[go: up one dir, main page]

CN2171107Y - Movable surveying markers - Google Patents

Movable surveying markers Download PDF

Info

Publication number
CN2171107Y
CN2171107Y CN 93246019 CN93246019U CN2171107Y CN 2171107 Y CN2171107 Y CN 2171107Y CN 93246019 CN93246019 CN 93246019 CN 93246019 U CN93246019 U CN 93246019U CN 2171107 Y CN2171107 Y CN 2171107Y
Authority
CN
China
Prior art keywords
marker
mark
cross bar
bar
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 93246019
Other languages
Chinese (zh)
Inventor
贾景云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUADONG GEOLOGY COLLEGE
Original Assignee
HUADONG GEOLOGY COLLEGE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUADONG GEOLOGY COLLEGE filed Critical HUADONG GEOLOGY COLLEGE
Priority to CN 93246019 priority Critical patent/CN2171107Y/en
Application granted granted Critical
Publication of CN2171107Y publication Critical patent/CN2171107Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The utility model relates to movable surveying marker, comprising a marker root, a marker body, a marker target, and a marker stone. A marker body mainly comprises a base rod, a marker rod, and a cross rod, which are made of a circular pipeline. The basic rod and the marker rod shaft one shaft together. The shaft line of the marker rod is vertical to the shaft line of the cross rod. A spherical shape sighting mark is erected on the cross rod by a steel rod penetrating in the pipeline. The rods are connected by a joint, a connecting rod, and a three-way joint. The marker of the utility model has simple structure, convenient carrying, and low cost. The utility model is easily assembled and disassembled. User can judge the center of the spherical marker from any direction observation and the utility model can accurately measure the height. The marker can be combined into a maker with various standards which is suitable for variant heights and variant distance measurement.

Description

Movable surveying markers
The utility model relates to measurement mechanism, a kind of movable survey signal of more specifically saying so.
(State Bureau of Surveying and Mapping compiles in " national triangulation and precise traversing scope ", Mapping Press's publication) introduced multiple surveyor's beacon in, wherein more general have an ordinary mark of steel, and it is the tripod surveyor's beacon made from the angle steel material that does not have internal frame (seeing Fig. 1 and Fig. 2).Fig. 1 is 4.3 meters ordinary marks of steel, and Fig. 2 is 6 meters ordinary marks of steel.Their structure comprises mark root, mark body, the mark heart and markstone.This class surveyor's beacon has following defective: the mark body structure complexity of (1) surveyor's beacon, and mark body weight, cost height, promptly fixing after burying underground in the open air, inconvenience is reclaimed, thereby becomes main spending in the mapping expense.(2) after surveyor's beacon is buried underground, the center of mira not with the markstone center on same pedal line, when surveying horizontal angle, to do the surveyor's beacon projection before and after the observation, survey eccentric element, to do correction to centre during calculating, time-consuming.(3) representing the position at the center of mira is not a unique point, when surveying vertical angle, observes mira from different directions, is to impinge upon on the different positions, and the surveyor's beacon height is accurately measured in inconvenience, should not make Data Processing in Rigorous Trigonometric Leveling.
The purpose of this utility model provide a kind of simple in structure, easy to use, measure accurately, be convenient to install and reclaim cheap movable survey signal.
The utility model is achieved like this, it comprises mark root, mark body, target and markstone.It is characterized in that marking body mainly is made up of basic bar, mark post and the cross bar of tubulose.Base bar and mark post are coaxial, the axis normal of mark post and cross bar, base bar upper end is connected by connecting link with the mark post lower end, there is the regulation and control spiral base bar upper end on the X-Y direction, can fixed connecting rod, and the position of fine-tuning thus mark post X and Y direction (the Y direction is the markstone center and the line at mark root center, and directions X is meant vertical with the Y direction, and with the vertical direction of mark body axis).Connecting link upper end is connected with the mark post lower end by joint, is connected with cross bar by threeway on the mark post, run through a steel pole in the cross bar, and steel pole one end frame has spherical mira.Steel pole can in cross bar, slide with regulate mira centering, available holding screw is lived the steel pole stationkeeping.The length of mark post can be as required height and be provided with many.
Movable survey signal of the present utility model has following advantage:
(1) its centre of sphere of spherical mira is the target center, and the center with mira can be correctly judged in observation in any direction.
(2) mira can regulate centering, promptly the target center is placed on the pedal line at markstone center, thereby can accurately measure the surveyor's beacon height.
(3) owing to adopt the structure of tubulose steel and connector, make that surveyor's beacon is installed, dismounting easily, the mark body is also light and handy, be beneficial to resettlement, cheap.
Fig. 3 is a wiring layout of the present utility model;
Fig. 4 buries underground mark root synoptic diagram underground;
Fig. 5 buries underground mark root cross-sectional view underground;
Fig. 6 is the mark root synoptic diagram that lays the roof;
Fig. 7 is the mark root cross-sectional view that lays the roof;
Fig. 8 is basic bar synoptic diagram;
Fig. 9 is the horizontal synoptic diagram of basic bar;
Figure 10 is the connecting link synoptic diagram;
Figure 11 is the connecting link sectional view;
Figure 12 is connecting link and basic bar socket synoptic diagram;
Figure 13 is the mark post synoptic diagram;
Figure 14 is the cross bar synoptic diagram;
Figure 15 is the connection diagram of cross bar and mira;
Figure 16 adds the stay bolt schematic representation of apparatus;
Figure 17 is three trunuion bearing synoptic diagram.
As seen from Figure 3, surveyor's beacon of the present utility model comprises mark root 1, mark body 2, target 3 and markstone 4.Mark body 2 mainly is made up of basic bar 5, mark post 6 and cross bar 7.Base bar 5 and mark post 6 same axis, the axis normal of the axis of mark post 6 and cross bar 7.Base bar 5, mark post 6, cross bar 7 are made by round pipe.Run through a steel pole 8 in cross bar 7 pipelines, the 3(of steel pole 8 one end framves one spherical mira sees Fig. 3,15).Basic bar 5 lower ends of mark body 2 are connected by joint 10 with steel pipe 9 upper ends of mark root 1.Connecting link 11 of socket in the upper end of base bar 5 is fastenedly connected bar 11(with the regulation and control of four couple on basic bar 5 upper end X-Y direction spiral 12 and sees Figure 12).Connecting link 11 upper ends are connected with mark post 6 by joint 13.Mark post 6 upper ends are connected with cross bar 7 by threeway 14, make the axis normal of axis with the mark body 2 of cross bar 7.Steel pole 8 can slide in cross bar 7, to regulate the position of target 3, in case regulate with two pairs of holding screws in two ends on the cross bar 7 15 fixing (seeing Figure 14,15).
Can find out that from Fig. 6-Fig. 7 mark root 1 is made up of steel pipe 9 and angle steel 16.With 4 angle steel 16 steel pipe 9 is stuck in the centre, adopts welding between angle steel 16 and the steel pipe 9, the mark root of this structure, the roof can be laid in.The mark root of Fig. 4-Fig. 5 is to be embedded in underground structure, and two angle steel 16 are vertical configuration and are fixed on steel pole 9 middle parts, also has two angle steel 16 also to be vertically, is fixed on the lower end of steel pipe 9.There is external thread steel pipe 9 upper ends, so that be connected with basic bar 5 with joint 10.
Base bar 5 is circular pipes, and its lower end has external thread to be connected with mark root 1 by joint 10.In the X-Y direction a pair of rotation dial hole 17 is arranged respectively on screw thread top, dial hole 17 can insert driving lever to tighten being connected of basic bar 5 and joint 10.Base bar 5 upper ends have four couples of regulation and control spiral 12(to see Fig. 8 on the X-Y direction).Be divided into two rows.Regulation and control spiral 12 is made up of nut and screw, and nut is welded in (see figure 9) on the basic bar 5, but screw is by nut and pass basic bar and tube wall fixed connecting rod 11.
Connecting link 11 is circular pipes, and there is an external thread (see figure 10) its upper end, can be connected with mark post 6 by joint 13, at the periphery wall upper edge of pipe connecting link 11 four planes is arranged vertically, two X to, two at Y to (seeing Figure 11).This helps on the basic bar 5 tightening of four pairs of regulation and control spirals 12.Base bar 5 is seen Figure 12 with the socket situation of connecting link 11.
Mark post 6 is circular pipes, and its upper/lower terminal has external thread, and respectively has a pair of dial hole 18(to see Figure 13), work the effect of tightening.The length of mark post 6 is decided by the height of surveyor's beacon, can be 1, also can form available joint connection therebetween by many.Be convenient to like this install, dismantle and carry.
Cross bar 7 is round pipes, the one end has external thread (seeing Figure 14), available threeway 14 is connected with mark post, keeps the axis of cross bar 7 and the axis normal of mark post 6, is penetrated with steel pole 8(and sees Figure 15 in the pipeline of cross bar 7), end at steel pole 8 connects 3 of spherical mira, steel pole 8 can in cross bar 7, freely do Y to slip, to regulate the position of target 3, finish in case regulate, fixing with two pairs of holding screws 15 on the cross bar 7, also can bore dial hole on the cross bar 7.Steel pole 8 usefulness band steels are made.When surveyor's beacon surpassed 6 meters, for guaranteeing the stability of surveyor's beacon, surveyor's beacon need add stay bolt device (seeing Figure 16) on mark post 6.The stay bolt device comprises three trunuion bearings 19, wire rope 20, flexible screw rod 21, ground nail 22.Three trunuion bearings 19 are sleeved in the reducer union.Three trunuion bearings 19 are three nuts 23 of burn-oning on bearing, and they are evenly distributed on the outer of bearing and place, with fixing wire rope 20.Wire rope 20 usefulness ground nails 22 are fixed on the ground, and the elasticity by stretching screw rod 21 adjusting wire rope 20.19, be connected with hook, ring between 20,21,22.
Precision for intervisibility or raising measurement vertical angle when needing the rising instrument to observe, can add an instrument carriage at the suitable height place of mark post 6, and the observation platform of suit corresponding height.
Embodiment.
One the 4.5 meters high movable survey signal for open-air 5 kilometers distance observation usefulness can select for use following other parts of cover to assemble.
1. mark root: 1.5 inch steel pipes, height is 500mm, there is external thread the upper end; Angle steel is 25 * 25mm, two of length 250mm, and two of 200mm are welded on the steel pipe by Fig. 4.1.5 1 of inch joint.
2. basic bar: 1.5 inch steel pipes, length is 1500mm, and there is external thread the lower end, and 1 pair of regulation and control spiral is respectively arranged apart from upper end 30mm, 210mm place, and nut, screw rod are 10mm, apart from lower end 200mm place 2 pairs of dial holes, φ 10mm are arranged.
3. connecting link: 1 inch steel pipe, long 240mm becomes four planes four of X-Y to the 1mm that respectively shoots off; 1 of 1 inch joint.
4. mark post: one is 1 inch steel pipe, long 1500mm, and upper/lower terminal has external thread, to the dial hole that a pair of φ 10mm is arranged, one is 4 minutes steel pipe, long 1500mm apart from the upper/lower terminal 100mm X of place, upper/lower terminal has external thread, and the X of 100mm place, two ends is to the dial hole that a pair of φ 8mm is arranged about the distance; 1 of 1 inch * 4 taps; 1 of threeway in 4 fens.
5. cross bar: steel pipe was one in 4 minutes, longly was 500mm, and an end has external thread, and nut, the screw rod of a pair of M8 respectively arranged apart from two ends 50mm place.
6. steel pole: one long is the band steel of 13 * 7mm of 800mm, and an end bores two holes at a distance of 100mm, sees Figure 15.
7. mira: 1 of the hollow ball of φ 214mm; (plastics or metal thin shell hollow ball) crossed the centre of sphere and penetrated the long same band steel of 350mm, and the frame ball also is connected with steel pole; Cross the boring of centre of sphere place, hang the thin bar of practicing, can freely stretch out, see Figure 15 from the ball lower opening.
Mira if mix light, can become the luminous mira used for night-time observation.
Can receive above-mentioned parts in addition by following installation method the movable target of desired height.
1. the installation of mark root: the mark location of root will fix on apart from 60~70 centimetres of markstones, does not keep off the place (the markstone center is the Y direction with the line at mark root center) of observed ray.The long-term use or the frequent surveyor's beacon that uses, underground bury underground or the roof lays all and will use cement sealing; The interim surveyor's beacon that uses, when burying underground in the open air, casting cement not, but will tamp, and use the wire rope stay bolt.To make during installation the central axis of mark root steel pipe be in plumbous double recipe to.Can use " bushing bar " form the basis when burying underground.
2. the installation of basic bar: the steel pipe of basic bar lower end with the mark root is connected with joint, and available driving lever screws it.Be screwed into terminal hour, make a pair of dial hole over against the markstone center.Such 4 pairs of regulating screws promptly are in the X-Y direction in space.
3. spherical target is installed: will support spherical target steel pole and inject in the cross bar, and make the centre of sphere to the distance at threeway center equal the distance of markstone center to mark root center just.With two pairs of holding screws on the cross bar with band steel card jail.To screw between cross bar and the threeway, and the opening of a horizontal interface of threeway and spherical target below is remained on the same direction.
4. the installation of connecting link, mark post, cross bar: the surveyor's beacon height apolegamy mark post according to drafting, connecting link, mark post and cross bar are connected in regular turn, with driving lever they are screwed.Being screwed into terminal hour, make pair of planar and cross bar on the connecting link all be in the Y direction.At last they are inserted in the basic bar, fastening with the regulation and control spiral it.
5. the centering of target: low mark utilizes the 4 couple regulation and control spiral on the basic bar; High standard utilizes three flexible screw rods on the stay bolt device, and target is moved along X or Y direction, thereby reaches the purpose of centering, judges the means of centering: low mark, calm, can utilize the plumb bob that hangs from the centre of sphere.High standard, gentle breeze can utilize up and down the optical plummet of centering simultaneously.In the time of can't using above-mentioned means, can use through big instrument commander centering.
The method that survey signal is high is as follows:
1 directly measures: see shown in Figure 180ly, move the steel tape end points to hang from the centre of sphere suspension ring place with the fine rule rope, erect dead man at the markstone center, its upper end is contacted with the chi face, it is long to keep suspension ring length, chi segment length and driving lever respectively in mind, and three's addition is the surveyor's beacon height.
Notice that when up drawing steel tape with the fine rule rope, the stressed meeting of cross bar is little inclines, influential to measuring the surveyor's beacon height downwards.Measuring the high purpose of surveyor's beacon is to ask the discrepancy in elevation for trigonometric levelling, generally all is to carry out reciprocal observation to average, and so in the end can eliminate the influence of this error among the result automatically.
2 measure indirectly: see shown in Figure 19ly, settle through big instrument at about 30 meters of distance markstone, measure the markstone center to the horizontal range D between the instrument plumb bob line with steel ruler, use the vertical angle β that measures target center and markstone center through big instrument respectively On, β Down, (when sighting spherical target, face left and take a fancy to edge, lower edge is taken aim on the dish right side, number equals to aim at the centre ofs sphere in getting) then is calculated as follows the surveyor's beacon height
V=b On+ b Down=D(tg β On-tg β Down)
V is the surveyor's beacon height.B in the formula OnFor horizontal line of sight with top; b DownFor horizontal line of sight with the lower part.

Claims (8)

1, a kind of movable survey signal, it comprises mark root (1), mark body (2), target (3) and markstone (4), it is characterized in that marking the main basic bar (5) of body (2) by tubulose, mark post (6) and cross bar (7) are formed, base bar (5) and mark post (6) are coaxial, the axis normal of the axis of mark post (6) and cross bar (7), socket one connecting link (11) in base bar (5) upper end, regulation and control spiral (12) with basic bar (5) upper end is fastening, connecting link (11) upper end is connected with mark post (6) by joint (13), mark post (6) upper end is connected with cross bar (7) by threeway (14), run through steel pole (8) in cross bar (7) pipeline, steel pole (8) in cross bar (7) slidably, (3) that steel pole (8) one ends set up a spherical mira, the position of the slip scalable target (3) by steel pole (8), this position can be fixing by the holding screw (15) on the tight cross bar (7), and basic bar (5) lower end is connected by the steel pipe (9) of joint (10) with mark root (1).
2, survey signal as claimed in claim 1 is characterized in that marking root (1) and steel pipe (9) is stuck in middle by four angle steel (16).
3, as the described survey signal of claim (1), the regulation and control spiral (12) that it is characterized in that basic bar (5) top is made up of nut and screw rod, regulation and control spiral (12) totally 4 pairs, divide upper and lower two rows, in totally 2 pairs in two X faces, totally 2 pairs in two Y faces, 2 pairs of dial holes are arranged at basic bar (5) lower end, externally threaded top, a pair of at the X face, a pair of at the y face.
4, survey signal as claimed in claim 1 is characterized in that the periphery wall upper edge connecting link (11) of connecting link (11) vertically has 4 planes, two X to, two Y to, a pair of dial hole is arranged at connecting link (11) top.
5, survey signal as claimed in claim 1 is characterized in that respectively there is a pair of hole of pulling out mark post (6) upper and lower part.
6, survey signal as claimed in claim 1 is characterized in that cross bar (7) the right and left respectively has a pair of holding screw (15), and cross bar has a pair of dial hole on (7).
7, survey signal as claimed in claim 1 is characterized in that steel pole (8) makes for band steel.
8, survey signal as claimed in claim 1 is characterized in that being equipped with the stay bolt device on mark body 2, and the stay bolt device comprises three trunuion bearings (19), wire rope (20), flexible screw rod (21), ground nail (22).
CN 93246019 1993-12-07 1993-12-07 Movable surveying markers Expired - Fee Related CN2171107Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 93246019 CN2171107Y (en) 1993-12-07 1993-12-07 Movable surveying markers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 93246019 CN2171107Y (en) 1993-12-07 1993-12-07 Movable surveying markers

Publications (1)

Publication Number Publication Date
CN2171107Y true CN2171107Y (en) 1994-07-06

Family

ID=33818808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 93246019 Expired - Fee Related CN2171107Y (en) 1993-12-07 1993-12-07 Movable surveying markers

Country Status (1)

Country Link
CN (1) CN2171107Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102269585A (en) * 2011-04-29 2011-12-07 西南交通大学 Method for precisely measuring survey beacon height
CN103575258A (en) * 2012-08-10 2014-02-12 李先一 Steel cable central measuring target framework
RU232882U1 (en) * 2024-11-24 2025-03-25 Общество ограниченной ответственностью "Газпром добыча Ямбург" A deformation mark installed on pile foundations of buildings/structures to monitor their vertical movements

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102269585A (en) * 2011-04-29 2011-12-07 西南交通大学 Method for precisely measuring survey beacon height
CN102269585B (en) * 2011-04-29 2012-11-07 西南交通大学 Method for precisely measuring survey beacon height
CN103575258A (en) * 2012-08-10 2014-02-12 李先一 Steel cable central measuring target framework
CN103575258B (en) * 2012-08-10 2016-03-02 李先一 Wirerope center measures target framework
RU232882U1 (en) * 2024-11-24 2025-03-25 Общество ограниченной ответственностью "Газпром добыча Ямбург" A deformation mark installed on pile foundations of buildings/structures to monitor their vertical movements

Similar Documents

Publication Publication Date Title
US4803784A (en) Portable stand for a surveyor's rod
CN205333053U (en) Automatic right formula surveyor's level measurment scale
CN102944228A (en) Adjustable precise lofting device
CN105444733A (en) Measuring scale and measuring method for automatically-centralized level gauge
CN2171107Y (en) Movable surveying markers
CN211550976U (en) Mounting tool of metering device
KR102056755B1 (en) Apparatus for maintaining horizontal of tripod in geodetic
US3911589A (en) Adjustable support base for a field measurement device
CN201217936Y (en) Signal generating structure of plastering machine aligning apparatus
CN110081870B (en) Coordinate transfer target device for underground culvert laser scanning and application method
CN210108333U (en) Vault settlement measurement device based on precision laser rangefinder
CN218671445U (en) Bottom levelling device of surveying instrument
CN212843559U (en) Pipe sheet attitude measuring scale
CN211626469U (en) Engineering measurement equipment's regulation platform
CN213179767U (en) Leveling rod is measured to building
CN211736444U (en) Positioning equipment for grouted rubble retaining wall
CN105973195A (en) Level gage
CN208206103U (en) Sopwith staff supports erection device
CN219062943U (en) Auxiliary stand for engineering measurement
CN221147752U (en) Novel water level measuring instrument
CN108645376B (en) Telescopic leveling device and detection method thereof
CN214470850U (en) Laser type coordinate system lofting tool
CN218787411U (en) On-spot mapping equipment of building engineering cost
CN220205196U (en) Auxiliary coordinate positioning and measuring device
CN216815483U (en) Alignment equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee