CN217272383U - A kind of pipeline support buckle for construction engineering - Google Patents
A kind of pipeline support buckle for construction engineering Download PDFInfo
- Publication number
- CN217272383U CN217272383U CN202220069773.5U CN202220069773U CN217272383U CN 217272383 U CN217272383 U CN 217272383U CN 202220069773 U CN202220069773 U CN 202220069773U CN 217272383 U CN217272383 U CN 217272383U
- Authority
- CN
- China
- Prior art keywords
- arc
- shaped clamp
- clamp
- pipeline
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及建筑工程领域,尤其涉及一种建筑工程用管道支撑扣。The utility model relates to the field of construction engineering, in particular to a pipeline support buckle for construction engineering.
背景技术Background technique
建筑工程是指为人类生活、生产提供物质技术基础的各类建筑物和工程设施的统称。Construction engineering refers to the collective name of various buildings and engineering facilities that provide material and technical foundations for human life and production.
进行建筑工程施工的过程中,需要在建筑外部设置排水管,以将建筑顶层的雨水拍下,避免雨水聚集在建筑顶层,导致屋内渗水,而在进行排水管道安装时,为了整体的稳定性,需要使用管道支撑扣对管道进行固定。During the construction of the building project, it is necessary to set up a drainage pipe outside the building to take pictures of the rainwater on the top of the building, so as to avoid rainwater from gathering on the top of the building and causing water seepage in the house. When installing the drainage pipe, for the overall stability, Pipe support clips are required to secure the pipe.
而现有的管道支撑扣的弧形箍是硬性材料,形状不易改变,不能根据不同管道的直径进行调整,不方便对不同直径的管道进行固定,实用性较差。On the other hand, the arc hoop of the existing pipe support buckle is a rigid material, and the shape is not easily changed, and cannot be adjusted according to the diameters of different pipes, which is inconvenient to fix pipes of different diameters, and has poor practicability.
因此,有必要提供一种建筑工程用管道支撑扣解决上述技术问题。Therefore, it is necessary to provide a pipeline support buckle for construction engineering to solve the above technical problems.
实用新型内容Utility model content
本实用新型提供一种建筑工程用管道支撑扣,解决了现有的管道支撑扣不方便对不同管径的管道进行固定的问题。The utility model provides a pipeline support buckle for construction engineering, which solves the problem that the existing pipeline support buckle is inconvenient to fix pipelines with different diameters.
为解决上述技术问题,本实用新型提供的建筑工程用管道支撑扣,包括:支撑座;In order to solve the above technical problems, the utility model provides a pipeline support buckle for construction engineering, comprising: a support seat;
第一弧形夹具,所述第一弧形夹具固定连接于所述支撑座的顶端,所述第一弧形夹具顶部的中间开设有凹槽;a first arc-shaped clamp, the first arc-shaped clamp is fixedly connected to the top of the support seat, and a groove is opened in the middle of the top of the first arc-shaped clamp;
第二弧形夹具,所述第二弧形夹具位于所述凹槽内,所述第二弧形夹具顶部的左右两侧均设置有长杆螺栓,所述长杆螺栓的底端与所述第一弧形夹具螺纹连接;The second arc-shaped clamp, the second arc-shaped clamp is located in the groove, the left and right sides of the top of the second arc-shaped clamp are provided with long rod bolts, and the bottom end of the long rod bolt is connected to the The first arc clamp is threadedly connected;
滑槽,所述滑槽开设于所述第二弧形夹具的顶部的左右两侧;a chute, which is opened on the left and right sides of the top of the second arc-shaped clamp;
限位件,两个所述限位件位于所述滑槽的内部,所述限位件的底端延伸至所述第一弧形夹具的底部。Limiting pieces, the two limiting pieces are located inside the chute, and the bottom ends of the limiting pieces extend to the bottom of the first arc-shaped clamp.
优选的,所述第一弧形夹具和所述第二弧形夹具的相对一侧均设置有橡胶垫。Preferably, rubber pads are provided on opposite sides of the first arc-shaped clamp and the second arc-shaped clamp.
优选的,所述第一弧形夹具底部的四周均匀开设有卡孔。Preferably, clamping holes are evenly opened around the bottom of the first arc-shaped clamp.
优选的,所述限位件包括螺纹杆,所述螺纹杆的底端固定连接有横杆,所述横杆顶部的两端均固定连接有第一卡块,所述第一卡块的一端延伸至所述卡孔的内部,所述螺纹杆的表面滑动连接有弧形板,所述螺纹杆的表面且位于所述第二弧形夹具的顶部螺纹连接有螺帽。Preferably, the limiting member includes a threaded rod, the bottom end of the threaded rod is fixedly connected with a cross rod, both ends of the top of the cross rod are fixedly connected with a first clamping block, and one end of the first clamping block is fixedly connected Extending to the inside of the clamping hole, the surface of the threaded rod is slidably connected with an arc-shaped plate, and the surface of the threaded rod and the top of the second arc-shaped clamp is threadedly connected with a nut.
优选的,所述第二弧形夹具的大小与所述凹槽大小适配,所述第二弧形夹具位于所述第一弧形夹具的顶部,所述第二弧形夹具的底端可延伸至所述凹槽的内部。Preferably, the size of the second arc-shaped clamp is adapted to the size of the groove, the second arc-shaped clamp is located on the top of the first arc-shaped clamp, and the bottom end of the second arc-shaped clamp can be extends to the inside of the groove.
优选的,所述第一弧形夹具的底部固定连接有套管,所述套管的底部设置有支撑杆,所述支撑杆的顶端延伸至所述套管的内部,所述支撑杆表面的左右两侧均匀开设有卡槽。Preferably, the bottom of the first arc-shaped clamp is fixedly connected with a sleeve, the bottom of the sleeve is provided with a support rod, the top of the support rod extends to the inside of the sleeve, and the surface of the support rod is Card slots are evenly opened on the left and right sides.
优选的,所述套管外表面的左右两侧均固定连接有弹性件,所述弹性件一侧的底部固定连接有第二卡块,所述第二卡块的一端延伸至所述卡槽的内部。Preferably, elastic pieces are fixedly connected to the left and right sides of the outer surface of the sleeve, and a second blocking block is fixedly connected to the bottom of one side of the elastic piece, and one end of the second blocking block extends to the blocking slot internal.
通过在第一弧形夹具底部设置套管,套管与支撑杆之间通过弹性件和第二卡块卡接,第二卡块卡在不同位置处的卡槽内,方便调整底座与第一弧形夹具之间的距离,便于对距离墙面不同距离的管道进行固定,增强了管道支撑扣的实用性。By arranging a sleeve at the bottom of the first arc-shaped clamp, the sleeve and the support rod are clamped by an elastic member and the second clamping block, and the second clamping block is clamped in the clamping grooves at different positions, which facilitates the adjustment between the base and the first clamp. The distance between the arc clamps is convenient for fixing pipes with different distances from the wall, which enhances the practicability of the pipe support buckle.
与相关技术相比较,本实用新型提供的建筑工程用管道支撑扣具有如下有益效果:Compared with the related art, the pipeline support buckle for construction engineering provided by the utility model has the following beneficial effects:
本实用新型提供一种建筑工程用管道支撑扣,通过在第一弧形夹具中间开设凹槽,第二弧形夹具可向凹槽内延伸,从而改变第一弧形夹具和第二弧形夹具之间的距离,方便对不同直径的管道进行固定,且两个限位件卡在不同位置处的卡孔内,从侧面对管道进行固定,增大与管道之间的接触面积,提高稳定性。The utility model provides a pipeline support buckle for construction engineering. By opening a groove in the middle of a first arc-shaped clamp, the second arc-shaped clamp can extend into the groove, thereby changing the first arc-shaped clamp and the second arc-shaped clamp. The distance between the pipes is convenient for fixing pipes of different diameters, and the two limiters are stuck in the card holes at different positions to fix the pipes from the side, increase the contact area with the pipes, and improve the stability. .
附图说明Description of drawings
图1为本实用新型提供的建筑工程用管道支撑扣的第一实施例的结构示意图;Fig. 1 is the structural representation of the first embodiment of the pipeline support buckle for construction engineering provided by the utility model;
图2为图1所示的结构仰视图;Fig. 2 is the bottom view of the structure shown in Fig. 1;
图3为图1所示的限位件的结构示意图;FIG. 3 is a schematic structural diagram of the limiter shown in FIG. 1;
图4为本实用新型提供的建筑工程用管道支撑扣的第二实施例的结构示意图。FIG. 4 is a schematic structural diagram of a second embodiment of a pipeline support buckle for construction engineering provided by the present invention.
图中标号:1、支撑座,2、第一弧形夹具,3、凹槽,4、第二弧形夹具,5、长杆螺栓,6、滑槽,Labels in the figure: 1. Support seat, 2. The first arc-shaped clamp, 3. Groove, 4. The second arc-shaped clamp, 5. Long rod bolt, 6. Chute,
7、限位件,71、螺纹杆,72、横杆,73、第一卡块,74、弧形板,75、螺帽,7. Limiting piece, 71, threaded rod, 72, cross rod, 73, first block, 74, curved plate, 75, nut,
8、橡胶垫,9、卡孔,8. Rubber pad, 9. Card hole,
10、套管,11、支撑杆,12、卡槽,13、弹性件,14、第二卡块。10, casing, 11, support rod, 12, clip slot, 13, elastic piece, 14, second clip.
具体实施方式Detailed ways
下面结合附图和实施方式对本实用新型作进一步说明。The present utility model will be further described below with reference to the accompanying drawings and embodiments.
第一实施例first embodiment
请结合参阅图1、图2和图3,其中,图1为本实用新型提供的建筑工程用管道支撑扣的第一实施例的结构示意图;图2为图1所示的结构仰视图;图3为图1所示的限位件的结构示意图。建筑工程用管道支撑扣包括:支撑座1;Please refer to Fig. 1, Fig. 2 and Fig. 3 in conjunction with Fig. 1, wherein Fig. 1 is a schematic structural diagram of the first embodiment of the pipe support buckle for construction engineering provided by the utility model; Fig. 2 is a bottom view of the structure shown in Fig. 1; Fig. 3 is a schematic structural diagram of the limiting member shown in FIG. 1 . The pipeline support buckle for construction engineering includes: a support seat 1;
第一弧形夹具2,所述第一弧形夹具2固定连接于所述支撑座1的顶端,所述第一弧形夹具2顶部的中间开设有凹槽3;a first arc-
第二弧形夹具4,所述第二弧形夹具4位于所述凹槽3内,所述第二弧形夹具4顶部的左右两侧均设置有长杆螺栓5,所述长杆螺栓5的底端与所述第一弧形夹具2螺纹连接;The second arc-
滑槽6,所述滑槽6开设于所述第二弧形夹具4的顶部的左右两侧;A
限位件7,两个所述限位件7位于所述滑槽6的内部,所述限位件7的底端延伸至所述第一弧形夹具2的底部。Limiting
第一弧形夹具2和第二弧形夹具4中间环形的弧度相同,两者通过长杆螺栓5固定,位置可调,滑槽6与限位件7大小适配,两个限位件7从两侧对管道进行支撑,避免第一弧形夹具2和第二弧形夹具4两者与管道之间接触面积过小,稳定性不强。The arc of the middle ring of the
所述第一弧形夹具2和所述第二弧形夹具4的相对一侧均设置有橡胶垫8。The opposite sides of the first arc-
所述第一弧形夹具2底部的四周均匀开设有卡孔9。Card holes 9 are evenly opened around the bottom of the first arc-
橡胶垫8粘贴在第一弧形夹具2和第二弧形夹具4的弧形面上,增大与管道之间的摩擦,也避免夹持过紧,导致管道变形,卡孔9均匀开设在第一弧形夹具2底部。The
所述限位件7包括螺纹杆71,所述螺纹杆71的底端固定连接有横杆72,所述横杆72顶部的两端均固定连接有第一卡块73,所述第一卡块73的一端延伸至所述卡孔9的内部,所述螺纹杆71的表面滑动连接有弧形板74,所述螺纹杆71的表面且位于所述第二弧形夹具4的顶部螺纹连接有螺帽75。The
螺纹杆71通过滑槽6延伸至第一弧形夹具2底部,横杆72通过两个第一卡块73卡在卡孔9内,由螺帽75固定,从而使弧形板74可从侧面对管道进行夹持。The threaded
所述第二弧形夹具4的大小与所述凹槽3大小适配,所述第二弧形夹具4位于所述第一弧形夹具2的顶部,所述第二弧形夹具4的底端可延伸至所述凹槽3的内部。The size of the second arc-
本实用新型提供的建筑工程用管道支撑扣的工作原理如下:The working principle of the pipeline support buckle for construction engineering provided by the utility model is as follows:
对直径较小的管道进行固定时,首先通过螺栓将支撑座1固定在墙壁等固定物上。When fixing a pipe with a small diameter, firstly, the support base 1 is fixed to a fixed object such as a wall by means of bolts.
随后将第一弧形夹具2放置在管道表面,随后便可使用长杆螺栓5将第二弧形夹具4固定在第一弧形夹具2一侧,并使橡胶垫8与管道表面接触。Then the
此时便可将弧形板74向管道处移动,然后将第一卡块73卡在对应位置处的卡孔9后,便可使用螺帽75将螺纹杆71位置固定。At this point, the arc-shaped
与相关技术相比较,本实用新型提供的建筑工程用管道支撑扣具有如下有益效果:Compared with the related art, the pipeline support buckle for construction engineering provided by the utility model has the following beneficial effects:
通过在第一弧形夹具2中间开设凹槽3,第二弧形夹具4可向凹槽3内延伸,从而改变第一弧形夹具2和第二弧形夹具4之间的距离,方便对不同直径的管道进行固定,且两个限位件7卡在不同位置处的卡孔9内,从侧面对管道进行固定,增大与管道之间的接触面积,提高稳定性。By opening a
第二实施例Second Embodiment
请结合参阅图4,基于本申请的第一实施例提供的建筑工程用管道支撑扣,本申请的第二实施例提出另一种建筑工程用管道支撑扣。第二实施例仅仅是第一实施例优选的方式,第二实施例的实施对第一实施例的单独实施不会造成影响。Referring to FIG. 4 , based on the pipeline support buckle for construction engineering provided by the first embodiment of the present application, the second embodiment of the present application proposes another pipeline support buckle for construction engineering. The second embodiment is only a preferred mode of the first embodiment, and the implementation of the second embodiment will not affect the independent implementation of the first embodiment.
具体的,本申请的第二实施例提供的建筑工程用管道支撑扣的不同之处在于,所述第一弧形夹具2的底部固定连接有套管10,所述套管10的底部设置有支撑杆11,所述支撑杆11的顶端延伸至所述套管10的内部,所述支撑杆11表面的左右两侧均匀开设有卡槽12。Specifically, the difference between the pipe support buckle for construction engineering provided by the second embodiment of the present application is that the bottom of the first arc-shaped
套管10与支撑杆11大小适配,卡槽12均匀开设在支撑杆11表面,卡槽12一侧稍微倾斜一点。The
所述套管10外表面的左右两侧均固定连接有弹性件13,所述弹性件13一侧的底部固定连接有第二卡块14,所述第二卡块14的一端延伸至所述卡槽12的内部。An
弹性件13为一个弹性金属板,与套管10外表面焊接在一起,第二卡块14与卡槽12大小对应,卡在卡槽12内,便可限制套管10和支撑杆11的位置。The
本实用新型提供的建筑工程用管道支撑扣的工作原理如下:The working principle of the pipeline support buckle for construction engineering provided by the utility model is as follows:
当需要固定的管道距离墙面有一定距离时,首先将支撑杆11底端的底座通过螺栓固定在墙面上。When the pipe to be fixed is at a certain distance from the wall, the base at the bottom end of the
随后便可将两个弹性件13向两侧拉扯,从而将第二卡块14拉动出来,随后便可根据需要将支撑杆11从套管10中向外拉,使管道位于第一弧形夹具2和第二弧形夹具4之间。Then, the two
位置调整好后,便可松开弹性件13,在弹性件13自身弹性的作用下,第二卡块14便可卡在卡槽12内,从而固定套管10和支撑杆11的距离,方便调整。After the position is adjusted, the
与相关技术相比较,本实用新型提供的建筑工程用管道支撑扣具有如下有益效果:Compared with the related art, the pipeline support buckle for construction engineering provided by the utility model has the following beneficial effects:
通过在第一弧形夹具2底部设置套管10,套管10与支撑杆11之间通过弹性件13和第二卡块14卡接,第二卡块14卡在不同位置处的卡槽12内,方便调整底座与第一弧形夹具2之间的距离,便于对距离墙面不同距离的管道进行固定,增强了管道支撑扣的实用性。By arranging the
以上所述仅为本实用新型的实施例,并非因此限制本实用新型的专利范围,凡是利用本实用新型说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其它相关的技术领域,均同理包括在本实用新型的专利保护范围内。The above are only the embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the description and accompanying drawings of the present invention, or directly or indirectly applied to other Relevant technical fields are similarly included in the scope of patent protection of the present invention.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220069773.5U CN217272383U (en) | 2022-01-12 | 2022-01-12 | A kind of pipeline support buckle for construction engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220069773.5U CN217272383U (en) | 2022-01-12 | 2022-01-12 | A kind of pipeline support buckle for construction engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217272383U true CN217272383U (en) | 2022-08-23 |
Family
ID=82895727
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220069773.5U Expired - Fee Related CN217272383U (en) | 2022-01-12 | 2022-01-12 | A kind of pipeline support buckle for construction engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217272383U (en) |
-
2022
- 2022-01-12 CN CN202220069773.5U patent/CN217272383U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203560217U (en) | An adjustable semicircle hoop | |
CN207584178U (en) | Plumbing installation | |
CN217272383U (en) | A kind of pipeline support buckle for construction engineering | |
CN201094102Y (en) | Ultrasonic Sensor Measuring Device | |
CN210577527U (en) | Control protection line effective installation fixing device | |
CN103454350B (en) | Waveguide rod fixing device for acoustic emission inspection of pipeline | |
CN111609219A (en) | A kind of building seismic support hanger hinge | |
CN217669991U (en) | Assembly type component pipeline grooving tool | |
CN208060277U (en) | A kind of drawing experiment fixture of stainless steel card pressure connecting pipe | |
CN216279743U (en) | Electromechanical device reforms transform and uses auxiliary fixture | |
CN206787592U (en) | For the mobile support of the three-dimensional of quick-clamping on non-magnet material pipe fitting | |
CN109307104A (en) | An anti-seismic device for a building pipeline | |
CN211315324U (en) | Pipeline supporting device for underground pipe ditch | |
CN209903034U (en) | A rapid positioning device for elbows | |
CN209800865U (en) | Pipeline fastener for construction | |
CN211439715U (en) | Signal butterfly valve water flow indicator integrated standard assembly pipe joint connecting tool | |
CN211475393U (en) | Civil engineering uses portable theodolite support | |
CN203443935U (en) | Wave guide rod fixing device for pipe acoustic emission detection | |
CN217583455U (en) | A support correction device for heating pipes | |
CN211693799U (en) | Valve pipeline connecting and clamping structure | |
CN217683590U (en) | Pipeline clamping device that takes precautions against earthquakes for building engineering | |
CN219774992U (en) | Positioning device for pipeline installation | |
CN221811087U (en) | Fastener for pipeline installation | |
CN213177080U (en) | Novel anticorrosive type antidetonation gallows based on metal surface coating technique | |
CN207470921U (en) | pipe erection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A pipeline support buckle for construction engineering Effective date of registration: 20231114 Granted publication date: 20220823 Pledgee: Jiangsu Xinghua Rural Commercial Bank Co.,Ltd. Pledgor: ZHONGPENG ELECTRIC (JIANGSU) CO.,LTD. Registration number: Y2023980065224 |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220823 |