[go: up one dir, main page]

CN216785607U - Material management device for building engineering - Google Patents

Material management device for building engineering Download PDF

Info

Publication number
CN216785607U
CN216785607U CN202122860740.0U CN202122860740U CN216785607U CN 216785607 U CN216785607 U CN 216785607U CN 202122860740 U CN202122860740 U CN 202122860740U CN 216785607 U CN216785607 U CN 216785607U
Authority
CN
China
Prior art keywords
fixedly connected
wall
placing box
management device
material management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122860740.0U
Other languages
Chinese (zh)
Inventor
沈晓兵
岳贤乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122860740.0U priority Critical patent/CN216785607U/en
Application granted granted Critical
Publication of CN216785607U publication Critical patent/CN216785607U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a material management device for constructional engineering, and relates to the field of constructional engineering. The material management device for the building engineering comprises a placing box, wherein a groove is formed in the top of the placing box; the lifting mechanism comprises a lifting frame, a right arc-shaped plate, a connecting block, a lifting plate, a rotary column and a right gear, the front end of the placing box is provided with a round hole, the inner wall of the round hole formed in the front end of the placing box is movably inserted with the rotary column, and the rear end of the rotary column is fixedly connected with the right gear. The material management device for the building engineering comprises a placing box, wherein a groove is formed in the top of the placing box; the lifting mechanism comprises a lifting frame, a right arc-shaped plate, a connecting block, a lifting plate, a rotary column and a right gear, the front end of the placing box is provided with a round hole, and the inner wall of the round hole formed in the front end of the placing box is movably inserted with the rotary column.

Description

Material management device for building engineering
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to a material management device for constructional engineering.
Background
The building engineering refers to an engineering entity formed by the construction of various house buildings and auxiliary facilities thereof and the installation activities of lines, pipelines and equipment matched with the house buildings, and the material management device for the building engineering refers to: at present, as materials on construction sites play different roles in building, the building materials are divided into two main categories, the first category is building materials for load-bearing structures, such as masonry, concrete, steel and wood, and the second category is special materials, such as acoustic panels, refractory bricks, rust-proof paint, foam and glass.
At present, the material management device for the building engineering on the market can only play a basic storage function, when the materials are used to the bottom of the management cabinet, the inner wall of the management cabinet is deep, the materials are not convenient to take out by a user, the bottom of the management cabinet is dark, the materials which are found out are difficult to distinguish by the user, the materials are not convenient to find, and the working efficiency is reduced.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
In order to overcome the defects in the prior art, the utility model discloses a material management device for construction engineering, which aims to solve the problems in the background technology.
(II) technical scheme
In order to achieve the purpose, the utility model is realized by the following technical scheme: a material management apparatus for construction engineering, comprising:
the top of the placing box is provided with a groove;
elevating system, elevating system includes crane, right arc, connecting block, lifter plate, column spinner and right gear, place the case front end and seted up the round hole, the round hole inner wall activity of seting up of placing the case front end is pegged graft and is had the column spinner, column spinner rear end fixedly connected with right gear, crane inner wall fixedly connected with right arc, right arc is connected with right gear meshing, crane rear wall fixedly connected with connecting block, wall fixedly connected with lifter plate behind the connecting block, the activity of lifter plate bottom is pegged graft in the recess of seting up at placing the roof portion.
Preferably, the inner wall of the groove formed in the top of the placing box is rotatably connected with a left gear through a pin shaft, the outer wall of the left gear is meshed with a right gear, the inner wall of the lifting frame is fixedly connected with a left arc-shaped plate, and the left arc-shaped plate is meshed with the left gear.
Preferably, the rotary column front end fixedly connected with rectangular block, the rectangular block outer wall rotates through the round pin axle and is connected with rotatory handle, it is connected with the protective cover through the hinge rotation to place the roof portion.
Preferably, the top of the rotating handle is fixedly connected with a clamping block, the front wall of the placing box is fixedly connected with a limiting plate, a groove is formed in the front end of the limiting plate, and the rear end of the clamping block is movably clamped in the groove formed in the front end of the limiting plate.
Preferably, the bottom of the groove formed in the top of the placing box is fixedly connected with a partition plate, a moving groove is formed in the rear wall of the partition plate, and the rear end of the connecting block penetrates through the moving groove and extends backwards.
The utility model discloses a material management device for construction engineering, which has the following beneficial effects:
1. this material management device for building engineering, place the case through the setting, the crane, right side arc, rotatory handle, the relation of connection of right gear and lifter plate, drive right gear through rotating rotatory handle, make right gear drive crane rebound, make rebound's crane can drive the lifter plate rebound, be convenient for drive the material rebound of placing the bottom of the case portion, make the material can remove to placing the roof portion exit, the person of facilitating the use takes out the material from placing the incasement, and it is brighter to place roof portion exit light, the staff of being convenient for seeks corresponding material, be favorable to improving the practicality of placing the case, be convenient for improve staff's work efficiency.
2. This material management device for building engineering through setting up rotatory handle top fixedly connected with fixture block, places case antetheca fixedly connected with limiting plate, and the limiting plate front end is seted up flutedly, and fixture block rear end activity joint is in the recess that the limiting plate front end was seted up, and the position of the rotatory handle of restriction of being convenient for avoids rotatory handle to continue to rotate, is favorable to fixing the position of lifter plate, is convenient for fix the horizontal position of material, and convenient to use person takes the material.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the internal structure of the storage box of the present invention;
FIG. 3 is a schematic view of the crane structure of the present invention;
FIG. 4 is a schematic view of a right gear structure according to the present invention;
fig. 5 is a schematic view of the structure of the rotating handle of the present invention.
In the figure: 1. placing a box; 101. a protective cover; 102. a partition panel; 103. a moving groove; 104. a limiting plate; 2. a lifting frame; 201. a left arc-shaped plate; 202. a left gear; 203. a right arc-shaped plate; 204. connecting blocks; 205. a lifting plate; 3. rotating the handle; 301. a spin column; 302. a right gear; 303. a clamping block; 304. a rectangular block.
Detailed Description
The embodiment of the utility model discloses a material management device for construction engineering, which comprises the following components in parts by weight as shown in figures 1-5:
according to the attached drawing 2, the placing box 1 is provided with a groove at the top of the placing box 1, so that the building materials can be conveniently stored and managed;
according to fig. 3 and 4, elevating system includes crane 2, right side arc 203, connecting block 204, lifter plate 205, column spinner 301 and right gear 302, place 1 front end of case and seted up the round hole, the round hole inner wall activity of placing 1 front end and seting up is pegged graft and is had column spinner 301, column spinner 301 rear end fixedly connected with right gear 302, crane 2 inner wall fixedly connected with right arc 203, right side arc 203 is connected with right gear 302 meshing, crane 2 back wall fixedly connected with connecting block 204, connecting block 204 back wall fixedly connected with lifter plate 205, lifter plate 205 bottom activity is pegged graft in the recess of placing 1 top and seting up, make and drive lifter plate 205 rebound through rotating column spinner 301, be convenient for drive the material rebound of placing 1 bottom, the person of facilitating the use takes it.
According to shown in the attached figures 3 and 4, the inner wall of a groove formed in the top of the placing box 1 is connected with a left gear 202 in a rotating mode through a pin shaft, the outer wall of the left gear 202 is connected with a right gear 302 in a meshing mode, the inner wall of the lifting frame 2 is fixedly connected with a left arc-shaped plate 201, the left arc-shaped plate 201 is connected with the left gear 202 in a meshing mode, the left gear 202 is convenient to contact with the motion of the right gear 302, the right gear 302 can drive the left gear 202 to rotate, the two sides of the lifting frame 2 can move upwards simultaneously, and the stability of the lifting frame 2 moving upwards is improved.
According to shown in the attached fig. 1 and 5, the front end of the rotary column 301 is fixedly connected with the rectangular block 304, the outer wall of the rectangular block 304 is connected with the rotary handle 3 through the pin shaft in a rotating mode, a user can rotate the rotary column 301 conveniently, the top of the placing box 1 is connected with the protective cover 101 through the hinge in a rotating mode, and materials stored in the placing box 1 can be protected conveniently.
According to fig. 5, 3 top fixedly connected with fixture blocks 303 of rotatory handle place 1 antetheca fixedly connected with limiting plate 104, limiting plate 104 front end is seted up flutedly, fixture block 303 rear end activity joint is in the recess that limiting plate 104 front end was seted up, be convenient for restrict rotatory handle 3's position, avoid rotatory handle 3 to continue to rotate, be favorable to fixing the position of lifter plate 205, be convenient for fix the horizontal position of material, the person of facilitating the use takes the material.
According to the attached drawings 2 and 3, the bottom of the groove formed in the top of the placing box 1 is fixedly connected with a partition plate 102, the rear wall of the partition plate 102 is provided with a moving groove 103, and the rear end of the connecting block 204 penetrates through the moving groove 103 to extend backwards, so that the lifting frame 2, the left gear 202 and the right gear 302 can be protected conveniently.
The working principle is as follows: in order to take out the material at the bottom of the placing box 1 conveniently, a user can rotate the rotating handle 3 counterclockwise to the left, so that the rotating handle 3 rotating to the left drives the rotating column 301 to rotate to the left, the rotating column 301 rotating to the left drives the right gear 302 to rotate to the left, the right gear 302 rotating to the left is extruded to push the right arc-shaped plate 203 to move upwards, the left gear 302 rotating counterclockwise to the left is extruded to push the left gear 202, the left gear 202 can rotate clockwise to the right, the left arc-shaped plate 201 is extruded to push the left to move upwards by the left gear 202 rotating rightwards, the left arc-shaped plate 201 and the right arc-shaped plate 203 simultaneously move upwards to drive the lifting frame 2 to move upwards, the lifting frame 2 moving upwards drives the connecting block 204 to move upwards, the lifting plate 205 is driven by the connecting block 204 moving upwards to move upwards, and the lifting plate 205 moving upwards drives the material to move towards the outlet at the top of the placing box 1, the material is convenient to take out.
After the height of lifter plate 205 has been adjusted through according to the demand, through promoting rotatory handle 3 backward for the rotatory handle 3 of backward movement drives fixture block 303 backward movement, makes in fixture block 303 of backward movement can insert the recess of the limiting plate 104 that corresponds, is convenient for fix the position of rotatory handle 3, is convenient for fix the height of lifter plate 205, and convenient to use person looks for the material or carries.
The foregoing shows and describes the general principles and features of the present invention, together with the advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (5)

1. A material management device for construction engineering, characterized by comprising:
the device comprises a placing box (1), wherein a groove is formed in the top of the placing box (1);
elevating system, elevating system includes crane (2), right arc (203), connecting block (204), lifter plate (205), column spinner (301) and right gear (302), place case (1) front end and seted up the round hole, the round hole inner wall activity of placing case (1) front end and seting up is pegged graft and is had column spinner (301), column spinner (301) rear end fixedly connected with right gear (302), crane (2) inner wall fixedly connected with right arc (203), right side arc (203) are connected with right gear (302) meshing, crane (2) back wall fixedly connected with connecting block (204), connecting block (204) back wall fixedly connected with lifter plate (205), lifter plate (205) bottom activity is pegged graft in the recess of placing case (1) top and seting up.
2. A construction work material management device according to claim 1, wherein: the inner wall of a groove formed in the top of the placing box (1) is rotatably connected with a left gear (202) through a pin shaft, the outer wall of the left gear (202) is meshed with a right gear (302) and is fixedly connected with a left arc-shaped plate (201) on the inner wall of the lifting frame (2), and the left arc-shaped plate (201) is meshed with the left gear (202).
3. A construction work material management device according to claim 1, wherein: rotatory post (301) front end fixedly connected with rectangular block (304), rectangular block (304) outer wall rotates through the round pin axle and is connected with rotation handle (3), it is connected with protective cover (101) through hinge rotation to place case (1) top.
4. A construction work material management device according to claim 3, wherein: rotatory handle (3) top fixedly connected with fixture block (303), place case (1) antetheca fixedly connected with limiting plate (104), limiting plate (104) front end is seted up flutedly, fixture block (303) rear end activity joint is in the recess that limiting plate (104) front end was seted up.
5. A construction work material management device according to claim 1, wherein: the bottom of the groove formed in the top of the placing box (1) is fixedly connected with a partition plate (102), a moving groove (103) is formed in the rear wall of the partition plate (102), and the rear end of the connecting block (204) penetrates through the moving groove (103) to extend backwards.
CN202122860740.0U 2021-11-22 2021-11-22 Material management device for building engineering Expired - Fee Related CN216785607U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122860740.0U CN216785607U (en) 2021-11-22 2021-11-22 Material management device for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122860740.0U CN216785607U (en) 2021-11-22 2021-11-22 Material management device for building engineering

Publications (1)

Publication Number Publication Date
CN216785607U true CN216785607U (en) 2022-06-21

Family

ID=82004225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122860740.0U Expired - Fee Related CN216785607U (en) 2021-11-22 2021-11-22 Material management device for building engineering

Country Status (1)

Country Link
CN (1) CN216785607U (en)

Similar Documents

Publication Publication Date Title
CN211369077U (en) A wall joint for prefabricated building wall installation support
CN216785607U (en) Material management device for building engineering
CN213597436U (en) Portable building decoration moving platform
CN108532844A (en) A kind of solar panel roof with decorative effect
CN210289031U (en) Decorate inorganic composite sheet installation device of heat preservation fire prevention
CN113338502B (en) Building curtain wall
CN210195203U (en) Building equipment for foundation building
CN116791786A (en) Green energy-saving assembled building wall component and assembling method thereof
CN215759804U (en) Assembled building wallboard
CN214600036U (en) Intelligent brushing equipment for constructional engineering
CN220035982U (en) Built-in fitting fixing device used in stone curtain wall construction
CN220580200U (en) A new type of assembled nonlinear systematic structure
CN112431427A (en) Shallow equipment of building stand wall plastering engineering
CN216949778U (en) Building engineering safety control device
CN221958322U (en) Construction pipeline support
CN221346569U (en) Sound insulation equipment is used to fitment convenient to dismantlement installation
CN222227894U (en) A special scaffolding for suspended ceiling
CN220167704U (en) Fence for building engineering construction
CN220565627U (en) Plastering device for building
CN215561979U (en) A safety construction frame for bridge engineering
CN220599278U (en) Building installation protective structure
CN221422934U (en) Construction enclosure
CN215060655U (en) Safety management device for construction engineering site construction
CN214786528U (en) Building construction encloses fender with safety protection that has rain-proof function
CN216122612U (en) Monitoring device for building construction management

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220621

CF01 Termination of patent right due to non-payment of annual fee