[go: up one dir, main page]

CN217169014U - Adjustable pre-buried channel - Google Patents

Adjustable pre-buried channel Download PDF

Info

Publication number
CN217169014U
CN217169014U CN202122860512.3U CN202122860512U CN217169014U CN 217169014 U CN217169014 U CN 217169014U CN 202122860512 U CN202122860512 U CN 202122860512U CN 217169014 U CN217169014 U CN 217169014U
Authority
CN
China
Prior art keywords
channel
block
connecting rod
nut
adjustment block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122860512.3U
Other languages
Chinese (zh)
Inventor
王文静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou University
Original Assignee
Suzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou University filed Critical Suzhou University
Priority to CN202122860512.3U priority Critical patent/CN217169014U/en
Application granted granted Critical
Publication of CN217169014U publication Critical patent/CN217169014U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses an adjustable pre-buried channel belongs to built-in fitting technical field, and this pre-buried channel includes the channel body, and the one end of channel body is equipped with first supporting part and the second supporting part that is used for supporting T type bolt, and swing joint has first regulating block on the first supporting part, and first regulating block includes first extension piece, the head rod of being connected with first extension piece and the first nut with head rod threaded connection, is equipped with first perforation hole on the first supporting part, and the head rod runs through first perforation hole is connected with the second regulating block on the second supporting part. The utility model can adjust the size of the opening of the channel by arranging the first adjusting block and the second adjusting block, thereby using T-shaped bolts of various types in a matching way, expanding the application range of the channel, reducing the drilling operation on the installed equipment and improving the installation efficiency; the T-shaped bolt with the spring can be matched by arranging the annular spring groove, so that the stability is better.

Description

一种可调节预埋槽道An adjustable pre-embedded channel

技术领域technical field

本实用新型属于预埋件技术领域,具体涉及一种可调节预埋槽道。The utility model belongs to the technical field of embedded parts, in particular to an adjustable embedded channel.

背景技术Background technique

预埋槽道是指将槽道埋入混凝土中,可作为现浇、预制混凝土构件上承载锚固点的理想解决方案。应用范围包括:地铁管片的管路及设备的安装固定、铁路桥检修吊篮安装、铁路桥四电上桥、电缆爬梯安装等,在现有的预埋槽道中,槽道的大小是固定的,与其配套的T型螺栓也只能使用固定的型号,而被安装的连接管片或者机电设备上连接孔大小不同,有时仅与小号的T型螺栓匹配,在T型螺栓直径过大时需要在连接管片或者机电设备上重新开孔,使孔与T型螺栓相匹配,重新开孔的过程增加了工作量,降低了安装效率。Pre-embedded channel refers to the channel embedded in concrete, which can be used as an ideal solution for load-bearing anchor points on cast-in-place and precast concrete components. The scope of application includes: the installation and fixation of the pipeline and equipment of the subway segment, the installation of the railway bridge maintenance gondola, the four electric bridges of the railway bridge, the installation of the cable ladder, etc. In the existing embedded channels, the size of the channel is fixed. However, the size of the connection holes on the connected segments or electromechanical equipment to be installed is different, and sometimes only matches with small T-bolts, and the diameter of the T-bolts is too large. At times, it is necessary to re-drill holes on the connecting segments or electromechanical equipment to match the holes with the T-bolts. The process of re-drilling increases the workload and reduces the installation efficiency.

实用新型内容Utility model content

技术问题:针对现有技术中存在的上述问题,本实用新型所要解决的技术问题在于提供一种可调节预埋槽道,适用于多种型号的T型螺栓,提高安装效率。Technical problem: In view of the above problems existing in the prior art, the technical problem to be solved by the present invention is to provide an adjustable pre-embedded channel, which is suitable for various types of T-bolts and improves installation efficiency.

技术方案:为了解决上述技术问题,本实用新型采用的技术方案如下:Technical scheme: in order to solve the above-mentioned technical problems, the technical scheme adopted by the utility model is as follows:

一种可调节预埋槽道,包括槽道本体,所述槽道本体的一端设有用于支撑T型螺栓的第一支撑部和第二支撑部,所述第一支撑部上活动连接有第一调节块,所述第一调节块包括第一延长块、与所述第一延长块连接的第一连接杆以及与所述第一连接杆螺纹连接的第一螺母,所述第一支撑部上设有第一贯穿孔,所述第一连接杆贯穿所述第一贯穿孔,所述第二支撑部上连接有第二调节块。An adjustable pre-embedded channel includes a channel body, one end of the channel body is provided with a first support part and a second support part for supporting the T-bolt, the first support part is movably connected with a first support part. An adjustment block, the first adjustment block includes a first extension block, a first connecting rod connected with the first extension block, and a first nut threadedly connected with the first connecting rod, the first support portion A first through hole is arranged thereon, the first connecting rod passes through the first through hole, and a second adjusting block is connected to the second support part.

优选的,所述第二调节块包括第二延长块、与所述第二延长块连接的第二连接杆以及与所述第二连接杆螺纹连接的第二螺母,所述第二支撑部上设有第二贯穿孔,所述第二连接杆贯穿所述第二贯穿孔。Preferably, the second adjustment block includes a second extension block, a second connecting rod connected with the second extension block, and a second nut threadedly connected with the second connecting rod, and the second support portion is on the second support portion. A second through hole is provided, and the second connecting rod penetrates through the second through hole.

优选的,所述第一调节块与第二调节块对称设置。Preferably, the first adjustment block and the second adjustment block are symmetrically arranged.

优选的,所述第一调节块还包括与所述第一连接杆螺纹连接的第三螺母,所述第三螺母位于第一延长块和第一支撑部之间,所述第二调节块还包括与所述第二连接杆螺纹连接的第四螺母,所述第四螺母位于第二延长块和第二支撑部之间。Preferably, the first adjustment block further comprises a third nut threadedly connected to the first connecting rod, the third nut is located between the first extension block and the first support portion, and the second adjustment block further The fourth nut is threadedly connected with the second connecting rod, and the fourth nut is located between the second extension block and the second support part.

优选的,所述槽道本体的横截面为“C”形。Preferably, the cross section of the channel body is "C" shaped.

优选的,所述槽道本体上连接有多个锚杆。Preferably, a plurality of anchor rods are connected to the channel body.

优选的,所述槽道本体为直线型槽道或弧形槽道。Preferably, the channel body is a straight channel or an arc channel.

优选的,所述槽道本体的内腔顶壁设有环形弹簧槽,所述环形弹簧槽设置有多道。Preferably, the top wall of the inner cavity of the channel body is provided with an annular spring groove, and the annular spring groove is provided with multiple channels.

有益效果:与现有技术相比,本实用新型具有以下优点:1、通过设置第一调节块和第二调节块,可以调节槽道开口的大小,从而配套使用各种型号的T型螺栓,扩大槽道的适用范围,减少了在被安装设备上钻孔作业,提高安装效率;2、设置环形弹簧槽可以配套带弹簧的T型螺栓,稳定性更好。Beneficial effects: Compared with the prior art, the utility model has the following advantages: 1. By setting the first adjusting block and the second adjusting block, the size of the opening of the channel can be adjusted, so that various types of T-bolts can be used together, Expand the scope of application of the groove, reduce the drilling operation on the installed equipment, and improve the installation efficiency; 2. The annular spring groove can be equipped with a T-bolt with a spring, and the stability is better.

附图说明Description of drawings

图1是本实用新型实施例1结构示意图;Fig. 1 is the structural representation of Embodiment 1 of the present utility model;

图2是实施例1中第一调节块结构示意图;2 is a schematic structural diagram of a first adjustment block in Embodiment 1;

图3是实施例1中第二调节块结构示意图;3 is a schematic structural diagram of a second adjustment block in Embodiment 1;

图4是实施例1中第一调节块使用状态示意图;4 is a schematic diagram of the use state of the first adjustment block in Embodiment 1;

图5是实施例1中第一调节块和第二调节块使用状态示意图;5 is a schematic diagram of the use state of the first adjustment block and the second adjustment block in Embodiment 1;

图6是本实用新型实施例1侧视结构示意图;Fig. 6 is a side view structural schematic diagram of Embodiment 1 of the present utility model;

图7是本实施例1与带弹簧T型螺栓配套使用状态结构示意图;FIG. 7 is a schematic structural diagram of the present embodiment 1 and the T-bolt with a spring in the supporting state;

图8是本实用新型实施例2结构示意图。8 is a schematic structural diagram of Embodiment 2 of the present invention.

具体实施方式Detailed ways

下面结合具体实施例,进一步阐明本发明,实施例在以本发明技术方案为前提下进行实施,应理解这些实施例仅用于说明本发明而不用于限制本发明的范围。The present invention will be further illustrated below in conjunction with specific examples, which are implemented on the premise of the technical solutions of the present invention. It should be understood that these examples are only used to illustrate the present invention and not to limit the scope of the present invention.

实施例1Example 1

如图1、图2和图3所示,一种可调节预埋槽道,包括槽道本体1,槽道本体1为C型槽道,其横截面为“C”形,槽道本体1的一端设有用于支撑T型螺栓9的第一支撑部2和第二支撑部3,两个支撑部之间为开口,T型螺栓9竖向从开口处放入槽道本体1内后转动90度即可被第一支撑部2和第二支撑部3承托,第一支撑部2上活动连接有第一调节块4,第一调节块4包括第一延长块41、第一连接杆42和第一螺母43,第一连接杆42与第一延长块41焊接或者一体成型,第一连接杆42上有螺纹,第一螺母43与第一连接杆42螺纹连接,第一支撑部2上设有第一贯穿孔21,第一连接杆42贯穿第一贯穿孔21,第一调节块4位于第一支撑部2的上方,使第一螺母43在第一支撑部2的下方,将第一调节块4与第一支撑部2固定连接,第二支撑部3上设有与第一调节块4对称的第二调节块5,第二调节块5包括第二延长块51、第二连接杆52和第二螺母53,其连接结构与第一调节块4相同,第二连接杆52与第二延长块51焊接或一体成型,第二支撑部3上设有第二贯穿孔31,第二连接杆52贯穿第二贯穿孔31,第二螺母53螺纹连接在第二连接杆52上。As shown in Figure 1, Figure 2 and Figure 3, an adjustable pre-embedded channel includes a channel body 1, the channel body 1 is a C-shaped channel, and its cross section is "C" shape, the channel body 1 One end is provided with a first support part 2 and a second support part 3 for supporting the T-bolt 9, between the two support parts is an opening, the T-bolt 9 is vertically placed into the channel body 1 from the opening and then rotated The first support part 2 and the second support part 3 can be supported by the first support part 2 and the second support part 3 at 90 degrees. The first support part 2 is movably connected with the first adjustment block 4. The first adjustment block 4 includes a first extension block 41 and a first connecting rod. 42 and the first nut 43, the first connecting rod 42 is welded or integrally formed with the first extension block 41, the first connecting rod 42 is threaded, the first nut 43 is threadedly connected with the first connecting rod 42, the first supporting part 2 There is a first through hole 21 on the top, the first connecting rod 42 penetrates through the first through hole 21, the first adjustment block 4 is located above the first support part 2, and the first nut 43 is located below the first support part 2. The first adjustment block 4 is fixedly connected with the first support part 2, and the second support part 3 is provided with a second adjustment block 5 symmetrical with the first adjustment block 4, and the second adjustment block 5 includes a second extension block 51, a second adjustment block 5, and a second adjustment block 5. The connection structure of the connecting rod 52 and the second nut 53 is the same as that of the first adjusting block 4 , the second connecting rod 52 is welded or integrally formed with the second extension block 51 , and the second support portion 3 is provided with a second through hole 31 , The second connecting rod 52 penetrates through the second through hole 31 , and the second nut 53 is threadedly connected to the second connecting rod 52 .

如图4所示,当使用中号螺栓91时,由于中号螺栓91的栓头放入槽道本体1后再转动90度,其栓头的宽度d1小于槽道本体1开口的宽度D,从而中号螺栓91与槽道本体1不能连接使用,此时转动第一调节块4,使第一延长块41向第二调节块5处突出,再拧紧第一螺母43使第一调节块4固定,从而使开口的宽度变小,中号螺栓91能够正常使用。As shown in FIG. 4 , when the medium bolt 91 is used, since the bolt head of the medium bolt 91 is placed in the channel body 1 and then rotated 90 degrees, the width d1 of the bolt head is smaller than the width D of the opening of the channel body 1, Therefore, the medium bolt 91 cannot be connected with the channel body 1. At this time, the first adjustment block 4 is rotated to make the first extension block 41 protrude toward the second adjustment block 5, and then the first nut 43 is tightened to make the first adjustment block 4 Fixed, so that the width of the opening is reduced, and the medium bolt 91 can be used normally.

如图5所示,当使用小号螺栓92时,由于小号螺栓92的栓头宽度d2更小,所以需要将第二调节块5的第二延长块51转动,使其向第一调节块4处突出,从而使开口的宽度更小,使小号螺栓92能够配套槽道本体1正常使用。As shown in FIG. 5 , when the small bolts 92 are used, since the head width d2 of the small bolts 92 is smaller, the second extension block 51 of the second adjusting block 5 needs to be rotated to make it move toward the first adjusting block. 4 places protrude, so that the width of the opening is smaller, so that the small bolt 92 can be used with the channel body 1 normally.

如图6所示,槽道本体1为直线型槽道(也可以按照使用需求为弧形槽道)槽道本体1的背面连接有两个锚杆6(锚杆数量根据需要合理设置),第一调节块4和第二调节块5在槽道本体1上均匀设置有多对。As shown in FIG. 6 , the channel body 1 is a straight channel (or an arc channel according to the usage requirements). The back of the channel body 1 is connected with two anchor rods 6 (the number of anchor rods is reasonably set according to the needs), A plurality of pairs of the first adjusting block 4 and the second adjusting block 5 are evenly arranged on the channel body 1 .

如图7所示,槽道本体1的内腔顶壁设有一道环形弹簧槽7(环形弹簧槽数量可设置多个,匹配不同大小的弹簧),由于现有的部分T型螺栓9的栓头部上设有弹簧8,环形弹簧槽7与弹簧8圈体的大小对应,当T型螺栓9放入槽道本体1的内后,弹簧8顶端落入环形弹簧槽7,对弹簧8起到限位作用,弹簧8利用其弹性将T型螺栓9抵紧在第一调节块4和第二调节块5上,当槽道本体1竖向按照或与水平面倾斜一定角度安装时,可防止T型螺栓9滑落。As shown in FIG. 7 , the top wall of the inner cavity of the channel body 1 is provided with an annular spring groove 7 (the number of annular spring grooves can be set in multiples to match springs of different sizes). There is a spring 8 on the head, and the annular spring groove 7 corresponds to the size of the coil body of the spring 8. When the T-bolt 9 is put into the groove body 1, the top end of the spring 8 falls into the annular spring groove 7, and the spring 8 rises. To the limit function, the spring 8 uses its elasticity to press the T-bolt 9 against the first adjustment block 4 and the second adjustment block 5. When the channel body 1 is installed vertically or inclined at a certain angle to the horizontal plane, it can prevent T-bolt 9 slips off.

实施例2Example 2

如图8所示,与实施例1不同的地方在于,第一调节块4还包括与第一连接杆42螺纹连接的第三螺母44,第三螺母44位于第一延长块41和第一支撑部2之间,第二调节块5还包括与第二连接杆52螺纹连接的第四螺母54,第四螺母54位于第二延长块51和第二支撑部3之间。通过设置第三螺母44和第四螺母54,可以调节第一调节块4和第二调节块5在槽道本体1内的高度,从而可以调节小号螺栓92的高度。As shown in FIG. 8 , the difference from Embodiment 1 is that the first adjustment block 4 further includes a third nut 44 threadedly connected to the first connecting rod 42 , and the third nut 44 is located between the first extension block 41 and the first support Between the parts 2 , the second adjusting block 5 further includes a fourth nut 54 threadedly connected with the second connecting rod 52 , and the fourth nut 54 is located between the second extension block 51 and the second support part 3 . By arranging the third nut 44 and the fourth nut 54 , the heights of the first adjusting block 4 and the second adjusting block 5 in the channel body 1 can be adjusted, so that the height of the small bolt 92 can be adjusted.

以上仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以作出若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。The above are only the preferred embodiments of the present utility model. It should be pointed out that for those skilled in the art, without departing from the principles of the present utility model, several improvements and modifications can also be made, and these improvements and modifications should also be It is regarded as the protection scope of the present invention.

Claims (8)

1.一种可调节预埋槽道,包括槽道本体(1),所述槽道本体(1)的一端设有用于支撑T型螺栓(9)的第一支撑部(2)和第二支撑部(3),其特征在于,所述第一支撑部(2)上活动连接有第一调节块(4),所述第一调节块(4)包括第一延长块(41)、与所述第一延长块(41)连接的第一连接杆(42)以及与所述第一连接杆(42)螺纹连接的第一螺母(43),所述第一支撑部(2)上设有第一贯穿孔(21),所述第一连接杆(42)贯穿所述第一贯穿孔(21),所述第二支撑部(3)上连接有第二调节块(5)。1. An adjustable pre-embedded channel, comprising a channel body (1), and one end of the channel body (1) is provided with a first support portion (2) and a second support portion for supporting the T-bolt (9). The support part (3) is characterized in that a first adjustment block (4) is movably connected to the first support part (2), and the first adjustment block (4) comprises a first extension block (41), and A first connecting rod (42) connected with the first extension block (41) and a first nut (43) threadedly connected with the first connecting rod (42), the first support portion (2) is provided with There is a first through hole (21), the first connecting rod (42) passes through the first through hole (21), and a second adjusting block (5) is connected to the second support portion (3). 2.根据权利要求1所述的可调节预埋槽道,其特征在于,所述第二调节块(5)包括第二延长块(51)、与所述第二延长块(51)连接的第二连接杆(52)以及与所述第二连接杆(52)螺纹连接的第二螺母(53),所述第二支撑部(3)上设有第二贯穿孔(31),所述第二连接杆(52)贯穿所述第二贯穿孔(31)。2. The adjustable pre-embedded channel according to claim 1, wherein the second adjustment block (5) comprises a second extension block (51), a The second connecting rod (52) and the second nut (53) threadedly connected with the second connecting rod (52), the second supporting part (3) is provided with a second through hole (31), the The second connecting rod (52) penetrates the second through hole (31). 3.根据权利要求2所述的可调节预埋槽道,其特征在于,所述第一调节块(4)与第二调节块(5)对称设置。3. The adjustable pre-embedded channel according to claim 2, wherein the first adjustment block (4) and the second adjustment block (5) are symmetrically arranged. 4.根据权利要求2所述的可调节预埋槽道,其特征在于,所述第一调节块(4)还包括与所述第一连接杆(42)螺纹连接的第三螺母(44),所述第三螺母(44)位于第一延长块(41)和第一支撑部(2)之间,所述第二调节块(5)还包括与所述第二连接杆(52)螺纹连接的第四螺母(54),所述第四螺母(54)位于第二延长块(51)和第二支撑部(3)之间。4. The adjustable pre-embedded channel according to claim 2, wherein the first adjusting block (4) further comprises a third nut (44) threadedly connected with the first connecting rod (42) , the third nut (44) is located between the first extension block (41) and the first support part (2), and the second adjustment block (5) further comprises a thread with the second connecting rod (52) A connected fourth nut (54), the fourth nut (54) is located between the second extension block (51) and the second support part (3). 5.根据权利要求1所述的可调节预埋槽道,其特征在于,所述槽道本体(1)的横截面为“C”形。5. The adjustable pre-embedded channel according to claim 1, characterized in that, the cross section of the channel body (1) is "C"-shaped. 6.根据权利要求1所述的可调节预埋槽道,其特征在于,所述槽道本体(1)上连接有多个锚杆(6)。6. The adjustable pre-embedded channel according to claim 1, wherein a plurality of anchor rods (6) are connected to the channel body (1). 7.根据权利要求1所述的可调节预埋槽道,其特征在于,所述槽道本体(1)为直线型槽道或弧形槽道。7 . The adjustable pre-embedded channel according to claim 1 , wherein the channel body ( 1 ) is a straight channel or an arc channel. 8 . 8.根据权利要求1所述的可调节预埋槽道,其特征在于,所述槽道本体(1)的内腔顶壁设有环形弹簧槽(7),所述环形弹簧槽(7)数量为一个或一个以上。8 . The adjustable pre-embedded channel according to claim 1 , wherein the inner cavity top wall of the channel body ( 1 ) is provided with an annular spring groove ( 7 ), and the annular spring groove ( 7 ) The number is one or more.
CN202122860512.3U 2021-11-19 2021-11-19 Adjustable pre-buried channel Active CN217169014U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122860512.3U CN217169014U (en) 2021-11-19 2021-11-19 Adjustable pre-buried channel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122860512.3U CN217169014U (en) 2021-11-19 2021-11-19 Adjustable pre-buried channel

Publications (1)

Publication Number Publication Date
CN217169014U true CN217169014U (en) 2022-08-12

Family

ID=82706556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122860512.3U Active CN217169014U (en) 2021-11-19 2021-11-19 Adjustable pre-buried channel

Country Status (1)

Country Link
CN (1) CN217169014U (en)

Similar Documents

Publication Publication Date Title
CN217169014U (en) Adjustable pre-buried channel
CN211344229U (en) Sliding support bottom plate structure with freely adjustable height
CN206020765U (en) A kind of double cables of Ultra-high Voltage Substations OPGW single poles draw lower fastener
CN205369978U (en) Prefabricated plate support frame
CN205180190U (en) Drive bird ware structure and special installation pole thereof
CN111997245A (en) A plug-in light steel external wall panel connection node
CN107380011B (en) Bending-resistant embedded channel vertical suspension base device
CN114300990A (en) Female combination hoisting device of pipe
CN207781379U (en) A kind of voltage transformer support
CN216238190U (en) Culvert supports reinforcing apparatus
CN207896623U (en) A kind of pedestal linking cable bearer
CN205276308U (en) Adjustable mechanical connection built -in fitting
CN222316161U (en) Metal pipeline support for steel structure engineering
CN216711418U (en) A tube-mother combined lifting device
CN221783707U (en) A vertical weak current box structure
CN221072092U (en) Be used for prefabricated column type inspection hole track panel strutting arrangement in parking area storehouse
CN219471588U (en) Verticality adjuster for vertical component of assembly structure
CN222295397U (en) A kind of installation connection sleeve core for building curtain wall
CN221323544U (en) Pipeline bracket for building construction
CN218702835U (en) Adjustable combined contact net support
CN214462453U (en) Steel pipe scaffold gasket
CN221210532U (en) Auxiliary device is changed to thermal power unit excessive reheat temperature reduction water regulating valve linear thruster
CN222169180U (en) Adjustable fixing buckle for overhead travelling crane three-phase power supply sliding wire
CN215484903U (en) Civil engineering construction support
CN220870245U (en) Pipeline installation regulator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant