[go: up one dir, main page]

CN215797948U - Quick adjustment power plant boiler stove three combination mounting tool - Google Patents

Quick adjustment power plant boiler stove three combination mounting tool Download PDF

Info

Publication number
CN215797948U
CN215797948U CN202121465454.8U CN202121465454U CN215797948U CN 215797948 U CN215797948 U CN 215797948U CN 202121465454 U CN202121465454 U CN 202121465454U CN 215797948 U CN215797948 U CN 215797948U
Authority
CN
China
Prior art keywords
thread
adjusting
double
screw rod
tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121465454.8U
Other languages
Chinese (zh)
Inventor
黄少伟
闫文伟
吴兴泊
孔令涛
亓逢君
玄纪凯
张正
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO3 Electric Power Construction Co Ltd
Original Assignee
SEPCO3 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO3 Electric Power Construction Co Ltd filed Critical SEPCO3 Electric Power Construction Co Ltd
Priority to CN202121465454.8U priority Critical patent/CN215797948U/en
Application granted granted Critical
Publication of CN215797948U publication Critical patent/CN215797948U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the technical field of construction equipment, in particular to a tool for quickly adjusting three-unit combination installation in a power station boiler. A quick adjustment three-unit combined installation tool in a power station boiler comprises an adjusting rod, a double-thread screw rod and a T-shaped hook plate; adjusting nuts are arranged at two ends of the adjusting rod, and each adjusting nut is connected with a double-thread screw rod; the other end of the double-thread screw rod is connected with the T-shaped hook plate. The tool provided by the utility model has the advantages that the number of construction tools is reduced, and the construction is optimized; the safety and the adjustability are better; the construction period and the economic benefit are obvious.

Description

Quick adjustment power plant boiler stove three combination mounting tool
Technical Field
The utility model relates to the technical field of construction equipment, in particular to a tool for quickly adjusting three-unit combination installation in a power station boiler.
Background
All three devices (an economizer, a superheater and a reheater) of the supercritical tower boiler are arranged in a hearth in a horizontal snake-shaped structure, and the three devices in the boiler are sequentially suspended in series from a boiler top suspension device through an internal suspension pipe. Therefore, three devices in the furnace are arranged in a closed space formed by the surrounding water-cooled walls and the ceiling tube panels, and are large in number, wide in size and heavy in mass, so that the lifting device can only be used for lifting by arranging the furnace bottom at the top of the lifting device. According to the installation and adjustment mode, the speed of combined welding of the internal suspension pipes is far behind the hoisting speed of three devices in the furnace, and large batches of hand-pulling chain blocks, steel wire ropes and snap rings need to be put into the furnace in a short time, but if large batches of hoisting tools are purchased, the cost for executing projects is not different from the cost for increasing the cost for executing the projects. Therefore, how to quickly carry out hoisting and adjustment is the key for solving the overall installation progress and reducing the cost investment.
SUMMERY OF THE UTILITY MODEL
The utility model aims to overcome the problems in the existing construction process, and aims at solving the problems of large requirements, high damage rate and uneven quality of lifting tools of a lifting tool in the power station boiler by innovatively designing a rapid adjustment three-device combined installation tool in the power station boiler aiming at the installation mode of lifting three devices in the boiler by adopting the mode of arranging a furnace bottom on the top of a lifting device for lifting.
In order to achieve the purpose, the utility model adopts the technical scheme that: a quick adjustment three-unit combined installation tool in a power station boiler comprises an adjusting rod, a double-thread screw rod and a T-shaped hook plate; adjusting nuts are arranged at two ends of the adjusting rod, and each adjusting nut is connected with a double-thread screw rod; the other end of the double-thread screw rod is connected with the T-shaped hook plate.
Further preferably, the adjusting nut at one end of the adjusting rod is a left-hand thread, and the other end of the adjusting rod is a right-hand thread.
Preferably, both ends of one double-thread screw rod are right-handed threads, one end of the other double-thread screw rod is right-handed threads, and the other end of the other double-thread screw rod is left-handed threads.
Further preferably, two ends of the double-thread screw rod are respectively sleeved with locking nuts.
Further preferably, the left-hand thread or the right-hand thread is a fine thread.
The tool for quickly adjusting the three-unit combination in the boiler of the power station boiler has the advantages that:
reduce construction tool, optimize the construction: the utility model directly converts the hand chain block, two sets of steel wire ropes and the snap ring into a set of rapid adjustment tool according to the design requirements, thereby solving the problem of complicated construction;
the safety is higher: the thread pitch of the fine thread is small, the thread lead angle is small, the self-locking performance is good, the anti-vibration and anti-loosening capacity is strong, and the self-locking of the quick adjusting tool is realized through the matching of the adjusting rod, the double-thread screw rod and the locking nut. The problems that a clamp ring and a steel wire rope of a traditional tool are easy to fall in high altitude, and a chain is easy to slide and clamp when a chain is reversed by hand pulling are solved;
the adjustability is better: the utility model is suitable for hanging adjustment of the biplate assembled hanging tube bank, can quickly hook the tube bank and quickens the adjustment speed. The double-thread screw rod can be disassembled and replaced, has multiple specifications and multiple sizes, and is matched with the adjusting rod to realize the installation of three devices in the furnace with different specifications and quick adjustment of intervals
The construction reliability is higher: the T-shaped hook plate is perfectly attached to the actual snakelike tube panel, so that the tube panel is prevented from being scratched, bruised and pulled, and compared with a hoisting tool of a steel wire rope, a hand-pull chain block and a clamping ring, a protective cushion layer or an anti-abrasion device is not required to be added on the equipment protection, so that the method is simple and effective;
the construction period and the economic benefit are obvious: the left-handed and right-handed threaded adjusting rod and the double-threaded screw rod can be externally processed or adopt a pipeline supporting and lifting device, a large amount of expenses for purchasing hand-pulling chain blocks, snap rings and splicing steel wire ropes are saved, and the economic benefit is obvious.
Drawings
FIG. 1 is a schematic structural diagram of a tool for quickly adjusting the installation of three combinations in a furnace of a utility boiler;
FIG. 2 is a schematic diagram of an application of a three-unit installation tool for rapidly adjusting the furnace inside a utility boiler;
in the figure: 1. the left-right-handed screw thread adjusting rod comprises a left-right-handed screw thread adjusting rod 2, a double-threaded screw rod 3, a T-shaped hook plate 4 and a locking nut.
Detailed Description
For better understanding of the present invention, the technical solution of the present invention will be described in detail with reference to the following embodiments, but the present invention is not limited thereto.
As shown in fig. 1 and fig. 2, the tool for quickly adjusting the three combinations in the boiler of the utility boiler comprises a left-right screw thread adjusting rod 1, a double-thread screw rod 2, a T-shaped hook plate 3 and a locking nut 4.
Wherein, the two ends of the left-right screw thread adjusting rod 1 are respectively provided with a left-handed fine thread adjusting nut and a right-handed fine thread adjusting nut.
The double-thread lead screw 2 comprises an upper double-thread lead screw and a lower double-thread lead screw.
The upper double-thread screw rod is a double right-handed fine-thread screw rod, one end of the upper double-thread screw rod is matched and connected with a right-handed fine-thread adjusting nut of the right-handed thread adjusting rod 1, and the other end of the upper double-thread screw rod is in threaded connection with a T-shaped hook plate 3.
The lower double-thread screw rod is a left-right fine-thread screw rod, namely, one end of the screw rod is a left-right fine-thread screw, and the other end of the screw rod is a right-right fine-thread screw. The left-handed fine thread end of the lower double-thread screw rod is in matched connection with the left-handed fine thread adjusting nut of the left-handed and right-handed thread adjusting rod 1, and the right-handed fine thread end is in threaded connection with a T-shaped hook plate 3. Two ends of the double-thread screw rod are respectively locked and fixed with the left-right-hand thread adjusting rod 1 and the T-shaped hook plate 3 through locking nuts 4. Wherein the lock nut 4 comprises three right-hand threaded lock nuts and one left-hand threaded nut.
The double-thread screw rod 2 can be disassembled and replaced, and has multiple specifications and sizes, and the size of the T-shaped hook plate 3 is matched with the pipe screen pipe in a clearance way. The left-handed and right-handed threaded adjusting rod 1, the T-shaped hook plate 3 and the locking nut 4 are in threaded fit, the size between tube panels is calculated in advance during use, and the double-thread screw rod 2 with a proper size is selected.
When the two-piece assembled hanging tube bank is lifted from the bottom of a boiler through a winch, the utility model is configured and combined in advance, then the T-shaped hook plate 3 is hung on a tube panel on the upper layer of the top, a hook needs to be connected when the next layer of the tube panel is hoisted in place, the lower T-shaped hook plate 3 is rotated to complete the hook connection, then the adjusting rods 1 with left and right threads are rotated to be adjusted to be in proper size with the double-thread screw rod 2, and then the locking nuts 4 are fastened to ensure the hoisting safety.

Claims (5)

1. The utility model provides a quick adjustment power plant boiler stove three combination mounting tool which characterized in that: comprises an adjusting rod, a double-thread screw rod and a T-shaped hook plate; adjusting nuts are arranged at two ends of the adjusting rod, and each adjusting nut is connected with a double-thread screw rod; the other end of the double-thread screw rod is connected with the T-shaped hook plate.
2. The tool of claim 1 for quickly adjusting the setting of three combinations in a utility boiler, wherein: the adjusting nut at one end of the adjusting rod is a left-handed thread, and the other end of the adjusting rod is a right-handed thread.
3. The tool of claim 2 for quickly adjusting the setting of three combinations in a utility boiler, wherein: two ends of one double-thread screw rod are both right-handed threads; one end of the other double-thread screw rod is a right-handed thread, and the other end of the other double-thread screw rod is a left-handed thread.
4. The tool of claim 1 for quickly adjusting the setting of three combinations in a utility boiler, wherein: and locking nuts are respectively sleeved at two ends of the double-thread screw rod.
5. The tool for quickly adjusting the setting of the combinations of three inside the utility boiler according to claim 2 or 3, characterized in that: the left-hand thread or the right-hand thread is a fine thread.
CN202121465454.8U 2021-06-30 2021-06-30 Quick adjustment power plant boiler stove three combination mounting tool Active CN215797948U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121465454.8U CN215797948U (en) 2021-06-30 2021-06-30 Quick adjustment power plant boiler stove three combination mounting tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121465454.8U CN215797948U (en) 2021-06-30 2021-06-30 Quick adjustment power plant boiler stove three combination mounting tool

Publications (1)

Publication Number Publication Date
CN215797948U true CN215797948U (en) 2022-02-11

Family

ID=80179463

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121465454.8U Active CN215797948U (en) 2021-06-30 2021-06-30 Quick adjustment power plant boiler stove three combination mounting tool

Country Status (1)

Country Link
CN (1) CN215797948U (en)

Similar Documents

Publication Publication Date Title
CN215797948U (en) Quick adjustment power plant boiler stove three combination mounting tool
CN108382847A (en) A kind of aluminium bar production handling device
CN111017707B (en) Clamping mechanism for lifting vertical placing pipeline
CN206250724U (en) A kind of long-range cable that transmits electric power tightens pull bar
CN208997472U (en) A kind of fixed structure in pipeline elevator adjustment replacement process
CN218564594U (en) Adjustable support and hanger for mounting electromechanical pipelines of building
CN203494080U (en) Safety rope suspension device for transformer
CN107487713B (en) integral combination hoisting and positioning process for upper part of water behind pi-shaped boiler
CN204824952U (en) Water-cooled furnace mouth of converter
CN205099291U (en) Heat exchanger overhauls hoist device
CN214881718U (en) Furnace chassis of vacuum gas quenching furnace
CN204400627U (en) A kind of equilibrator of polycrystalline silicon reducing furnace lifting counterweight
CN109488011B (en) Device for longitudinally connecting scaffold steel pipes
CN212893447U (en) Unhooking device for boiler heating surface
CN208218198U (en) A kind of sunpender regulating mechanism of thermal power plant's suspention boiler
CN208289298U (en) Supporting device is used in a kind of maintenance of boiler superheater
CN214733764U (en) Direct current wall bushing hoisting accessory
CN210813942U (en) Full-space free Weiya transmission device
CN207719729U (en) A kind of anchor support extension ring replacement tool
CN212863798U (en) Rod lifting appliance
CN222293364U (en) Multifunctional lifting appliance for overhauling steam turbine
CN220950792U (en) Prefabricated component telescopic lifting appliance
CN216550525U (en) A quick installation device for tap hole of vertical masonry converter
CN210499863U (en) Fixing structure in maintenance process of floating main throttle valve of gas turbine power plant
CN108063396A (en) A kind of anchor support extends ring and replaces instrument

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant