CN216973055U - A cast-in-place concrete pavement formwork - Google Patents
A cast-in-place concrete pavement formwork Download PDFInfo
- Publication number
- CN216973055U CN216973055U CN202122715255.4U CN202122715255U CN216973055U CN 216973055 U CN216973055 U CN 216973055U CN 202122715255 U CN202122715255 U CN 202122715255U CN 216973055 U CN216973055 U CN 216973055U
- Authority
- CN
- China
- Prior art keywords
- template
- formwork
- cast
- socket
- place concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
Description
技术领域technical field
本实用新型为一种新型现浇混凝土路面模板,属于混凝土路面施工技术领域。The utility model relates to a novel cast-in-place concrete pavement formwork, which belongs to the technical field of concrete pavement construction.
背景技术Background technique
目前现浇混凝土路面模板的采用一般都是槽钢模板,槽钢模板自重较重,在移动和安装的过程中需要小型机具吊运配合,安装较为不便。随着钢模板的使用次数的增加,钢模板的外观会被锈蚀,打磨后使用还是会对混凝土表面的美观程度造成一定的影响,模板报废后只能当作废弃钢铁处理,残值较低。At present, the cast-in-place concrete pavement formwork is generally channel steel formwork, and the channel steel formwork is heavy, and requires small equipment for lifting and coordination in the process of moving and installation, which is inconvenient to install. With the increase in the number of uses of the steel formwork, the appearance of the steel formwork will be corroded, and the use after grinding will still have a certain impact on the aesthetics of the concrete surface. After the formwork is scrapped, it can only be treated as waste steel, and the residual value is low.
为提高施工效率,增加混凝土外观美观性,本实用新型设计了一种新型现浇混凝土路面模板,整体采用铝合金材质,在模板中间设置直角定位板,模板两端分别设置承插孔和承插接头,周转次数高,整体性好,精度高,表面光滑,浇筑后混凝土外观美观,质量轻便,材质环保,便于施工,经济效益和社会效益更好。In order to improve the construction efficiency and increase the aesthetic appearance of concrete, the utility model designs a new type of cast-in-place concrete pavement formwork, which is made of aluminum alloy as a whole. The joint has high turnover, good integrity, high precision, smooth surface, beautiful appearance of concrete after pouring, light quality, environmentally friendly material, easy construction, and better economic and social benefits.
发明内容SUMMARY OF THE INVENTION
为了解决上述问题,本实用新型提出了一种新型模板,可以有效解决钢模板施工进度慢,需要的人员机械多及材质问题,从而保证模板易于施工,混凝土浇筑后整体美观,线性流畅,加快施工进度。In order to solve the above problems, the utility model proposes a new type of formwork, which can effectively solve the problems of slow construction progress of steel formwork, many people and machinery required and material problems, so as to ensure that the formwork is easy to construct, the overall appearance after concrete is poured, the linearity is smooth, and the construction is accelerated. schedule.
为实现上述目的,本实用新型采用的技术方案为一种现浇混凝土路面浇筑模板,包括:模板面板6、可活动支撑杆2和钢背楞支撑条5;模板面板6的非成型面(即模板面板6底部)焊接有钢背楞支撑条5,钢背楞支撑条5为用于安装可活动支撑杆2的卡槽;模板面板6的一侧设有承插孔1,另一侧设有承插接头4;各个模板面板6之间通过承插孔1与承插接头4连接组成路面浇筑模板主体;路面浇筑模板主体的最下方焊接有与直角定位板3,直角定位板3与浇筑基础面相接触。In order to achieve the above purpose, the technical scheme adopted by the present utility model is a cast-in-place concrete pavement pouring formwork, including: formwork panel 6,
进一步地,安装可活动支撑杆2的卡槽中设有钢套筒,可活动支撑杆2与钢套筒滑动连接;可活动支撑杆2的底部设有螺纹连接的底座,底座与支撑面接触对路面浇筑模板主体进行横向稳固性支撑。可活动支撑杆2与钢套筒之间通过加设橡胶垫进行防滑。Further, a steel sleeve is provided in the slot for installing the
进一步地,所述的路面浇筑模板主体由铝合金制成。Further, the main body of the road pouring formwork is made of aluminum alloy.
进一步地,所述的直角定位板3为L形,直角定位板3的竖直段与模板面板6平行,直角定位板3的水平段上设有孔,可以通过膨胀螺栓与浇筑基础面进行辅助连接固定,以增加现浇混凝土路面模板的稳定性。Further, the right-
与现有技术相比,本实用新型具有如下有益效果。Compared with the prior art, the present invention has the following beneficial effects.
1、本实用新型材料简单,制作容易,容易操作,设有四条可活动支撑杆,使用时不易变形或跑模。1. The material of the utility model is simple, easy to manufacture, and easy to operate. Four movable support rods are provided, so that it is not easy to deform or run out of molds during use.
2、本实用新型能有效地保证施工作业连续,模板搭设需要人工少,施工速度快。2. The utility model can effectively ensure the continuous construction operation, less labor is required for setting up the formwork, and the construction speed is fast.
3、回收价值高。铝模板报废后,当废料处理残值高,均摊成本优势明显,低碳减排。铝模板系统所有材料均为可再生材料,符合国家对建筑项目节能、环保、低碳、减排的规定。3. High recycling value. After the aluminum formwork is scrapped, when the residual value of the waste treatment is high, the average cost advantage is obvious, and the low carbon emission is reduced. All materials of the aluminum formwork system are renewable materials, in line with the national regulations on energy conservation, environmental protection, low carbon and emission reduction of construction projects.
附图说明Description of drawings
图1为本实用新型的新型现浇混凝土路面模板的主视图。Fig. 1 is the front view of the novel cast-in-place concrete pavement formwork of the present invention.
图2为本实用新型的新型现浇混凝土路面模板的俯视图。FIG. 2 is a top view of the novel cast-in-place concrete pavement formwork of the present invention.
图3为本实用新型的新型现浇混凝土路面模板的侧视图。Figure 3 is a side view of the new cast-in-place concrete pavement formwork of the present invention.
图中:1、承插孔,2、可活动支撑杆,3、直角定位板,4、承插接头,5、钢背楞支撑条。In the picture: 1. Socket socket, 2. Movable support rod, 3. Right-angle positioning plate, 4. Socket joint, 5. Steel back corrugated support bar.
具体实施方式Detailed ways
下面结合附图对本实用新型对具体说明:Below in conjunction with accompanying drawing, the utility model is described in detail:
如图1-3所示,一种新型现浇混凝土路面模板,该设备包括承插孔1、可活动支撑杆2、直角定位板3、承插接头4和钢背楞支撑条5。主体采用铝合金材料,使用时先固定直角定位板3,确保模板与浇筑基础面垂直,再固定两侧可活动支撑杆2,固定好一块模板后下一块模板的1承插孔与已固定模板的4承插接头连接,或者下一块模板的承插接头与已固定模板的承插孔连接亦可。As shown in Figure 1-3, a new type of cast-in-place concrete pavement formwork, the equipment includes socket holes 1,
先固定直角定位板可以确保模板与浇筑基础面垂直,再通过可活动支撑杆对模板进行整体性固定,承插孔与承插接头连接可提高模板整体性,减少模板拼缝处施工,加设钢背楞支撑条对模板整体强度进行保证。Fixing the right-angle positioning plate first can ensure that the formwork is perpendicular to the pouring foundation surface, and then the formwork is integrally fixed by the movable support rod. The connection of the socket hole and the socket joint can improve the integrity of the formwork and reduce the construction of the formwork joints. The steel back corrugated support bar ensures the overall strength of the formwork.
所述模板使用时先固定直角定位板,确保模板与浇筑基础面垂直,再固定两侧可活动支撑杆,固定好一块模板后下一块模板的承插孔与已固定模板的承插接头连接,或者下一块模板的承插接头与已固定模板的承插孔连接亦可。可活动支撑杆2采用带螺纹钢钎,配合螺母固定在底座上。When the formwork is used, the right-angle positioning plate is first fixed to ensure that the formwork is perpendicular to the pouring foundation surface, and then the movable support rods on both sides are fixed. After one formwork is fixed, the socket holes of the next formwork are connected with the socket joints of the fixed formwork. Or the socket joint of the next template can be connected to the socket hole of the fixed template. The
模板采用铝合金材质,整体基本为长方形形状。模板两端分别设置承插孔与承插接头,单侧设置两条钢背楞支撑条,中间设置三孔直角定位板,每两米设置两根水平支撑杆,使用时先将单块模板从中间到两边固定,然后将下一块模板承插接头插入已固定模板的承插孔中,再次从中间到两边固定。The template is made of aluminum alloy, and the overall shape is basically rectangular. The two ends of the formwork are respectively provided with socket holes and socket joints, two steel back corrugated support bars are set on one side, three-hole right-angle positioning plates are set in the middle, and two horizontal support rods are set every two meters. Fix from the middle to both sides, then insert the next piece of template socket connector into the socket hole of the fixed template, and fix again from the middle to the sides.
使用了该新型模板后,能够有效的避免传统槽钢模板的弊端,不仅可以加快现浇混凝土路面模板搭设的进度,而且可以减少模板拼缝处施工,提升模板整体性,精度更高,减少模板施工所需的人员及机械,线形、外观更加流畅美观。从而减少了因为钢模板材质导致的混凝土浇筑后外观差,拼缝处漏浆等施工问题,加快了施工施工进度,同时减少成本。After using the new formwork, it can effectively avoid the drawbacks of the traditional channel steel formwork. It can not only speed up the construction of the cast-in-place concrete pavement formwork, but also reduce the construction of the formwork joints, improve the integrity of the formwork, have higher precision, and reduce the number of formwork. The personnel and machinery required for construction are more fluent and beautiful in linear shape and appearance. Thereby, construction problems such as poor appearance after concrete pouring due to the material of the steel formwork and leakage of slurry at the joints are reduced, the construction progress is accelerated, and the cost is reduced at the same time.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122715255.4U CN216973055U (en) | 2021-11-08 | 2021-11-08 | A cast-in-place concrete pavement formwork |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122715255.4U CN216973055U (en) | 2021-11-08 | 2021-11-08 | A cast-in-place concrete pavement formwork |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216973055U true CN216973055U (en) | 2022-07-15 |
Family
ID=82344040
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122715255.4U Expired - Fee Related CN216973055U (en) | 2021-11-08 | 2021-11-08 | A cast-in-place concrete pavement formwork |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216973055U (en) |
-
2021
- 2021-11-08 CN CN202122715255.4U patent/CN216973055U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201202271Y (en) | Adjustable formwork for multi-curved face concrete structure construction | |
CN206344287U (en) | A kind of horizontal adjustable precast stair mould | |
CN203321538U (en) | Variable-cross-section tunnel lining mold | |
CN210622306U (en) | Assembly type floor post-cast strip template splicing structure | |
CN216973055U (en) | A cast-in-place concrete pavement formwork | |
CN204715763U (en) | A kind of aluminum alloy mould plate diagonal brace supporting member pre-embedded bolt structure | |
CN203238548U (en) | Concrete pier template device | |
CN209779560U (en) | Steel formwork for irrigation and water conservancy concrete channel | |
CN109318351B (en) | Combined die for producing prefabricated parts | |
CN214940390U (en) | Template for pouring full-package concrete of pipeline | |
CN201809683U (en) | CRTSⅡ track plate fast edge banding device | |
CN205604289U (en) | Can resist single storehouse underground pipe gallery of big deformation | |
CN211873823U (en) | Concrete pier platform steel form | |
CN204382575U (en) | A kind of plastic pipe double molds forming machine | |
CN210976581U (en) | Connect high formula aluminum alloy template for building | |
CN210370682U (en) | Tunnel adjustable support distance self-stabilizing inverted arch steel end mold | |
CN210976452U (en) | Ground keel frame with flatness adjusted by screw | |
CN208792078U (en) | Temporarily driving passes through device at a kind of notch of novel bridge expansion joint | |
CN203741864U (en) | Special die for iron tower foundation protection cap | |
CN209737910U (en) | Combined die for producing prefabricated parts | |
CN208396295U (en) | A kind of open-cut station construction stair formwork erecting structure | |
CN206873926U (en) | A kind of circular columns bean column node template of 3D printing | |
CN221119282U (en) | Device suitable for mortar is spread in advance to brickwork | |
CN114961240B (en) | Special-shaped high-low span bottom plate construction template and construction method | |
CN205976467U (en) | Modular aluminum alloy building templates |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220715 |