CN217078241U - Track traffic engineering construction track laying device - Google Patents

Track traffic engineering construction track laying device Download PDF

Info

Publication number
CN217078241U
CN217078241U CN202220773803.0U CN202220773803U CN217078241U CN 217078241 U CN217078241 U CN 217078241U CN 202220773803 U CN202220773803 U CN 202220773803U CN 217078241 U CN217078241 U CN 217078241U
Authority
CN
China
Prior art keywords
plate
threaded rod
opposite side
carrier plate
engineering construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220773803.0U
Other languages
Chinese (zh)
Inventor
汤卫芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Boshang Weiye Investment Co ltd
Original Assignee
Liyang Tianji Electromechanical Installation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liyang Tianji Electromechanical Installation Co ltd filed Critical Liyang Tianji Electromechanical Installation Co ltd
Priority to CN202220773803.0U priority Critical patent/CN217078241U/en
Application granted granted Critical
Publication of CN217078241U publication Critical patent/CN217078241U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

本实用新型涉及一种轨道交通工程建设轨道铺设装置,包括载板,所述载板的顶部左右两侧均固定安装有立板,所述立板相背的一侧螺纹连接有贯穿并延伸到立板相对一侧的第一螺纹杆,所述载板的顶部且位于立板之间开设有贯穿并延伸到载板下方的活动孔。该轨道交通工程建设轨道铺设装置,通过设置第一夹板、竖板、第二螺纹杆和第二夹板,使用者在使用设备时,将两段铁轨放到枕木上,然后推动设备前进,将铁轨放在相邻的第一夹板和第二夹板之间,转动第二螺纹杆和第一螺纹杆使得第一夹板和第二夹板移动,以此调整铁轨的位置,整个过程不需要使用钢钎撬动铁轨位移,对于人员的配合默契要求不高,可以有效提升铁轨铺设的效率。

Figure 202220773803

The utility model relates to a track laying device for rail transit engineering construction, which comprises a carrier plate, the top left and right sides of the carrier plate are fixedly installed with vertical plates, and the opposite side of the vertical plates is screwed through and extends to the The first threaded rod on the opposite side of the vertical plate, the top of the carrier plate and located between the vertical plates is provided with a movable hole that penetrates and extends to the bottom of the carrier plate. The rail transit engineering construction track laying device is provided with a first plywood, a vertical plate, a second threaded rod and a second plywood. When using the equipment, the user puts two sections of rails on the sleepers, and then pushes the equipment forward to move the rails forward. It is placed between the adjacent first splint and second splint, and the second threaded rod and the first threaded rod are rotated to make the first splint and the second splint move, so as to adjust the position of the rail, the whole process does not need to use a steel pry The displacement of moving rails does not require high tacit understanding of personnel, which can effectively improve the efficiency of rail laying.

Figure 202220773803

Description

一种轨道交通工程建设轨道铺设装置A rail transit engineering construction track laying device

技术领域technical field

本实用新型涉及轨道铺设技术领域,具体为一种轨道交通工程建设轨道铺设装置。The utility model relates to the technical field of track laying, in particular to a track laying device for rail transit engineering construction.

背景技术Background technique

轨道交通是指运营车辆需要在特定轨道上行驶的一类交通工具或运输系统,最典型的轨道交通就是由传统火车和标准铁路所组成的铁路系统,随着火车和铁路技术的多元化发展,轨道交通呈现出越来越多的类型,不仅遍布于长距离的陆地运输,也广泛运用于中短距离的城市公共交通中。Rail transit refers to a type of vehicle or transportation system that requires running vehicles to run on specific tracks. The most typical rail transit is a railway system composed of traditional trains and standard railways. With the diversified development of train and railway technology, Rail transit presents more and more types, not only in long-distance land transportation, but also widely used in short- and medium-distance urban public transportation.

火车轨道的铺设中,现在线路上铺设减震用的石子,然后将枕木放置定位,最后将两段铁轨放到枕木上,调节好位置后进行定位;将铁轨用起吊设备放到枕木上之后,其位置与安装位置有一定的差距,工人们使用钢钎撬动铁轨进行位置调整,这个过程需要多个工人,且需要工人的经验和相互之间的默契,所以调整位置较为耗费时间,故而提出一种轨道交通工程建设轨道铺设装置。In the laying of the train track, the stones for shock absorption are now laid on the line, and then the sleepers are placed and positioned. Finally, two sections of the rails are placed on the sleepers, and the positions are adjusted for positioning; after the rails are placed on the sleepers with lifting equipment, There is a certain gap between its position and the installation position. The workers use steel rods to pry the rails to adjust the position. This process requires multiple workers, and requires the workers' experience and mutual understanding. Therefore, it is time-consuming to adjust the position. Therefore, it is proposed A rail transit engineering construction track laying device.

实用新型内容Utility model content

针对现有技术的不足,本实用新型提供了一种轨道交通工程建设轨道铺设装置,具备方便调节铁轨的位置等优点,解决了工人们使用钢钎撬动铁轨进行位置调整,较为耗费时间的问题。Aiming at the deficiencies of the prior art, the utility model provides a rail transit engineering construction track laying device, which has the advantages of convenient adjustment of the position of the rails, and solves the problem that workers use steel brazing to move the rails to adjust the position, which is time-consuming. .

为实现上述目的,本实用新型提供如下技术方案:一种轨道交通工程建设轨道铺设装置,包括载板,所述载板的顶部左右两侧均固定安装有立板,所述立板相背的一侧螺纹连接有贯穿并延伸到立板相对一侧的第一螺纹杆,所述载板的顶部且位于立板之间开设有贯穿并延伸到载板下方的活动孔,所述第一螺纹杆相对的一侧设置有一端贯穿活动孔并延伸到载板下方的第一夹板,所述载板的底部固定安装有竖板,所述竖板相背的一侧螺纹连接有贯穿并延伸到竖板相对一侧的第二螺纹杆,所述第二螺纹杆相对的一侧设置有第二夹板。In order to achieve the above purpose, the present utility model provides the following technical solutions: a rail transit engineering construction track laying device, comprising a carrier plate, the top left and right sides of the carrier plate are fixedly installed with vertical plates, and the vertical plates are opposite to each other. One side is threadedly connected with a first threaded rod that penetrates and extends to the opposite side of the vertical plate. The top of the carrier plate and located between the vertical plates is provided with a movable hole that penetrates and extends to the bottom of the carrier plate. The first threaded rod The opposite side of the rod is provided with a first clamp plate, one end of which penetrates the movable hole and extends to the bottom of the carrier plate, the bottom of the carrier plate is fixedly installed with a vertical plate, and the opposite side of the vertical plate is threadedly connected with a pass through and extending to the bottom of the carrier plate. The second threaded rod on the opposite side of the vertical plate is provided with a second clamping plate on the opposite side of the second threaded rod.

进一步,所述第一螺纹杆和第一夹板通过第一轴承活动连接,所述第二螺纹杆和第二夹板通过第二轴承活动连接。Further, the first threaded rod and the first clamping plate are movably connected through a first bearing, and the second threaded rod and the second clamping plate are movably connected through a second bearing.

进一步,所述第一夹板的正面和背面分别与活动孔的内壁前侧和内壁后侧相贴合,所述第二夹板的顶部与载板的底部相贴合。Further, the front side and the back side of the first clamping plate are respectively attached to the front side of the inner wall and the rear side of the inner wall of the movable hole, and the top of the second clamping plate is attached to the bottom of the carrier plate.

进一步,所述竖板的底部固定安装有螺纹套筒,所述螺纹套筒的内部螺纹连接有活动螺杆,所述活动螺杆的底部固定安装有贯穿并延伸到螺纹套筒下方的支撑杆,所述支撑杆的底部固定安装有万向轮。Further, a threaded sleeve is fixedly installed at the bottom of the vertical plate, a movable screw is threadedly connected to the inside of the threaded sleeve, and a support rod that penetrates and extends below the threaded sleeve is fixedly installed at the bottom of the movable screw, so A universal wheel is fixedly installed at the bottom of the support rod.

进一步,所述支撑杆相背的一侧固定安装有握持柄,所述握持柄位于螺纹套筒的下方。Further, a holding handle is fixedly installed on the opposite side of the support rod, and the holding handle is located below the threaded sleeve.

进一步,所述第一夹板和第二夹板相对的一侧均固定安装有橡胶板,所述橡胶板相对的一侧开设增阻纹。Further, rubber plates are fixedly installed on opposite sides of the first clamping plate and the second clamping plate, and resistance increasing lines are provided on the opposite side of the rubber plates.

与现有技术相比,本申请的技术方案具备以下有益效果:Compared with the prior art, the technical solution of the present application has the following beneficial effects:

1、该轨道交通工程建设轨道铺设装置,通过设置第一夹板、竖板、第二螺纹杆和第二夹板,使用者在使用设备时,将两段铁轨放到枕木上,然后推动设备前进,将铁轨放在相邻的第一夹板和第二夹板之间,转动第二螺纹杆和第一螺纹杆使得第一夹板和第二夹板移动,以此调整铁轨的位置,整个过程不需要使用钢钎撬动铁轨位移,对于人员的配合默契要求不高,可以有效提升铁轨铺设的效率。1. The rail transit engineering construction track laying device, by setting the first plywood, the vertical plate, the second threaded rod and the second plywood, when the user uses the equipment, put the two sections of the rail on the sleepers, and then push the equipment forward, Put the rail between the adjacent first and second clamps, turn the second threaded rod and the first threaded rod to move the first and second clamps, so as to adjust the position of the rail, the whole process does not require the use of steel Drilling to move the rails does not require high tacit understanding of the personnel, which can effectively improve the efficiency of rail laying.

2、该轨道交通工程建设轨道铺设装置,万向轮在线路两侧的石子上行走,转动支撑杆使得活动螺杆在螺纹套筒内上下移动,以此调整载板与地面的距离,可以适应不同情况下的轨道铺设。2. The track laying device for the construction of the rail transit project, the universal wheel walks on the stones on both sides of the line, and the support rod is rotated to make the movable screw move up and down in the threaded sleeve, so as to adjust the distance between the carrier plate and the ground, which can adapt to different Case of track laying.

附图说明Description of drawings

图1为本实用新型结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型左视图。Figure 2 is a left side view of the utility model.

图中:1载板、2立板、3第一螺纹杆、31第一轴承、4活动孔、5第一夹板、6竖板、7第二螺纹杆、71第二轴承、8第二夹板、9螺纹套筒、10活动螺杆、11支撑杆、111握持柄、12万向轮、13橡胶板。In the figure: 1 carrier plate, 2 vertical plate, 3 first threaded rod, 31 first bearing, 4 movable hole, 5 first splint, 6 vertical plate, 7 second threaded rod, 71 second bearing, 8 second splint , 9 threaded sleeve, 10 movable screw, 11 support rod, 111 handle, 12 universal wheel, 13 rubber plate.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

请参阅图1-2,本实施例中的一种轨道交通工程建设轨道铺设装置,包括载板1,载板1的顶部左右两侧均固定安装有立板2,立板2相背的一侧螺纹连接有贯穿并延伸到立板2相对一侧的第一螺纹杆3,载板1的顶部且位于立板2之间开设有贯穿并延伸到载板1下方的活动孔4,第一螺纹杆3相对的一侧设置有一端贯穿活动孔4并延伸到载板1下方的第一夹板5,活动孔4的规格要适配第一夹板5的活动范围,第一夹板5的正面和背面分别与活动孔4的内壁前侧和内壁后侧相贴合,第一螺纹杆3和第一夹板5通过第一轴承31活动连接;载板1的底部固定安装有竖板6,竖板6相背的一侧螺纹连接有贯穿并延伸到竖板6相对一侧的第二螺纹杆7,第二螺纹杆7相对的一侧设置有第二夹板8,第二螺纹杆7和第二夹板8通过第二轴承71活动连接,第二夹板8的顶部与载板1的底部相贴合,载板1、立板2、第一螺纹杆3、第一夹板5、竖板6、第二螺纹杆7和第二夹板8均使用高碳钢材质制作,如此,设备整体强度高,在施工环境下不易损毁。Please refer to Fig. 1-2, a rail transit engineering construction track laying device in this embodiment includes a carrier plate 1, and vertical plates 2 are fixedly installed on the left and right sides of the top of the carrier plate 1. The vertical plates 2 are opposite to each other. The side is threadedly connected with a first threaded rod 3 that penetrates and extends to the opposite side of the vertical plate 2. The top of the carrier plate 1 and located between the vertical plates 2 is provided with a movable hole 4 that penetrates and extends to the bottom of the carrier plate 1. The opposite side of the threaded rod 3 is provided with a first clamp plate 5 whose one end penetrates the movable hole 4 and extends to the bottom of the carrier plate 1. The specification of the movable hole 4 should be adapted to the movable range of the first clamp plate 5. The back is respectively fitted with the front side of the inner wall and the rear side of the inner wall of the movable hole 4, the first threaded rod 3 and the first clamp plate 5 are movably connected through the first bearing 31; the bottom of the carrier plate 1 is fixedly installed with a vertical plate 6, the vertical plate The opposite side of 6 is threadedly connected with a second threaded rod 7 penetrating and extending to the opposite side of the vertical plate 6, and the opposite side of the second threaded rod 7 is provided with a second clamping plate 8, the second threaded rod 7 and the second threaded rod 7 The splint 8 is movably connected by the second bearing 71, the top of the second splint 8 is in contact with the bottom of the carrier plate 1, the carrier plate 1, the vertical plate 2, the first threaded rod 3, the first splint 5, the vertical plate 6, the first Both the second threaded rod 7 and the second clamping plate 8 are made of high carbon steel material, so that the overall strength of the equipment is high, and it is not easy to be damaged in the construction environment.

转动第一螺纹杆3可使得第一夹板5左右移动,转动第二螺纹杆7可使得第二夹板8左右移动,同侧的第一夹板5和第二夹板8对铁轨的位置进行规范,便于铁轨的位置调整,操作难度低,对工人要求较低,施工效率也相应提高。Rotating the first threaded rod 3 can make the first splint 5 move left and right, and rotating the second threaded rod 7 can make the second splint 8 move left and right. The first splint 5 and the second splint 8 on the same side regulate the position of the rail, which is convenient for The position of the rail is adjusted, the operation difficulty is low, the requirements for workers are low, and the construction efficiency is correspondingly improved.

本实施例中,竖板6的底部固定安装有螺纹套筒9,螺纹套筒9的内部螺纹连接有活动螺杆10,活动螺杆10的底部固定安装有贯穿并延伸到螺纹套筒9下方的支撑杆11,支撑杆11相背的一侧固定安装有握持柄111,通过握持柄111转动使得活动螺杆10在螺纹套筒9内上下移动,所以握持柄111的长度设置要考虑设备整体的重量,当设备放在地面时,正常成年男性的力量要足够转动握持柄111,握持柄111位于螺纹套筒9的下方,支撑杆11的底部固定安装有万向轮12。In this embodiment, a threaded sleeve 9 is fixedly installed at the bottom of the vertical plate 6 , a movable screw 10 is threadedly connected to the inside of the threaded sleeve 9 , and a support that penetrates and extends below the threaded sleeve 9 is fixedly installed at the bottom of the movable screw 10 . The rod 11 and the opposite side of the support rod 11 are fixedly installed with a holding handle 111. The rotation of the holding handle 111 makes the movable screw 10 move up and down in the threaded sleeve 9. Therefore, the length of the holding handle 111 should be set in consideration of the overall equipment. When the device is placed on the ground, the strength of a normal adult male should be enough to rotate the handle 111, the handle 111 is located under the threaded sleeve 9, and the bottom of the support rod 11 is fixedly installed with a universal wheel 12.

本实施例中,第一夹板5和第二夹板8相对的一侧均固定安装有橡胶板13,橡胶板13相对的一侧开设增阻纹,橡胶板13与铁轨直接接触,在施力时不易在铁轨表面造成凹痕等损伤。In this embodiment, the opposite sides of the first clamping plate 5 and the second clamping plate 8 are fixedly installed with a rubber plate 13, and the opposite side of the rubber plate 13 is provided with resistance increasing patterns, and the rubber plate 13 is in direct contact with the rail. It is not easy to cause dents and other damages on the surface of the rail.

上述实施例的工作原理为:The working principle of the above embodiment is:

(1)将设备放在轨道路线上,通过万向轮12在线路两侧的石子上行走;(1) Put the equipment on the track route, and walk on the stones on both sides of the route through the universal wheel 12;

(2)根据石子铺设高度和铁轨的安装位置的高度差不同,转动支撑杆11使得活动螺杆10在螺纹套筒9内上下移动,以此调整载板1与地面的距离;(2) According to the height difference between the stone laying height and the installation position of the rail, rotating the support rod 11 makes the movable screw 10 move up and down in the threaded sleeve 9, thereby adjusting the distance between the carrier plate 1 and the ground;

(3)将两段铁轨放到枕木上,然后推动设备前进,将铁轨放在相邻的第一夹板5和第二夹板8之间,转动第二螺纹杆7和第一螺纹杆3使得第一夹板5和第二夹板8移动,以此调整铁轨的位置;(3) Put the two sections of rails on the sleepers, then push the equipment forward, put the rails between the adjacent first plywood 5 and the second plywood 8, and turn the second threaded rod 7 and the first threaded rod 3 to make the first A splint 5 and a second splint 8 move to adjust the position of the rail;

(4)因为是通过第一夹板5和第二夹板8对铁轨推动进行位置调整,调整过程不需要使用钢钎撬动铁轨位移,对于人员的配合默契要求不高,可以有效提升铁轨铺设的效率。(4) Because the position adjustment of the rail is carried out through the first plywood 5 and the second plywood 8, the adjustment process does not require the use of steel rods to move the rail displacement, and the tacit understanding of personnel is not required, which can effectively improve the efficiency of rail laying .

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that, in this document, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any relationship between these entities or operations. any such actual relationship or sequence exists. Moreover, the terms "comprising", "comprising" or any other variation thereof are intended to encompass a non-exclusive inclusion such that a process, method, article or device comprising a list of elements includes not only those elements, but also includes not explicitly listed or other elements inherent to such a process, method, article or apparatus. Without further limitation, an element qualified by the phrase "comprising a..." does not preclude the presence of additional identical elements in a process, method, article or apparatus that includes the element.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention , alternatives and modifications, the scope of the present invention is defined by the appended claims and their equivalents.

Claims (6)

1.一种轨道交通工程建设轨道铺设装置,包括载板(1),其特征在于:所述载板(1)的顶部左右两侧均固定安装有立板(2),所述立板(2)相背的一侧螺纹连接有贯穿并延伸到立板(2)相对一侧的第一螺纹杆(3),所述载板(1)的顶部且位于立板(2)之间开设有贯穿并延伸到载板(1)下方的活动孔(4),所述第一螺纹杆(3)相对的一侧设置有一端贯穿活动孔(4)并延伸到载板(1)下方的第一夹板(5),所述载板(1)的底部固定安装有竖板(6),所述竖板(6)相背的一侧螺纹连接有贯穿并延伸到竖板(6)相对一侧的第二螺纹杆(7),所述第二螺纹杆(7)相对的一侧设置有第二夹板(8)。1. A rail transit engineering construction track laying device, comprising a carrier plate (1), characterized in that: a vertical plate (2) is fixedly installed on the top left and right sides of the carrier plate (1), and the vertical plate ( 2) The opposite side is threadedly connected with a first threaded rod (3) that penetrates and extends to the opposite side of the vertical plate (2), and the top of the carrier plate (1) is opened between the vertical plates (2). There is a movable hole (4) penetrating and extending to the bottom of the carrier plate (1), and the opposite side of the first threaded rod (3) is provided with one end passing through the movable hole (4) and extending to the bottom of the carrier plate (1). A first clamping plate (5), a vertical plate (6) is fixedly installed at the bottom of the carrier plate (1), and the opposite side of the vertical plate (6) is threadedly connected with a thread that penetrates and extends to the opposite side of the vertical plate (6). A second threaded rod (7) on one side, a second clamping plate (8) is provided on the opposite side of the second threaded rod (7). 2.根据权利要求1所述的一种轨道交通工程建设轨道铺设装置,其特征在于:所述第一螺纹杆(3)和第一夹板(5)通过第一轴承(31)活动连接,所述第二螺纹杆(7)和第二夹板(8)通过第二轴承(71)活动连接。2. A rail transit engineering construction track laying device according to claim 1, characterized in that: the first threaded rod (3) and the first clamping plate (5) are movably connected through the first bearing (31), so that the The second threaded rod (7) and the second clamping plate (8) are movably connected through a second bearing (71). 3.根据权利要求1所述的一种轨道交通工程建设轨道铺设装置,其特征在于:所述第一夹板(5)的正面和背面分别与活动孔(4)的内壁前侧和内壁后侧相贴合,所述第二夹板(8)的顶部与载板(1)的底部相贴合。3. A rail transit engineering construction track laying device according to claim 1, characterized in that: the front side and the back side of the first plywood (5) are respectively connected with the inner wall front side and the inner wall rear side of the movable hole (4) The top of the second splint (8) is abutted with the bottom of the carrier plate (1). 4.根据权利要求1所述的一种轨道交通工程建设轨道铺设装置,其特征在于:所述竖板(6)的底部固定安装有螺纹套筒(9),所述螺纹套筒(9)的内部螺纹连接有活动螺杆(10),所述活动螺杆(10)的底部固定安装有贯穿并延伸到螺纹套筒(9)下方的支撑杆(11),所述支撑杆(11)的底部固定安装有万向轮(12)。4. A rail transit engineering construction track laying device according to claim 1, characterized in that: a threaded sleeve (9) is fixedly installed at the bottom of the vertical plate (6), and the threaded sleeve (9) A movable screw (10) is threadedly connected to the inner thread of the movable screw, the bottom of the movable screw (10) is fixedly mounted with a support rod (11) that penetrates and extends below the threaded sleeve (9), and the bottom of the support rod (11) A universal wheel (12) is fixedly installed. 5.根据权利要求4所述的一种轨道交通工程建设轨道铺设装置,其特征在于:所述支撑杆(11)相背的一侧固定安装有握持柄(111),所述握持柄(111)位于螺纹套筒(9)的下方。5. A rail transit engineering construction track laying device according to claim 4, characterized in that a holding handle (111) is fixedly installed on the opposite side of the support rod (11), and the holding handle is (111) is located below the threaded sleeve (9). 6.根据权利要求4所述的一种轨道交通工程建设轨道铺设装置,其特征在于:所述第一夹板(5)和第二夹板(8)相对的一侧均固定安装有橡胶板(13),所述橡胶板(13)相对的一侧开设增阻纹。6. A rail transit engineering construction track laying device according to claim 4, wherein a rubber plate (13) is fixedly installed on the opposite side of the first plywood (5) and the second plywood (8) ), the opposite side of the rubber plate (13) is provided with resistance increasing lines.
CN202220773803.0U 2022-04-06 2022-04-06 Track traffic engineering construction track laying device Active CN217078241U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220773803.0U CN217078241U (en) 2022-04-06 2022-04-06 Track traffic engineering construction track laying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220773803.0U CN217078241U (en) 2022-04-06 2022-04-06 Track traffic engineering construction track laying device

Publications (1)

Publication Number Publication Date
CN217078241U true CN217078241U (en) 2022-07-29

Family

ID=82555138

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220773803.0U Active CN217078241U (en) 2022-04-06 2022-04-06 Track traffic engineering construction track laying device

Country Status (1)

Country Link
CN (1) CN217078241U (en)

Similar Documents

Publication Publication Date Title
CN219547454U (en) A subway track installation device
CN217078241U (en) Track traffic engineering construction track laying device
CN203700892U (en) Continuous multi-sleeper renewal device and sleeper renewal car using same
CN204530347U (en) Double-block type ballastless track sleeper adjuster
CN206298813U (en) A kind of milling machine automatic horizontal control system
CN206573321U (en) A kind of express highway pavement sampler
CN211199930U (en) A composite track plate applied to maglev lines
CN110004830B (en) A shrinkage joint cutting and sealing integrated device for bridge deck concrete
CN203716011U (en) Ballast cleaning device of automatic leveling track lifting and lining tamping wagon
CN208235240U (en) Laying of welded long rails traction device
CN111337004A (en) Equipment fixing, moving, positioning and paying-off device in tunnel of urban rail transit section
CN211389594U (en) Automatic chiseling equipment for concrete member
CN209208777U (en) A kind of metro shield locomotive double rail device
CN102011354B (en) Arrival-departure line track sleeper assembling platform for broad-sleeper
CN203702187U (en) Tunnel waterproof plate laying trolley
CN113774812A (en) A graded jacking trolley system and construction method for continuous jacking operation of bridges
CN207673280U (en) A kind of shallow layer drilling mobile device
CN201850479U (en) Assembly platform for broad sleeper track arrival and departure track panel
CN205929084U (en) A perforating device for high -speed railway ballastless track mud pumping disease treatment
CN111335077A (en) Anti-splashing high-speed ballast track structure
CN211366720U (en) A combined gantry crane dedicated for maglev train track
CN212047340U (en) A portable railway tool car carrying device
CN205653747U (en) Suction sewage truck for railway ballast bed
CN222613870U (en) A rapid conversion device for man-car and mine car
CN219428132U (en) Derailment prevention device special for mine car track

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20241028

Address after: No. 025, Datang Pu Team, Chagen Village, Jingkou Town, Bobai County, Yulin City, Guangxi Zhuang Autonomous Region, 537602

Patentee after: Chen Zhifang

Country or region after: China

Patentee after: Li Manxia

Address before: 2133333 No. 5, tianjiashan Industrial Zone, Tianmu Lake Industrial Park, Liyang City, Changzhou City, Jiangsu Province

Patentee before: Liyang Tianji electromechanical installation Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20241107

Address after: No. 219, 220, 221, 222, 223, 2nd Floor, Building 33, Dajiahui ASEAN International Trade Port, Dajiahui Automotive New Theme Commercial City, No. 5 Kunlun Avenue, Xingning District, Nanning City, Guangxi Zhuang Autonomous Region, 530010

Patentee after: Guangxi Boshang Weiye Investment Co.,Ltd.

Country or region after: China

Address before: No. 025, Datang Pu Team, Chagen Village, Jingkou Town, Bobai County, Yulin City, Guangxi Zhuang Autonomous Region, 537602

Patentee before: Chen Zhifang

Country or region before: China

Patentee before: Li Manxia