Prior art keywords
construction
construction platform
installation base
telescopic machine
guide block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120261559.5U
Other languages
Chinese (zh)
Inventor
李丛丛
程琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120261559.5U priority Critical patent/CN214364865U/en
Application granted granted Critical
Publication of CN214364865U publication Critical patent/CN214364865U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Construction platform for building engineering, including the wall body, the wall body is equipped with the installation base through bolt fixed connection, the installation base bottom is connected through the bolt dismantlement and is equipped with the telescopic machine, the one end that the wall body was kept away from to the telescopic machine is dismantled and is connected and be equipped with the construction platform, one side that the telescopic machine was kept away from on the construction platform top is connected through rotating and is equipped with the telescopic link, the telescopic link top is equipped with the rotation piece through rotating the connection, the one end bottom that the telescopic machine was kept away from to the construction platform is equipped with the discharge gate through the welding, sliding connection is equipped with the pay-off storehouse in the discharge gate, the one end that the pay-off storehouse is close to the installation base is equipped with the mount through the welding, the utility model discloses the beneficial effect who reaches is: the telescopic machine that stretches out through the installation base bottom holds, promotes the construction platform and removes on the installation base to change the distance that the construction platform stretches out, be convenient for adjust building construction position, make things convenient for the workman to be under construction, the shock attenuation spring that is located between anticreep piece and the stopper can be when telescopic machine starts the shock attenuation, prevents that the construction platform from removing suddenly, leads to the constructor to fall down.

Description

Construction platform for building engineering
Technical Field
The utility model relates to a building engineering technical field, concretely relates to construction platform for building engineering.
Background
With the continuous rise of the building industry in China, when the building outer wall is constructed, a construction platform needs to be built, and constructors can construct the wall body through the construction platform.
The construction platform for the existing constructional engineering is fixed at most installation positions, so that the operable space is limited, and meanwhile, a large amount of construction waste can be generated in the construction process, and the construction platform is inconvenient for construction personnel to clean.
SUMMERY OF THE UTILITY MODEL
The utility model discloses the current construction platform for building engineering of technical problem that solves, most mounted position are fixed for but operating space is limited, simultaneously in the work progress, can produce a large amount of construction waste materials, the constructor clearance of being not convenient for provides construction platform for building engineering for this, makes it reach the adjustable effect of being convenient for clear away the waste material of construction platform.
The utility model provides a technical scheme that technical problem adopted is: a construction platform for construction engineering comprises a wall body, wherein the wall body is provided with an installation base through fixed connection of bolts, the bottom end of the installation base is provided with a telescopic machine through detachable connection of bolts, one end of the telescopic machine, which is far away from the wall body, is provided with a construction table through detachable connection, one side, which is far away from the telescopic machine, of the top end of the construction table is provided with a telescopic rod through rotatable connection, the top end of the telescopic rod is provided with a rotating piece through rotatable connection, the bottom of one end, which is far away from the telescopic machine, of the construction table is provided with a discharge port through welding, the discharge port is internally and slidably connected with a feeding bin, one end, which is close to the installation base, of the feeding bin is provided with a fixed frame through welding, a return spring is arranged in the feeding bin through insertion connection, the return spring is rotatably connected with a resistance plate, one end, which is close to the construction table, of the installation base is provided with a guide block, one end, which is far away from the telescopic machine, is provided with a damping spring through insertion connection, the one end that the guide block was kept away from to the damping spring is equipped with the stopper through pegging graft, the spout has been seted up to one side that the construction platform is close to the guide block, the upside that the construction platform is close to the spout is equipped with the anticreep piece through the welding.
As an optimized technical scheme of the utility model, the installation base is "T" form, installation base right angle department passes through bolt fixed connection on the wall body.
As an optimized technical scheme of the utility model, the guide block is the same with the spout shape, the guide block passes through spout sliding connection construction platform bottom.
As an optimized technical scheme of the utility model, the air brake is the netted board of circular arc type, feeding bin width is the same with air brake length.
As an optimized technical scheme of the utility model, the stopper is located the spout intermediate position, the anticreep piece is located the top of installation base.
The utility model has the advantages of it is following: the telescopic machine that stretches out through the installation base bottom holds, promotes the construction platform and removes on the installation base to change the distance that the construction platform stretches out, be convenient for adjust building construction position, make things convenient for the workman to be under construction, the shock attenuation spring that is located between anticreep piece and the stopper can be when telescopic machine starts the shock attenuation, prevents that the construction platform from removing suddenly, leads to the constructor to fall down.
Drawings
Fig. 1 is a schematic front structural view of a construction platform for construction engineering according to a preferred embodiment of the present invention;
fig. 2 is a schematic front structural view of a construction platform for construction engineering according to a preferred embodiment of the present invention;
fig. 3 is a schematic structural view of a front side of a construction platform for construction engineering according to a preferred embodiment of the present invention;
fig. 4 is a schematic cross-sectional view of the feeding bin of the construction platform for construction engineering according to a preferred embodiment of the present invention.
Description of reference numerals: 1. a wall body; 2. installing a base; 3. a compressor; 4. a construction table; 5. a telescopic rod; 6. a discharge port; 7. a feeding bin; 8. a return spring; 9. a resistance plate; 10. a guide block; 11. a damping spring; 12. a chute; 13. a limiting block; 14. an anti-drop block; 15. a rotating member; 16. a fixing frame.
Detailed Description
The technical solution of the present invention will be clearly and completely described with reference to the accompanying drawings. In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The present invention will be further explained with reference to the accompanying drawings.
Referring to fig. 1-4 in combination, the construction platform for construction engineering comprises a wall body 1, the wall body 1 is provided with an installation base 2 through bolt fixed connection, the bottom end of the installation base 2 is provided with a telescopic machine 3 through bolt detachable connection, the end of the telescopic machine 3 far away from the wall body 1 is provided with a construction table 4 through detachable connection, one side of the top end of the construction table 4 far away from the telescopic machine 3 is provided with a telescopic rod 5 through rotating connection, the top end of the telescopic rod 5 is provided with a rotating part 15 through rotating connection, the bottom of one end of the construction table 4 far away from the telescopic machine 3 is provided with a discharge port 6 through welding, the discharge port 6 is provided with a feeding bin 7 through sliding connection, one end of the feeding bin 7 close to the installation base 2 is provided with a fixed mount 16 through welding, a return spring 8 is arranged in the feeding bin 7 through insertion connection, the return spring 8 is rotatably connected with a resistance plate 9, one end of the installation base 2 close to the construction table 4 is provided with a guide block 10, one end of the guide block 10 far away from the telescopic machine 3 is provided with a damping spring 11 through insertion, one end of the damping spring 11 far away from the guide block 10 is provided with a limiting block 13 through insertion, one side of the construction table 4 close to the guide block 10 is provided with a sliding groove 12, and the upper side of the construction table 4 close to the sliding groove 12 is provided with an anti-falling block 14 through welding.
Stopper 13 is located spout 12 intermediate position, anticreep piece 14 is located the top of installation base 2, stopper 13 can carry on spacingly to 4 portable positions of construction stage, anticreep piece 14 can prevent that construction stage 4 from breaking away from installation base 2, installation base 2 is "T" form, 2 right angle departments of installation base pass through bolt fixed connection on wall body 1, the installation base 2 of "T" form can increase the stability of installation, guide block 10 is the same with spout 12 shape, guide block 10 passes through spout 12 sliding connection construction stage 4 bottom, construction stage 4 slides on installation base 2 through guide block 10, thereby adjust the construction position, resistance plate 9 is the netted board of circular arc type, the same with resistance plate 9 length of feed bin 7 width, prevent that building waste material from directly flowing out through the inner wall of resistance plate 9 and feed bin 7.
Specifically, a T-shaped mounting base 2 is fixedly mounted on a building wall surface through bolts, a construction table 4 is connected on the mounting base 2 in a sliding manner through a sliding groove 12, the extending end of a telescopic machine 3 at the bottom of the mounting base 2 is used for pushing the construction table 4 to move on the mounting base 2, so that the extending distance of the construction table 4 is changed, the building construction position is convenient to adjust, and the construction is convenient for workers, a damping spring 11 between an anti-falling block 14 and a limiting block 13 can damp when the telescopic machine 3 is started, the construction table 4 is prevented from suddenly moving and causing constructors to fall down, when the construction table 4 moves, a telescopic rod 5 is driven to telescopically rotate, the telescopic rod 5 can play a role of auxiliary protection, construction waste generated in the construction process flows into a material conveying bin 7 through a discharge port 6, when the waste slides to a resistance plate 9, the waste is blocked under the resistance of a return spring 8, the falling speed of the waste can be reduced, and meanwhile, the feeding bin 7 can prevent dust from flying.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of improvements and decorations can be made without departing from the principle of the present invention, and these improvements and decorations should also be regarded as the protection scope of the present invention.
Other parts not described in detail in the present invention belong to the prior art, and are not described herein again.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention.

Claims (5)

1. Construction platform for building engineering, its characterized in that includes: the wall body (1), the wall body (1) is provided with an installation base (2) through bolt fixed connection, the bottom of the installation base (2) is provided with a telescopic machine (3) through bolt disassembly connection, one end of the telescopic machine (3) far away from the wall body (1) is disassembled and connected with a construction table (4), one side of the construction table (4) far away from the telescopic machine (3) is provided with a telescopic rod (5) through rotation connection, the top end of the telescopic rod (5) is provided with a rotating part (15) through rotation connection, the bottom of one end of the construction table (4) far away from the telescopic machine (3) is provided with a discharge port (6) through welding, a feeding bin (7) is arranged in the discharge port (6) in a sliding connection manner, one end of the feeding bin (7) close to the installation base (2) is provided with a fixing frame (16) through welding, and a return spring (8) is arranged in the feeding bin (7) through insertion connection, return spring (8) rotate and are connected with resistance board (9), the one end that installation base (2) are close to construction table (4) is equipped with guide block (10), the one end that stretch out and draw back machine (3) was kept away from in guide block (10) is equipped with shock attenuation spring (11) through pegging graft, the one end that guide block (10) were kept away from in shock attenuation spring (11) is equipped with stopper (13) through pegging graft, spout (12) have been seted up to one side that construction table (4) are close to guide block (10), the upside that construction table (4) are close to spout (12) is equipped with anticreep piece (14) through the welding.
2. The construction platform for the constructional engineering as claimed in claim 1, wherein the mounting base (2) is "T" shaped, and the right angle of the mounting base (2) is fixedly connected to the wall (1) through bolts.
3. The construction platform for constructional engineering as claimed in claim 1, wherein the guide block (10) is of the same shape as the chute (12), the guide block (10) being slidably connected to the bottom end of the construction table (4) through the chute (12).
4. The construction platform for building engineering as claimed in claim 1, wherein the resistance plate (9) is a circular arc-shaped net plate, and the width of the feeding bin (7) is the same as the length of the resistance plate (9).
5. The construction platform for constructional engineering as claimed in claim 1, wherein the stop block (13) is located at a middle position of the sliding groove (12), and the anti-drop block (14) is located above the mounting base (2).
CN202120261559.5U 2021-01-29 2021-01-29 Construction platform for building engineering Active CN214364865U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120261559.5U CN214364865U (en) 2021-01-29 2021-01-29 Construction platform for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120261559.5U CN214364865U (en) 2021-01-29 2021-01-29 Construction platform for building engineering

Publications (1)

Publication Number Publication Date
CN214364865U true CN214364865U (en) 2021-10-08

Family

ID=77960970

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120261559.5U Active CN214364865U (en) 2021-01-29 2021-01-29 Construction platform for building engineering

Country Status (1)

Country Link
CN (1) CN214364865U (en)

Similar Documents

Publication Publication Date Title
CN105178578A (en) Plastering machine capable of plastering irregular walls
CN212070651U (en) A cutting device for scaffold processing
CN214364865U (en) Construction platform for building engineering
CN208471075U (en) Tilting device for meat product processing
CN210159949U (en) Feeding and screening equipment for quartz sand
CN221002021U (en) Discharging platform
CN204999316U (en) Automatic material overturning and piling machine
CN208070738U (en) Utilize the gravity blanking of workpiece, automatic feed mechanism
CN109822241A (en) A kind of blanking automatic reception structure for laser pipe cutter
CN212424707U (en) Conveyor of convenient maintenance
CN214877980U (en) Semi-finished product spiral conveying device for calcium hydroxide production
CN210906912U (en) Sand sieving mechanism for building site
CN212221460U (en) A new type of electrical automatic feeding device
CN206748053U (en) A kind of production equipment automatic charging device
CN211811832U (en) Novel dust-free cooling and conveying equipment
CN209520351U (en) A kind of die casting machine automatic part picking and conveying device
CN210029038U (en) Conveyor for machining
CN208412198U (en) Vertical helical autofeed quantitative package machine
CN118404435B (en) Chamfering component and ceramic edge repair equipment
CN217395097U (en) A entry conveyor for rock wool crosscut saw
CN213504543U (en) Automatic feeding mechanism with accuse volume function
CN220411856U (en) Telescopic mounting transmission device
CN208345009U (en) Buffer bin
CN216627818U (en) Elevating platform for engineering cost
CN220722600U (en) Conveyer belt that anti-drop goods dropped

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant