CN212295596U - Combined hanging basket for house construction - Google Patents
Combined hanging basket for house construction Download PDFInfo
- Publication number
- CN212295596U CN212295596U CN202020401927.7U CN202020401927U CN212295596U CN 212295596 U CN212295596 U CN 212295596U CN 202020401927 U CN202020401927 U CN 202020401927U CN 212295596 U CN212295596 U CN 212295596U
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- basket body
- fixed
- hanging
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Power-Operated Mechanisms For Wings (AREA)
Abstract
The utility model relates to a combined hanging basket for building construction, which comprises a hanging basket body arranged on the outer wall of a building, wherein the hanging basket body is connected with a suspension device for driving the hanging basket body to move up and down; the fixed pulley is rotatably supported on the support frame, the motor is fixed on the support frame and is connected with the speed reducer, the unwinding disc is coaxially fixed on an output shaft of the speed reducer, and a steel rope is wound on the unwinding disc; one end of the steel rope is fixed on the unwinding disc, the other end of the steel rope winds the upper part of the fixed pulley and is downwards connected with a translation device which drives the hanging basket body to move left and right, and the hanging basket body is installed on the translation device. The utility model discloses have the removal range that can make the hanging flower basket and cover whole building outer wall operation area's effect.
Description
Technical Field
The utility model belongs to the technical field of the technique of equipment is used in the room construction and specifically relates to a combination formula hanging flower basket is used in room construction.
Background
The hanging basket is a construction machine for high-altitude operation in construction engineering, and is used for curtain wall installation and outer wall cleaning. In a common hanging basket, a cantilever mechanism is erected on a building or a structure, a lifting mechanism is used for driving a suspension platform, and the suspension platform is driven to move up and down along the vertical surface of the building or the structure through a steel wire rope.
At present, the patent document of grant bulletin number CN208380055U discloses a hanging flower basket, including hanging flower basket body and the hoist system who is used for driving the motion of hanging flower basket body, hoist system is including encorbelmenting the mechanism, hoist mechanism and wire rope, be provided with solar protection devices on the hanging flower basket body, solar protection devices is including the sunshade and be used for the locking in the locking subassembly of the sunshade of expansion state, the sunshade sets up to the collapsible structure of circular arc type, the one end of sunshade is fixed in on the hanging flower basket body, and rotate between the other end of sunshade and the hanging flower basket body and be connected with the rotor arm.
When the rail hanging basket is used, the hanging basket body can only move up and down but not move horizontally under the action of the suspension mechanism, a worker can only carry out construction operation on the building outer wall covered by the hanging basket body in the vertical direction, and when the construction operation is needed on the rest part of the building outer wall, the hanging basket and the suspension mechanism must be reinstalled at different positions, so that the rail hanging basket is very inconvenient to use.
SUMMERY OF THE UTILITY MODEL
To the not enough of existence among the above-mentioned prior art, the utility model aims at providing a construction is built with combination formula hanging flower basket in room, it has the removal range that can make the hanging flower basket and covers whole building outer wall operation area's effect.
The above object of the present invention is achieved by the following technical solutions:
a combined hanging basket for building construction comprises a hanging basket body arranged on an outer wall of a building, wherein the hanging basket body is connected with a suspension device for driving the hanging basket body to move up and down; the fixed pulley is rotatably supported on the support frame, the motor is fixed on the support frame and is connected with the speed reducer, the unwinding disc is coaxially fixed on an output shaft of the speed reducer, and a steel rope is wound on the unwinding disc; one end of the steel rope is fixed on the unwinding disc, the other end of the steel rope winds the upper part of the fixed pulley and is downwards connected with a translation device which drives the hanging basket body to move left and right, and the hanging basket body is installed on the translation device.
By adopting the technical scheme, the motor can drive the speed reducer to rotate after being started, the speed reducer can drive the unwinding disc to rotate, the unwinding disc rotates to enable the steel rope to be wound on the unwinding disc or the steel rope to be unwound from the unwinding disc, and therefore the translation device and the hanging basket body can move up and down; can make the hanging flower basket body remove about through translation device to combine hanging device to make the hanging flower basket body carry out comprehensive cover to the work area of whole building outer wall, have more the practicality.
The utility model discloses a further set up to: the translation device comprises a shell, and the end parts of the two steel ropes are fixed on the shell; a plurality of sliding grooves are formed below the casing, circular rails are fixed in the casing and horizontally arranged, a plurality of connecting seats are fixedly arranged on the hanging basket body, connecting holes are formed in the connecting seats, and the connecting seats penetrate through the sliding grooves and are in sliding fit with the circular rails through the connecting holes; a driving motor is arranged in the shell and connected with a second speed reducer, a first gear is coaxially fixed on an output shaft of the second speed reducer, a lead screw is rotatably supported in the shell and arranged in parallel to the circular rail, a second gear is coaxially fixed on the lead screw, and the first gear is meshed with the second gear; the hanging basket is characterized in that a fixing seat is arranged on the hanging basket body, a threaded hole is formed in the fixing seat, and the fixing seat penetrates through the sliding groove and is matched with the screw rod through threads of the threaded hole.
By adopting the technical scheme, the driving motor is started, the driving motor rotates to drive the second speed reducer to rotate, and the second speed reducer rotates to drive the screw rod to rotate, so that the fixed seat moves along the screw rod, and the hanging basket body is driven to translate; the hanging basket body is in sliding fit on the round rail through the connecting seat, so that the hanging basket body is more stable in moving; to the different outer wall body of width, change the casing that suits with the outer wall width and can make the utility model discloses the application scope is wider.
The utility model discloses a further set up to: the circular rails are provided with two circular rails which are arranged in parallel, and the connecting seats are arranged on each circular rail in a sliding fit mode.
Through adopting above-mentioned technical scheme, with two circular rails that are parallel to each other and set up side by side with this body coupling of hanging flower basket on the circular rail, it is more stable when can making the hanging flower basket body use, avoid the hanging flower basket body to take place the slope.
The utility model discloses a further set up to: the support frame is fixedly provided with a vertical rod, the vertical rod is provided with a plurality of balancing weights, through holes are formed in the balancing weights, and the balancing weights penetrate through the through holes and are arranged on the vertical rod.
Through adopting above-mentioned technical scheme, set up the pulling force that a plurality of balancing weights can balance the hanging flower basket body to the support frame on the montant, make the balancing weight push down the hanging flower basket body, improve the stability of support frame.
The utility model discloses a further set up to: the upper end of the vertical rod is provided with a pin hole, and a pin penetrates through the pin hole.
Through adopting above-mentioned technical scheme, wear to establish the balancing weight of sufficient quantity on the montant after, insert the upper end of establishing the montant with the pin, be favorable to avoiding in use the balancing weight to be taken out from the montant, improve the security.
The utility model discloses a further set up to: the supporting frame is provided with an iron chain, one end of the iron chain is fixed on the supporting frame, and the other end of the iron chain is fixed on the pin.
Through adopting above-mentioned technical scheme, with the iron chain with pin fixed connection on the support frame, when the pin is not suitable, the iron chain can prevent that the pin from taking place to lose.
The utility model discloses a further set up to: and a protective door is arranged on the hanging basket body.
Through adopting above-mentioned technical scheme, the subaerial back falls to the hanging flower basket body, and it is originally internal that the staff can conveniently get into the hanging flower basket after opening the guard gate, gets into this internal back of hanging flower basket and locks the guard gate and be favorable to improving the degree of safety of construction.
The utility model discloses a further set up to: and a rubber pad is arranged on the side surface of the hanging basket body close to the building outer wall.
Through adopting above-mentioned technical scheme, because probably bump between the outer wall body when the hanging flower basket body removes, the rubber pad can cushion the intensity of striking between hanging flower basket body and the building outer wall to can play the guard action to outer wall body and hanging flower basket body.
To sum up, the utility model discloses a beneficial technological effect does:
1. the motor can drive the speed reducer to rotate after being started, the speed reducer rotates to drive the unwinding disc to rotate, the unwinding disc rotates to enable the steel rope to be wound on the unwinding disc or to be unwound from the unwinding disc, and therefore the translation device and the hanging basket body can move up and down; the hanging basket body can move left and right through the translation device, so that the hanging basket body can comprehensively cover the working area of the whole building outer wall by combining the suspension device, and the hanging basket has higher practicability;
2. the motor and the driving motor are matched with each other, so that the full coverage of the hanging basket body on the working area of the outer wall of the building is realized, and the application range of the hanging basket is wider by replacing the casing which is adaptive to the width of the outer wall; the two circular rails are arranged, so that the hanging basket body is more stable in use; the hanging basket body is pressed by the balancing weight, so that the stability of the supporting frame is improved;
3. the pin is beneficial to preventing the balancing weight from being taken out of the vertical rod, so that the safety is improved; when the pin is not suitable, the iron chain can prevent the pin from being lost; the protective door can facilitate workers to get in and out of the hanging basket body; the rubber pad can play the guard action to outer wall body and hanging flower basket body.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is an enlarged partial schematic view of portion A of FIG. 1;
figure 3 is a schematic view of a basket body and casing;
fig. 4 is a schematic structural view of the translation device.
In the figure, 1, an outer wall of a building; 2. a suspension device; 21. a support frame; 211. a vertical rod; 212. a balancing weight; 213. a pin hole; 214. a pin; 215. an iron chain; 22. a fixed pulley; 23. an electric motor; 24. a speed reducer; 25. placing the reel; 26. a steel cord; 3. a basket body; 31. a connecting seat; 311. connecting holes; 32. a fixed seat; 321. a threaded hole; 33. a protective door; 34. a non-slip mat; 35. a rubber pad; 4. a translation device; 41. a housing; 411. a chute; 42. a circular rail; 43. a drive motor; 44. a second decelerator; 45. a screw rod; 46. a first gear; 47. a second gear.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, the combined hanging basket for building construction disclosed by the present invention comprises a suspension device 2 installed on the top of a building, the suspension device 2 is connected with a hanging basket body 3, and a translation device 4 for horizontally moving the hanging basket body 3 is installed on the suspension device 2; the hanging basket body 3 can move up and down on the building outer wall 1 under the driving of the suspension device 2, and can horizontally move on the building outer wall 1 under the driving of the translation device 4, so that the wall surface of the whole building outer wall 1 is covered, and the construction operation of different parts of the building outer wall 1 by workers is facilitated.
Referring to fig. 1, the suspension device 2 comprises two support frames 21 arranged on the top of the building, and the two support frames 21 are respectively detachably fixed at two ends of the edge of the outer wall 1 of the building; a fixed pulley 22 is rotatably supported on the support frame 21, a motor 23 is fixed on the support frame 21, the motor 23 is connected with a speed reducer 24, an unwinding disc 25 is coaxially fixed on an output shaft of the speed reducer 24, and a steel rope 26 is wound on the unwinding disc 25; one end of the steel cable 26 is fixed on the unwinding disc 25, and the other end is connected with the translation device 4 by passing over the fixed pulley 22.
Referring to fig. 1 and 3, the translation device 4 includes a housing 41, the ends of two steel cables 26 are fixed on the housing 41, and the steel cables 26 can drive the housing 41 to move up and down on the building outer wall 1 under the driving of the motor 23; a plurality of sliding grooves 411 are formed below the casing 41, and with reference to fig. 4, two circular rails 42 arranged in parallel are fixed in the casing 41, the circular rails 42 are horizontally arranged, a plurality of connecting seats 31 are fixedly arranged on the hanging basket body 3, connecting holes 311 are formed in the connecting seats 31, the connecting seats 31 penetrate through the sliding grooves 411 and are in sliding fit with the circular rails 42 through the connecting holes 311, and each circular rail 42 is in sliding fit with the connecting seat 31; in order to drive the hanging basket body 3 to perform translational motion, a driving motor 43 is arranged in the shell 41, the driving motor 43 is connected with a second speed reducer 44, a first gear 46 is coaxially fixed on an output shaft of the second speed reducer 44, a screw rod 45 is rotatably supported in the shell, the screw rod 45 is arranged in parallel to the circular rail 42, a second gear 47 is coaxially fixed on the screw rod 45, and the first gear 46 and the second gear 47 are mutually meshed; the hanging basket body 3 is provided with a fixed seat 32, a threaded hole 321 is formed in the fixed seat 32, and the fixed seat 32 penetrates through the sliding groove 411 and is in threaded fit with the screw rod 45 through the threaded hole 321; when the driving motor 43 rotates, the screw rod 45 can rotate to drive the basket body 3 to translate on the circular rail 42.
Referring to fig. 1 and 2, a vertical rod 211 is fixedly disposed on the support frame 21, in order to improve the stability of the support frame 21 during operation, a plurality of balancing weights 212 are disposed on the vertical rod 211, through holes are disposed on the balancing weights 212, and the balancing weights 212 are disposed on the vertical rod 211 through the through holes; the upper end of the vertical rod 211 is provided with a pin hole 213, a pin 214 penetrates through the pin hole 213, and after the plurality of balancing weights 212 are pressed on the support frame 21, the pin 214 penetrates through the pin hole 213 to improve the safety; in order to prevent the pin 214 from being lost, the supporting frame 21 is provided with an iron chain 215, one end of the iron chain 215 is fixed on the supporting frame 21, the other end of the iron chain 215 is fixed on the pin 214, and the pin 214 can be kept connected with the supporting frame 21 through the iron chain 215 after being pulled out from the pin hole 213, so that the pin 214 is prevented from being lost.
Referring to fig. 1 and 4, a protective door 33 is arranged on the basket body 3, and after the protective door 33 is opened, a worker can conveniently enter the basket body 3 and lock the protective door 33 after entering the basket body 3, so as to improve safety; the upper surface of the bottom of the hanging basket body 3 is provided with an anti-slip pad 34, which is beneficial to preventing workers in rainy weather from slipping down; the hanging basket body 3 is likely to collide with the wall body of the building outer wall 1 when moving, and in order to buffer the impact strength, a rubber pad 35 is arranged on the side surface of the hanging basket body 3 close to the wall body, so that the hanging basket body 3 and the wall body of the building outer wall 1 can be protected.
The working principle of the utility model is that the motor 23 drives the reducer 24 to drive the unwinding disc 25 to rotate, thereby driving the casing 41 to move up and down, and further enabling the hanging basket body 3 to move up and down on the building outer wall 1; a driving motor 43 in the casing 41 drives a screw rod 45 to rotate, the screw rod 45 rotates to enable a fixing seat 32 fixed on the hanging basket body 3 to move left and right, and therefore the hanging basket body 3 is driven to move left and right on the building outer wall 1, and the whole working area of the building outer wall 1 is completely covered.
The embodiment of the present invention is a preferred embodiment of the present invention, which is not limited in this way to the protection scope of the present invention, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.
Claims (8)
1. The utility model provides a construction is built in room is with combination formula hanging flower basket, is including setting up hanging flower basket body (3) on building outer wall (1), hanging flower basket body (3) are connected with the drive hanging device (2) of hanging flower basket body (3) up-and-down motion, install at the building top in hanging device (2), its characterized in that: the suspension device (2) comprises two support frames (21), and the two support frames (21) are respectively detachably fixed at two ends of the edge of the building outer wall (1); the fixed pulley (22) is rotatably supported on the support frame (21), the motor (23) is fixed on the support frame (21), the motor (23) is connected with the speed reducer (24), the unwinding disc (25) is coaxially fixed on an output shaft of the speed reducer (24), and a steel rope (26) is wound on the unwinding disc (25); one end of the steel rope (26) is fixed on the unwinding disc (25), the other end of the steel rope is downwards connected with a translation device (4) which drives the hanging basket body (3) to move left and right by bypassing the upper part of the fixed pulley (22), and the hanging basket body (3) is installed on the translation device (4).
2. The modular hanging basket for building construction according to claim 1, wherein: the translation device (4) comprises a machine shell (41), and the ends of the two steel ropes (26) are fixed on the machine shell (41); a plurality of sliding grooves (411) are formed below the casing (41), circular rails (42) are fixed in the casing (41), the circular rails (42) are horizontally arranged, a plurality of connecting seats (31) are fixedly arranged on the hanging basket body (3), connecting holes (311) are formed in the connecting seats (31), and the connecting seats (31) penetrate through the sliding grooves (411) and are in sliding fit with the circular rails (42) through the connecting holes (311); a driving motor (43) is arranged in the machine shell (41), the driving motor (43) is connected with a second speed reducer (44), a first gear (46) is coaxially fixed on an output shaft of the second speed reducer (44), a screw rod (45) is rotatably supported in the machine shell (41), the screw rod (45) is arranged in parallel to the circular rail (42), a second gear (47) is coaxially fixed on the screw rod (45), and the first gear (46) and the second gear (47) are meshed with each other; the hanging basket is characterized in that a fixing seat (32) is arranged on the hanging basket body (3), a threaded hole (321) is formed in the fixing seat (32), and the fixing seat (32) penetrates through the sliding groove (411) and is in threaded fit with the screw rod (45) through the threaded hole (321).
3. The modular hanging basket for building construction according to claim 2, wherein: circular rails (42) are provided with two, and two circular rails (42) are parallel to each other, all sliding fit have on every circular rail (42) connecting seat (31).
4. The modular hanging basket for building construction according to any one of claims 1 to 3, wherein: the support frame (21) is fixedly provided with a vertical rod (211), the vertical rod (211) is provided with a plurality of balancing weights (212), the balancing weights (212) are provided with through holes, and the balancing weights (212) penetrate through the vertical rod (211) through the through holes.
5. The modular hanging basket for building construction according to claim 4, wherein: the upper end of the vertical rod (211) is provided with a pin hole (213), and a pin (214) penetrates through the pin hole (213).
6. The modular hanging basket for building construction according to claim 5, wherein: an iron chain (215) is arranged on the support frame (21), one end of the iron chain (215) is fixed on the support frame (21), and the other end of the iron chain is fixed on the pin (214).
7. The modular hanging basket for building construction according to any one of claims 1 to 3, wherein: and a protective door (33) is arranged on the hanging basket body (3).
8. The modular hanging basket for building construction according to any one of claims 1 to 3, wherein: and a rubber pad (35) is arranged on the side surface of the hanging basket body (3) close to the building outer wall (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020401927.7U CN212295596U (en) | 2020-03-25 | 2020-03-25 | Combined hanging basket for house construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020401927.7U CN212295596U (en) | 2020-03-25 | 2020-03-25 | Combined hanging basket for house construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212295596U true CN212295596U (en) | 2021-01-05 |
Family
ID=73960101
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020401927.7U Expired - Fee Related CN212295596U (en) | 2020-03-25 | 2020-03-25 | Combined hanging basket for house construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212295596U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113123587A (en) * | 2021-04-23 | 2021-07-16 | 湖南汉坤实业有限公司 | High altitude hanging flower basket for construction |
CN113202284A (en) * | 2021-05-20 | 2021-08-03 | 润盛建设集团有限公司 | High-stability protection device for high-rise building construction |
CN113653311A (en) * | 2021-07-20 | 2021-11-16 | 宝鸡建安集团股份有限公司 | House construction work platform and construction method thereof |
CN113931431A (en) * | 2021-09-24 | 2022-01-14 | 上海绿地建设(集团)有限公司 | Construction hanging basket for outdoor operation |
CN113958111A (en) * | 2021-10-28 | 2022-01-21 | 余炳月 | Building outer wall surface moving function platform |
-
2020
- 2020-03-25 CN CN202020401927.7U patent/CN212295596U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113123587A (en) * | 2021-04-23 | 2021-07-16 | 湖南汉坤实业有限公司 | High altitude hanging flower basket for construction |
CN113123587B (en) * | 2021-04-23 | 2023-09-26 | 湖南汉坤实业有限公司 | High-altitude hanging basket for building construction |
CN113202284A (en) * | 2021-05-20 | 2021-08-03 | 润盛建设集团有限公司 | High-stability protection device for high-rise building construction |
CN113653311A (en) * | 2021-07-20 | 2021-11-16 | 宝鸡建安集团股份有限公司 | House construction work platform and construction method thereof |
CN113931431A (en) * | 2021-09-24 | 2022-01-14 | 上海绿地建设(集团)有限公司 | Construction hanging basket for outdoor operation |
CN113931431B (en) * | 2021-09-24 | 2022-11-15 | 上海绿地建设(集团)有限公司 | Construction hanging basket for outdoor operation |
CN113958111A (en) * | 2021-10-28 | 2022-01-21 | 余炳月 | Building outer wall surface moving function platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212295596U (en) | Combined hanging basket for house construction | |
CN210828276U (en) | Hanging basket with high-rise sliding protection for building construction | |
CN102406986A (en) | High-rise escape device | |
CN207644663U (en) | A kind of purely mechanic counter weight type lifting ground well | |
CN211817865U (en) | Supporting structure is adjusted to assembly type structure | |
CN201116259Y (en) | Concealed persons-goods construction elevator | |
CN211899571U (en) | Special construction platform of core section of thick bamboo elevator pit shaft | |
CN206088700U (en) | Elevator protection network | |
CN111691660A (en) | Building user external lifting hanging basket | |
CN212716289U (en) | Infrared induction intelligent electric lifting door | |
CN208279276U (en) | A kind of manned trolley | |
CN116425096A (en) | Overhead working suspension platform for architectural decoration engineering | |
CN214217829U (en) | Elevator maintenance safety device | |
CN111927075B (en) | Attached lifting scaffold equipment | |
CN210214484U (en) | Elevator of micro machine room | |
CN208176737U (en) | A kind of installing mechanism for escape device | |
CN219622231U (en) | Construction hanging basket for engineering construction | |
CN211201114U (en) | High-altitude safety hanging basket for construction engineering | |
CN215974504U (en) | Lift for construction | |
CN212982187U (en) | Building construction is with lift that has high-efficient safety device | |
CN116373726B (en) | Camping house convenient to climb | |
CN218292745U (en) | A stable hanging basket specially used for high-altitude building construction | |
CN221543772U (en) | Novel lifting cage for building construction lifter | |
CN205668854U (en) | A kind of bidirectional construction elevator with buffering plate | |
CN221116895U (en) | Rotary hanging basket device with soft rope constraint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210105 |