[go: up one dir, main page]

CN215759019U - Deep hole bored concrete pile steel reinforcement cage correcting unit - Google Patents

Deep hole bored concrete pile steel reinforcement cage correcting unit Download PDF

Info

Publication number
CN215759019U
CN215759019U CN202122235830.0U CN202122235830U CN215759019U CN 215759019 U CN215759019 U CN 215759019U CN 202122235830 U CN202122235830 U CN 202122235830U CN 215759019 U CN215759019 U CN 215759019U
Authority
CN
China
Prior art keywords
plate
reinforcement cage
fixedly connected
stabilizing
concrete pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122235830.0U
Other languages
Chinese (zh)
Inventor
梁盛友
林正超
杜世友
张子龙
胡建
周锡兵
周波
王义泽
沈阳奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 8 Engineering Group Co Ltd
Original Assignee
China Railway No 8 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 8 Engineering Group Co Ltd filed Critical China Railway No 8 Engineering Group Co Ltd
Priority to CN202122235830.0U priority Critical patent/CN215759019U/en
Application granted granted Critical
Publication of CN215759019U publication Critical patent/CN215759019U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to the technical field of constructional engineering, in particular to a correction device for a deep hole bored concrete pile reinforcement cage, which comprises: the surface of the first stabilizing plate is provided with a mounting groove, the top end of the first stabilizing plate is provided with limiting holes, the limiting holes are provided with four groups, and mounting columns are arranged inside the mounting groove; the top end of the second stabilizing plate is fixedly connected with a first mounting frame. According to the utility model, the second stabilizing plate, the first mounting frame, the rotating wheel, the first pulley block, the rope, the second pulley block, the second mounting frame, the hook, the limiting ring and the correcting cylinder are arranged, so that the steel reinforcement cage is prevented from deviating in the descending process, the position of the steel reinforcement cage is prevented from deviating in the descending process and is always in a horizontal position through the matching among the hook, the first pulley block and the second pulley block, the correcting effect on the steel reinforcement cage is improved, and the position of the steel reinforcement cage can be fixed.

Description

Deep hole bored concrete pile steel reinforcement cage correcting unit
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to a correction device for a deep hole bored concrete pile reinforcement cage.
Background
The reinforcement cage mainly plays a role in the same principle as the stress of longitudinal steel bars of the column and mainly plays a role in tensile strength, the compressive strength of concrete is high, but the tensile strength is very low, the pile body concrete plays a role in restraining so that the pile body concrete can bear certain axial tension, when a bridge or a high-rise building is constructed, a foundation is piled according to requirements possibly, the method is to use a machine to punch holes and grind the holes with water, the hole depth reaches the design requirement, then the reinforcement cage is placed in the pile hole, and then a guide pipe is inserted for concrete pouring.
In the past building engineering, the position of the steel reinforcement cage usually inclines when the steel reinforcement cage is installed, the stability of the whole building is affected if the position of the steel reinforcement cage inclines, the correction effect is poor, and the past correction device is troublesome to install and poor in stability, so that the improvement and improvement of the problems become problems which need to be solved at present.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a correction device for a deep-hole bored concrete pile reinforcement cage, which solves the problems that in the prior building engineering proposed in the background art, the position of the reinforcement cage is inclined usually when the reinforcement cage is installed, the inclination affects the stability of the whole building, the correction effect is poor, the prior correction device is troublesome to install and the stability is poor.
In order to achieve the purpose, the utility model provides the following technical scheme: a deep hole bored concrete pile reinforcement cage correcting device, comprising:
the surface of the first stabilizing plate is provided with a mounting groove, the top end of the first stabilizing plate is provided with limiting holes, the limiting holes are provided with four groups, and mounting columns are arranged inside the mounting groove;
the first mounting bracket of top fixedly connected with of second stabilizer plate, the inside of first mounting bracket is provided with the runner, one side swing joint of runner has first assembly pulley, the surface of first assembly pulley is provided with the rope, the surface of rope is provided with the second assembly pulley, the bottom of second assembly pulley is provided with the second mounting bracket, the one end fixedly connected with couple of rope.
Preferably, the bottom end of the second mounting frame is fixedly connected with a limiting ring, and the bottom end of the limiting ring is fixedly connected with a correction cylinder.
Preferably, a first sliding groove is formed in one side of the first stabilizing plate, and a second sliding groove is formed in the inner side wall of the first stabilizing plate.
Preferably, a first sliding plate is arranged inside the first sliding groove, and a first stabilizing column is fixedly connected to one side of the first sliding plate.
Preferably, a second sliding plate is arranged inside the second sliding groove, and a second stabilizing column is fixedly connected to one side of the second sliding plate.
Preferably, the inside in spacing hole is provided with spacing bolt, mutual adaptation between spacing hole and the spacing bolt, the opposite side fixedly connected with bottom plate of first stabilizer plate, the bottom plate is provided with four groups.
Compared with the prior art, the utility model has the beneficial effects that:
1. the correction device for the reinforcement cage of the deep hole cast-in-place pile comprises a second stabilizing plate, a first mounting frame, a rotating wheel, a first pulley block, a rope, a second pulley block, a second mounting frame, a hook, a limiting ring and a correction cylinder, wherein the second stabilizing plate, the first mounting frame, the rotating wheel, the first pulley block, the rope, the second pulley block, the second mounting frame, the hook, the limiting ring and the correction cylinder are arranged, when the correction device is used, the reinforcement cage is placed inside the correction cylinder through a crane, the rope and the hook are driven by the first pulley block in the falling process of the reinforcement cage, and the reinforcement cage is hooked by two groups of hooks, so that the reinforcement cage is prevented from deviating in the falling process, the position of the reinforcement cage is prevented from inclining and deviating in the placing process, the position of the reinforcement cage and the correction cylinder is kept horizontal, the position of the reinforcement cage is prevented from deviating in the falling process and is always kept in a horizontal position through the cooperation among the hook, the first pulley block and the second pulley block, the correction effect on the reinforcement cage is improved, and the position of the reinforcement cage can be fixed, the deflection of the position of the reinforcement cage is prevented, and the practicability of the device is reflected.
2. The correction device for the reinforcement cage of the deep hole bored concrete pile comprises a first stabilizing plate, a mounting groove, a limiting hole, a mounting column, a second stabilizing plate, a first sliding groove, a second sliding groove, a first sliding plate, a first stabilizing column, a second sliding plate, a second stabilizing column and a limiting bolt, wherein the first stabilizing plate, the mounting groove, the limiting hole, the mounting column, the second stabilizing plate, the first sliding groove, the second sliding groove, the first sliding plate, the second sliding plate, the first sliding plate and the second sliding plate are firstly slid into the first sliding groove and the second sliding groove, then a correction cylinder is placed into the first stabilizing plate, and then the correction cylinder is fixed through the mutual adaptation between four groups of limiting bolts and the limiting hole, so that the first sliding plate and the second sliding plate can be fixed, then the correction cylinder can be fixed through the four groups of first stabilizing columns and second stabilizing columns, the correction cylinder is effectively fixed, the stability of the correction cylinder is improved, the stability of the reinforcement cage is improved, the installation stability of the reinforcement cage is ensured, the position of the correction cylinder is horizontal, and fix first steadying plate through the bottom plate to can carry out stable concreting, make coaxially between steel reinforcement cage and the correction section of thick bamboo, ensure the stability of structure, this device assembles also comparatively simply, and the structure is also corresponding comparatively stable, and the on-the-spot operating personnel's of being convenient for daily use, and the cost is lower, is fit for using widely.
Drawings
FIG. 1 is a schematic view of a three-dimensional structure according to the present invention;
FIG. 2 is a perspective view of the first and second mount configurations of the present invention;
FIG. 3 is a schematic exploded view of a first stabilizer plate structure according to the present invention;
fig. 4 is a schematic diagram of a second embodiment of the first stabilizer plate structure according to the present invention.
In the figure: 1. a first stabilizer plate; 2. mounting grooves; 3. a limiting hole; 4. mounting a column; 5. a second stabilizing plate; 6. a first mounting bracket; 7. a rotating wheel; 8. a first pulley block; 9. a rope; 10. a second pulley block; 11. a second mounting bracket; 12. hooking; 13. a limiting ring; 14. a correction cylinder; 15. a first chute; 16. a second chute; 17. a first sliding plate; 18. a first stabilizing post; 19. a second sliding plate; 20. a second stabilizing post; 21. a limit bolt; 22. a base plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, an embodiment of the present invention is shown:
a deep hole bored concrete pile reinforcement cage correcting device, comprising:
the surface of the first stabilizing plate 1 is provided with a mounting groove 2, the top end of the first stabilizing plate 1 is provided with a limiting hole 3, the limiting holes 3 are provided with four groups, and a mounting column 4 is arranged in the mounting groove 2;
a second stabilizing plate 5, a first mounting frame 6 is fixedly connected to the top end of the second stabilizing plate 5, a rotating wheel 7 is arranged inside the first mounting frame 6, one side of the rotating wheel 7 is movably connected with a first pulley block 8, a rope 9 is arranged on the surface of the first pulley block 8, a second pulley block 10 is arranged on the surface of the rope 9, a second mounting frame 11 is arranged at the bottom end of the second pulley block 10, one end of the rope 9 is fixedly connected with a hook 12, the bottom end of the second mounting frame 11 is fixedly connected with a limiting ring 13, the bottom end of the limiting ring 13 is fixedly connected with a correcting cylinder 14, a steel reinforcement cage is placed inside the correcting cylinder 14 by a crane, the rope 9 and the hook 12 are driven by the first pulley block 8 in the falling process of the steel reinforcement cage, the steel reinforcement cage is hooked by two groups of hooks 12, so that the steel reinforcement cage is prevented from deviating in the descending process, and the position of the steel reinforcement cage is prevented from inclining and deviating in the placing process, the reinforcing cage and the 14 position levels of a correction section of thick bamboo have been guaranteed, make through the cooperation between couple 12, first assembly pulley 8 and the second assembly pulley 10 can not squint at the in-process reinforcing cage position that descends, are in a horizontally position all the time, have improved the correction effect to the reinforcing cage to can fix the position of reinforcing cage, prevent the deflection of reinforcing cage position.
Further, first spout 15 has been seted up to one side of first stabilizer plate 1, second spout 16 has been seted up to the inside wall of first stabilizer plate 1, the inside of first spout 15 is provided with first sliding plate 17, one side fixedly connected with first stable post 18 of first sliding plate 17, the inside of second spout 16 is provided with second sliding plate 19, one side fixedly connected with second stable post 20 of second sliding plate 19, through with the inside of first sliding plate 17 and second sliding plate 19 board slip-in first spout 15 and second spout 16, then put into the inside of first stabilizer plate 1 with a correction section of thick bamboo 14.
Furthermore, the limiting bolts 21 are arranged in the limiting holes 3, the limiting holes 3 are matched with the limiting bolts 21, the other side of the first stabilizing plate 1 is fixedly connected with a bottom plate 22, the bottom plate 22 is provided with four groups, the first sliding plate 17 and the second sliding plate 19 can be fixed by the four groups of limiting bolts 21 and the limiting holes 3 which are matched with each other, then the correcting cylinder 14 can be fixed by the four groups of first stabilizing columns 18 and the four groups of second stabilizing columns 20, the correcting cylinder 14 is effectively fixed, the stability of the correcting cylinder 14 is improved, the installation stability of the reinforcement cage is improved, the position horizontality of the reinforcement cage and the correcting cylinder 14 is ensured, the first stabilizing plate 1 is fixed by the bottom plate 22, the stable concrete pouring can be carried out, the reinforcement cage and the correcting cylinder 14 are coaxial, and the structural stability is ensured, the device is simple to assemble, the structure is correspondingly stable, the daily use of operators on the site is facilitated, the cost is low, and the device is suitable for popularization and use.
The working principle is as follows: when in use, the first sliding plate 17 and the second sliding plate 19 are firstly slid into the first sliding groove 15 and the second sliding groove 16, then the correction cylinder 14 is placed into the first stabilizing plate 1, and then the correction cylinder 14 is fixed through the mutual matching between the four groups of limiting bolts 21 and the limiting holes 3, so that the first sliding plate 17 and the second sliding plate 19 can be fixed, then the correction cylinder 14 can be fixed through the four groups of first stabilizing columns 18 and second stabilizing columns 20, the correction cylinder 14 is effectively fixed, the stability of the correction cylinder 14 is improved, the stability of the installation of the reinforcement cage is improved, the position levelness of the reinforcement cage and the correction cylinder 14 is ensured, the first stabilizing plate 1 is fixed through the bottom plate 22, so that the stable concrete pouring can be carried out, the reinforcement cage and the correction cylinder 14 are coaxial, when in use, the reinforcement cage is placed into the correction cylinder 14 through a crane, the rope 9 and the hook 12 are driven by the first pulley block 8 in the process of falling of the reinforcement cage, the reinforcement cage is hooked by the two groups of hooks 12, so that the reinforcement cage is prevented from deviating in the descending process, the position of the reinforcement cage is prevented from inclining and deviating in the placing process, the position of the reinforcement cage and the correcting cylinder 14 is kept horizontal, the position of the reinforcement cage is prevented from deviating in the descending process through the matching among the hooks 12, the first pulley block 8 and the second pulley block 10 and is always in a horizontal position, and the correcting effect of the reinforcement cage is improved.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a deep hole bored concrete pile steel reinforcement cage correcting unit which characterized in that includes:
the device comprises a first stabilizing plate (1), wherein a mounting groove (2) is formed in the surface of the first stabilizing plate (1), limiting holes (3) are formed in the top end of the first stabilizing plate (1), four groups of limiting holes (3) are formed in the limiting holes, and mounting columns (4) are arranged in the mounting groove (2);
second stabilizer plate (5), the first mounting bracket of top fixedly connected with (6) of second stabilizer plate (5), the inside of first mounting bracket (6) is provided with runner (7), one side swing joint of runner (7) has first assembly pulley (8), the surface of first assembly pulley (8) is provided with rope (9), the surface of rope (9) is provided with second assembly pulley (10), the bottom of second assembly pulley (10) is provided with second mounting bracket (11), the one end fixedly connected with couple (12) of rope (9).
2. The device for correcting the deep hole bored concrete pile cage according to claim 1, wherein: the bottom fixedly connected with spacing ring (13) of second mounting bracket (11), the bottom fixedly connected with of spacing ring (13) corrects a section of thick bamboo (14).
3. The device for correcting the deep hole bored concrete pile cage according to claim 1, wherein: a first sliding groove (15) is formed in one side of the first stabilizing plate (1), and a second sliding groove (16) is formed in the inner side wall of the first stabilizing plate (1).
4. The device of claim 3, wherein: a first sliding plate (17) is arranged inside the first sliding groove (15), and a first stabilizing column (18) is fixedly connected to one side of the first sliding plate (17).
5. The device of claim 3, wherein: a second sliding plate (19) is arranged in the second sliding groove (16), and a second stabilizing column (20) is fixedly connected to one side of the second sliding plate (19).
6. The device for correcting the deep hole bored concrete pile cage according to claim 1, wherein: the utility model discloses a stabilizer plate, including spacing hole (3), spacing hole (3) and spacing bolt (21), the inside of spacing hole (3) is provided with spacing bolt (21), mutual adaptation between spacing hole (3) and spacing bolt (21), the opposite side fixedly connected with bottom plate (22) of first stabilizer plate (1), bottom plate (22) are provided with four groups.
CN202122235830.0U 2021-09-15 2021-09-15 Deep hole bored concrete pile steel reinforcement cage correcting unit Expired - Fee Related CN215759019U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122235830.0U CN215759019U (en) 2021-09-15 2021-09-15 Deep hole bored concrete pile steel reinforcement cage correcting unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122235830.0U CN215759019U (en) 2021-09-15 2021-09-15 Deep hole bored concrete pile steel reinforcement cage correcting unit

Publications (1)

Publication Number Publication Date
CN215759019U true CN215759019U (en) 2022-02-08

Family

ID=80087848

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122235830.0U Expired - Fee Related CN215759019U (en) 2021-09-15 2021-09-15 Deep hole bored concrete pile steel reinforcement cage correcting unit

Country Status (1)

Country Link
CN (1) CN215759019U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114703850A (en) * 2022-04-01 2022-07-05 天津弘野建设集团有限公司 Cast-in-place pile reinforcement cage hanging verticality correcting device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114703850A (en) * 2022-04-01 2022-07-05 天津弘野建设集团有限公司 Cast-in-place pile reinforcement cage hanging verticality correcting device
CN114703850B (en) * 2022-04-01 2024-04-12 天津弘野建设集团有限公司 Cast-in-place pile reinforcement cage hanging verticality correcting device

Similar Documents

Publication Publication Date Title
CN212503601U (en) Installation die for unit sections of vertical pipes of pipe well
CN215759019U (en) Deep hole bored concrete pile steel reinforcement cage correcting unit
CN211873836U (en) Support base of support pole setting
CN210066810U (en) Assembled cutting barricade
CN215828208U (en) Auxiliary device for installation of overweight oblique support embedded part
CN216948179U (en) Detachable overhanging trestle access hole drilling machine operation platform
CN214116620U (en) Adjustable support for accurate positioning of permanent double-steel-pipe column
CN116641369A (en) Long spiral drilling pressure grouting pile bar planting method and bar planting out-of-place treatment method
CN211920714U (en) Support system of pull-up and pull-down type external hanging self-climbing tower crane
CN211849438U (en) Device for pile connection and perpendicularity adjustment
CN212866086U (en) Lattice column direction control device
CN219653713U (en) Heavy pile foundation steel reinforcement cage positioner
CN216516501U (en) Portable multipurpose steel reinforcement cage lengthening positioner
CN214996126U (en) Lattice column direction control structure
CN210396067U (en) Special bearing stores pylon of civil engineering
CN217896185U (en) Bent cap construction structures
CN218090545U (en) Pier-pile steel-concrete transition joint steel plate levelness and plane position adjusting device
CN219327099U (en) Steel tube support frame for raft foundation
CN219586706U (en) Foundation reinforcement embedded pile for building construction
CN215629895U (en) Pile foundation reinforcement cage suspension positioning structure
CN219825216U (en) Positioning device for pile foundation reinforcement cage
CN217325401U (en) Foundation pit pre-installation equipment and foundation pit protection system
CN220848643U (en) Back-pull type anchoring wall-riding hanging basket support frame
CN222314603U (en) Construction support draw gear
CN211421123U (en) Joist steel mounting bracket based on TRD construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220208

CF01 Termination of patent right due to non-payment of annual fee