[go: up one dir, main page]

CN212270564U - Sponge city permeable pavement capable of draining water quickly - Google Patents

Sponge city permeable pavement capable of draining water quickly Download PDF

Info

Publication number
CN212270564U
CN212270564U CN202020469653.5U CN202020469653U CN212270564U CN 212270564 U CN212270564 U CN 212270564U CN 202020469653 U CN202020469653 U CN 202020469653U CN 212270564 U CN212270564 U CN 212270564U
Authority
CN
China
Prior art keywords
plate
pavement
permeable
layer
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020469653.5U
Other languages
Chinese (zh)
Inventor
杨群娇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baishi Industrial Development Co Ltd
Original Assignee
Shanghai Baishi Industrial Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baishi Industrial Development Co Ltd filed Critical Shanghai Baishi Industrial Development Co Ltd
Priority to CN202020469653.5U priority Critical patent/CN212270564U/en
Application granted granted Critical
Publication of CN212270564U publication Critical patent/CN212270564U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to a permeable pavement technical field, in particular to a sponge city permeable pavement capable of quickly draining water, which comprises a pavement permeable brick, wherein the surface of the pavement permeable brick is provided with an upper-layer protruded plate, the surface of the pavement permeable brick is provided with a lower-layer protruded plate, the bottom surface of the upper-layer protruded plate is provided with a splicing groove, the top surface of the lower-layer protruded plate is provided with a splicing plate, the surfaces of the pavement permeable brick and the upper-layer protruded plate are both provided with a hydrophobic gridding channel, and the surfaces of the pavement permeable brick and the upper-layer protruded plate are both provided with mounting grooves; the beneficial effects are that: the utility model provides a sponge city permeable pavement that can quick drainage sets up the mounting groove on the surface of the brick that permeates water on the road surface, and the backing plate that the surface has the blind spot passes through pitch bonding inside the mounting groove, and partial blind spot is damaged the back, only needs to cut off the asphalt layer, then prizes out the backing plate from the mounting groove, realizes reducing the maintenance cost to the independent change of blind spot.

Description

Sponge city permeable pavement capable of draining water quickly
Technical Field
The utility model relates to a permeable pavement correlation technique field specifically is a sponge city permeable pavement of drainage fast.
Background
The pavior brick is a paving material, cement, stones and sand are used as raw materials, stripes or grids are cut and ground on the surface of the pavior brick through vibration molding, the pavior brick is paved on the ground and loosened after being trampled for a period of time, so that a certain amount of accumulated water can be formed among the pavior bricks, and when a pedestrian tramples the pavior brick, the accumulated water can receive larger extrusion force and splash out from among the pavior bricks, and even can splash onto the shoes or trousers of the pedestrian, so that the trouble is brought to the pedestrian; the edge of the road surface is provided with the water permeable bricks with the blind spots, so that part of the blind spots are seriously abraded after long-term use, the whole water permeable bricks need to be replaced when the blind spots are replaced, and the replacement cost is high; therefore, the utility model provides a sponge city permeable pavement that can quick drainage is used for solving above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a sponge city permeable pavement of drainage fast to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a sponge city permeable pavement that can drainage fast, includes the road surface brick that permeates water, the surface that the road surface permeates water the brick is provided with the upper strata suddenly the board, and the surface that the road surface permeates water the brick is provided with the lower floor suddenly the board, the splice groove has been seted up to the bottom surface that the upper strata suddenly the board, the top surface that the lower floor suddenly the board is provided with the splice plate, and hydrophobic net way has all been seted up on the surface that the brick and the upper strata suddenly the board that permeates water on the road surface, the inside of mounting groove is provided with the backing plate, the limit groove has been seted up on the surface of backing plate, and is provided with the pitch layer between the lateral wall of mounting groove and the backing plate, and the surface of backing plate is provided with the blind spot, and the hole of permeating water has all been seted up on.
Preferably, the upper-layer raised plate and the lower-layer raised plate are both in a square plate structure, and the upper-layer raised plate and the lower-layer raised plate are diagonally symmetrical with respect to the center of the pavement water permeable brick.
Preferably, splice groove and splice plate all are square structure, and splice groove and splice plate one-to-one set up, and the splice groove is provided with a plurality ofly, and a plurality of splice grooves are arranged along the long limit of upper suddenly board and are distributed.
Preferably, the drainage grid channels are in a grid shape, the mounting grooves are in a square cylinder structure, the side grooves are in a semicircular cylinder structure, and the mounting grooves are formed in the protrusions separated by the drainage grid channels.
Preferably, the hole of permeating water is round hole shape structure, and the hole of permeating water runs through the plate body at place, and metal mesh piece is provided with two sets ofly, and two sets of metal mesh pieces are about the high central symmetry distribution in the hole of permeating water.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model provides a sponge city permeable pavement that can drain water fast sets up hydrophobic net way on the surface of the brick that permeates water of road surface, and sparse ponding leaks downwards through the hole of permeating water, and hydrophobic net way has played the antiskid effect, and add splice groove and splice piece concatenation respectively on two dash board surfaces, reduce the single brick of road surface permeable brick and subside;
2. the utility model provides a sponge city permeable pavement that can quick drainage sets up the mounting groove on the surface of the brick that permeates water on the road surface, and the backing plate that the surface has the blind spot passes through pitch bonding inside the mounting groove, and partial blind spot is damaged the back, only needs to cut off the asphalt layer, then prizes out the backing plate from the mounting groove, realizes reducing the maintenance cost to the independent change of blind spot.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the structure of the water permeable pavement brick of the present invention;
fig. 3 is an enlarged schematic view of a structure in fig. 1.
In the figure: the road surface brick 1 that permeates water, upper strata suddenly board 2, lower floor suddenly board 3, splice groove 4, splice plate 5, hydrophobic net way 6, mounting groove 7, backing plate 8, limit groove 9, pitch layer 10, blind spot 11, hole 12, metal mesh 13 of permeating water.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 3, the present invention provides a technical solution: a sponge city permeable pavement capable of draining water quickly comprises a pavement permeable brick 1, wherein an upper layer of protruding plates 2 are integrally formed on the surface of the pavement permeable brick 1, a lower layer of protruding plates 3 are integrally formed on the surface of the pavement permeable brick 1, the upper layer of protruding plates 2 and the lower layer of protruding plates 3 are both in square plate structures, the upper layer of protruding plates 2 and the lower layer of protruding plates 3 are diagonally symmetrical with respect to the center of the pavement permeable brick 1, splicing grooves 4 are formed in the bottom surface of the upper layer of protruding plates 2, splicing plates 5 are fixedly connected to the top surface of the lower layer of protruding plates 3, the splicing grooves 4 and the splicing plates 5 are both in square structures, the splicing grooves 4 and the splicing plates 5 are arranged in a one-to-one correspondence manner, the splicing grooves 4 are provided in plurality, the splicing grooves 4 are distributed along the long edges of the upper layer of protruding plates 2, when two adjacent pavement permeable bricks 1 are spliced, as shown in figure 1, the upper layer of protruding plates 2 on the left pavement permeable brick 1 is lapped on the, at the moment, the splicing grooves 4 on the bottom surface of the upper-layer protruding plate 2 are in butt joint with the splicing plates 5 on the top surface of the lower-layer protruding plate 3, so that the splicing and dislocation between the two road surface water permeable bricks 1 is avoided.
Hydrophobic net way 6 has all been seted up on the surface of the brick 1 that permeates water on road surface and upper suddenly board 2, hydrophobic net way 6 is latticed, hydrophobic net way 6 surface and the surface of lower floor suddenly board 3 have all been seted up hole 12 of permeating water, the trompil fixedly connected with metal mesh piece 13 of hole 12 of permeating water, hole 12 of permeating water is the round hole shape structure, hole 12 of permeating water runs through the plate body at place, and metal mesh piece 13 is provided with two sets ofly, two sets of metal mesh piece 13 are about the high central symmetry distribution of hole 12 of permeating water, hydrophobic net way 6 on the brick 1 surface that permeates water on road surface plays the mediation effect to ponding, and ponding sees through hole 12 seepage downwards of permeating water, metal mesh piece 13 separation debris get into inside hole 12 of permeating water, but can not influence the ponding seepage in.
The surfaces of the pavement permeable brick 1 and the upper layer raised plate 2 are both provided with mounting grooves 7, a backing plate 8 is arranged inside the mounting grooves 7, the mounting grooves 7 are of square column structures, the side grooves 9 are of semi-circular column structures, the mounting grooves 7 are arranged on the bulges separated by the drainage grid channels 6, the surface of the backing plate 8 is provided with the side grooves 9, an asphalt layer 10 is arranged between the side wall of the mounting groove 7 and the backing plate 8, a blind spot 11 is fixedly connected with the surface of the backing plate 8, when part of the blind spots 11 are worn seriously and need to be replaced, the cutter body cuts off the asphalt layer 10 along the edge of the mounting groove 7, then digging out the asphalt layer 10 at the side groove 9, then prying the base plate 8 out of the mounting groove 7 against the side groove 9 by means of a pry bar, placing a new base plate 8 in the mounting groove 7, and an asphalt layer 10 is coated at the gap between the backing plate 8 and the mounting groove 7 for connection, so that the blind spot 11 is independently replaced.
The working principle is as follows: in actual work, when two adjacent road surface water permeable bricks 1 are spliced, as shown in the attached drawing 1, the upper-layer protruded plate 2 on the left road surface water permeable brick 1 is lapped on the lower-layer protruded plate 3 of the right road surface water permeable brick 1, at the moment, the splicing groove 4 on the bottom surface of the upper-layer protruded plate 2 is butted with the splicing plate 5 on the top surface of the lower-layer protruded plate 3, the splicing dislocation between the two road surface water permeable bricks 1 is avoided, the hydrophobic grid channel 6 on the surface of the road surface water permeable brick 1 plays a role in dredging accumulated water, the accumulated water leaks downwards through the water permeable holes 12, the metal mesh 13 prevents impurities from entering the water permeable holes 12, but soil dust cannot affect the accumulated water leakage when entering the water permeable holes 12; when 11 wearing and tearing of part blind spot seriously need to be changed, and live the cutter body and cut off pitch layer 10 along the edge of mounting groove 7, then dig out pitch layer 10 with limit groove 9 department, then lean on with the help of the crow bar and prize out backing plate 8 from mounting groove 7 in limit groove 9 department, place new backing plate 8 in mounting groove 7 to scribble pitch layer 10 and connect in the gap department between backing plate 8 and mounting groove 7, so realize the independent change to blind spot 11.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a sponge city permeable pavement of quick drainage, includes road surface permeable brick (1), its characterized in that: an upper-layer raised plate (2) is arranged on the surface of the pavement water permeable brick (1), a lower-layer raised plate (3) is arranged on the surface of the pavement water permeable brick (1), splicing grooves (4) are formed in the bottom surface of the upper-layer raised plate (2), splicing plates (5) are arranged on the top surface of the lower-layer raised plate (3), hydrophobic grid channels (6) are formed in the surfaces of the pavement water permeable brick (1) and the upper-layer raised plate (2), mounting grooves (7) are formed in the surfaces of the pavement water permeable brick (1) and the upper-layer raised plate (2), a backing plate (8) is arranged inside the mounting grooves (7), side grooves (9) are formed in the surface of the backing plate (8), a bitumen layer (10) is arranged between the side wall of the mounting grooves (7) and the backing plate (8), blind spots (11) are formed in the surface of the backing plate (8), and water permeable holes (12) are formed in the surfaces of the hydrophobic grid channels (6, and a metal net sheet (13) is arranged at the opening position of the water permeable hole (12).
2. The sponge urban permeable pavement capable of draining water rapidly according to claim 1, characterized in that: the upper-layer raised plate (2) and the lower-layer raised plate (3) are both of square plate structures, and the upper-layer raised plate (2) and the lower-layer raised plate (3) are diagonally symmetrical about the center of the pavement water permeable brick (1).
3. The sponge urban permeable pavement capable of draining water rapidly according to claim 1, characterized in that: splice groove (4) and splice plate (5) all are square structure, splice groove (4) and splice plate (5) one-to-one setting, splice groove (4) are provided with a plurality ofly, and a plurality of splice grooves (4) are arranged along the long limit of upper suddenly board (2) and are distributed.
4. The sponge urban permeable pavement capable of draining water rapidly according to claim 1, characterized in that: the drainage grid channel (6) is in a grid shape, the mounting groove (7) is in a square cylinder structure, the side groove (9) is in a semicircular cylinder structure, and the mounting groove (7) is formed in each protrusion separated by the drainage grid channel (6).
5. The sponge urban permeable pavement capable of draining water rapidly according to claim 1, characterized in that: the holes (12) of permeating water are round hole shape structure, the holes (12) of permeating water run through the plate body at place, and metal mesh sheet (13) are provided with two sets, two sets of metal mesh sheet (13) about the high central symmetry distribution of the holes (12) of permeating water.
CN202020469653.5U 2020-04-02 2020-04-02 Sponge city permeable pavement capable of draining water quickly Active CN212270564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020469653.5U CN212270564U (en) 2020-04-02 2020-04-02 Sponge city permeable pavement capable of draining water quickly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020469653.5U CN212270564U (en) 2020-04-02 2020-04-02 Sponge city permeable pavement capable of draining water quickly

Publications (1)

Publication Number Publication Date
CN212270564U true CN212270564U (en) 2021-01-01

Family

ID=73884984

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020469653.5U Active CN212270564U (en) 2020-04-02 2020-04-02 Sponge city permeable pavement capable of draining water quickly

Country Status (1)

Country Link
CN (1) CN212270564U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114351530A (en) * 2021-12-19 2022-04-15 杨群娇 Sponge urban rainwater recycling system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114351530A (en) * 2021-12-19 2022-04-15 杨群娇 Sponge urban rainwater recycling system

Similar Documents

Publication Publication Date Title
CN108486977A (en) A kind of tunnel cement concrete pavement structure
CN212270564U (en) Sponge city permeable pavement capable of draining water quickly
CN109281299B (en) Construction method of water conservancy agricultural irrigation seepage-proofing channel
CN212611756U (en) Town road design waterproof construction
CN206680830U (en) A kind of highway center isolated area drainage system
CN209958165U (en) Assembled gap permeable pavement
CN213173176U (en) Municipal works road pavement structure
CN112112242A (en) Roadbed structure based on rainwater storage and regulation system and construction method thereof
CN112281566A (en) Pavior brick with drainage function
CN217500503U (en) Multifunctional cover plate of underground reservoir
CN213114153U (en) Road surface water permeable brick
CN111139753B (en) Prefabricated square culvert convenient to connect and construction process thereof
CN211689725U (en) Landscape drainage road surface
JP2006097229A (en) Pavement plate and pavement structure using the same
GB2507967A (en) Rainwater ground collection system
RU2689963C1 (en) Method of section construction of process timber road
CN214783039U (en) Curb with drainage and cut dirty function
CN208088051U (en) A kind of fast spreading road surface
CN212834820U (en) Concrete pavement brick permeable pavement
CN217710186U (en) Water permeability pavement of urban road
TWM579447U (en) Mold of making grass piece for planting lawn
CN220013546U (en) Concrete lattice slope protection for downstream dam slope of earth-rock dam
CN214301079U (en) Outdoor water-permeable ground structure
CN216892750U (en) Garden ground paving structure
CN212801092U (en) Sponge city water permeable brick capable of preventing side lifting of corner

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant