CN212450187U - Old building with corridor is additionally provided with elevator - Google Patents
Old building with corridor is additionally provided with elevator Download PDFInfo
- Publication number
- CN212450187U CN212450187U CN202020838525.3U CN202020838525U CN212450187U CN 212450187 U CN212450187 U CN 212450187U CN 202020838525 U CN202020838525 U CN 202020838525U CN 212450187 U CN212450187 U CN 212450187U
- Authority
- CN
- China
- Prior art keywords
- vestibule
- frame
- movable
- sides
- elevator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 36
- 239000010959 steel Substances 0.000 claims abstract description 36
- 229910000838 Al alloy Inorganic materials 0.000 claims abstract description 23
- 238000005034 decoration Methods 0.000 claims abstract description 3
- 230000003014 reinforcing effect Effects 0.000 claims description 13
- 239000011229 interlayer Substances 0.000 claims description 9
- 239000011521 glass Substances 0.000 claims description 3
- 239000010410 layer Substances 0.000 claims description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 12
- 238000003466 welding Methods 0.000 abstract description 9
- 238000000034 method Methods 0.000 abstract description 5
- 238000009434 installation Methods 0.000 description 7
- 238000010079 rubber tapping Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The utility model relates to a from old building of taking vestibule installs the elevator additional, install the vestibule of each floor one-to-one of multilayer and old building in the steel structure well front side of elevator additional, the vestibule is including the aluminum alloy side wall frame of bottom plate subassembly, furred ceiling board and both sides that enclose closed loop structure, the bottom plate subassembly includes telescopic frame, wave board and the surface decoration board that sets gradually from bottom to top. The utility model is provided with the guardrail with the closed structure for the elevator from the old building with the corridor, and has high safety; the whole corridor can adopt a prefabricated mode, welding is not needed on site, and the corridor is convenient to install, rapid and firm; the manufacturing, welding and assembling processes of the telescopic frame serving as the most important bearing part can be completed on a production line of a factory workshop, the precision is high, the universality is high, and standardized mass production can be realized.
Description
Technical Field
The utility model relates to a from old building of taking vestibule installs the elevator additional.
Background
In order to provide convenience for resident travel, many buildings without elevators are beginning to be installed with additional elevators. Considering that the passageways of buildings are different in size and have no uniform standard, the corridor additionally provided with the elevator must be manufactured after on-site measurement, great inconvenience is caused to a manufacturing factory, and a plurality of components need to be installed by welding, so that the installation is troublesome and the efficiency is low.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model aims at providing a can reduce the technical requirement to the site operation technology, the convenient old building of taking vestibule installs the elevator additional from the scene.
The utility model discloses a following scheme realizes: the utility model provides an install the elevator additional from old building of taking vestibule, install the vestibule of multilayer and each floor one-to-one of old building additional steel structure well front side of elevator, the vestibule includes the aluminum alloy side wall frame of bottom plate subassembly, furred ceiling board and both sides that enclose closed loop structure, the bottom plate subassembly includes telescopic frame, wave board and the surface decoration board that up set gradually by down.
Furthermore, a channel is reserved between two layers of corridors which are adjacent up and down, and interlayer decorative plates are arranged on two sides of the channel.
Furthermore, a glass window is arranged on the aluminum alloy side wall frame, the lower end of the aluminum alloy side wall frame falls on the side edge of the wave plate, and the lower edge of the interlayer decorative plate falls on the upper end of the aluminum alloy side wall frame.
Furthermore, the wave plate comprises a plurality of groove plates A with upward openings and groove plates B with downward openings, the groove plates A and the groove plates B are arranged in a staggered mode at intervals, and the groove plates B are arranged on the groove plates A.
Furthermore, through holes which are arranged at intervals along the vertical direction and used for installing telescopic frames are respectively formed in the steel structure stand columns on the two sides of the steel structure hoistway; the telescopic frame comprises a fixed frame and a movable frame capable of sliding relatively, the fixed frame comprises fixed main channel steel positioned on two sides and a fixed cross beam connected with the fixed main channel steel on two sides, and the movable frame comprises movable straight beams which are in sliding fit with the fixed main channel steel of the fixed frame and are arranged on two sides and movable cross beams which are connected with the movable straight beams on two sides.
Furthermore, the fixed frame is further provided with reinforcing channel steel positioned between the fixed main channel steel on the two sides, the movable frame is further provided with movable secondary beams in sliding fit with the reinforcing channel steel of the fixed frame, and movable reinforcing beams are detachably connected between the adjacent movable secondary beams and the movable straight beams on the two sides.
Compared with the prior art, the utility model discloses following beneficial effect has: the utility model is provided with the guardrail with the closed structure for the elevator from the old building with the corridor, and has high safety; the whole corridor can adopt a prefabricating mode, so that the technical requirements on the site construction process can be reduced, welding is not needed on site, and the corridor is convenient to install, rapid and firm; the manufacturing, welding and assembling processes of the telescopic frame serving as the most important bearing part can be completed on a production line of a factory workshop, the precision is high, the universality is high, and standardized mass production can be realized.
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in further detail below with reference to specific embodiments and related drawings.
Drawings
FIG. 1 is a perspective view of an embodiment of the present invention;
fig. 2 is a schematic view of the embodiment of the present invention showing the contraction state of the telescopic frame;
fig. 3 is a schematic view illustrating an extended state of the telescopic frame according to an embodiment of the present invention;
FIG. 4 is a schematic view of the connection between a trough plate A and a trough plate B on a corrugated plate according to an embodiment of the present invention;
the reference numbers in the figures illustrate: 100-steel upright posts, 200-bottom plate assemblies, 210-wave plates, 220-surface decorative plates, 230-fixed frames, 231-fixed main channel steel, 232-fixed cross beams, 233-reinforced channel steel, 240-movable frames, 241-movable straight beams, 242-movable cross beams, 243-movable secondary beams, 244-movable reinforced beams, 300-ceiling boards, 400-aluminum alloy side ledges and 500-interlayer decorative plates.
Detailed Description
As shown in fig. 1-4, an old building with a corridor is additionally provided with an elevator, the corridor which corresponds to each floor of the old building in multiple layers one by one is installed on the front side of a steel structure hoistway 100 which is additionally provided with the elevator, the corridor comprises a bottom plate assembly 200, a ceiling plate 300 and aluminum alloy side ledges 400, the bottom plate assembly 200 comprises a telescopic frame, a corrugated plate 210 and a surface decorative plate 220, the telescopic frame, the corrugated plate 210 and the surface decorative plate 220 are sequentially arranged from bottom to top, the corrugated plate 210 is paved on the telescopic frame, the surface decorative plate 220 is paved on the corrugated plate 210, and the corrugated plate 210 and the telescopic frame are connected by fishtail self-tapping nails; the aluminum alloy side ledges 400 on the two sides of the corridor for installing the elevator form a closed guardrail, so that the safety is high; the telescopic frame of the corridor is the most important bearing part, the length of the bottom plate of the telescopic frame can be adjusted through telescoping, so that the manufacturing, welding and assembling processes of the part can be completed on a production line of a factory workshop, the precision is high, the modularization is realized, the production efficiency is high, welding is not needed on the installation site, and the site installation is convenient, rapid and firm; and only need make 2 series and be applicable to 2 kinds of circumstances that vestibule length is greater than 2000mm and vestibule length is less than 2000mm respectively, cover all vestibule lengths of installing the elevator additional basically, the commonality is strong, can realize standardized volume production.
In this embodiment, a channel is left between two adjacent corridors, and interlayer decorative plates 500 are arranged on two sides of the channel; the corrugated plate, the surface decorative plate, the aluminum alloy side ledges on two sides, the interlayer decorative plate and the ceiling plate of the corridor are processed and manufactured in a factory according to the size measured by design and the size checked on site, are assembled on site without welding, and are fast and attractive in installation.
In this embodiment, a glass window is installed on the aluminum alloy side wall frame 400, the lower end of the aluminum alloy side wall frame 400 falls on the side edge of the corrugated board 210, and the lower edge of the interlayer decorative plate 500 falls on the upper end of the aluminum alloy side wall frame 400; longitudinal channels are arranged at the upper end and the lower end of the aluminum alloy side wall frame, the two side edges of the wave plate are bent to form bending plates extending into the longitudinal channels at the lower end of the aluminum alloy side wall frame and connected with the lower end of the aluminum alloy side wall frame through fishtail self-tapping screws, and the lower side edge of the interlayer decorative plate extends into the longitudinal channels at the lower end of the aluminum alloy side wall frame and is connected through the fishtail self-tapping screws; the inner side of the upper end of the aluminum alloy side wall frame is provided with an aluminum alloy channel for installing a ceiling board, and the two side edges of the ceiling board are embedded in the aluminum alloy channel and are connected through self-tapping screws at the fishtail.
In this embodiment, the corrugated board 210 includes a plurality of channel boards a with upward openings and channel boards B with downward openings, the channel boards a and the channel boards B are arranged in a staggered manner at intervals, and the channel boards B are placed on the channel boards a.
In this embodiment, through holes for installing telescopic frames are respectively formed in the steel structure upright columns on two sides of the steel structure hoistway 100 at intervals along the vertical direction, so that the installation height of the bottom plate assembly is adjustable; the telescopic frame comprises a fixed frame 230 and a movable frame 240 capable of sliding relative to the fixed frame, the front end of the fixed frame is connected to a floor plate or a floor beam of an old building, the fixed frame 230 comprises fixed main channel steel 231 positioned at two sides and a fixed cross beam 232 connected with the fixed main channel steel at the two sides, and the movable frame 240 comprises a movable straight beam 241 with two sides in sliding fit with the fixed main channel steel of the fixed frame and a movable cross beam 242 connected with the movable straight beams at the two sides; the telescopic frame for supporting the bottom plate assembly is of a telescopic structure with adjustable length, so that the difficulty of field installation caused by manufacturing errors is avoided, and the telescopic frame is installed after the length of the telescopic frame is adjusted according to the distance between the elevator and the old building additionally installed on the field.
In this embodiment, in order to improve the overall strength of the rope frame, the fixed frame 230 is further provided with a reinforcing channel 233 located between the fixed main channel steels on both sides, the movable frame 240 is further provided with movable secondary beams 243 in sliding fit with the reinforcing channel of the fixed frame, movable reinforcing beams 244 are detachably connected between adjacent movable secondary beams and between the adjacent movable secondary beams and the movable straight beams on both sides, and the movable reinforcing beams 244 can be detached when the movable frame is influenced by the movable reinforcing beams 244 to be retracted; the movable frame is limited to move after being connected through bolts between the fixed main channel steel 231 and the movable straight beam 241 and between the reinforcing channel steel 233 and the movable secondary beam 243, a row of bolt holes for bolts to pass through are formed in the fixed main channel steel 231 and the reinforcing channel steel 233, and a row of long holes for the bolts to pass through are formed in the movable straight beam 241 and the movable secondary beam 243.
In this embodiment, a supporting beam is connected between the steel structure columns on both sides of the steel structure hoistway 100, the supporting beam is connected to the through holes of the steel structure columns through bolts, the supporting beam is connected to brackets for supporting the movable beams on both sides of the movable frame through bolts, the front end of the fixed frame is fixedly connected to the building during installation, and then the movable frame is adjusted to be lapped on the brackets at the rear end and locked and fixed through bolts.
Any technical solution disclosed in the present invention is, unless otherwise stated, disclosed a numerical range if it is disclosed, and the disclosed numerical range is a preferred numerical range, and any person skilled in the art should understand that: the preferred ranges are merely those values which are obvious or representative of the technical effect which can be achieved. Because numerical value is more, can't be exhaustive, so the utility model discloses just disclose some numerical values with the illustration the technical scheme of the utility model to, the numerical value that the aforesaid was enumerated should not constitute right the utility model discloses create the restriction of protection scope.
The utility model discloses if disclose or related to mutual fixed connection's spare part or structure, then, except that other the note, fixed connection can understand: a detachable fixed connection (for example using bolts or screws) is also understood as: non-detachable fixed connections (e.g. riveting, welding), but of course, fixed connections to each other may also be replaced by one-piece structures (e.g. manufactured integrally using a casting process) (unless it is obviously impossible to use an integral forming process).
In addition, the terms used in any aspect of the present disclosure as described above to indicate positional relationships or shapes include similar, analogous, or approximate states or shapes unless otherwise stated.
The utility model provides an arbitrary part both can be assembled by a plurality of solitary component parts and form, also can be the solitary part that the integrated into one piece technology was made.
Finally, it should be noted that the above embodiments are only used for illustrating the technical solutions of the present invention and not for limiting the same; although the present invention has been described in detail with reference to preferred embodiments, it should be understood by those skilled in the art that: the invention can be modified or equivalent substituted for some technical features; without departing from the spirit of the present invention, it should be understood that the scope of the claims is intended to cover all such modifications and variations.
Claims (6)
1. The utility model provides a install elevator additional from old building of taking vestibule which characterized in that: install the vestibule of multilayer and each floor one-to-one of old building in the steel structure well front side of elevator additional, the vestibule is including the aluminum alloy side wall frame of bottom plate subassembly, furred ceiling board and both sides that enclose closed loop structure, the bottom plate subassembly includes telescopic frame, wave board and the surface decoration board that sets gradually from bottom to top.
2. The old building with vestibule of claim 1 additionally installed with elevator, characterized in that: a channel is reserved between the two layers of corridors which are adjacent from top to bottom, and interlayer decorative plates are arranged on two sides of the channel.
3. The old building with vestibule of claim 2 additionally installed with elevator, characterized in that: the glass window is arranged on the aluminum alloy side wall frame, the lower end of the aluminum alloy side wall frame falls on the side edge of the wave plate, and the lower edge of the interlayer decorative plate falls on the upper end of the aluminum alloy side wall frame.
4. The old building with vestibule of claim 1 additionally installed with elevator, characterized in that: the corrugated plate comprises a plurality of groove-shaped plates A with upward openings and groove-shaped plates B with downward openings, the groove-shaped plates A and the groove-shaped plates B are arranged in a staggered mode at intervals, and the groove-shaped plates B are arranged on the groove-shaped plates A.
5. The old building with vestibule of claim 1 additionally installed with elevator, characterized in that: through holes which are arranged at intervals along the vertical direction and used for installing telescopic frames are respectively formed in the steel structure stand columns on the two sides of the steel structure hoistway; the telescopic frame comprises a fixed frame and a movable frame capable of sliding relatively, the fixed frame comprises fixed main channel steel positioned on two sides and a fixed cross beam connected with the fixed main channel steel on two sides, and the movable frame comprises movable straight beams which are in sliding fit with the fixed main channel steel of the fixed frame and are arranged on two sides and movable cross beams which are connected with the movable straight beams on two sides.
6. The old building with vestibule of claim 5 additionally installed with elevator, characterized in that: the fixed frame is also provided with reinforcing channel steel positioned between the fixed main channel steel on two sides, the movable frame is also provided with movable secondary beams in sliding fit with the reinforcing channel steel of the fixed frame, and movable reinforcing beams are detachably connected between the adjacent movable secondary beams and between the movable straight beams on two sides.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020838525.3U CN212450187U (en) | 2020-05-19 | 2020-05-19 | Old building with corridor is additionally provided with elevator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020838525.3U CN212450187U (en) | 2020-05-19 | 2020-05-19 | Old building with corridor is additionally provided with elevator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212450187U true CN212450187U (en) | 2021-02-02 |
Family
ID=74482366
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020838525.3U Active CN212450187U (en) | 2020-05-19 | 2020-05-19 | Old building with corridor is additionally provided with elevator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212450187U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114482261A (en) * | 2021-12-31 | 2022-05-13 | 中国铁建重工集团股份有限公司 | A prefabricated pressure-bearing corridor |
CN116122537A (en) * | 2023-01-17 | 2023-05-16 | 梅赛德斯电梯(苏州)有限公司 | Prefabricated assembled well of old building additional installation elevator |
-
2020
- 2020-05-19 CN CN202020838525.3U patent/CN212450187U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114482261A (en) * | 2021-12-31 | 2022-05-13 | 中国铁建重工集团股份有限公司 | A prefabricated pressure-bearing corridor |
CN116122537A (en) * | 2023-01-17 | 2023-05-16 | 梅赛德斯电梯(苏州)有限公司 | Prefabricated assembled well of old building additional installation elevator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212450187U (en) | Old building with corridor is additionally provided with elevator | |
CN201250038Y (en) | Wall-attached elevator hoistway | |
CN102180394A (en) | Integrated building-block-type lift of strip steel structure | |
JP2018178573A (en) | Staircase structure and method of manufacturing steel staircase | |
EP2162377B1 (en) | Elevator shaft | |
CN112575933B (en) | Ultra-large special-shaped curved surface enamel plate modeling unit type curtain wall system | |
CN107217783B (en) | Assembled integral external wall panel | |
CN211523478U (en) | Install flexible vestibule between elevator and building additional | |
CN218403229U (en) | Traction type household elevator | |
CN116065750B (en) | Steel structure multifunctional hall wavy aluminum plate suspended ceiling and modularized installation method thereof | |
CN213597400U (en) | Elevator shaft | |
CN112209205B (en) | Modular elevator/stair structure | |
RU2003106142A (en) | METHOD FOR PREPARING A BUILDING FOR LIFT ADJUSTMENT, WALL PANEL AND ELEVATOR SHAFT | |
FI124759B (en) | Balcony structure and method of making it | |
JP3732846B2 (en) | Open stair unit | |
JP5970306B2 (en) | building | |
JP4171350B2 (en) | Outdoor staircase and construction method of outdoor staircase | |
RU75680U1 (en) | PANEL FOR DISABLED PERSONS WITH DISABILITIES (OPTIONS) | |
CN213868754U (en) | Elevator well and elevator | |
CN113896074B (en) | Elevator well structure | |
CN217580912U (en) | Stair module and stair composed of same | |
CN216428676U (en) | Connecting structure and connecting component of truss girder and wall of cold-formed thin-walled steel house | |
CN216072664U (en) | Integral type lift-cabin door structure | |
CN113697650B (en) | Integrated elevator door structure | |
CN212866360U (en) | Plate fixing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Fan Inventor after: Teng Jingqiang Inventor before: Zhang Fan Inventor before: Teng Jingqiang |
|
CB03 | Change of inventor or designer information |