与所述引入箱相互靠近的一侧固定连通有同一个连接管,所述锅炉本体的一侧固定连通有混合进气管,所述引入箱的顶部固定连通有排气管,所述引入箱靠近所述锅炉本体的一侧固定安装有抽气泵,所述抽气泵的抽气端与所述引入箱固定连通,所述抽气泵的排气端固定连通有循环管,所述循环管的顶端与所述混合进气管固定连通;A flue gas introduction device for a boiler includes a boiler body and an introduction box, the boiler body and the introduction box are fixedly connected to one side with the same connection pipe, and one side of the boiler body is fixedly connected to a mixing inlet. The top of the introduction box is fixedly connected with an exhaust pipe, the side of the introduction box close to the boiler body is fixedly installed with an air extraction pump, and the air extraction end of the air extraction pump is fixedly connected with the introduction box, so The exhaust end of the air suction pump is fixedly connected with a circulation pipe, and the top of the circulation pipe is fixedly connected with the mixed intake pipe;

所述引入箱远离所述锅炉本体的一侧固定连接有四个连接板,所述引入箱远离所述锅炉本体的一侧开设有两个凹槽,所述凹槽的一侧内壁上开设有通孔,所述凹槽内卡装有密封板,所述密封板的一侧活动安装有吸附板,所述密封板的另一侧固定连接有U型板,所述密封板的另一侧转动连接有水平设置的蜗杆,所述蜗杆与所述U型板转动连接,所述U型板的顶部转动连接有螺纹套筒,所述螺纹套筒上固定连接有蜗轮,所述蜗杆与所述蜗轮相啮合,所述螺纹套筒内螺纹连接有两个螺纹杆,所述螺纹杆与相对应的所述连接板滑动连接。The side of the introduction box away from the boiler body is fixedly connected with four connecting plates, the side of the introduction box away from the boiler body is provided with two grooves, and the inner wall of one side of the groove is opened with A through hole, a sealing plate is clamped in the groove, an adsorption plate is movably installed on one side of the sealing plate, a U-shaped plate is fixedly connected to the other side of the sealing plate, and the other side of the sealing plate is fixedly connected with a U-shaped plate. A horizontally arranged worm is rotatably connected, the worm is rotatably connected to the U-shaped plate, a threaded sleeve is rotatably connected to the top of the U-shaped plate, and a worm wheel is fixedly connected to the threaded sleeve, and the worm is connected to the U-shaped plate. The worm gears are engaged with each other, and the threaded sleeve is internally threaded with two threaded rods, and the threaded rods are slidably connected with the corresponding connecting plates.

优选的,所述密封板的一侧固定连接有两个对称设置的固定板,两个所述固定板相互靠近的一侧通过螺栓与相对应的所述吸附板活动连接。Preferably, two symmetrically arranged fixing plates are fixedly connected to one side of the sealing plate, and the sides of the two fixing plates that are close to each other are movably connected to the corresponding adsorption plates through bolts.

优选的,所述引入箱内固定连接有多个导向板,所述吸附板与相对应的所述导向板相接触。Preferably, a plurality of guide plates are fixedly connected in the introduction box, and the adsorption plates are in contact with the corresponding guide plates.

优选的,所述U型板的顶部与底部均固定连接有竖板,所述竖板的一侧开设有滑槽,所述螺纹杆上固定连接有连接杆,所述连接杆滑动连接在相对应的所述滑槽内。Preferably, a vertical plate is fixedly connected to the top and bottom of the U-shaped plate, a sliding slot is opened on one side of the vertical plate, a connecting rod is fixedly connected to the threaded rod, and the connecting rod is slidably connected to the corresponding in the corresponding chute.

优选的,所述密封板的另一侧开设有圆槽,所述蜗杆上固定套设有轴承的内圈,所述轴承的外圈与所述圆槽的内壁固定连接。Preferably, a circular groove is formed on the other side of the sealing plate, an inner ring of a bearing is fixedly sleeved on the worm, and the outer ring of the bearing is fixedly connected with the inner wall of the circular groove.

优选的,所述螺纹套筒上固定套设有两个限位环,所述限位环与所述U型板相接触。Preferably, two limiting rings are fixedly sleeved on the threaded sleeve, and the limiting rings are in contact with the U-shaped plate.

本实用新型中,所述的一种锅炉用烟气引入装置,转动蜗杆转动,蜗杆与蜗轮相啮合传动蜗轮转动,蜗轮的转动带动螺纹套筒转动,螺纹套筒的转动带动相对应的两个螺纹杆相互靠近,当螺纹杆不与连接板相接触时即可取出吸附板并对其进行清理更换;In the utility model, the described flue gas introduction device for boilers rotates by rotating the worm, the worm is engaged with the worm wheel to drive the worm wheel to rotate, the rotation of the worm wheel drives the threaded sleeve to rotate, and the rotation of the threaded sleeve drives the corresponding two The threaded rods are close to each other, and when the threaded rods are not in contact with the connecting plate, the adsorption plate can be taken out and cleaned and replaced;

本实用新型中,所述的一种锅炉用烟气引入装置,启动抽气泵,抽气泵将引入箱内的烟气通过循环管引入锅炉本体内,两个吸附板可有效降低其表面附着的杂质,延长吸附板的使用寿命,提高吸附板的吸附效率;In the utility model, in the above-mentioned flue gas introduction device for boiler, the air extraction pump is activated, and the air extraction pump introduces the flue gas introduced into the box into the boiler body through the circulation pipe, and the two adsorption plates can effectively reduce the impurities attached to the surface thereof. , prolong the service life of the adsorption plate and improve the adsorption efficiency of the adsorption plate;

本实用新型结构设计合理,操作简单,可以对过滤网板进行快速拆卸清理,提高了烟气内杂质的吸附效率,使用效果好,工作效率高。The utility model has reasonable structure design and simple operation, can quickly disassemble and clean the filter screen plate, improves the adsorption efficiency of impurities in the flue gas, has good use effect and high work efficiency.

附图说明Description of drawings

图1为本实用新型提出的一种锅炉用烟气引入装置的立体结构示意图;Fig. 1 is the three-dimensional structure schematic diagram of a kind of boiler flue gas introduction device proposed by the utility model;

图2为本实用新型提出的一种锅炉用烟气引入装置的主视的剖视结构示意图;FIG. 2 is a schematic cross-sectional structural schematic diagram of a front view of a flue gas introduction device for a boiler proposed by the utility model;

图3为本实用新型提出的一种锅炉用烟气引入装置的A部分的结构示意图。FIG. 3 is a schematic structural diagram of part A of a boiler flue gas introduction device proposed by the utility model.

图中:1、锅炉本体;2、引入箱;3、混合进气管;4、连接管;5、排气管;6、抽气泵;7、循环管;8、密封板;9、固定板;10、吸附板;11、U型板;12、连接板;13、蜗杆;14、螺纹套筒;15、蜗轮;16、螺纹杆;17、竖板;18、滑槽;19、连接杆;20、导向板。In the figure: 1. Boiler body; 2. Introduction box; 3. Mixing inlet pipe; 4. Connecting pipe; 5. Exhaust pipe; 6. Air pump; 7. Circulation pipe; 8. Sealing plate; 9. Fixing plate; 10, adsorption plate; 11, U-shaped plate; 12, connecting plate; 13, worm; 14, threaded sleeve; 15, worm gear; 16, threaded rod; 17, vertical plate; 18, chute; 19, connecting rod; 20. Guide plate.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example.

参照图1-3,本方案提供的一种实施例:一种锅炉用烟气引入装置,包括锅炉本体1与引入箱2,锅炉本体1与引入箱2相互靠近的一侧固定连通有同一个连接管4,锅炉本体1的一侧固定连通有混合进气管3,引入箱2的顶部固定连通有排气管5,引入箱2靠近锅炉本体1的一侧固定安装有抽气泵6,抽气泵6的抽气端与引入箱2固定连通,抽气泵6的排气端固定连通有循环管7,循环管7的顶端与混合进气管3固定连通;1-3, an embodiment provided by this solution: a boiler flue gas introduction device, including a boiler body 1 and an introduction box 2, and the side of the boiler body 1 and the introduction box 2 that are close to each other is fixedly communicated with the same Connecting pipe 4, one side of the boiler body 1 is fixedly connected with a mixed intake pipe 3, the top of the introduction box 2 is fixedly connected with an exhaust pipe 5, and the side of the introduction box 2 close to the boiler body 1 is fixedly installed with an air pump 6, and the air pump The suction end of 6 is fixedly communicated with the introduction box 2, the exhaust end of the suction pump 6 is fixedly connected with a circulation pipe 7, and the top of the circulation pipe 7 is fixedly connected with the mixed intake pipe 3;

引入箱2远离锅炉本体1的一侧固定连接有四个连接板12,引入箱2远离锅炉本体1的一侧开设有两个凹槽,凹槽的一侧内壁上开设有通孔,凹槽内卡装有密封板8,密封板8的一侧活动安装有吸附板10,密封板8的另一侧固定连接有U型板11,密封板8的另一侧转动连接有水平设置的蜗杆13,蜗杆13与U型板11转动连接,U型板11的顶部转动连接有螺纹套筒14,螺纹套筒14上固定连接有蜗轮15,蜗杆13与蜗轮15相啮合,螺纹套筒14内螺纹连接有两个螺纹杆16,螺纹杆16与相对应的连接板12滑动连接。The side of the introduction box 2 away from the boiler body 1 is fixedly connected with four connecting plates 12, the side of the introduction box 2 away from the boiler body 1 is provided with two grooves, and the inner wall of one side of the groove is provided with a through hole, and the groove A sealing plate 8 is clamped inside, an adsorption plate 10 is movably installed on one side of the sealing plate 8, a U-shaped plate 11 is fixedly connected to the other side of the sealing plate 8, and a horizontally arranged worm is rotatably connected to the other side of the sealing plate 8 13. The worm 13 is rotatably connected with the U-shaped plate 11. The top of the U-shaped plate 11 is rotatably connected with a threaded sleeve 14. The threaded sleeve 14 is fixedly connected with a worm wheel 15. The worm 13 is engaged with the worm wheel 15. Two threaded rods 16 are threadedly connected, and the threaded rods 16 are slidably connected with the corresponding connecting plates 12 .

参照图2,本实施例中,密封板8的一侧固定连接有两个对称设置的固定板9,两个固定板9相互靠近的一侧通过螺栓与相对应的吸附板10活动连接,便于拆卸吸附板10进行清洗与更换。Referring to FIG. 2 , in this embodiment, two symmetrically arranged fixing plates 9 are fixedly connected to one side of the sealing plate 8 , and the sides of the two fixing plates 9 that are close to each other are movably connected to the corresponding adsorption plates 10 through bolts, so as to facilitate the Remove the adsorption plate 10 for cleaning and replacement.

参照图3,本实施例中,螺纹套筒14上固定套设有两个限位环,限位环与U型板11相接触,对螺纹套筒14起到限位的作用。Referring to FIG. 3 , in this embodiment, two limit rings are fixedly sleeved on the threaded sleeve 14 , and the limit rings are in contact with the U-shaped plate 11 to limit the position of the threaded sleeve 14 .

参照图2,本实施例中,引入箱2内固定连接有多个导向板20,吸附板10与相对应的导向板20相接触,便于安装吸附板10并对吸附板10起到支撑的效果。Referring to FIG. 2 , in this embodiment, a plurality of guide plates 20 are fixedly connected in the introduction box 2 , and the adsorption plates 10 are in contact with the corresponding guide plates 20 , which facilitates the installation of the adsorption plates 10 and supports the adsorption plates 10 . .

参照图3,本实施例中,密封板8的另一侧开设有圆槽,蜗杆13上固定套设有轴承的内圈,轴承的外圈与圆槽的内壁固定连接,使蜗杆13的转动更加稳定。3, in this embodiment, the other side of the sealing plate 8 is provided with a circular groove, the inner ring of the bearing is fixedly sleeved on the worm 13, and the outer ring of the bearing is fixedly connected with the inner wall of the circular groove, so that the rotation of the worm 13 more stable.

参照图3,本实施例中,U型板11的顶部与底部均固定连接有竖板17,竖板17的一侧开设有滑槽18,螺纹杆16上固定连接有连接杆19,连接杆19滑动连接在相对应的滑槽18内,对螺纹杆16起到导向的效果。Referring to FIG. 3 , in this embodiment, the top and bottom of the U-shaped plate 11 are fixedly connected with a vertical plate 17 , one side of the vertical plate 17 is provided with a chute 18 , and a connecting rod 19 is fixedly connected to the threaded rod 16 . 19 is slidably connected in the corresponding chute 18 to guide the threaded rod 16 .

工作原理,当需要拆卸吸附板10进行清理更换时,转动旋钮,旋钮带动蜗杆13转动,蜗杆13与蜗轮15相啮合传动蜗轮15转动,蜗轮15的转动带动螺纹套筒14转动,螺纹套筒14的转动带动相对应的两个螺纹杆16相互靠近,当螺纹杆16不与连接板12相接触时即可取出吸附板10并对其进行清理更换,当需要对烟气进行引入时只需要启动抽气泵6,抽气泵6将引入箱2内的烟气通过循环管7引入锅炉本体1内,两个吸附板10可有效降低其表面附着的杂质,延长吸附板10的使用寿命,提高吸附板10的吸附效率。Working principle, when it is necessary to disassemble the adsorption plate 10 for cleaning and replacement, turn the knob, the knob drives the worm 13 to rotate, the worm 13 engages with the worm wheel 15 to drive the worm wheel 15 to rotate, the rotation of the worm wheel 15 drives the threaded sleeve 14 to rotate, and the threaded sleeve 14 rotates. The rotation drives the corresponding two threaded rods 16 to approach each other. When the threaded rods 16 are not in contact with the connecting plate 12, the adsorption plate 10 can be taken out and cleaned and replaced. When the flue gas needs to be introduced, it is only necessary to start The suction pump 6, the suction pump 6 introduces the flue gas introduced into the box 2 into the boiler body 1 through the circulation pipe 7, and the two adsorption plates 10 can effectively reduce the impurities attached to the surface, prolong the service life of the adsorption plate 10, and improve the adsorption plate. 10 adsorption efficiency.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above description is only a preferred embodiment of the present invention, but the protection scope of the present invention is not limited to this. Equivalent replacement or modification of the new technical solution and its utility model concept shall be included within the protection scope of the present utility model.

Claims (6)

1. The utility model provides a flue gas introducing device for boiler, includes boiler body (1) and introduces case (2), its characterized in that: one side, close to each other, of the boiler body (1) and the introduction box (2) is fixedly communicated with a same connecting pipe (4), one side of the boiler body (1) is fixedly communicated with a mixed air inlet pipe (3), the top of the introduction box (2) is fixedly communicated with an exhaust pipe (5), one side, close to the boiler body (1), of the introduction box (2) is fixedly provided with an air suction pump (6), the air suction end of the air suction pump (6) is fixedly communicated with the introduction box (2), the exhaust end of the air suction pump (6) is fixedly communicated with a circulating pipe (7), and the top end of the circulating pipe (7) is fixedly communicated with the mixed air inlet pipe (3);
introduce case (2) and keep away from four connecting plates (12) of one side fixedly connected with of boiler body (1), it keeps away from to introduce case (2) two recesses have been seted up to one side of boiler body (1), the through-hole has been seted up on one side inner wall of recess, closing plate (8) are equipped with to the card in the recess, one side movable mounting of closing plate (8) has adsorption plate (10), opposite side fixedly connected with U template (11) of closing plate (8), the opposite side of closing plate (8) is rotated and is connected with worm (13) that the level set up, worm (13) with U template (11) are rotated and are connected, the top of U template (11) is rotated and is connected with threaded sleeve (14), fixedly connected with worm wheel (15) on threaded sleeve (14), worm (13) with worm wheel (15) mesh mutually, threaded sleeve (14) threaded rod (16) have two threaded rod (16), threaded rod (16) and corresponding connecting plate (12) sliding connection.
2. The flue gas introduction apparatus for a boiler according to claim 1, wherein: one side of the sealing plate (8) is fixedly connected with two symmetrically arranged fixing plates (9), and one side of each fixing plate (9) which is close to each other is movably connected with the corresponding adsorption plate (10) through a bolt.
3. The flue gas introduction apparatus for a boiler according to claim 1, wherein: a plurality of guide plates (20) are fixedly connected in the lead-in box (2), and the adsorption plates (10) are in contact with the corresponding guide plates (20).
4. The flue gas introduction apparatus for a boiler according to claim 1, wherein: the top and the equal fixedly connected with riser (17) in bottom of U template (11), spout (18) have been seted up to one side of riser (17), fixedly connected with connecting rod (19) are gone up in threaded rod (16), connecting rod (19) sliding connection is corresponding in spout (18).
5. The flue gas introducing apparatus for a boiler according to claim 1, wherein: the other side of the sealing plate (8) is provided with a circular groove, the worm (13) is fixedly sleeved with an inner ring of a bearing, and an outer ring of the bearing is fixedly connected with the inner wall of the circular groove.
6. The flue gas introducing apparatus for a boiler according to claim 1, wherein: the threaded sleeve (14) is fixedly sleeved with two limiting rings, and the limiting rings are in contact with the U-shaped plate (11).
CN202220059318.7U 2022-01-11 2022-01-11 Flue gas introducing device for boiler Expired - Fee Related CN217604135U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220059318.7U CN217604135U (en) 2022-01-11 2022-01-11 Flue gas introducing device for boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220059318.7U CN217604135U (en) 2022-01-11 2022-01-11 Flue gas introducing device for boiler

Publications (1)

Publication Number Publication Date
CN217604135U true CN217604135U (en) 2022-10-18

Family

ID=83562257

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220059318.7U Expired - Fee Related CN217604135U (en) 2022-01-11 2022-01-11 Flue gas introducing device for boiler

Country Status (1)

Country Link
CN (1) CN217604135U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117244351A (en) * 2023-10-16 2023-12-19 江苏华星东方电力环保科技有限公司 Primary flue gas purifying equipment with heat recovery

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117244351A (en) * 2023-10-16 2023-12-19 江苏华星东方电力环保科技有限公司 Primary flue gas purifying equipment with heat recovery
CN117244351B (en) * 2023-10-16 2024-05-31 江苏华星东方电力环保科技有限公司 Primary flue gas purifying equipment with heat recovery

Similar Documents

Publication Publication Date Title
CN217604135U (en) Flue gas introducing device for boiler
CN110360585B (en) Circulating fluidized bed boiler combustion chamber assists deashing structure
CN220506756U (en) Waste heat recovery device for heat power supply
CN110327706B (en) Industrial waste gas purification treatment device with waste heat recycling function
CN220355443U (en) A boiler separator
CN209706022U (en) A kind of energy-saving, environmental protection boiler
CN204806907U (en) Activation lime rotary kiln flue gas waste heat reutilization device
CN216131906U (en) Boiler with heat is recycled
CN204268441U (en) Heat pipe quenching waste-heat recovery device in a kind of internal thermal upright carbonization furnace
CN104329654B (en) Heat pipe quenching waste-heat recovery device in a kind of internal thermal upright carbonization furnace
CN211450969U (en) Ash cleaning device for boiler
CN115804986A (en) An integrated treatment system for boiler flue gas
CN211204071U (en) Split type waste gas incinerator
CN221944257U (en) A high-efficiency and energy-saving waste heat recovery device for boilers
CN216827704U (en) Pipeline dirt remover
CN222865199U (en) Full-automatic horizontal hot air boiler
CN207298971U (en) Powdered activated carbon drying and incineration treatment system
CN222143092U (en) An open gas and oil boiler
CN223010107U (en) Exhaust-heat boiler flue gas filter equipment
CN222069329U (en) A water heating device for a kiln waste heat boiler
CN217737171U (en) Boiler blow-off heat energy cyclic utilization device
CN221424878U (en) Incineration flue gas treatment device for coal-fired power plant
CN221923544U (en) A dust removal water tank for the tail of an industrial boiler
CN221882210U (en) A new energy-saving and high-yield graphitization furnace for the production of electrode negative materials
CN220039160U (en) Thermal power plant waste heat recovery and utilization device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221018