[go: up one dir, main page]

CN214803272U - Operation panel for road and bridge engineering cost - Google Patents

Operation panel for road and bridge engineering cost Download PDF

Info

Publication number
CN214803272U
CN214803272U CN202121532474.2U CN202121532474U CN214803272U CN 214803272 U CN214803272 U CN 214803272U CN 202121532474 U CN202121532474 U CN 202121532474U CN 214803272 U CN214803272 U CN 214803272U
Authority
CN
China
Prior art keywords
operation panel
panel
cabinet body
fixedly connected
road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121532474.2U
Other languages
Chinese (zh)
Inventor
孔繁嵩
韦丽
李俊
周晓可
秦学
李姝霓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Qiujing Engineering Cost Co ltd
Original Assignee
Chongqing Qiujing Engineering Cost Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Qiujing Engineering Cost Co ltd filed Critical Chongqing Qiujing Engineering Cost Co ltd
Priority to CN202121532474.2U priority Critical patent/CN214803272U/en
Application granted granted Critical
Publication of CN214803272U publication Critical patent/CN214803272U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Combinations Of Kitchen Furniture (AREA)

Abstract

The utility model discloses a road and bridge is operation panel for engineering cost, including the operation panel cabinet body, operation panel cabinet body top is equipped with receiving mechanism, receiving mechanism is including accomodating the frame, the inside operation panel that is equipped with of frame is accomodate, operation panel comprises main panel and two side boards, two the side board sets up respectively in main panel bottom both sides, two the side board links to each other with the main panel both sides through the hinge respectively, accomodate frame bottom fixedly connected with support sleeve. The utility model discloses a design into the split type structure that a home panel and two side boards are constituteed with the operation panel, turn over two side boards and roll over to the home panel bottom to inhale the piece through first magnetism and second magnetism and inhale the piece and inhale the side board magnetism and be fixed in the home panel bottom, the operation panel area obtains effectively reducing after folding, thereby conveniently accomodate the operation panel, the cost person of being convenient for carries the haul.

Description

Operation panel for road and bridge engineering cost
Technical Field
The utility model relates to an operation panel technical field, concretely relates to road and bridge is operation panel for engineering cost.
Background
The project cost refers to the construction cost expected or actually paid out during the construction period of the constituent project. The work process of forecasting, planning, controlling, accounting, analyzing and evaluating the engineering cost by comprehensively using knowledge and skills in the aspects of management, economics, engineering technology and the like is called engineering cost management. The construction cost person is a construction cost budgeting person, and in actual cost estimation, the construction cost person often needs to observe on the spot to measure data and quantity, so that office operation needs to be performed on an operation table.
The current road bridge for engineering cost of engineering operation panel its operation mesa most all is fixed connection on the support frame on the market, can't fold to take in the operation mesa, often carries the haulage because of the too big cost person of not being convenient for of operation mesa.
Therefore, it is necessary to provide a console for road and bridge construction to solve the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a road and bridge is operation panel for engineering cost to its operation mesa of operation panel for engineering cost of road and bridge that has now on the market in the solution technique all is fixed connection on the support frame mostly, can't fold to the operation mesa and accomodate, often because of the too big problem that the cost person of being not convenient for carries the haul of operation mesa.
In order to achieve the above object, the present invention provides the following technical solutions: the utility model provides a road and bridge is operation panel for engineering cost, includes the operation panel cabinet body, operation panel cabinet body top is equipped with receiving mechanism, receiving mechanism is including accomodating the frame, accomodate the inside operation panel that is equipped with of frame, the operation panel comprises main panel and two side boards, two the side board sets up respectively in main panel bottom both sides, two the side board links to each other with the main panel both sides through the hinge respectively, accomodate frame bottom fixedly connected with supporting sleeve, support sleeve bottom and operation panel cabinet body top fixed connection, the inside electric putter that is equipped with of supporting sleeve, accomodate the frame bottom and seted up the through-hole, the through-hole is linked together with the supporting sleeve is inside, electric putter one end and operation panel cabinet body top fixed connection, the electric putter other end run through the through-hole and with main panel bottom fixed connection.
Preferably, two the side board all sets up to the half of main panel size, two semicircle breach has all been seted up to side board one side, two the semicircle breach all with electric putter phase-match.
Preferably, the inside fixedly connected with first magnetism of main panel inhales the piece, two the inside equal fixedly connected with second magnetism of side panel inhales the piece, first magnetism is inhaled piece and second magnetism and is inhaled a magnetism looks and inhale.
Preferably, the inside first storing room and the second storing room of having seted up of operation panel cabinet body, the second storing room sets up in first storing room bottom, the inside sliding connection of first storing room has storage drawer.
Preferably, one side of the operation table cabinet body is hinged with a cabinet door, the cabinet door is matched with the second storage chamber, and the surfaces of the storage drawer and the cabinet door are fixedly connected with handles.
Preferably, one side of the operating platform cabinet body is fixedly connected with a trolley handrail, and the trolley handrail is obliquely arranged.
Preferably, the four corners of the bottom of the operating table cabinet body are fixedly connected with moving wheels, and the moving wheels are all set to be universal self-locking rolling wheels.
Preferably, the equal fixedly connected with in operation panel cabinet body both sides puts the thing couple, it sets up to a plurality ofly to put thing couple quantity it is a linear array distribution to put the thing couple.
The utility model discloses a design into the split type structure that a main panel and two side boards constitute with the operation panel, turn over two side boards and roll over to the main panel bottom to inhale the piece through first magnetism and second magnetism and inhale the piece with side board magnetism and fix in the main panel bottom, the operation panel is through folding back area of occupation effectively reduced, thereby conveniently accomodate the operation panel, the cost person of being convenient for carries the haul; through setting up first storing room and second storing room in the internal portion of operation panel cabinet to the cost person deposits and carries article such as office accommodation, and the setting of shallow handrail is convenient for the cost person right the utility model discloses promote, will remove the wheel and set up to universal auto-lock gyro wheel and can make things convenient for the removal of position, set up in operation panel cabinet body both sides and put the thing couple and be favorable to improving the utility model discloses an article carrying capacity.
Drawings
Fig. 1 is a schematic view of the overall structure of a first viewing angle of the present invention;
fig. 2 is a schematic view of the overall structure at a second viewing angle of the present invention;
FIG. 3 is a schematic structural view of the electric putter of the present invention in an extended state;
FIG. 4 is a schematic structural view of the console panel of the present invention in an expanded state;
fig. 5 is a partial structural sectional view of the present invention.
Description of reference numerals:
1. an operation desk cabinet body; 2. a storage frame; 3. an operation panel; 4. a main panel; 5. a side panel; 6. a hinge; 7. a support sleeve; 8. an electric push rod; 9. a through hole; 10. a semicircular notch; 11. a first magnetic attraction block; 12. a second magnetic attraction block; 13. a first storage compartment; 14. a second storage compartment; 15. a storage drawer; 16. a cabinet door; 17. a handle; 18. a cart armrest; 19. a moving wheel; 20. a hook for placing articles.
Detailed Description
In order to make the technical solution of the present invention better understood by those skilled in the art, the present invention will be further described in detail with reference to the accompanying drawings.
The utility model provides an operation table for road and bridge engineering cost as shown in figures 1-5, which comprises an operation table cabinet body 1, wherein the top of the operation table cabinet body 1 is provided with a receiving mechanism, the receiving mechanism comprises a receiving frame 2, an operation table panel 3 is arranged inside the receiving frame 2, the operation table panel 3 consists of a main panel 4 and two side panels 5, the two side panels 5 are respectively arranged at two sides of the bottom of the main panel 4, the two side panels 5 are respectively connected with two sides of the main panel 4 through hinges 6, the bottom of the receiving frame 2 is fixedly connected with a supporting sleeve 7, the bottom of the supporting sleeve 7 is fixedly connected with the top of the operation table cabinet body 1, an electric push rod 8 is arranged inside the supporting sleeve 7, the bottom of the receiving frame 2 is provided with a through hole 9, the through hole 9 is communicated with the inside of the supporting sleeve 7, one end of the electric push rod 8 is fixedly connected with the top of the operation table cabinet body 1, the other end of the electric push rod 8 penetrates through the through hole 9 and is fixedly connected with the bottom of the main panel 4.
Two side panel 5 all sets up to the half of 4 sizes of main panel, two semicircle breach 10, two have all been seted up to side panel 5 one side semicircle breach 10 all with electric putter 8 phase-match, the setting up of semicircle breach 10 does benefit to and avoids side panel 5 to cause the unnecessary influence to electric putter 8 when accomodating.
Piece 11, two are inhaled to the inside first magnetism of fixedly connected with of main panel 4 the inside equal fixedly connected with second magnetism of side panel 5 is inhaled piece 12, piece 12 magnetism is inhaled mutually to first magnetism inhale piece 11 and second magnetism, inhales piece 12 through first magnetism and second magnetism and inhale the piece 11 and can inhale 5 magnetism of side panel and be fixed in the 4 bottoms of main panel.
First storing room 13 and second storing room 14 have been seted up to the inside of operation panel cabinet body 1, second storing room 14 sets up in first storing room 13 bottom, the inside sliding connection of first storing room 13 has storage drawer 15, and the cost person of being convenient for of setting up of first storing room 13 and second storing room 14 deposits the office supplies.
A cabinet door 16 is hinged to one side of the operating platform cabinet body 1, the cabinet door 16 is matched with the second storage chamber 14, and handles 17 are fixedly connected to the surfaces of the storage drawer 15 and the cabinet door 16.
Operation panel cabinet body 1 one side fixedly connected with shallow handrail 18, shallow handrail 18 slope sets up, and shallow handrail 18 sets up the cost person of being convenient for right the utility model discloses promote.
Equal fixedly connected with in 1 bottom four corners of the operation panel cabinet body removes wheel 19, four remove wheel 19 and all set up to universal auto-lock gyro wheel, will remove wheel 19 and set up to universal auto-lock gyro wheel can be convenient the utility model discloses the removal of position.
The equal fixedly connected with in 1 both sides of the operation panel cabinet body puts thing couple 20, it sets up to a plurality ofly to put thing couple 20 quantity, and is a plurality of put thing couple 20 and be linear array distribution, put being provided with of thing couple 20 and do benefit to the improvement the utility model discloses an article carrying capacity.
Referring to the attached drawings 1-5 of the specification, when the utility model is used, the electric push rod 8 is started, the electric push rod 8 extends upwards and drives the operation panel 3 to lift, after the operation panel 3 is lifted to a certain height, the two side panels 5 are respectively turned over and opened towards two sides until the two side panels 5 are both level with the main panel 4, the electric push rod 8 is started again, the electric push rod 8 returns downwards and drives the operation panel 3 to slowly descend until the two side panels 5 are respectively overlapped on two sides of the top of the containing frame 2, the side panels 5 are effectively supported by the containing frame 2, so that the overall stability of the operation panel 3 is improved, a constructor can conveniently work on the operation panel 3, the operation panel 3 is composed of the main panel 4 and the two side panels 5, the two side panels 5 are turned over to the bottom of the main panel 4, the side panel 5 is fixed at the bottom of the main panel 4 through the first magnetic block 11 and the second magnetic block 12, and the floor area of the operation panel 3 is effectively reduced after being folded, so that the operation panel 3 is convenient to store and carry by a constructor;
referring to the attached drawings 1-5 of the specification, the utility model discloses when using, through setting up first storing room 13 and second storing room 14 in the operation panel cabinet body 1 inside to the cost person deposits and carries article such as office supplies, and setting up of shallow handrail 18 is convenient for the cost person right the utility model discloses promote, will remove wheel 19 and set up to universal auto-lock gyro wheel and can make things convenient for the utility model discloses the removal of position sets up at the operation panel cabinet body 1 both sides and puts thing couple 20 and be favorable to improving the utility model discloses an article carrying capacity.
While certain exemplary embodiments of the present invention have been described above by way of illustration only, it will be apparent to those of ordinary skill in the art that the described embodiments may be modified in various different ways without departing from the spirit and scope of the present invention. Accordingly, the drawings and description are illustrative in nature and should not be construed as limiting the scope of the invention.

Claims (8)

1. The utility model provides a road and bridge is operation panel for engineering cost, includes the operation panel cabinet body (1), its characterized in that: the top of the operating table cabinet body (1) is provided with a containing mechanism, the containing mechanism comprises a containing frame (2), an operating table panel (3) is arranged in the containing frame (2), the operating table panel (3) consists of a main panel (4) and two side panels (5), the two side panels (5) are respectively arranged on two sides of the bottom of the main panel (4), the two side panels (5) are respectively connected with two sides of the main panel (4) through hinges (6), the bottom of the containing frame (2) is fixedly connected with a supporting sleeve (7), the bottom of the supporting sleeve (7) is fixedly connected with the top of the operating table cabinet body (1), an electric push rod (8) is arranged in the supporting sleeve (7), the bottom of the containing frame (2) is provided with a through hole (9), the through hole (9) is communicated with the inside of the supporting sleeve (7), one end of the electric push rod (8) is fixedly connected with the top of the operating table cabinet body (1), the other end of the electric push rod (8) penetrates through the through hole (9) and is fixedly connected with the bottom of the main panel (4).
2. The console for road and bridge construction cost according to claim 1, wherein: two side board (5) all set up to half of main panel (4) size, two semicircle breach (10) have all been seted up to side board (5) one side, two semicircle breach (10) all with electric putter (8) phase-match.
3. The console for road and bridge construction cost according to claim 1, wherein: piece (11), two are inhaled to the inside first magnetism of fixedly connected with of main panel (4) the inside equal fixedly connected with second magnetism of side board (5) is inhaled piece (12), piece (11) are inhaled mutually with second magnetism to first magnetism and inhale piece (12) magnetism.
4. The console for road and bridge construction cost according to claim 1, wherein: first storing room (13) and second storing room (14) have been seted up to operation panel cabinet body (1) inside, second storing room (14) set up in first storing room (13) bottom, the inside sliding connection of first storing room (13) has storing drawer (15).
5. The operating table for road and bridge engineering construction cost according to claim 4, wherein: a cabinet door (16) is hinged to one side of the operating platform cabinet body (1), the cabinet door (16) is matched with the second storage chamber (14), and handles (17) are fixedly connected to the surfaces of the storage drawer (15) and the cabinet door (16).
6. The console for road and bridge construction cost according to claim 1, wherein: one side of the operating platform cabinet body (1) is fixedly connected with a trolley handrail (18), and the trolley handrail (18) is obliquely arranged.
7. The console for road and bridge construction cost according to claim 1, wherein: all fixedly connected with in operation panel cabinet body (1) bottom four corners removes wheel (19), four remove wheel (19) and all set up to universal auto-lock gyro wheel.
8. The console for road and bridge construction cost according to claim 1, wherein: the equal fixedly connected with in operation panel cabinet body (1) both sides puts thing couple (20), it sets up to a plurality ofly to put thing couple (20) quantity put thing couple (20) and be linear array and distribute.
CN202121532474.2U 2021-07-06 2021-07-06 Operation panel for road and bridge engineering cost Active CN214803272U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121532474.2U CN214803272U (en) 2021-07-06 2021-07-06 Operation panel for road and bridge engineering cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121532474.2U CN214803272U (en) 2021-07-06 2021-07-06 Operation panel for road and bridge engineering cost

Publications (1)

Publication Number Publication Date
CN214803272U true CN214803272U (en) 2021-11-23

Family

ID=78812993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121532474.2U Active CN214803272U (en) 2021-07-06 2021-07-06 Operation panel for road and bridge engineering cost

Country Status (1)

Country Link
CN (1) CN214803272U (en)

Similar Documents

Publication Publication Date Title
US5848798A (en) Office cart
CN204323443U (en) A kind of Multi-purpose pushcart
US20130313029A1 (en) Modular customizable cart
CN201019253Y (en) Multi-purpose table capable of being as computer-able/dining-table
CN214803272U (en) Operation panel for road and bridge engineering cost
US3446386A (en) Portable custodial unit
CN204500064U (en) A kind of students' dormitory Multipurpose cabinet
CN202236074U (en) A multifunctional mobile nurse station
CN204414084U (en) welding tool cabinet
CN217524242U (en) Bear frame and install this folding table that bears frame
CN215303727U (en) Office table convenient to move
CN214112652U (en) An omnidirectional intelligent transport trolley
CN205359875U (en) Medical multifunctional nursing vehicle
CN206687857U (en) The Medical nursing vehicle of modified form
CN202518721U (en) Novel cabinet transportation vehicle
CN219029468U (en) Folding pull rod shallow
CN208434857U (en) Multifunctional travel suitcase
CN218052568U (en) Intelligent movable tool vehicle
CN215971573U (en) Mobile vehicle with convenient writing and storage functions
CN219467445U (en) A painting tool cart
CN211592614U (en) Conveniently load and unload rotatable book car of putting on shelf
CN206612387U (en) Desk
CN216651772U (en) Table and cabinet combined furniture
CN219166961U (en) Special transport trolley for parenteral nutrient solution
CN211675071U (en) Multifunctional nursing trolley

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant