[go: up one dir, main page]

CN216973055U - A cast-in-place concrete pavement formwork - Google Patents

A cast-in-place concrete pavement formwork Download PDF

Info

Publication number
CN216973055U
CN216973055U CN202122715255.4U CN202122715255U CN216973055U CN 216973055 U CN216973055 U CN 216973055U CN 202122715255 U CN202122715255 U CN 202122715255U CN 216973055 U CN216973055 U CN 216973055U
Authority
CN
China
Prior art keywords
template
formwork
cast
socket
place concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122715255.4U
Other languages
Chinese (zh)
Inventor
王卿
乔海
李金洋
解乘
陈明剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN202122715255.4U priority Critical patent/CN216973055U/en
Application granted granted Critical
Publication of CN216973055U publication Critical patent/CN216973055U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a cast-in-place concrete pavement template which is made of aluminum alloy and basically rectangular in shape. The template both ends set up socket hole and socket joint respectively, and the unilateral sets up two stupefied support bars of steel backing, and the centre sets up the right angle locating plate, and earlier during the use is fixed monolithic template from centre to both sides, then inserts next template socket joint in the socket hole of fixed die plate, and is fixed from centre to both sides once more. The utility model has the advantages of simplicity, easy manufacture and easy operation, and is provided with the four movable supporting rods, thereby being not easy to deform or run a die when in use. The utility model can effectively ensure the continuity of construction operation, needs less manpower for building the template and has high construction speed.

Description

一种现浇混凝土路面模板A cast-in-place concrete pavement formwork

技术领域technical field

本实用新型为一种新型现浇混凝土路面模板,属于混凝土路面施工技术领域。The utility model relates to a novel cast-in-place concrete pavement formwork, which belongs to the technical field of concrete pavement construction.

背景技术Background technique

目前现浇混凝土路面模板的采用一般都是槽钢模板,槽钢模板自重较重,在移动和安装的过程中需要小型机具吊运配合,安装较为不便。随着钢模板的使用次数的增加,钢模板的外观会被锈蚀,打磨后使用还是会对混凝土表面的美观程度造成一定的影响,模板报废后只能当作废弃钢铁处理,残值较低。At present, the cast-in-place concrete pavement formwork is generally channel steel formwork, and the channel steel formwork is heavy, and requires small equipment for lifting and coordination in the process of moving and installation, which is inconvenient to install. With the increase in the number of uses of the steel formwork, the appearance of the steel formwork will be corroded, and the use after grinding will still have a certain impact on the aesthetics of the concrete surface. After the formwork is scrapped, it can only be treated as waste steel, and the residual value is low.

为提高施工效率,增加混凝土外观美观性,本实用新型设计了一种新型现浇混凝土路面模板,整体采用铝合金材质,在模板中间设置直角定位板,模板两端分别设置承插孔和承插接头,周转次数高,整体性好,精度高,表面光滑,浇筑后混凝土外观美观,质量轻便,材质环保,便于施工,经济效益和社会效益更好。In order to improve the construction efficiency and increase the aesthetic appearance of concrete, the utility model designs a new type of cast-in-place concrete pavement formwork, which is made of aluminum alloy as a whole. The joint has high turnover, good integrity, high precision, smooth surface, beautiful appearance of concrete after pouring, light quality, environmentally friendly material, easy construction, and better economic and social benefits.

发明内容SUMMARY OF THE INVENTION

为了解决上述问题,本实用新型提出了一种新型模板,可以有效解决钢模板施工进度慢,需要的人员机械多及材质问题,从而保证模板易于施工,混凝土浇筑后整体美观,线性流畅,加快施工进度。In order to solve the above problems, the utility model proposes a new type of formwork, which can effectively solve the problems of slow construction progress of steel formwork, many people and machinery required and material problems, so as to ensure that the formwork is easy to construct, the overall appearance after concrete is poured, the linearity is smooth, and the construction is accelerated. schedule.

为实现上述目的,本实用新型采用的技术方案为一种现浇混凝土路面浇筑模板,包括:模板面板6、可活动支撑杆2和钢背楞支撑条5;模板面板6的非成型面(即模板面板6底部)焊接有钢背楞支撑条5,钢背楞支撑条5为用于安装可活动支撑杆2的卡槽;模板面板6的一侧设有承插孔1,另一侧设有承插接头4;各个模板面板6之间通过承插孔1与承插接头4连接组成路面浇筑模板主体;路面浇筑模板主体的最下方焊接有与直角定位板3,直角定位板3与浇筑基础面相接触。In order to achieve the above purpose, the technical scheme adopted by the present utility model is a cast-in-place concrete pavement pouring formwork, including: formwork panel 6, movable support rod 2 and steel back corrugated support bar 5; The bottom of the template panel 6) is welded with a steel back corrugated support bar 5, and the steel back corrugated support bar 5 is a slot for installing the movable support rod 2; one side of the template panel 6 is provided with a socket 1, and the other side is provided with a socket 1. There are socket joints 4; each formwork panel 6 is connected with socket joints 4 through socket holes 1 to form the main body of the pavement pouring formwork; the bottom of the main body of the pavement pouring formwork is welded with a right-angle positioning plate 3, and the right-angle positioning plate 3 is connected with the pouring base surface contact.

进一步地,安装可活动支撑杆2的卡槽中设有钢套筒,可活动支撑杆2与钢套筒滑动连接;可活动支撑杆2的底部设有螺纹连接的底座,底座与支撑面接触对路面浇筑模板主体进行横向稳固性支撑。可活动支撑杆2与钢套筒之间通过加设橡胶垫进行防滑。Further, a steel sleeve is provided in the slot for installing the movable support rod 2, and the movable support rod 2 is slidably connected with the steel sleeve; the bottom of the movable support rod 2 is provided with a threaded base, and the base is in contact with the support surface. Carry out lateral stability support for the main body of the pavement pouring formwork. A rubber pad is added between the movable support rod 2 and the steel sleeve to prevent slippage.

进一步地,所述的路面浇筑模板主体由铝合金制成。Further, the main body of the road pouring formwork is made of aluminum alloy.

进一步地,所述的直角定位板3为L形,直角定位板3的竖直段与模板面板6平行,直角定位板3的水平段上设有孔,可以通过膨胀螺栓与浇筑基础面进行辅助连接固定,以增加现浇混凝土路面模板的稳定性。Further, the right-angle positioning plate 3 is L-shaped, the vertical section of the right-angle positioning plate 3 is parallel to the formwork panel 6, and the horizontal section of the right-angle positioning plate 3 is provided with holes, which can be assisted by expansion bolts and the pouring foundation surface. The connection is fixed to increase the stability of the cast-in-place concrete pavement formwork.

与现有技术相比,本实用新型具有如下有益效果。Compared with the prior art, the present invention has the following beneficial effects.

1、本实用新型材料简单,制作容易,容易操作,设有四条可活动支撑杆,使用时不易变形或跑模。1. The material of the utility model is simple, easy to manufacture, and easy to operate. Four movable support rods are provided, so that it is not easy to deform or run out of molds during use.

2、本实用新型能有效地保证施工作业连续,模板搭设需要人工少,施工速度快。2. The utility model can effectively ensure the continuous construction operation, less labor is required for setting up the formwork, and the construction speed is fast.

3、回收价值高。铝模板报废后,当废料处理残值高,均摊成本优势明显,低碳减排。铝模板系统所有材料均为可再生材料,符合国家对建筑项目节能、环保、低碳、减排的规定。3. High recycling value. After the aluminum formwork is scrapped, when the residual value of the waste treatment is high, the average cost advantage is obvious, and the low carbon emission is reduced. All materials of the aluminum formwork system are renewable materials, in line with the national regulations on energy conservation, environmental protection, low carbon and emission reduction of construction projects.

附图说明Description of drawings

图1为本实用新型的新型现浇混凝土路面模板的主视图。Fig. 1 is the front view of the novel cast-in-place concrete pavement formwork of the present invention.

图2为本实用新型的新型现浇混凝土路面模板的俯视图。FIG. 2 is a top view of the novel cast-in-place concrete pavement formwork of the present invention.

图3为本实用新型的新型现浇混凝土路面模板的侧视图。Figure 3 is a side view of the new cast-in-place concrete pavement formwork of the present invention.

图中:1、承插孔,2、可活动支撑杆,3、直角定位板,4、承插接头,5、钢背楞支撑条。In the picture: 1. Socket socket, 2. Movable support rod, 3. Right-angle positioning plate, 4. Socket joint, 5. Steel back corrugated support bar.

具体实施方式Detailed ways

下面结合附图对本实用新型对具体说明:Below in conjunction with accompanying drawing, the utility model is described in detail:

如图1-3所示,一种新型现浇混凝土路面模板,该设备包括承插孔1、可活动支撑杆2、直角定位板3、承插接头4和钢背楞支撑条5。主体采用铝合金材料,使用时先固定直角定位板3,确保模板与浇筑基础面垂直,再固定两侧可活动支撑杆2,固定好一块模板后下一块模板的1承插孔与已固定模板的4承插接头连接,或者下一块模板的承插接头与已固定模板的承插孔连接亦可。As shown in Figure 1-3, a new type of cast-in-place concrete pavement formwork, the equipment includes socket holes 1, movable support rods 2, right-angle positioning plates 3, socket joints 4 and steel back corrugated support strips 5. The main body is made of aluminum alloy material. When using, first fix the right-angle positioning plate 3 to ensure that the formwork is perpendicular to the pouring foundation surface, and then fix the movable support rods 2 on both sides. After fixing one formwork, the socket 1 of the next formwork is connected to the fixed formwork. It can also be connected with the 4 socket connector of the next template, or the socket connector of the next template can be connected with the socket hole of the fixed template.

先固定直角定位板可以确保模板与浇筑基础面垂直,再通过可活动支撑杆对模板进行整体性固定,承插孔与承插接头连接可提高模板整体性,减少模板拼缝处施工,加设钢背楞支撑条对模板整体强度进行保证。Fixing the right-angle positioning plate first can ensure that the formwork is perpendicular to the pouring foundation surface, and then the formwork is integrally fixed by the movable support rod. The connection of the socket hole and the socket joint can improve the integrity of the formwork and reduce the construction of the formwork joints. The steel back corrugated support bar ensures the overall strength of the formwork.

所述模板使用时先固定直角定位板,确保模板与浇筑基础面垂直,再固定两侧可活动支撑杆,固定好一块模板后下一块模板的承插孔与已固定模板的承插接头连接,或者下一块模板的承插接头与已固定模板的承插孔连接亦可。可活动支撑杆2采用带螺纹钢钎,配合螺母固定在底座上。When the formwork is used, the right-angle positioning plate is first fixed to ensure that the formwork is perpendicular to the pouring foundation surface, and then the movable support rods on both sides are fixed. After one formwork is fixed, the socket holes of the next formwork are connected with the socket joints of the fixed formwork. Or the socket joint of the next template can be connected to the socket hole of the fixed template. The movable support rod 2 is made of threaded steel brazing and fixed on the base with a nut.

模板采用铝合金材质,整体基本为长方形形状。模板两端分别设置承插孔与承插接头,单侧设置两条钢背楞支撑条,中间设置三孔直角定位板,每两米设置两根水平支撑杆,使用时先将单块模板从中间到两边固定,然后将下一块模板承插接头插入已固定模板的承插孔中,再次从中间到两边固定。The template is made of aluminum alloy, and the overall shape is basically rectangular. The two ends of the formwork are respectively provided with socket holes and socket joints, two steel back corrugated support bars are set on one side, three-hole right-angle positioning plates are set in the middle, and two horizontal support rods are set every two meters. Fix from the middle to both sides, then insert the next piece of template socket connector into the socket hole of the fixed template, and fix again from the middle to the sides.

使用了该新型模板后,能够有效的避免传统槽钢模板的弊端,不仅可以加快现浇混凝土路面模板搭设的进度,而且可以减少模板拼缝处施工,提升模板整体性,精度更高,减少模板施工所需的人员及机械,线形、外观更加流畅美观。从而减少了因为钢模板材质导致的混凝土浇筑后外观差,拼缝处漏浆等施工问题,加快了施工施工进度,同时减少成本。After using the new formwork, it can effectively avoid the drawbacks of the traditional channel steel formwork. It can not only speed up the construction of the cast-in-place concrete pavement formwork, but also reduce the construction of the formwork joints, improve the integrity of the formwork, have higher precision, and reduce the number of formwork. The personnel and machinery required for construction are more fluent and beautiful in linear shape and appearance. Thereby, construction problems such as poor appearance after concrete pouring due to the material of the steel formwork and leakage of slurry at the joints are reduced, the construction progress is accelerated, and the cost is reduced at the same time.

Claims (4)

1. The utility model provides a cast-in-place concrete pavement template which characterized in that: comprises a template panel, a movable supporting rod and a steel back ridge supporting strip; the non-molding surface of the template panel is welded with a steel back ridge support bar which is a clamping groove for mounting the movable support bar; one side of the template panel is provided with a socket hole, and the other side of the template panel is provided with a socket joint; the formwork panels are connected with socket joints through socket holes to form a pavement pouring formwork main body; the bottom welding of template main part is pour on the road surface has with the right angle locating plate, the right angle locating plate with pour the basal surface and contact.
2. A cast-in-place concrete pavement formwork according to claim 1, characterized in that: a steel sleeve is arranged in the clamping groove, and the movable support rod is connected with the steel sleeve in a sliding manner; the bottom of the movable supporting rod is provided with a base in threaded connection, and the base is in contact with a supporting surface to transversely and stably support the pavement pouring template main body; a rubber pad is additionally arranged between the movable support rod and the steel sleeve to prevent skidding.
3. A cast-in-place concrete pavement formwork according to claim 1, characterized in that: the pavement pouring template main body is made of aluminum alloy.
4. A cast-in-place concrete pavement formwork according to claim 1, characterized in that: the right angle locating plate be L shape, the vertical section of right angle locating plate is parallel with the template panel, is equipped with the hole on the right angle locating plate horizontal segment, carries out supplementary connection through expansion bolts and pouring basal plane and fixes.
CN202122715255.4U 2021-11-08 2021-11-08 A cast-in-place concrete pavement formwork Expired - Fee Related CN216973055U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122715255.4U CN216973055U (en) 2021-11-08 2021-11-08 A cast-in-place concrete pavement formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122715255.4U CN216973055U (en) 2021-11-08 2021-11-08 A cast-in-place concrete pavement formwork

Publications (1)

Publication Number Publication Date
CN216973055U true CN216973055U (en) 2022-07-15

Family

ID=82344040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122715255.4U Expired - Fee Related CN216973055U (en) 2021-11-08 2021-11-08 A cast-in-place concrete pavement formwork

Country Status (1)

Country Link
CN (1) CN216973055U (en)

Similar Documents

Publication Publication Date Title
CN201202271Y (en) Adjustable formwork for multi-curved face concrete structure construction
CN206344287U (en) A kind of horizontal adjustable precast stair mould
CN203321538U (en) Variable-cross-section tunnel lining mold
CN210622306U (en) Assembly type floor post-cast strip template splicing structure
CN216973055U (en) A cast-in-place concrete pavement formwork
CN204715763U (en) A kind of aluminum alloy mould plate diagonal brace supporting member pre-embedded bolt structure
CN203238548U (en) Concrete pier template device
CN209779560U (en) Steel formwork for irrigation and water conservancy concrete channel
CN109318351B (en) Combined die for producing prefabricated parts
CN214940390U (en) Template for pouring full-package concrete of pipeline
CN201809683U (en) CRTSⅡ track plate fast edge banding device
CN205604289U (en) Can resist single storehouse underground pipe gallery of big deformation
CN211873823U (en) Concrete pier platform steel form
CN204382575U (en) A kind of plastic pipe double molds forming machine
CN210976581U (en) Connect high formula aluminum alloy template for building
CN210370682U (en) Tunnel adjustable support distance self-stabilizing inverted arch steel end mold
CN210976452U (en) Ground keel frame with flatness adjusted by screw
CN208792078U (en) Temporarily driving passes through device at a kind of notch of novel bridge expansion joint
CN203741864U (en) Special die for iron tower foundation protection cap
CN209737910U (en) Combined die for producing prefabricated parts
CN208396295U (en) A kind of open-cut station construction stair formwork erecting structure
CN206873926U (en) A kind of circular columns bean column node template of 3D printing
CN221119282U (en) Device suitable for mortar is spread in advance to brickwork
CN114961240B (en) Special-shaped high-low span bottom plate construction template and construction method
CN205976467U (en) Modular aluminum alloy building templates

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220715