[go: up one dir, main page]

CN217350515U - Civil engineering building construction siding wall lifts by crane installation integration equipment - Google Patents

Civil engineering building construction siding wall lifts by crane installation integration equipment Download PDF

Info

Publication number
CN217350515U
CN217350515U CN202221126286.4U CN202221126286U CN217350515U CN 217350515 U CN217350515 U CN 217350515U CN 202221126286 U CN202221126286 U CN 202221126286U CN 217350515 U CN217350515 U CN 217350515U
Authority
CN
China
Prior art keywords
hoisting
framework
frame
civil engineering
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221126286.4U
Other languages
Chinese (zh)
Inventor
康苗
杨鹏
白宇
闫亚团
李守富
关晓楠
王腾
薛毓鑫
姚尔可
徐盼
陈晨
王升
陈伯佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Bureau Group Co Ltd
Original Assignee
China Construction Third Bureau Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Bureau Construction Engineering Co Ltd filed Critical China Construction Third Bureau Construction Engineering Co Ltd
Priority to CN202221126286.4U priority Critical patent/CN217350515U/en
Application granted granted Critical
Publication of CN217350515U publication Critical patent/CN217350515U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a civil engineering building construction panel wall lifting and mounting integrated device, which relates to the field of building engineering construction and solves the problems of quality, safety and slow construction progress existing in the manual installation of light partition boards, and comprises a lifting device, a trolley, an L-shaped steel plate and an operation frame; during the hoisting process, the trolley is matched with the bottom of the plate wall, and the upper part of the trolley is matched with the L-shaped steel plate to protect the bottom of the plate wall from being damaged by friction with the ground. The upper part of the hoisting framework is provided with the idler wheel and the limiting device so as to prevent the plate wall from being scratched by the upper pulley and prevent the side slipping from causing safety accidents in the hoisting process. The operation frame and the hoisting equipment can be connected with each other and move simultaneously, so that the hoisting and the installation of the plate wall are synchronized. Compared with the prior art, the utility model, can guarantee installation quality when safety, install light baffle wall fast.

Description

Civil engineering building construction siding wall lifts by crane installation integration equipment
Technical Field
The utility model relates to a building engineering construction field, specific saying so, civil engineering construction siding wall lifts by crane installation integration equipment.
Background
In recent years, ALC light partition boards are increasingly used for replacing on-site masonry to form indoor wall partitions. Because the material is not only low in cost, but also convenient to install. Only cement mortar for fixing and pasting is needed to be smeared after the pre-designed male and female grooves are installed and spliced, and the use is very convenient. The process that the traditional wall surface needs to be built one by one and the masonry, cement and sand are carried is changed. At present, the plate wall installation equipment used on site is too crude, has a plurality of defects, and has complex operation and lacks of safety.
The applicant has found that the existing hoisting installation equipment has at least the following problems: if the pulley at the upper part causes damage to the plate surface in the hoisting process of the plate wall and the friction between the plate bottom and the ground in the hoisting process causes damage to the plate wall, certain quality defects exist during construction, the hoisting and installation have inconsistency, certain safety and quality hidden dangers exist in the installation process, certain inconvenience is caused to the construction on site, and the construction progress is influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to design a civil engineering construction siding wall lifts by crane installation integration equipment for the quality that exists when solving artifical installation light partition plate, safety, the slow problem of construction progress can be in safety, install light partition wall fast in guarantee the installation quality.
The utility model discloses a following technical scheme realizes:
the civil engineering building construction plate wall lifting and mounting integrated equipment comprises lifting equipment, a trolley, an L-shaped steel plate and an operating frame; the L-shaped steel plate is used for clamping a bottom corner of the panel wall; the L-shaped steel plate extends along the longitudinal direction, the opening of the L-shaped steel plate is arranged upwards, the folded angle part of the L-shaped steel plate is connected with the top of the trolley in a turnover way, and the turnover axis of the L-shaped steel plate extends along the longitudinal direction; the lifting equipment comprises a frame main body, a winding device, a first wheel, a lifting framework, a limiting device, a roller and a traction rope; the first wheels are provided with brakes, and a plurality of first wheels are connected to the bottom of the frame main body; the hoisting framework is connected to the top of the frame main body; the winding device is used for winding and unwinding the traction rope, is arranged on the frame main body and is positioned on the rear side of the hoisting framework in the transverse direction; one end of the traction rope is connected with the winding device and winds from the winding device to a position which is located on the front side of the hoisting framework in the transverse direction after passing through the top of the hoisting framework; the limiting device is connected to the hoisting framework and is transversely positioned on the front side of the hoisting framework, and the limiting device is used for limiting the panel wall to laterally move in the longitudinal direction; the axes of the rollers are arranged along the longitudinal direction, the rollers are connected to the lifting framework and are positioned on the front side of the lifting framework in the transverse direction, and the rollers and the limiting device are arranged vertically; the operation frame is used for getting on people and is positioned on one side of the hoisting equipment in the longitudinal direction; the handling frame includes support body and a plurality of second wheel, the second wheel connect in the support body bottom, the support body can dismantle connect in lift by crane equipment.
When the structure is arranged, the hoisting equipment is used for hoisting the plate wall through the traction rope. When lifting, the trolley is arranged at the bottom of the plate wall, one side base angle of the plate wall is clamped on the L-shaped steel plate, the trolley is driven by the L-shaped steel plate to move towards the frame main body when the plate wall is lifted, meanwhile, the L-shaped steel plate can change along with the change of the inclination angle of the plate wall, and the bottom of the plate wall can be protected from being damaged by friction with the ground.
The idler wheels arranged on the frame main body are in contact with the wall surface when the plate wall is lifted, so that the distance between the plate wall and the top of the frame main body can be kept in the lifting process, and the plate wall is prevented from being scratched. The limiting device arranged on the frame main body can prevent the frame main body from sideslipping to cause safety accidents when the frame main body lifts a plate wall.
The operation frame and the hoisting equipment can be connected with each other and move simultaneously, so that the hoisting and the installation of the plate wall are synchronized.
Therefore, the lifting and mounting integrated equipment can ensure the mounting quality while safely and quickly mounting the light partition wall
Further: the limiting device comprises two transversely extending limiting rods which are sequentially arranged in the longitudinal direction.
Further: the winding device is provided with a motor provided with a winding wheel.
Further: the switch of motor sets up to have the hand pine and closes the return button switch of function promptly, return button switch set up in frame main part rear side top portion position on transversely.
When the structure is adopted, the switch of the motor adopts a button switch which is turned off when being loosened by hand, so that safety accidents caused by misoperation of people are prevented.
Further for better realization the utility model discloses, adopt following structure that sets up very much: the frame main body is connected with a balance weight, and the balance weight is transversely positioned at the rear side of the hoisting framework.
Further for better realization the utility model discloses, adopt following structure that sets up very much: the frame main part is connected with the protection casing, the protection casing covers rolling equipment with the counter weight.
When adopting above-mentioned structure that sets up, rolling equipment and counter weight all set up independent protection casing, further strengthen the security of equipment.
Further for better realization the utility model discloses, adopt the following structure that sets up very much: the bottom of the lifting framework is hinged with the top of the frame main body through a roller hinge, and the axis of the roller hinge extends longitudinally;
the hoisting framework is characterized in that an inclined strut is arranged on the transverse rear side of the hoisting framework, the top of the inclined strut is hinged to the hoisting framework, and the bottom of the inclined strut is detachably clamped to the framework main body.
When the structure is arranged, the bottom of the hoisting framework and the top of the framework main body are connected in a rolling shaft hinge mode, the hoisting framework can be turned and folded when the hoisting framework needs to be transferred remotely, and the hoisting framework is convenient to transfer.
Further for better realization the utility model discloses, adopt the following structure that sets up very much: the inclined strut is a telescopic support frame.
When adopting above-mentioned structure that sets up, lift by crane the bracing that the skeleton was joined in marriage and be the telescopic support frame, can pack up the bracing with lifting by crane the skeleton when long-distance the needs are shifted, convenient the transfer.
Further for better realization the utility model discloses, adopt the following structure that sets up very much: the top end of the hoisting framework is connected with a pulley; the traction rope passes through the pulley and then winds to the position on the front side of the hoisting framework in the transverse direction.
Further for better realization the utility model discloses, adopt following structure that sets up very much: the frame body comprises four upright posts, a plurality of cross rods and at least one scaffold board;
the vertical rods are telescopic rods, the four vertical rods are arranged in an array in the transverse direction and the longitudinal direction, and the bottom end of each vertical rod is connected with one second wheel;
the frame body is provided with at least one layer, and two transverse rods which are arranged in sequence along the transverse direction and extend longitudinally are arranged at each layer; two ends of the cross rod are respectively correspondingly detachably connected to the two vertical rods which are sequentially arranged in the longitudinal direction;
the scaffold board is arranged at each layer position, and two lateral sides of the scaffold board in the transverse direction are respectively hung on the cross rods on the corresponding sides through scaffold board hooks;
the support body is two on one side in vertical direction the pole setting respectively with the frame main part can dismantle the connection.
When the structure is arranged, the vertical rods are telescopic rods, and can be retracted after being detached, so that the operation frame is convenient to transfer and can adapt to installation of the panel walls with different heights.
Further for better realization the utility model discloses, adopt following structure that sets up very much: two of the other side of the frame body in the longitudinal direction the upright stanchions can be detachably connected with a foot support, and the outer side of the foot support is in threaded connection with a vertically arranged screw rod.
Further for better realization the utility model discloses, adopt following structure that sets up very much: the both sides that the support body was vertically ascending all are provided with the bridging, the bridging can dismantle two of arranging according to the preface on horizontal of connecting corresponding side the pole setting.
Further for better realization the utility model discloses, adopt the following structure that sets up very much: one side of the frame body in the transverse direction is provided with a crawling ladder which is detachably connected with the vertical rod.
The utility model has the advantages of it is following and beneficial effect:
(1) the utility model discloses in, lift by crane equipment and be used for lifting by crane the siding wall through the haulage rope. When lifting by crane, be equipped with the dolly in panel wall bottom, one side base angle card of panel wall is established on L shaped steel board, can drive the dolly and remove towards the frame main part through L shaped steel board when the panel wall lifts up, and simultaneously, L shaped steel board can change along with the change of panel wall inclination, can protect the bottom of panel wall to avoid the friction damage between and the ground.
(2) The utility model discloses in, the gyro wheel that sets up in the frame subject contacts with the wall when lifting by crane the siding wall, can make the siding wall keep with the distance at frame subject top lifting by crane the in-process, prevents that the siding wall from being by the fish tail. The limiting device arranged on the frame main body can prevent the frame main body from sideslipping to cause safety accidents when the frame main body lifts a plate wall.
(3) The utility model discloses in, the handling frame can interconnect with the equipment of lifting by crane, removes simultaneously, makes lifting by crane and installation synchronization of siding wall.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 shows a left side structure of a lifting apparatus;
FIG. 2 shows a three-dimensional structure of a lifting apparatus;
FIG. 3 is a rear side schematic view of the handling frame;
FIG. 4 is a left side schematic view of the handling frame;
FIG. 5 shows a three-dimensional structure of a hoist mount integrated facility;
labeled in the figure as:
1. a frame body; 2a, a first wheel; 2b, a second wheel; 3. winding equipment; 4. balancing weight; 5. a protective cover; 6. a motor switch; 7. hoisting the framework; 8. a roller hinge; 9. a limiting device; 10. a roller; 11. bracing; 12. a pulley; 13. a hauling rope; 14. a panel wall; 15. a socket assembly; 16. a trolley; 16a, an L-shaped steel plate; 17. erecting a rod; 18. inserting a rod; 19. a foot support; 20. a screw; 21. a scissor support; 22. a cross bar; 23. a bolt and a nut; 24. a scaffold board; 25. the scaffold board is hooked; 26. the ladder is climbed.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clearer, the technical solutions of the present invention will be described in detail below. It is to be understood that the embodiments described are only some embodiments of the invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
In the description of the present invention, it is to be noted that, unless otherwise specified, "a plurality" means two or more; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood as the case may be, by those of ordinary skill in the art.
Example 1:
the utility model provides a civil engineering construction siding wall lifts by crane installation integration equipment, can guarantee the installation quality when safe, quick installation light partition wall, as shown in fig. 1, fig. 2, fig. 3, fig. 4, fig. 5, especially set up to following structure:
the lifting and mounting integrated equipment comprises lifting equipment, a trolley 16, an L-shaped steel plate 16a and an operating frame.
The position of the panel wall 14 during hoisting is set to the front side of the hoisting equipment, the front and rear direction of the hoisting equipment is set to the horizontal direction, and the left and right direction is set to the vertical direction. The hoisting device, the trolley 16, the L-shaped steel plate 16a and the handling frame are described below by using a use scenario in hoisting.
The trolley 16 is mainly composed of a steel plate with four wheels at the bottom, an L-shaped steel plate 16a which can be overturned is connected to the top of the trolley 16, and the angle of the L-shaped steel plate 16a is 90 degrees and used for clamping the bottom corner of the panel wall 14. The L-shaped steel plate 16a extends along the longitudinal direction, the opening of the L-shaped steel plate 16a is arranged upwards, and the folded angle part at the bottom of the L-shaped steel plate 16a is connected with the top of the trolley 16 through a roller hinge with the longitudinal axial direction, so that the L-shaped steel plate 16a can turn around the longitudinal direction. The trolley 16 is generally free to move but needs to be positioned in front of the lifting apparatus when in use.
The lifting equipment comprises a frame main body 1, a winding device 3, a first wheel 2a, a lifting framework 7, a limiting device 9, a roller 10 and a traction rope 13.
The frame main body 1 is a rectangular frame welded by square pipes. Four corners of the bottom of the frame body 1 are provided with a first wheel 2a, and the first wheel 2a is provided with a brake and has fixing capacity.
The lifting framework 7 is a door-shaped framework formed by welding square pipes. The whole hoisting framework 7 is vertically arranged, and the bottom end of the hoisting framework is connected to the top of the front end of the frame main body 1. The top of the hoisting framework 7 is connected with a pulley 12, and the axial direction of the pulley 12 is longitudinal.
The winding device 3 is provided with a motor provided with a winding wheel. A winding wheel of the winding device 3 is connected with one end of the traction rope 13 and used for winding and unwinding the traction rope 13. The winding device 3 is installed on the bottom of the frame body 1, and the whole body of the winding device is positioned on the rear side of the hoisting framework 7. The switch of the motor is arranged at the top end part of the rear side of the frame body 1 so as to be operated conveniently at a safe position far away from the plate wall 14, and the switch of the motor is arranged to be a return button switch with a function of turning off when being loosened by hand.
The hauling rope 13 is selected to be a nylon rope, and one end of the hauling rope is connected with and wound on the winding wheel. The hauling cable 13 is wound to the front side position of the hoisting framework 7 after passing through the pulley 12 at the top of the hoisting framework 7 from the winding device 3. The part of the hauling cable 13 at the front position of the hoisting framework 7 has a certain length for bolting on the panel wall 14.
The stop means 9 has a longitudinally extending slot for receiving the panel 14. In this embodiment, the limiting device 9 is provided as two limiting rods, and the two limiting rods are arranged in sequence in the longitudinal direction and extend along the transverse direction. The rear end of the limiting rod is fixedly connected to the hoisting framework 7 and is integrally positioned on the front side of the hoisting framework 7. The two limiting rods form a gap in the longitudinal direction for accommodating the plate wall 14, and the gap is used for limiting the plate wall 14 to move laterally in the longitudinal direction.
The roller 10 is a long roller whose axis is arranged in the longitudinal direction. The roller 10 is integrally positioned at the front side of the hoisting framework 7, the roller 10 is connected with the hoisting framework 7 through a wheel carrier, and the roller 10 and the limiting device 9 are vertically arranged and are specifically positioned above the limiting device 9 and below the pulley 12.
The operation frame is mainly used for getting on the people. The operation frame is integrally arranged on one side of the hoisting equipment in the longitudinal direction when in use, and can be arranged from left to right.
The operation frame comprises a frame body erected through rod pieces and four second wheels 2 b. The second wheel 2b is provided with brakes as the first wheel 2 a. The frame body comprises four upright posts 17, a plurality of cross bars 22 and at least one scaffold board 24. The pole setting 17 sets up to the telescopic link, and four pole settings 17 are transversely and vertically arranged in an array, and the bottom of every pole setting 17 all is connected with a second wheel 2 b. This support body has at least one level, for example two-layer as shown in fig. 5, all is provided with two horizontal poles 22 along the horizontal longitudinal extension that sets up according to the preface in every level department, and the both ends of horizontal pole 22 can be dismantled correspondingly respectively and connect on two pole settings 17 that arrange according to the preface on vertical, and wherein, cross bolt and nut 23 between horizontal pole 22 and the pole setting 17 and go on. A horizontally disposed scaffold board 24 is provided at each level. The two lateral sides of the scaffold board 24 are respectively provided with a plurality of scaffold board hooks 25, and the scaffold board 24 is hung on the cross rod 22 on the corresponding side through the scaffold board hooks 25 to complete installation.
A vertical insertion rod 18 is connected to the lower part of each upright 17 on the outer side in the longitudinal direction. A vertically extending jack assembly 15 is attached to the right side of the frame body 1. Two vertical rods 17 at the left side of the frame body in the longitudinal direction are respectively inserted into the socket assemblies 15 of the frame body 1 through the insertion rods 18 in a top-down manner to be detachably connected with the frame body 1.
Two upright stanchions 17 at the right side of the frame body in the longitudinal direction can be detachably connected with a foot support 19. Specifically, the inner side of the foot support 19 is connected with a vertically extending socket assembly 15, and two vertical rods 17 at the right side of the frame body in the longitudinal direction are respectively inserted into the socket assembly 15 of the foot support 19 through the inserting rods 18 in a top-down manner to detachably connect the foot support 19 together. The outer side of the foot support 19 is provided with a vertically arranged screw 20 which is in threaded connection with the foot support, and the screw 20 can be rotated to move up and down so as to fix the frame body on the ground and avoid shaking. The vertical rods 17 on the left side and the right side of the frame body are respectively provided with a cross brace 21 for reinforcement, and the cross brace 21 is detachably connected with two vertical rods 17 which are arranged on the corresponding side in sequence in the transverse direction. The front side position of support body is provided with cat ladder 26, and cat ladder 26 passes through the bolt and the nut can be dismantled and connect on pole setting 17.
Preferably, a counterweight 4 made of concrete is connected to the bottom position in the frame body 1, and the counterweight 4 is integrally located at the rear side of the winding device 3. The bottom in the frame body 1 is also connected with a rectangular steel protective cover 5, and the protective cover 5 covers the winding device 3 and the balance weight 4.
In this embodiment, the lifting device is used to lift the panel wall 14 by means of the hauling cable 13. During hoisting, the trolley 16 is arranged at the bottom of the plate wall 14, a bottom corner of one side of the plate wall 14 is clamped on the L-shaped steel plate 16a, the trolley 16 is driven by the L-shaped steel plate 16a to move towards the frame main body 1 when the plate wall 14 is hoisted, and meanwhile, the L-shaped steel plate 16a changes along with the change of the inclination angle of the plate wall 14, so that the bottom of the plate wall 14 can be protected from being damaged by friction with the ground.
The rollers 10 arranged on the frame main body 1 are in contact with the wall surface when the plate wall 14 is lifted, so that the plate wall 14 can keep a distance from the top of the frame main body 1 in the lifting process, and the plate wall 14 is prevented from being scratched. The limiting device 9 arranged on the frame main body 1 can prevent the side sliding of the hoisting plate wall 14 from causing safety accidents when the hoisting plate wall is hoisted.
The operation frame and the hoisting equipment can be connected with each other and move simultaneously, so that the hoisting and the installation of the plate wall are synchronized.
The switch of the motor adopts a button switch which is opened and closed by hands, thereby preventing safety accidents caused by misoperation.
Rolling device 3 and counter weight 4 all set up independent protection casing 5, further strengthen the security of equipment to the incident appears in the avoidance of errors.
Therefore, the lifting and mounting integrated equipment can ensure the mounting quality while safely and quickly mounting the light partition wall.
In addition, the upright rods 17 are telescopic rods, can be retracted after being disassembled, are convenient to transfer, and can enable the operation frame to adapt to installation of the panel walls with different heights.
Example 2:
this embodiment is further optimized on the basis of above-mentioned embodiment, and further for better realization the utility model discloses, adopt following setting structure very much:
in the embodiment, the bottom of the lifting framework 7 of the lifting and installing integrated equipment is movably connected with the frame main body 1. The bottom of the lifting framework 7 is hinged to the top of the frame main body 1 through a roller hinge 8, and the axis of the roller hinge 8 extends longitudinally, so that the lifting framework 7 can be turned over upwards and downwards towards the rear side. The rear side of the lifting framework 7 is provided with an inclined strut 11, the top of the inclined strut 11 is hinged to the lifting framework 7, the bottom of the inclined strut 11 extends backwards to abut against the top of the framework main body 1, and the rear end of the framework main body is not limited, so that detachable connection is realized.
In this embodiment, the bottom of lifting by crane skeleton 7 and the top connected mode of frame main part 1 are roller bearing hinged joint, can pack up lifting by crane skeleton 7 upset when long-range the transition of needs, and the convenient transition.
Preferably, the inclined strut 11 is arranged to be a telescopic support frame, so that the inclined strut 11 matched with the lifting framework 7 is a telescopic support frame, and the inclined strut 11 and the lifting framework 7 can be folded when the long-distance transfer is needed, so that the transfer is convenient.
The utility model discloses a lifting by crane installation integration equipment's use mode does:
before the lifting device is used, the lifting framework 7 is lifted, then the telescopic inclined strut 11 is supported, the balance weight 4 of the concrete block is added on the frame main body 1, and the brake on the first wheel 2a at the bottom of the frame main body 1 is pressed down to fix the wheels. After that, hoisting is started. The hoisting equipment is used for hoisting the plate wall 14, and meanwhile, the trolley 16 with the L-shaped steel plate 16a arranged at the top is placed at the bottom of the plate wall 14, so that the bottom of the plate is protected from being damaged. The plate top is contacted and limited by the roller 10 and the limiting device 9 during hoisting, so that the plate surface of the plate wall 14 is protected from being scratched and sliding laterally by the top pulley. When the panel wall 14 is lifted to a vertical position, the bottom trolley 16 is removed, and then the panel wall 14 is slowly lowered until it contacts the ground.
Before hoisting, the operation frame needs to be erected, and the specific operation steps are as follows, firstly, the four telescopic vertical rods 17 are extended to the required height, then the scissor supports 21 and the cross rods 22 are erected, and then the scaffold boards 24 and the ladder stands 26 are erected.
The hoisting equipment and the operation frame can be used in a matched mode, four inserting hole assemblies 15 are arranged on four square tubes of a frame main body 1 of the hoisting equipment, four inserting rods 18 are arranged on four upright rods 17 of the operation frame, and when the hoisting and the installation are carried out synchronously, the frame main body 1 and the upright rods 17 of the frame body can be connected and moved synchronously for use.
The above description is only for the specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art can easily think of the changes or substitutions within the technical scope of the present invention, and all should be covered within the protection scope of the present invention.

Claims (10)

1. The utility model provides a civil engineering construction siding wall lifts by crane installation integration equipment which characterized in that: comprises a hoisting device, a trolley (16), an L-shaped steel plate (16a) and an operation frame;
the L-shaped steel plate (16a) is used for clamping the bottom corner of the panel wall (14); the L-shaped steel plate (16a) extends along the longitudinal direction, the opening of the L-shaped steel plate (16a) is arranged upwards, the bending part of the L-shaped steel plate (16a) is connected with the top of the trolley (16) in a turnover mode, and the turning axis of the L-shaped steel plate (16a) extends along the longitudinal direction;
the hoisting equipment comprises a frame main body (1), a winding device (3), a first wheel (2a), a hoisting framework (7), a limiting device (9), a roller (10) and a traction rope (13); the first wheels (2a) are provided with brakes, and a plurality of first wheels (2a) are connected to the bottom of the frame main body (1); the hoisting framework (7) is connected to the top of the frame main body (1); the winding device (3) is used for winding and unwinding the traction rope (13), is arranged on the frame main body (1) and is positioned on the rear side of the hoisting framework (7) in the transverse direction; one end of the traction rope (13) is connected with the winding device (3) and winds from the winding device (3) to the front position of the hoisting framework (7) in the transverse direction after passing through the top of the hoisting framework (7); the limiting device (9) is connected to the hoisting framework (7) and is located on the front side of the hoisting framework (7) in the transverse direction, and the limiting device (9) is used for limiting the panel wall (14) to move laterally in the longitudinal direction; the axis of the roller (10) is arranged along the longitudinal direction, the roller (10) is connected to the lifting framework (7) and is positioned on the front side of the lifting framework (7) in the transverse direction, and the roller (10) and the limiting device (9) are arranged vertically;
the operation frame is used for people to get on, and the operation frame is longitudinally positioned on one side of the hoisting equipment; the handling frame includes support body and a plurality of second wheel (2b), second wheel (2b) connect in the support body bottom, the support body can dismantle connect in lift by crane equipment.
2. The civil engineering construction panel wall lifting and mounting integrated equipment of claim 1, wherein: the frame main body (1) is connected with a balance weight (4), and the balance weight (4) is located on the rear side of the hoisting framework (7) in the transverse direction.
3. The civil engineering construction panel wall lifting and mounting integrated equipment of claim 2, wherein: frame main part (1) is connected with protection casing (5), protection casing (5) cover rolling equipment (3) with counter weight (4).
4. The civil engineering construction panel wall lifting and mounting integrated equipment of claim 1, wherein: the bottom of the hoisting framework (7) is hinged with the top of the frame main body (1) through a roller hinge (8), and the axis of the roller hinge (8) extends along the longitudinal direction;
the hoisting framework (7) is transversely provided with an inclined strut (11) at the rear side, the top of the inclined strut (11) is hinged to the hoisting framework (7), and the bottom of the inclined strut (11) is detachably clamped to the framework main body (1).
5. The civil engineering construction panel wall lifting and mounting integrated equipment of claim 4, wherein: the inclined strut (11) is a telescopic support frame.
6. The civil engineering building construction siding wall lifts by crane installation integration equipment of claim 1, characterized in that: the top end of the hoisting framework (7) is connected with a pulley (12); the traction rope (13) passes through the pulley (12) and then is wound to the transverse position at the front side of the hoisting framework (7).
7. The civil engineering construction panel wall lifting and mounting integrated equipment of any one of claims 1 to 6, wherein: the frame body comprises four upright posts (17), a plurality of cross rods (22) and at least one scaffold board (24);
the upright posts (17) are telescopic rods, the four upright posts (17) are arranged in an array in the transverse direction and the longitudinal direction, and the bottom end of each upright post (17) is connected with one second wheel (2 b);
the rack body is provided with at least one layer, and two transverse rods (22) which are arranged in sequence along the transverse direction and extend in the longitudinal direction are arranged at each layer; two ends of the cross rod (22) are respectively and correspondingly detachably connected with the two upright rods (17) which are sequentially arranged in the longitudinal direction;
each layer position is provided with one scaffold board (24), and two lateral sides of each scaffold board (24) are respectively hung on the cross rods (22) on the corresponding sides through scaffold board hooks (25);
the two vertical rods (17) on one side of the frame body in the longitudinal direction are detachably connected with the frame main body (1) respectively.
8. The civil engineering construction panel wall lifting and mounting integrated equipment of claim 7, wherein: the two vertical rods (17) on the other side of the rack body in the longitudinal direction can be detachably connected with a foot support (19), and the outer side of the foot support (19) is in threaded connection with a vertically arranged screw rod (20).
9. The civil engineering construction panel wall lifting and mounting integrated equipment of claim 7, wherein: the both sides on the support body is vertical all are provided with bridging (21), bridging (21) can be dismantled two of arranging according to the preface on horizontal of connecting corresponding side pole setting (17).
10. The civil engineering construction panel wall lifting and mounting integrated equipment of claim 7, wherein: a ladder stand (26) is arranged on one lateral side of the frame body, and the ladder stand (26) is detachably connected with the vertical rod (17).
CN202221126286.4U 2022-05-11 2022-05-11 Civil engineering building construction siding wall lifts by crane installation integration equipment Active CN217350515U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221126286.4U CN217350515U (en) 2022-05-11 2022-05-11 Civil engineering building construction siding wall lifts by crane installation integration equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221126286.4U CN217350515U (en) 2022-05-11 2022-05-11 Civil engineering building construction siding wall lifts by crane installation integration equipment

Publications (1)

Publication Number Publication Date
CN217350515U true CN217350515U (en) 2022-09-02

Family

ID=83012363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221126286.4U Active CN217350515U (en) 2022-05-11 2022-05-11 Civil engineering building construction siding wall lifts by crane installation integration equipment

Country Status (1)

Country Link
CN (1) CN217350515U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116181083A (en) * 2023-03-17 2023-05-30 中国五冶集团有限公司 A detachable anti-overturning ALC wall panel installation trolley and its use method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116181083A (en) * 2023-03-17 2023-05-30 中国五冶集团有限公司 A detachable anti-overturning ALC wall panel installation trolley and its use method

Similar Documents

Publication Publication Date Title
US20060219478A1 (en) Construction
US4452337A (en) Sectional scaffolding raising apparatus
CN113550604B (en) Movable ALC light partition board installation device
CN217350515U (en) Civil engineering building construction siding wall lifts by crane installation integration equipment
CN116136122A (en) Integrated attached type inclined lifting climbing frame system and use method thereof
CN213418443U (en) Self-climbing type elevator shaft operation platform
US9440820B2 (en) Escalator lifting frame and method of using the same
KR100514133B1 (en) Carrier for curtain-wall panel establishing use and curtain-wall establishing method using the same
CN113511583A (en) Multi-functional high security assembly type structure handling anchor clamps
CN212957576U (en) Movable elevator shaft construction platform
WO2010061301A1 (en) Portable collapsible building structure
CN219031629U (en) Lifting equipment for indoor plate installation
CN214659903U (en) A cat ladder for safety engineering
CN214935303U (en) Hoisting device of steel reinforcement cage
JP3822084B2 (en) Construction lifting system for high-rise buildings
CN210049214U (en) Overhauling trolley
CN2237084Y (en) Bolt type lift scaffold
CN221502617U (en) Movable layer operation platform that encorbelments
CN220149027U (en) Movable lifting device for indoor building construction
CN220666849U (en) Hoisting operation platform car for high and large partition boards
JP6510212B2 (en) Method for disassembling construction elevator, assembling method, and disassembling and assembling apparatus
CN211115729U (en) Pc assembly type building well construction crawling ladder
CN213834317U (en) Tool for assembling and disassembling large screen
CN218708640U (en) Hoisting device for super high-rise inclined tower crown unit plate
CN210622809U (en) Multifunctional rack for tunnel construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant