CN214696743U - Lifting operation platform for wallboard installation - Google Patents
Lifting operation platform for wallboard installation Download PDFInfo
- Publication number
- CN214696743U CN214696743U CN202120378995.0U CN202120378995U CN214696743U CN 214696743 U CN214696743 U CN 214696743U CN 202120378995 U CN202120378995 U CN 202120378995U CN 214696743 U CN214696743 U CN 214696743U
- Authority
- CN
- China
- Prior art keywords
- wallboard
- platform
- operation platform
- lifting
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Power-Operated Mechanisms For Wings (AREA)
Abstract
A lifting operation platform for wallboard installation comprises an operation platform and a wallboard lifting platform arranged on at least one side of the operation platform, wherein the wallboard lifting platform comprises a wallboard cavity for accommodating a wallboard, a movable bottom plate is arranged below the wallboard cavity, and the movable bottom plate is in power connection with a wallboard power mechanism; a plurality of guide rods penetrating through the operating platform are arranged on two sides of the operating platform, and a platform power mechanism connected with the operating platform in a power mode is arranged below the operating platform. This application adopts wallboard lifting platform and operation platform cooperation to set up, can be large-scale improvement operating efficiency, because the removal of operation platform itself someone and apparatus, the atress is uneven, so adopt the mode of guide bar can guarantee operation platform's equilibrium, avoid taking place the side to move or the side is partially inclined.
Description
Technical Field
The application relates to a lifting operation platform for wallboard installation.
Background
The prefabricated concrete wallboard is a reinforced concrete plate type member processed and manufactured in a prefabrication factory or a construction site for building assembly, can improve the industrial and mechanical construction degree, reduce on-site wet operation, save on-site labor, overcome seasonal influence and shorten the construction period of a building. In prefabricated wallboard installation, generally be with wallboard hoist and mount installation, this still calculates commonly when the installation of small-scale, but at the large-span installation, especially when involving the wallboard installation of direction of height, generally need use lift platform, current lift platform exists wallboard hoist and mount and the inconsistent problem of operation platform lift at first, and secondly the problem of security is also comparatively outstanding.
SUMMERY OF THE UTILITY MODEL
In order to solve the problems, the application provides a lifting operation platform for wallboard installation, which comprises an operation platform and a wallboard lifting platform arranged on at least one side of the operation platform, wherein the wallboard lifting platform comprises a wallboard cavity for accommodating a wallboard, a movable bottom plate is arranged below the wallboard cavity, and the movable bottom plate is in power connection with a wallboard power mechanism; a plurality of guide rods penetrating through the operating platform are arranged on two sides of the operating platform, and a platform power mechanism connected with the operating platform in a power mode is arranged below the operating platform. This application adopts wallboard lifting platform and operation platform cooperation to set up, can be large-scale improvement operating efficiency, because the removal of operation platform itself someone and apparatus, the atress is uneven, so adopt the mode of guide bar can guarantee operation platform's equilibrium, avoid taking place the side to move or the side is partially inclined.
Preferably, operation platform includes a backup pad, is equipped with the threaded rod at the lateral part of guide bar, operation platform and threaded rod complex position are equipped with the screw thread and promote the piece, the screw thread promotes the piece and links firmly the setting with the backup pad.
Preferably, the platform power mechanism comprises a platform motor, an output shaft of the platform motor is connected with a transverse transmission shaft through bevel gear power, two ends of the transverse transmission shaft are respectively connected with a longitudinal transmission shaft through bevel gear power, and the longitudinal transmission shaft is connected with the threaded rod through bevel gear power. This application adopts the rotatory operating platform that drives of threaded rod that the symmetry set up to shift up for the atress can be as balanced as possible, improves the stability that operating platform shifted up.
Preferably, the number of the threaded rods is four, and the threaded rods are arranged on two sides of the operating platform in pairs.
Preferably, the wallboard lifting platform comprises a supporting table, an outer frame is arranged at the top of the supporting table, and the wallboard cavity is arranged in the outer frame.
Preferably, wallboard power unit includes a wallboard motor, a wallboard motor gearbox of end connection of wallboard motor passes a wallboard axle in wallboard motor gearbox, is equipped with the wallboard fluted roller respectively at the both ends of wallboard axle, is equipped with the wallboard rack that sets up with the cooperation of wallboard fluted roller on the frame.
Preferably, be equipped with the cushion block that sets up with wallboard rack cooperation on the frame. This application wallboard motor sets to the form with the frame linkage, is in order to lift the in-process, and its wallboard fluted roller that provides power is in the motion state, avoids under the overweight condition because the lateral part is used for taking place the fluted roller and damages the phenomenon, improves overall structure's stability and security.
Preferably, the number of the wallboard lifting platforms is two, and the wallboard lifting platforms are uniformly distributed on one side of the operation platform.
Preferably, a sliding rail is arranged between the wallboard lifting platforms.
Preferably, a protective baffle is arranged in the middle of the slide rail.
This application can bring following beneficial effect:
1. the wallboard lifting platform and the operation platform are matched, so that the operation efficiency can be improved on a large scale, and the operation platform is not stressed uniformly due to the fact that people and instruments move, the balance of the operation platform can be guaranteed by the aid of the guide rods, and lateral movement or lateral deviation is avoided;
2. the symmetrically arranged threaded rods are adopted to rotate to drive the operating platform to move upwards, so that the stress can be balanced as much as possible, and the stability of the operating platform in moving upwards is improved;
3. this application wallboard motor sets to the form with the frame linkage, is in order to lift the in-process, and its wallboard fluted roller that provides power is in the motion state, avoids under the overweight condition because the lateral part is used for taking place the fluted roller and damages the phenomenon, improves overall structure's stability and security.
Drawings
The accompanying drawings, which are included to provide a further understanding of the application and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the application and together with the description serve to explain the application and not to limit the application. In the drawings:
FIG. 1 is a schematic structural diagram of the present application;
fig. 2 is a schematic view of a wallboard lift platform section.
Detailed Description
In order to clearly explain the technical features of the present invention, the present application will be explained in detail by the following embodiments in combination with the accompanying drawings.
As shown in the drawings, the following detailed description is given by way of example in order to more clearly explain the overall concept of the present application.
In addition, in the description of the present application, it is to be understood that the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "axial", "radial", "circumferential", and the like, indicate orientations and positional relationships based on those shown in the drawings, are only for convenience of description and simplicity of description, and do not indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be construed as limiting the present application.
The embodiments in the present specification are described in a progressive manner, and the same and similar parts among the embodiments are referred to each other, and each embodiment focuses on the differences from the other embodiments.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present application, "a plurality" means two or more unless specifically limited otherwise.
In this application, unless expressly stated or limited otherwise, the terms "mounted," "connected," "secured," and the like are to be construed broadly and can include, for example, fixed connections, removable connections, or integral parts; the connection can be mechanical connection, electrical connection or communication; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meaning of the above terms in the present application can be understood by those of ordinary skill in the art as appropriate.
In this application, unless expressly stated or limited otherwise, the first feature "on" or "under" the second feature may be directly contacting the first and second features or indirectly contacting the first and second features through intervening media. In the description herein, reference to the description of the term "one embodiment," "some embodiments," "an example," "a specific example," or "some examples," etc., means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the application. In this specification, the schematic representations of the terms used above are not necessarily intended to refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
In a first embodiment, as shown in fig. 1-2, a lifting operation platform for wallboard installation comprises an operation platform and a wallboard lifting platform arranged on at least one side of the operation platform, wherein the wallboard lifting platform comprises a wallboard cavity for accommodating a wallboard 19, a movable bottom plate 1 is arranged below the wallboard cavity, and the movable bottom plate 1 is in power connection with a wallboard power mechanism; a plurality of guide rods 2 penetrating through the operating platform are arranged on two sides of the operating platform, and a platform power mechanism connected with the operating platform in a power mode is arranged below the operating platform. Operation platform includes a backup pad 3, is equipped with threaded rod 4 at the lateral part of guide bar 2, operation platform and 4 complex positions of threaded rod are equipped with screw thread lifting block 5, screw thread lifting block 5 links firmly with backup pad 3 and sets up. The platform power mechanism comprises a platform motor 6, an output shaft of the platform motor 6 is connected with a transverse transmission shaft 7 through bevel gear power, two ends of the transverse transmission shaft 7 are respectively connected with a longitudinal transmission shaft 8 through bevel gear power, and the longitudinal transmission shaft 8 is connected with the threaded rod 4 through bevel gear power. The number of the threaded rods 4 is 4, and the threaded rods are arranged on two sides of the operating platform in pairs. The wallboard lifting platform comprises a supporting platform 9, an outer frame 10 is arranged at the top of the supporting platform 9, and the wallboard cavity is arranged in the outer frame 10. Wallboard power unit includes a wallboard motor 11, a wallboard motor gearbox 12 of end connection of wallboard motor 11 passes a wallboard axle 13 in wallboard motor gearbox 12, is equipped with wallboard fluted roller 14 respectively at the both ends of wallboard axle 13, is equipped with the wallboard rack 15 that sets up with the cooperation of wallboard fluted roller 14 on outer frame 10. The outer frame 10 is provided with a cushion block 16 which is matched with the wallboard rack 15. The wallboard promotes the quantity of platform and is two, wallboard promotes the platform equipartition in one side of operation platform. And a sliding rail 17 is arranged between the wallboard lifting platforms. A protective baffle 18 is arranged in the middle of the slide rail 17.
During the use, arrange this application in a carrier that can remove on, wallboard 19 places in the wallboard cavity through lifting device or fork truck, the personnel then stand in backup pad 3, then come control people and wallboard 19's position through operation wallboard motor 11 and platform motor 6, this application is the wallboard that is used for installing the eminence generally, the wallboard installation is then with the wallboard on sliding to slide rail 17 from the wallboard cavity, and set up with 18 butts of guard flap, then lift and install can, because the two sides are provided with the wallboard cavity, can two people be under construction simultaneously, further improvement installation and efficiency of construction.
The embodiments in the present specification are described in a progressive manner, and the same and similar parts among the embodiments are referred to each other, and each embodiment focuses on the differences from the other embodiments. In particular, for the system embodiment, since it is substantially similar to the method embodiment, the description is simple, and for the relevant points, reference may be made to the partial description of the method embodiment.
The above are merely examples of the present application and are not intended to limit the present application. Various modifications and changes may occur to those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of the claims of the present application.
Claims (10)
1. The utility model provides a wallboard installation is with lift operation platform which characterized in that: the wallboard lifting platform comprises a wallboard cavity for accommodating a wallboard, a movable bottom plate is arranged below the wallboard cavity, and the movable bottom plate is in power connection with a wallboard power mechanism; a plurality of guide rods penetrating through the operating platform are arranged on two sides of the operating platform, and a platform power mechanism connected with the operating platform in a power mode is arranged below the operating platform.
2. The lifting operation platform for wallboard installation of claim 1, wherein: the operation platform comprises a supporting plate, a threaded rod is arranged on the side portion of the guide rod, a thread lifting block is arranged at the position where the operation platform is matched with the threaded rod, and the thread lifting block is fixedly connected with the supporting plate.
3. The lifting operation platform for wallboard installation of claim 2, wherein: the platform power mechanism comprises a platform motor, an output shaft of the platform motor is connected with a transverse transmission shaft through bevel gear power, two ends of the transverse transmission shaft are respectively connected with a longitudinal transmission shaft through bevel gear power, and the longitudinal transmission shaft is connected with a threaded rod through bevel gear power.
4. The lifting operation platform for wallboard installation of claim 3, wherein: the quantity of threaded rod is 4, sets up in pairs in operation platform's both sides.
5. The lifting operation platform for wallboard installation of claim 1, wherein: the wallboard lifting platform comprises a supporting table, an outer frame is arranged at the top of the supporting table, and the wallboard cavity is arranged in the outer frame.
6. The lifting operation platform for wallboard installation of claim 5, wherein: the wallboard power mechanism comprises a wallboard motor, the end part of the wallboard motor is connected with a wallboard motor gearbox, a wallboard shaft penetrates through the wallboard motor gearbox, wallboard toothed rollers are respectively arranged at two ends of the wallboard shaft, and a wallboard rack which is matched with the wallboard toothed rollers is arranged on the outer frame.
7. The lifting operation platform for wallboard installation of claim 6, wherein: and a buffer cushion block matched with the wallboard rack is arranged on the outer frame.
8. The lifting operation platform for wallboard installation of claim 1, wherein: the wallboard promotes the quantity of platform and is two, wallboard promotes the platform equipartition in one side of operation platform.
9. The lifting operation platform for wallboard installation of claim 8, wherein: and a sliding rail is arranged between the wallboard lifting platforms.
10. The lifting platform of claim 9, wherein: and a protective baffle is arranged in the middle of the slide rail.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120378995.0U CN214696743U (en) | 2021-02-19 | 2021-02-19 | Lifting operation platform for wallboard installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120378995.0U CN214696743U (en) | 2021-02-19 | 2021-02-19 | Lifting operation platform for wallboard installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214696743U true CN214696743U (en) | 2021-11-12 |
Family
ID=78567727
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120378995.0U Active CN214696743U (en) | 2021-02-19 | 2021-02-19 | Lifting operation platform for wallboard installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214696743U (en) |
-
2021
- 2021-02-19 CN CN202120378995.0U patent/CN214696743U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN216235657U (en) | On-spot hoisting installation device of large-span steel construction | |
CN214696743U (en) | Lifting operation platform for wallboard installation | |
CN209794376U (en) | Double-motor-driven large-volume refrigerator foaming clamp | |
CN214879778U (en) | Auxiliary structure is demolishd to tower machine balance arm end attachment piece | |
CN214653004U (en) | Floor transport gripper jaw | |
CN116675140B (en) | Concrete prefabricated component lifts and aligns installation device | |
CN221140920U (en) | Double-reel European-style trolley | |
CN117188311A (en) | Bridge stand staple bolt is from lift mounting platform | |
CN212269149U (en) | Double-chain household elevator of no well knapsack formula | |
CN110700604B (en) | Assembly type laminated slab mounting trolley and using method thereof | |
CN109972523B (en) | Prefabricated T roof beam diaphragm reinforcing bar construction equipment of road bridge | |
CN220886676U (en) | Hoist with adjustable prefabricated assembled superimposed sheet is used | |
CN209381034U (en) | Napper is used in a kind of energy-saving prefabricated components production | |
CN220578787U (en) | Small hoisting equipment for constructional engineering | |
CN222025421U (en) | Building floor slab concrete placement operation rack | |
CN112482792A (en) | Auxiliary device is used in installation of steel construction factory building | |
CN222540331U (en) | A gantry crane system for assembled structural components | |
CN118547598B (en) | Steel beam working platform with self-locking function | |
CN222389379U (en) | Lifting appliance for turning over reinforced bar block | |
CN218621820U (en) | Steel pipe arch rib vertical splicing line-shaped adjusting device | |
CN214652845U (en) | Building construction elevator guide rail mechanism | |
CN218754667U (en) | Movable portal frame for electromechanical installation | |
CN216739320U (en) | High pier automatic installation template equipment | |
CN220149044U (en) | Tensioning jack lifting device | |
CN222665175U (en) | Double-layer overweight steel reinforcement cage lifting appliance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |