[go: up one dir, main page]

CN212208613U - A PLC network automation comprehensive training device - Google Patents

A PLC network automation comprehensive training device Download PDF

Info

Publication number
CN212208613U
CN212208613U CN202021020407.8U CN202021020407U CN212208613U CN 212208613 U CN212208613 U CN 212208613U CN 202021020407 U CN202021020407 U CN 202021020407U CN 212208613 U CN212208613 U CN 212208613U
Authority
CN
China
Prior art keywords
operation panel
module
control
training
plc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021020407.8U
Other languages
Chinese (zh)
Inventor
许宜贺
赵建忠
张铁英
马敏
张振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Naval Aeronautical University
Original Assignee
Naval Aeronautical University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Naval Aeronautical University filed Critical Naval Aeronautical University
Priority to CN202021020407.8U priority Critical patent/CN212208613U/en
Application granted granted Critical
Publication of CN212208613U publication Critical patent/CN212208613U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Programmable Controllers (AREA)

Abstract

本实用新型提供一种PLC网络自动化综合实训装置,包括PLC网络控制实训柜和PC计算机,所述PLC网络控制实训柜挂装有各类实训操作面板,所述PC计算机安装有网卡、通讯卡和组态软件;所述PLC网络控制实训柜和PC计算机之间构建有:配电模块、远程监控模块、PLC网络通信站点模块、变频调速模块、运动控制模块和现场控制模块。该实训装置采用开放式设计,具有工程应用的真实性,实训开展的灵活性使用操作的安全性等优点,能较好的完成对工业自动化和工业网络全集成技术的相关技能实训,可作为职业院校、职业培训中心技能培训平台。

Figure 202021020407

The utility model provides a PLC network automation comprehensive training device, which comprises a PLC network control training cabinet and a PC computer, wherein various training operation panels are mounted on the PLC network control training cabinet, and the PC computer is installed with a network card , communication card and configuration software; the PLC network control training cabinet and the PC computer are constructed with: power distribution module, remote monitoring module, PLC network communication station module, frequency conversion speed regulation module, motion control module and field control module . The training device adopts an open design, which has the advantages of authenticity of engineering application, flexibility of training development and safety of operation, etc. It can better complete the relevant skills training of industrial automation and fully integrated industrial network technology. It can be used as a skill training platform for vocational colleges and vocational training centers.

Figure 202021020407

Description

一种PLC网络自动化综合实训装置A PLC network automation comprehensive training device

技术领域technical field

本实用新型涉及一种PLC网络自动化综合实训装置,属于PLC控制教学实训系统技术领域。The utility model relates to a PLC network automation comprehensive training device, which belongs to the technical field of PLC control teaching and training systems.

背景技术Background technique

目前PLC技术与机器人技术、CAD/CAM(计算机辅助设计/计算机辅助制造)并称为现代工业生产自动化的三大支柱,尤其以微处理器为核心的综合通信技术和自动控制的新型工业自动控制装置PLC,已成为现代工业自动化控制的一项重要技术,得到越来越广泛的应用。为适应社会工业发展的需要,各院校的机电类专业开设了《可编程控制器技术》、《电气及PLC控制技术》、《PLC及其应用》等相关课程,甚至职业培训学校、职教中心、也针对PLC技术开设了相关职业培训课程。At present, PLC technology, robot technology and CAD/CAM (computer-aided design/computer-aided manufacturing) are called the three pillars of modern industrial production automation, especially the integrated communication technology with microprocessor as the core and the new industrial automatic control of automatic control. Device PLC has become an important technology of modern industrial automation control and has been widely used. In order to meet the needs of social and industrial development, the electromechanical majors in various colleges and universities have set up relevant courses such as "Programmable Logic Controller Technology", "Electrical and PLC Control Technology", "PLC and Its Application", and even vocational training schools, vocational education. The center also offers relevant vocational training courses for PLC technology.

现有的PLC实验台(实训台),以培养PLC技术初级技能人才为目标,依据《可编程控制器技术》、《机床电气控制与PLC))、《可编程控制器及其应用》等课程教学大纲的要求而开发的产品,属于基本型的PLC可编程序控制器的实训台较多,主要功能为学生提供单个 PLC为核心的控制技术实训平台,而缺少利用通讯总线,构建PLC网络进行联网控制技能实训功能,无法满足培养PLC高级技能人才的需用。随着工业4.0的提出,自动化设备的应用广度逐步提升,对专业技能提出了更高的要求,亟需掌握PLC网络集成自动化技术的PLC 高级技能人才以满足工业发展需求。The existing PLC experimental bench (training bench) aims to cultivate primary skilled talents in PLC technology, based on "Programmable Logic Controller Technology", "Machine Machine Electrical Control and PLC)), "Programmable Logic Controller and Its Application", etc. The products developed according to the requirements of the course syllabus, belong to the basic PLC programmable controller training platform, the main function is to provide students with a single PLC as the core control technology training platform, but the lack of using the communication bus to construct The PLC network has the function of networking control skills training, which cannot meet the needs of cultivating advanced PLC skills. With the introduction of Industry 4.0, the application breadth of automation equipment has gradually increased, which has put forward higher requirements for professional skills. PLC senior skilled personnel who master PLC network integration automation technology are urgently needed to meet the needs of industrial development.

因此,开发出一种PLC网络自动化综合实训装置,满足教学实训需求,提高人才培养水平,接轨社会PLC技术人才技能需求,必要且具有重大意义。Therefore, it is necessary and of great significance to develop a PLC network automation comprehensive training device to meet the needs of teaching and training, improve the level of personnel training, and meet the needs of social PLC technical personnel skills.

发明内容SUMMARY OF THE INVENTION

为了解决现有实训平台仅能提供单个PLC为核心的控制技术,无法实现多个PLC组网集成自动化实训功能,本实用新型提出了一种 PLC网络自动化综合实训装置。该装置按照职业教育的教学和实训要求,结合当前实际职业岗位的技能需求,在满足单个PLC控制技能实训的基础上,把多网络、多型号PLC有机结合在一起,构建PLC网络自动化技能实训功能;采用开放式设计,学生可以直观各元器件及接口,增强直观性、增强工程应用真实性;可根据工程现场流程和控制要求,灵活选用各元器件,使其更加贴近工程化及项目实训的灵活性,能较好的完成对工业自动化和工业网络全集成技术的相关技能实训,适应学校教学。In order to solve the problem that the existing training platform can only provide a single PLC as the core control technology and cannot realize the integrated automation training function of multiple PLC networking, the utility model proposes a PLC network automation comprehensive training device. In accordance with the teaching and training requirements of vocational education, combined with the skills requirements of current actual occupational positions, the device combines multi-network and multi-model PLCs organically to build PLC network automation skills on the basis of satisfying a single PLC control skills training. Practical training function; using an open design, students can intuitively understand the components and interfaces, enhance the intuitiveness and enhance the authenticity of engineering applications; flexibly select various components according to the engineering site process and control requirements, making it closer to engineering and The flexibility of the project training can better complete the relevant skills training of industrial automation and industrial network fully integrated technology, and adapt to school teaching.

为解决上述问题,本实用新型所采用的技术方案是:In order to solve the above-mentioned problems, the technical scheme adopted by the present utility model is:

本实用新型的一种PLC网络自动化综合实训装置,其特殊之处在于,包括PLC网络控制实训柜和PC计算机,所述PLC网络控制实训柜挂装有各类实训操作面板,所述PC计算机安装有网卡、通讯卡和组态软件;所述PLC网络控制实训柜和PC计算机之间构建有:The PLC network automation comprehensive training device of the utility model is special in that it includes a PLC network control training cabinet and a PC computer, and various training operation panels are mounted on the PLC network control training cabinet. The PC computer is installed with a network card, a communication card and configuration software; the PLC network control training cabinet and the PC computer are constructed with:

配电模块,用以向其他模块提供电源,包括配置于PLC网络控制实训柜内的电源操作面板;The power distribution module is used to provide power to other modules, including the power operation panel configured in the PLC network control training cabinet;

远程监控模块,用以实现人机交互功能,包括PC计算机以及配置于PC计算机上的网卡、通讯卡和组态软件,所述PC计算机通过网卡或通讯卡与PLC网络通信站点相连;The remote monitoring module is used to realize the human-computer interaction function, including a PC computer and a network card, a communication card and configuration software configured on the PC computer, and the PC computer is connected with the PLC network communication site through the network card or the communication card;

PLC网络通信站点模块,包括挂装于PLC网络控制实训柜上的各类PLC操作面板、远程操作面板和人机界面HMI;所述PLC操作面板、远程操作面板及人机界面HMI的型号及数量根据实训需求选择性配置,灵活组成profinet网络、profibus-DP网络和profinet+profibus-DP混合式网络,以实现多型号、多网络PLC网络通信实训功能;PLC network communication station module, including various PLC operation panels, remote operation panels and human-machine interface HMIs mounted on the PLC network control training cabinet; the models and quantities of the PLC operation panels, remote operation panels and human-machine interface HMIs Selective configuration according to training requirements, flexibly form profinet network, profibus-DP network and profinet+profibus-DP hybrid network to realize multi-model, multi-network PLC network communication training function;

变频调速模块,包括挂装于PLC网络控制实训柜的若干变频器操作面板,用以实现各型号单台变频器的接线实训、速度定位实训、多段速度运转实训,以及多台变频器的并用操作运转实训和联网通讯运转实训等功能;The frequency conversion speed regulation module includes several inverter operation panels mounted on the PLC network control training cabinet, which are used to realize the wiring training, speed positioning training, multi-speed operation training, and multi-speed operation training of each type of single inverter. The functions of the inverter's combined operation and operation training and network communication operation training;

运动控制模块,包括挂装于PLC网络控制实训柜的伺服电机驱动控制操作面板和步进电机驱动控制操作面板,用以实现直线位移定位控制和转动角度位移定位控制实训;The motion control module, including the servo motor drive control operation panel and the stepper motor drive control operation panel mounted on the PLC network control training cabinet, is used to realize the training of linear displacement positioning control and rotational angle displacement positioning control;

现场控制模块,包括挂装于PLC网络控制实训柜的AI模拟量信号仿真面板、数字量I/O操作面板、三相异步电机拖动控制操作面板,用以与各PLC操作面板灵活组合,作为PLC网络控制现场设备级网络节点使用,或者实现基本的电机拖动控制实训功能。Field control module, including AI analog signal simulation panel, digital I/O operation panel, three-phase asynchronous motor drag control operation panel mounted on the PLC network control training cabinet, for flexible combination with various PLC operation panels, It can be used as a PLC network control field device level network node, or realize the basic motor drag control training function.

所述PC计算机包括PC计算机I、PC计算机II、PC计算机III 和PC计算机IV;四台PC计算机均配置为i7处理器、内存4G以上的计算机,安装有西门子通讯卡和博途软件。The PC computers include PC computer I, PC computer II, PC computer III and PC computer IV; the four PC computers are all configured as computers with an i7 processor and a memory of more than 4G, and are equipped with Siemens communication cards and Portal software.

所述PLC网络控制实训柜包括PLC网络控制实训柜I和PLC网络控制实训柜II;两柜在机械结构上相同,均采用内外双层框架式结构,包括柜体及设置在柜体内的安装框架,所述安装框架用以挂装各实训操作面板;所述柜体采用四面开放式结构,包括前、后、左、右四个柜门以及前、后两个安装框架,前柜门和后柜门上分别设置有数字量I/O操作面板和人机界面HMI,与前安装框架和后安装框架上的各实训操作面板,组合成前、后两个实训工位。The PLC network control training cabinet includes a PLC network control training cabinet I and a PLC network control training cabinet II; the two cabinets are the same in mechanical structure, and both adopt an inner and outer double-layer frame structure, including a cabinet body and a cabinet arranged in the cabinet body. The installation frame is used to hang each training operation panel; the cabinet adopts an open structure on four sides, including four cabinet doors, front, rear, left and right, and two installation frames. The cabinet door and the rear cabinet door are respectively provided with a digital I/O operation panel and a human-machine interface HMI, which are combined with the training operation panels on the front installation frame and the rear installation frame to form the front and rear training stations. .

所述PLC网络控制实训柜I上各类实训操作面板的挂装结构为:前安装框架上挂装有电源操作面板I、S7-1500PLC操作面板、 S7-1200PLC操作面板I、伺服电机驱动控制操作面板、S120变频器操作面板;后安装框架上挂装有电源操作面板II、S7-1200PLC操作面板II、操作面板(集成了AI模拟量信号仿真面板和远程I/O Profinet操作面板)、基本电气控制面板I、G120变频器操作面板;前柜门上设置有数字量I/O操作面板I和人机界面HMI I(集成 Profibus-DP接口);后柜门上设置有数字量I/O操作面板II和人机界面HMI II(集成Profinet接口)。The hanging structure of various training operation panels on the described PLC network control training cabinet 1 is: the front mounting frame is hung with power supply operation panel I, S7-1500PLC operation panel, S7-1200PLC operation panel I, servo motor drive Control operation panel, S120 inverter operation panel; power supply operation panel II, S7-1200PLC operation panel II, operation panel (integrated AI analog signal simulation panel and remote I/O Profinet operation panel), Basic electrical control panel I, G120 inverter operation panel; digital I/O operation panel I and human-machine interface HMI I (integrated Profibus-DP interface) are installed on the front cabinet door; O Operator Panel II and Human Machine Interface HMI II (integrated Profinet interface).

所述PLC网络控制实训柜II上各类实训操作面板的挂装结构为:前安装框架上挂装有电源操作面板III、S7-300PLC操作面板、 S7-200PLC操作面板I、步进电机驱动控制操作面板、V20变频器操作面板;后安装框架上挂装有电源操作面板IV、S7-200PLC操作面板II、操作面板(集成了AI模拟量信号仿真面板和远程I/O Profinet 操作面板)、基本电气控制面板II、M420变频器操作面板;前柜门上设置有数字量I/O操作面板III和人机界面HMIIII(集成 Profibus-DP接口);后柜门上设置有数字量I/O操作面板IV和人机界面HMIIV(集成Profinet接口)。The mounting structure of various training operation panels on the PLC network control training cabinet II is as follows: power supply operation panel III, S7-300PLC operation panel, S7-200PLC operation panel I, and stepper motor are hung on the front mounting frame. Drive control operation panel, V20 inverter operation panel; power supply operation panel IV, S7-200PLC operation panel II, operation panel (integrated AI analog signal simulation panel and remote I/O Profinet operation panel) , Basic electrical control panel II, M420 inverter operation panel; digital I/O operation panel III and human-machine interface HMIIII (integrated Profibus-DP interface) are installed on the front cabinet door; OOperating Panel IV and Human Machine Interface HMIIV (Integrated Profinet Interface).

所述PLC网络控制实训柜的机械结构还包括:用以给电气控制柜电源操作面板供配电的三相五线制工业防水固定插座,该固定插座具有防插错功能,确保了电气柜的三相电相序一致性;在柜体下方内侧设置的安全保护接地铜柱,并通过接地线与大地相连,实现接地保护;设置有用以给PC计算机提供电源的三线制AC220V插线排;安装于柜体底部、便于柜体搬运和移动的带锁止功能的万向移动轮;所述安装框架上开设有“V”型槽,各操作面板形状规格一致,在四角处设置有凸缘,以便于根据实训需求灵活移位组装。The mechanical structure of the PLC network control training cabinet also includes: a three-phase five-wire industrial waterproof fixed socket for power supply and distribution to the power operation panel of the electrical control cabinet. The fixed socket has the function of preventing wrong insertion and ensures the electrical cabinet. The three-phase electrical phase sequence is consistent; the safety protection grounding copper column is set on the inner side of the cabinet, and is connected to the ground through the grounding wire to realize grounding protection; there is a three-wire AC220V power strip for providing power to the PC computer; A universal moving wheel with locking function installed at the bottom of the cabinet to facilitate the handling and movement of the cabinet; the installation frame is provided with a "V"-shaped groove, the shape and specifications of each operation panel are the same, and flanges are provided at the four corners , so as to flexibly shift and assemble according to the training needs.

四台PC计算机与两台PLC网络控制实训柜组配为四工位单型号、单台PLC控制实训装置,PC计算机I、PC计算机II、PC计算机III 和PC计算机IV分别作为S7-1500PLC、S7-1200PLC、S7-300PLC、 S7-200PLC的编译调试运行环境。Four PC computers and two PLC network control training cabinets are assembled into a four-station single model and a single PLC control training device. PC computer I, PC computer II, PC computer III and PC computer IV are respectively used as S7-1500PLC , S7-1200PLC, S7-300PLC, S7-200PLC compile and debug running environment.

四台PC计算机与两台PLC网络控制实训柜组配为多型号、多台 PLC组网协调配合控制实训装置,运用一台或多台PC计算机运行 WINCC程序,作为中央监控中心。Four PC computers and two PLC network control training cabinets are assembled into multi-model and multi-PLC network coordination and control training devices, and one or more PC computers are used to run the WINCC program as the central monitoring center.

在实训过程中,学生采用香蕉双层护套线进行接线连接,增强操作安全性,提高实训项目展开的实效性。During the training process, the students used banana double-sheathed wires for wiring connections to enhance operational safety and improve the effectiveness of the training project.

挂装在安装框架上的各操作面板(电源操作板除外)的左上角或右上角处开设通讯线缆直径为80mm的圆孔,以方便通讯组网时的走线。A round hole with a diameter of 80mm for communication cables is provided at the upper left or upper right corner of each operation panel (except the power operation panel) mounted on the installation frame to facilitate the wiring during communication networking.

本实用新型的PLC网络自动化综合实训装置,基于西门子自动化产品,以PLC技术为主体,有机融合现场总线通信技术、触摸屏应用技术、交流变频应用技术、交流伺服技术和步进控制技术形成了集成 PLC网络自动化控制实训系统。在控制模式上采用经典的分布式三层网络结构,即第一层为中央监控层,以PC计算机、大型S7-1500PLC、精智面板HIM为中心,配以博途软件和网络通讯卡,用于设备网络自动化的远程监控、管理与调度;第二层为车间级过程监控层,以中型 S7-1200PLC、精智面板HIM为中心组成profinet网络站点,或以中型S7-300PLC、精智面板HIM为中心组成profibus-DP网络主站站点,用于车间各设备的监控、协调配合管理与调度;第三层为现场设备级控制层,以中型S7-1200PLC、精简面板HIM为中心组成profinet网络站点或以小型S7-200PLC、精简面板HIM为中心组成profibus-DP 网络从站站点,用于现场设备的变频调速驱动、交流伺服驱动、步进驱动、三相异步电机等现场运动部件的的监控、协调配合管理与调度。The PLC network automation comprehensive training device of the utility model is based on Siemens automation products, takes PLC technology as the main body, organically integrates field bus communication technology, touch screen application technology, AC frequency conversion application technology, AC servo technology and step control technology to form an integrated system. PLC network automation control training system. In the control mode, the classic distributed three-layer network structure is adopted, that is, the first layer is the central monitoring layer, which is centered on PC computer, large-scale S7-1500PLC, and smart panel HIM, and is equipped with Portal software and network communication card. It is used for remote monitoring, management and scheduling of equipment network automation; the second layer is the workshop-level process monitoring layer, with medium-sized S7-1200PLC and Comfort Panel HIM as the center to form a profinet network site, or medium-sized S7-300PLC, Comfort Panel HIM The profibus-DP network master station is formed as the center, which is used for monitoring, coordination and management and scheduling of various equipment in the workshop; the third layer is the field device level control layer, which is centered on the medium-sized S7-1200PLC and the simplified panel HIM to form the profinet network site Or use small S7-200PLC and simplified panel HIM as the center to form a profibus-DP network slave station, which is used for the monitoring of field moving parts such as variable frequency speed control drive, AC servo drive, step drive, and three-phase asynchronous motor of field equipment. , Coordinate with management and scheduling.

附图说明Description of drawings

图1本实用新型系统结构示意图;1 is a schematic diagram of the system structure of the present utility model;

图2本实用新型PLC网络控制实训柜结构示意图;2 is a schematic diagram of the structure of the PLC network control training cabinet of the present utility model;

图3本实用实用新型PLC网络控制实训柜I内部初始布局图;Fig. 3 initial layout diagram inside PLC network control training cabinet 1 of the present utility model;

图4本实用新型PLC网络控制实训柜II内部初始布局图。FIG. 4 is an initial layout diagram of the interior of the PLC network control training cabinet II of the present invention.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述.显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative work fall within the protection scope of the present invention.

一种PLC网络自动化综合实训装置,基于西门子自动化产品,以 PLC技术为主体,有机融合现场总线通信技术、触摸屏应用技术、交流变频应用技术、交流伺服技术和步进控制技术形成了集成PLC网络自动化实训系统。装置主体包括两台PLC网络控制实训柜和四台PC 计算机;其中两台网络控制实训柜分别命名为PLC网络控制实训柜 I5和PLC网络控制实训柜Ⅱ6,两台实训柜在机械结构上相同,均采用内外双层框架式机械结构,包括柜体21和设置在柜体21内的安装框架22,安装框架22上挂装各实训操作面板;四台PC计算机分别命名为PC计算机Ⅰ1、PC计算机Ⅱ2、PC计算机Ⅲ3和PC计算机Ⅳ4,四台PC计算机均优选i7处理器、内存4G以上计算机,安装有西门子通讯卡和博途软件。以上两台实训柜和四台PC计算机可以根据需要开展四工位单型号、单台PLC控制实训,也可开展多型号、多台 PLC组网协调配合控制实训,使学生在掌握技能的同时,培养团队协作精神。在单台PLC控制实训时,PC计算机I1、PC计算机II2、PC 计算机III3、PC计算机IV4,可分别作为S7-1500PLC、S7-1200PLC、S7-300PLC、S7-200PLC的编译调试运行环境;在多型号、多台PLC 组网协调配合控制实训时,运用一台PC计算机或多台PC计算机运行 WINCC程序,作为中央监控中心。A PLC network automation comprehensive training device, based on Siemens automation products, with PLC technology as the main body, organically integrating field bus communication technology, touch screen application technology, AC frequency conversion application technology, AC servo technology and stepper control technology to form an integrated PLC network. Automated training system. The main body of the device includes two PLC network control training cabinets and four PC computers; two of the network control training cabinets are named PLC network control training cabinet I5 and PLC network control training cabinet II6 respectively. The mechanical structure is the same, both of which use the inner and outer double-layer frame type mechanical structure, including the cabinet 21 and the installation frame 22 arranged in the cabinet 21, and each training operation panel is hung on the installation frame 22; the four PC computers are named as PC computer I1, PC computer II2, PC computer III3 and PC computer IV4, all four PC computers are preferably computers with i7 processor, memory above 4G, and installed with Siemens communication card and Portal software. The above two training cabinets and four PC computers can carry out four-station single-model, single-PLC control training according to needs, and can also carry out multi-model, multiple PLC network coordination and control training, so that students can master the skills At the same time, cultivate team spirit. In a single PLC control training, PC computer I1, PC computer II2, PC computer III3, and PC computer IV4 can be used as the compilation and debugging operation environment of S7-1500PLC, S7-1200PLC, S7-300PLC and S7-200PLC respectively; When multi-model and multi-PLC network coordination and control training, use one PC computer or multiple PC computers to run the WINCC program as the central monitoring center.

PLC网络控制实训柜的柜体21采用四门面开放式结构,设置有前柜门24、后柜门25、左柜门26和右柜门27,柜门与柜体通过铰链连接;前柜门24、和后柜门25上分别设置有数字量I/O操作面板、人机界面HMI,和安装框架22上的各实训操作面板,组合成前、后两个实训工位。开设可拆卸式左柜门26和右柜门27,以方便于实训时,通讯线路的穿线操作,与柜体通过销连接。在柜体右下方外侧处设有三相五线制、工业防水固定插座28,以给电气控制柜电源操作面板供配电,插座具有防插错功能,确保了电气柜的三相电相序一致性。在柜体左下方内侧处设有安全保护接地铜柱,并通过接地线与大地相连,实现接地保护。在柜体前左立柱外侧中部、后右立柱外侧中部设置有三线制AC220V插线排,以给PC计算机提供电源。柜体21 底部设置有带锁止功能的万向移动轮23,可方便搬运、移动。在安装框架上开设有“V”型槽,各操作面板形状规格一致,在四角处设置有凸缘,以便于根据实训需求灵活移位组装。挂装在安装框架上的各操作面板(电源操作板除外)的左上角或右上角处开设通讯线缆直径为80mm的圆孔,以方便通讯组网时的走线。The cabinet body 21 of the PLC network control training cabinet adopts a four-face open structure, and is provided with a front cabinet door 24, a rear cabinet door 25, a left cabinet door 26 and a right cabinet door 27. The cabinet door and the cabinet body are connected by hinges; the front cabinet The door 24 and the rear cabinet door 25 are respectively provided with a digital I/O operation panel, a human-machine interface HMI, and various training operation panels on the installation frame 22, which are combined into two training stations, front and rear. Detachable left cabinet door 26 and right cabinet door 27 are provided to facilitate the threading operation of communication lines during training, and are connected to the cabinet body through pins. There is a three-phase five-wire, industrial waterproof fixed socket 28 at the lower right outer side of the cabinet to supply and distribute power to the power operation panel of the electrical control cabinet. The socket has the function of preventing wrong insertion to ensure that the three-phase electrical phase sequence of the electrical cabinet is consistent. sex. There is a safety protection grounding copper column at the lower left inner side of the cabinet, and is connected to the ground through a grounding wire to achieve grounding protection. A three-wire AC220V power strip is arranged in the outer middle of the front left column and the outer middle of the rear right column to provide power to the PC. The bottom of the cabinet 21 is provided with a universal moving wheel 23 with a locking function, which is convenient for handling and moving. There is a "V"-shaped groove on the installation frame, the shape and specifications of each operation panel are the same, and flanges are provided at the four corners to facilitate flexible displacement and assembly according to training needs. A round hole with a diameter of 80mm for communication cables is provided at the upper left or upper right corner of each operation panel (except the power operation panel) mounted on the installation frame to facilitate the wiring during communication networking.

PLC网络控制实训柜I5操作面板布局如图3所示:前安装框架上从上到下依次挂装为:电源操作面板I511、S7-1500PLC操作面板512、S7-1200PLC操作面板I513、伺服电机驱动控制操作面板514、 S120变频器操作面板515;后安装框架上从上到下依次挂装为:电源操作面板II521、S7-1200PLC操作面板II522、操作面板523(集成了AI模拟量信号仿真面板5231和远程I/O Profinet操作面板5232)、基本电气控制面板I524、G120变频器操作面板525;前柜门上设置有数字量I/O操作面板I531、集成Profibus-DP接口的人机界面HMII532;后柜门上设置有数字量I/O操作面板II541、集成Profinet接口的人机界面HMIII542。The layout of the I5 operation panel of the PLC network control training cabinet is shown in Figure 3: The front mounting frame is mounted from top to bottom as follows: power operation panel I511, S7-1500PLC operation panel 512, S7-1200PLC operation panel I513, servo motor Drive control operation panel 514, S120 inverter operation panel 515; the rear mounting frame is mounted from top to bottom as follows: power supply operation panel II521, S7-1200PLC operation panel II522, operation panel 523 (integrated AI analog signal simulation panel 5231 and remote I/O Profinet operation panel 5232), basic electrical control panel I524, G120 inverter operation panel 525; digital I/O operation panel I531, integrated Profibus-DP interface man-machine interface HMII532 are installed on the front cabinet door ; The rear cabinet door is provided with a digital I/O operation panel II541 and a man-machine interface HMIII542 with integrated Profinet interface.

PLC网络控制实训柜II6操作面板布局如图4所示:前安装框架上从上到下依次挂装为:电源操作面板III611、S7-300PLC操作面板 612、S7-200PLC操作面板I613、步进电机驱动控制操作面板614、 V20变频器操作面板615;后安装框架上从上到下依次挂装为:电源操作面板IV621、S7-200PLC操作面板II622、操作面板623(集成了 AI模拟量信号仿真面板6231和远程I/O Profinet操作面板6232)、基本电气控制面板II624、M420变频器操作面板625。前柜门上设置有数字量I/O操作面板III631、集成Profibus-DP接口的人机界面HMIIII632。后柜门上设置有数字量I/O操作面板IV641、集成 Profinet接口的人机界面HMIIV642。The layout of the PLC network control training cabinet II6 operation panel is shown in Figure 4: The front mounting frame is mounted from top to bottom as follows: power supply operation panel III611, S7-300PLC operation panel 612, S7-200PLC operation panel I613, stepper Motor drive control operation panel 614, V20 inverter operation panel 615; the rear mounting frame is mounted from top to bottom as follows: power supply operation panel IV621, S7-200PLC operation panel II622, operation panel 623 (integrated AI analog signal simulation Panel 6231 and remote I/O Profinet operation panel 6232), basic electrical control panel II624, M420 inverter operation panel 625. The front cabinet door is provided with a digital I/O operation panel III631 and a human-machine interface HMIIII632 integrated with the Profibus-DP interface. The rear cabinet door is provided with digital I/O operation panel IV641 and human-machine interface HMIIV642 with integrated Profinet interface.

以上PLC网络控制实训柜I5操作面板布局和PLC网络控制实训柜II6操作面板布局只是说明最初始的布局,其各操作面板位置并不是固定的,各操作面板除电源操作面板外,可根据实训需求灵活移位组装。The above PLC network control training cabinet I5 operation panel layout and PLC network control training cabinet II6 operation panel layout only illustrate the initial layout, and the positions of the operation panels are not fixed. The training requires flexible shifting and assembly.

本实用新型在功能结构化模块设计上,集成有配电模块、远程监控模块、PLC网络通信站点模块、变频调速模块、运动控制模块和现场控制模块。In the functional structure module design, the utility model integrates a power distribution module, a remote monitoring module, a PLC network communication station module, a frequency conversion speed regulation module, a motion control module and an on-site control module.

配电模块,针对学生实训负载的不确定性或操作失误造成可能带来的各种触电和短路事故,使电源的安全性得以保障,共设4块,包括设置于PLC网络控制实训柜I5前安装框架上的电源操作面板I511、设置于PLC网络控制实训柜I5后安装框架上的电源操作面板II521,以及设置于PLC网络控制实训柜II6前安装框架上的电源操作面板 III611、设置于PLC网络控制实训柜II6后安装框架上的电源操作面板IV621,各电源操作面板上元器件型号、数量、布局一致,优选的断路器、熔断器、漏电保护器、开关电源、指示灯、启动按钮、急停按钮、接触器和保护接地端子等组成,具备很好的漏电、短路、过载、过热、失压、接地保护功能,使电源的安全性得以保障;保护人身、设备安全,并为其他模块提供AC380V、AC220V、DC24V、DC12V 和DC5V电源。The power distribution module is designed for various electric shock and short-circuit accidents that may be caused by the uncertainty of the students' training load or operation errors, so as to ensure the safety of the power supply. There are 4 blocks in total, including the PLC network control training cabinet. The power supply operation panel I511 on the front mounting frame of I5, the power supply operation panel II521 on the rear mounting frame of the PLC network control training cabinet I5, and the power supply operation panel III611 on the front mounting frame of the PLC network control training cabinet II6, The power supply operation panel IV621 installed on the installation frame behind the PLC network control training cabinet II6, the model, quantity and layout of components on each power supply operation panel are consistent, and the preferred circuit breakers, fuses, leakage protectors, switching power supplies, indicator lights , start button, emergency stop button, contactor and protective grounding terminal, etc., have good leakage, short circuit, overload, overheating, voltage loss, grounding protection functions, so that the safety of the power supply can be guaranteed; to protect personal and equipment safety, And provide AC380V, AC220V, DC24V, DC12V and DC5V power supply for other modules.

远程监控模块,优选的PC计算机、网卡、西门子通讯卡和组态软件。网卡、西门子通讯卡和组态软件均安装在PC计算机上。通过网卡或通讯卡与PLC网络通信站点相连,将中央监控命令传送给PLC 网络通信站点,并根据PLC网络通信站点上报数据,实时更新监控界面,实现人机交互功能。Remote monitoring module, preferred PC computer, network card, Siemens communication card and configuration software. The network card, Siemens communication card and configuration software are all installed on the PC computer. Connect to the PLC network communication station through the network card or communication card, transmit the central monitoring command to the PLC network communication station, and update the monitoring interface in real time according to the data reported by the PLC network communication station to realize the human-computer interaction function.

PLC网络通信站点模块,优选的西门子S7-1500PLC、S7-1200PLC、 S7-300PLC、S7-200PLC、精智面板HIM、精简面板HIM等典型自动化产品,包括S7-1500PLC操作面板、S7-1200PLC操作面板I、S7-1200PLC 操作面板II、S7-300PLC操作面板、S7-200PLC操作面板I、远程I/O Profinet操作面板、远程I/O Profibus-DP操作面板、人机界面HMI。各操作面板可根据实训需要,灵活组成profinet网络、profibus-DP 网络和profinet+profibus-DP混合式网络,以实现多型号、多网络PLC网络通信实训功能。PLC network communication station module, preferred Siemens S7-1500PLC, S7-1200PLC, S7-300PLC, S7-200PLC, Comfort Panel HIM, Simplified Panel HIM and other typical automation products, including S7-1500PLC operation panel, S7-1200PLC operation panel I, S7-1200PLC operation panel II, S7-300PLC operation panel, S7-200PLC operation panel I, remote I/O Profinet operation panel, remote I/O Profibus-DP operation panel, man-machine interface HMI. Each operation panel can flexibly form profinet network, profibus-DP network and profinet+profibus-DP hybrid network according to the training needs, so as to realize the multi-model and multi-network PLC network communication training function.

PLC网络通信站点模块的各操作面板的组成具体介绍如下:The composition of each operation panel of the PLC network communication station module is detailed as follows:

S7-1500PLC操作面板,优选的PM电源模块、CPU1516模块、AI/AO 模块、I/O模块、系统电源PS模块、IM155-5 PN接口模块、ptp通讯模块、S7-1500安装导轨组成S7-1500profinet站点或 profibus-DP主/从站点。S7-1500PLC operation panel, preferred PM power supply module, CPU1516 module, AI/AO module, I/O module, system power supply PS module, IM155-5 PN interface module, ptp communication module, S7-1500 mounting rail to form S7-1500profinet site or profibus-DP master/slave site.

S7-1200PLC操作面板I,优选的电源模块PM1207、CPU1214 (DC/DC/DC)模块、I/O模块、AI/AO模块、CM1243-5 DP主站模块、 CM1241通讯模块、CSM1277交换机模块和安装导轨组成S7-1200 profinet站点或S7-1200profibus-DP主站点。S7-1200PLC operation panel I, preferred power module PM1207, CPU1214 (DC/DC/DC) module, I/O module, AI/AO module, CM1243-5 DP master module, CM1241 communication module, CSM1277 switch module and installation The rails form the S7-1200 profinet station or the S7-1200profibus-DP master station.

S7-1200PLC操作面板II,优选的电源模块PM1207、CPU1214 (AC/DC/RLY)模块、I/O模块、AI/AO模块、CM1242-5 DP从站模块、 CM1241通讯板和安装导轨组成S7-1200profinet站点或 S7-1200profibus-DP从站点。S7-1200PLC operation panel II, preferred power supply module PM1207, CPU1214 (AC/DC/RLY) module, I/O module, AI/AO module, CM1242-5 DP slave module, CM1241 communication board and mounting rail to form S7- 1200profinet station or S7-1200profibus-DP slave station.

S7-300PLC操作面板,优选的电源模块PS307、CPU314C模块、 AI/AO模块、I/O模块、CMptp通讯模块、S7-300安装导轨组成S7-300 profinet站点或profibus-DP主/从站点。S7-300PLC operation panel, preferred power supply module PS307, CPU314C module, AI/AO module, I/O module, CMptp communication module, S7-300 installation guide rail constitute S7-300 profinet site or profibus-DP master/slave site.

S7-200PLC操作面板I,优选的电源模块PS207、CPU226 (DC/DC/DC)模块、AI/AO模块、I/O模块、profibus-DP通讯模块、 EM235定位模块和安装导轨组成S7-200 profibus-DP从站点。S7-200PLC operation panel I, preferred power supply module PS207, CPU226 (DC/DC/DC) module, AI/AO module, I/O module, profibus-DP communication module, EM235 positioning module and installation rail form S7-200 profibus -DP slave site.

S7-200PLC操作面板II,优选的电源模块PS207、CPU226 (AC/DC/RLY)模块、AI/AO模块、I/O模块、以太网通讯模块和安装导轨组成S7-200以太网络站点。S7-200PLC operation panel II, the preferred power supply module PS207, CPU226 (AC/DC/RLY) module, AI/AO module, I/O module, Ethernet communication module and installation rails form the S7-200 Ethernet network site.

远程I/O Profinet操作面板,优选的IM155-6 PN接口模块、 PM电源模块、系统电源PS模块、ET200SP I/O模块、ET200SP AI/AO 模块、ET200SP基座单元和安装导轨组成ET200SP远程I/O Profinet 站点。Remote I/O Profinet operator panel, preferably IM155-6 PN interface module, PM power supply module, system power supply PS module, ET200SP I/O module, ET200SP AI/AO module, ET200SP base unit and mounting rail make up the ET200SP remote I/O O Profinet site.

远程I/O Profibus-DP操作面板,优选的IM155-6 DP接口模块、 PM电源模块、系统电源PS模块、ET200SP I/O模块、ET200SP AI/AO 模块、ET200SP基座单元和安装导轨组成ET200SP远程I/O Profinet 站点。Remote I/O Profibus-DP operation panel, preferably IM155-6 DP interface module, PM power supply module, system power supply PS module, ET200SP I/O module, ET200SP AI/AO module, ET200SP base unit and mounting rail to form ET200SP remote I/O Profinet site.

人机界面HMI,设置有人机界面HMII、II、III、IV共四块,人机界面HMII、III,优选的精智面板TP700,人机界面HMIII,优选的精简面板KTP700(集成PROFINET接口),人机界面HMIIV优选的精简面板KTP700(集成MPI/PROFIBUS DP接口)。Human-machine interface HMI, set up four man-machine interface HMII, II, III, IV, human-machine interface HMII, III, preferred Comfort Panel TP700, human-machine interface HMIII, preferred Simple Panel KTP700 (integrated PROFINET interface), Human Machine Interface HMIIV preferred Basic Panel KTP700 (integrated MPI/PROFIBUS DP interface).

变频调速模块,优选的西门子高性能S120变频器,中性能G120 变频器、V20变频器和通用型M420变频器组成,包括S120变频器操作面板、G120变频器操作面板、V20变频器操作面板和M420变频器操作面板,实现各型号单台变频器的接线实训、速度定位实训、多段速度运转实训;多台变频器的并用操作运转实训和联网通讯运转实训等功能。Frequency conversion speed control module, the preferred Siemens high-performance S120 inverter, medium-performance G120 inverter, V20 inverter and general M420 inverter, including S120 inverter operation panel, G120 inverter operation panel, V20 inverter operation panel and The operation panel of the M420 inverter can realize the functions of wiring training, speed positioning training, multi-speed operation training of each type of single inverter; operation training of multiple inverters and network communication operation training and other functions.

运动控制模块,包括伺服电机驱动控制操作面板和步进电机驱动控制操作面板,实现直线位移定位控制和转动角度位移定位控制实训。伺服电机驱动控制操作面板,优选的V90伺服驱动模块、滑台模组精密直线导轨滚珠丝杠、增量型编码器、位移传感器、微动开关,模拟仿真工程直线运动定位控制实训。步进电机驱动控制操作面板, 优选的步科步进驱动模块、电动角度转台、增量型编码器、微动开关,模拟仿真工程角度定位控制实训。The motion control module, including the servo motor drive control panel and the stepper motor drive control panel, realizes the training of linear displacement positioning control and rotational angle displacement positioning control. Servo motor drive control operation panel, preferred V90 servo drive module, sliding table module precision linear guide ball screw, incremental encoder, displacement sensor, micro switch, simulation simulation engineering linear motion positioning control training. Stepper motor drive control operation panel, preferred stepper stepper drive module, electric angle turntable, incremental encoder, micro switch, analog simulation engineering angle positioning control training.

现场控制模块,包括AI模拟量信号仿真面板、数字量I/O操作面板和三相异步电机拖动控制操作面板,与PLC操作面板灵活组合,可作为PLC网络控制现场设备级网络节点使用,也可为学生提供四工位单个PLC为核心的控制技术实训平台,实现基本的电机拖动控制实训功能。Field control module, including AI analog signal simulation panel, digital I/O operation panel and three-phase asynchronous motor drag control operation panel, can be flexibly combined with PLC operation panel, and can be used as a PLC network control field device level network node. It can provide students with a control technology training platform with a four-station single PLC as the core, and realize the basic motor drag control training function.

AI模拟量信号仿真面板,优选的信号发生器,可以产生可调的 4~20mA、-5V~+5V、-10V~+10V、-0V~+10V模拟量信号,各量程模拟量信号通过旋钮可调节,实现现场模拟量信号的采集实训。AI analog signal simulation panel, the preferred signal generator, can generate adjustable 4~20mA, -5V~+5V, -10V~+10V, -0V~+10V analog signals, and the analog signals of each range can pass the knob. It can be adjusted to realize on-site analog signal acquisition and training.

数字量I/O操作面板,优选的主令电气、指示灯和蜂鸣器,为 PLC提供现场操作指令,并通过指示灯查看PLC的命令执行、运行状态等情况。设置有数字量I/O操作面板I、II、III、IV共4块,各数字量I/O操作面板上元器件型号、数量、布局一致,优选的DC24V指示灯(黄、绿、红、白、兰)、AC220V指示灯(黄、绿、红、白、兰), 自动复位按钮(黄、绿、红、白、黑),带指示灯锁止按钮(黄、绿、红、白、黑),急停按钮,钥匙开关,选择开关,蜂鸣器。Digital I/O operation panel, preferred main command electrical, indicator lights and buzzer, provide on-site operation instructions for PLC, and check PLC command execution and running status through indicator lights. There are 4 digital I/O operation panels I, II, III and IV in total. The model, quantity and layout of components on each digital I/O operation panel are consistent. The preferred DC24V indicator lights (yellow, green, red, White, blue), AC220V indicator light (yellow, green, red, white, blue), automatic reset button (yellow, green, red, white, black), lock button with indicator light (yellow, green, red, white, black), emergency stop button, key switch, selector switch, buzzer.

三相异步电机拖动控制操作面板共2块,包括三相异步电机拖动控制操作面板I和三相异步电机拖动控制操作面板II,各三相异步电机拖动控制操作面板上元器件型号、数量、布局一致,优选的电机保护型塑壳断路器、熔断器、电机综合保护器、制动电阻装置、能耗制动装置、电磁制动器、中间继电器、接触器、热继电器、速度继电器、三相异步电机,在整个系统中起着PLC控制信号放大和执行的作用。There are 2 three-phase asynchronous motor drag control operation panels in total, including three-phase asynchronous motor drag control operation panel I and three-phase asynchronous motor drag control operation panel II, and the component models on each three-phase asynchronous motor drag control operation panel , consistent in quantity and layout, the preferred motor-protected molded case circuit breakers, fuses, motor comprehensive protectors, braking resistor devices, dynamic braking devices, electromagnetic brakes, intermediate relays, contactors, thermal relays, speed relays, The three-phase asynchronous motor plays the role of PLC control signal amplification and execution in the whole system.

本实用新型在控制模式上采用经典的分布式三层网络结构,即第一层为中央监控层,以PC计算机、大型S7-1500PLC、精智面板HIM 为中心,配以博途软件和网络通讯卡,用于设备网络自动化的远程监控、管理与调度;第二层为车间级过程监控层,以中型S7-1200PLC、精智面板HIM为中心组成profinet网络站点,或以中型S7-300PLC、精智面板HIM为中心组成profibus-DP网络主站站点,用于车间各设备的监控、协调配合管理与调度;第三层为现场设备级控制层,以中型S7-1200PLC、精简面板HIM为中心组成profinet网络站点或以小型S7-200PLC、精简面板HIM为中心组成profibus-DP网络从站站点,用于现场设备的变频调速驱动、交流伺服驱动、步进驱动、三相异步电机等现场运动部件的的监控、协调配合管理与调度。The utility model adopts the classic distributed three-layer network structure in the control mode, that is, the first layer is the central monitoring layer, with PC computer, large-scale S7-1500PLC, and smart panel HIM as the center, equipped with Portal software and network communication Card, used for remote monitoring, management and scheduling of equipment network automation; the second layer is the workshop-level process monitoring layer, with medium-sized S7-1200PLC and Comfort Panel HIM as the center to form a profinet network site, or with medium-sized S7-300PLC, precision The smart panel HIM is the center to form the profibus-DP network master station, which is used for the monitoring, coordination and cooperation management and scheduling of various equipment in the workshop; the third layer is the field device level control layer, which is composed of medium-sized S7-1200PLC and simplified panel HIM as the center. The profinet network site or the small S7-200PLC and the simplified panel HIM as the center form the profibus-DP network slave site, which is used for the field moving parts such as the variable frequency speed control drive, AC servo drive, stepper drive, three-phase asynchronous motor and so on. monitoring, coordination and management and scheduling.

本实用新型采用积木组合式结构,电气控制柜体内设置有安装框架,用于安装固定挂装各操作面板,各操作面板形状规格一致,采用快速挂装装置,可根据实训需求灵活移位组装。每个操作面板均采用开放式设计,电气元件按照工程应用模式安装固定在操作面板上,使学生能够直观元器件的外形、端子接口,增强工程应用的真实性。电气元件的每个接线端子采用香蕉线插座引出,学生可根据需要灵活选用各元器件及元器件的各接线端子,增强实训项目展开的灵活性,与工程实践零接轨。在实训过程中,学生采用香蕉双层护套线进行接线连接,增强操作安全性,提高实训项目展开的实效性。The utility model adopts a modular structure of building blocks, and an installation frame is arranged in the electrical control cabinet, which is used to install and hang each operation panel. . Each operation panel adopts an open design, and the electrical components are installed and fixed on the operation panel according to the engineering application mode, so that students can intuitively understand the shape and terminal interface of the components and enhance the authenticity of the engineering application. Each terminal of the electrical component is drawn out by a banana wire socket. Students can flexibly select each component and each terminal of the component according to their needs, which enhances the flexibility of the training project and is in line with engineering practice. During the training process, the students used banana double-sheathed wires for wiring connections to enhance operational safety and improve the effectiveness of the training project.

以下基于不同的实训功能,给出几个不同的实施例,以体现本实用新型实训装置的综合性及灵活性。Based on different training functions, several different embodiments are given below to reflect the comprehensiveness and flexibility of the training device of the present invention.

实施例一Example 1

本实施例为开展四工位单型号、单台PLC控制实训情况。如图1 所示。This embodiment is the situation of carrying out four-station single-model, single PLC control training. As shown in Figure 1.

PC计算机I1、PC计算机II2、PC计算机III3、PC计算机IV4,可分别作为S7-1500PLC、S7-1200PLC、S7-300PLC、S7-200PLC的编译调试运行环境,通过PLC网络控制实训柜I5、PLC网络控制实训柜 II6的操作面板组合搭配,可实现S7-200PLC控制基本技能实训、 S7-300PLC控制基本技能实训、S7-1200PLC控制基本技能实训和 S7-1500PLC控制基本技能实训。PC computer I1, PC computer II2, PC computer III3, and PC computer IV4 can be used as the compilation and debugging operation environment of S7-1500PLC, S7-1200PLC, S7-300PLC and S7-200PLC respectively, and control the training cabinet I5 and PLC through the PLC network. The combination of the operation panels of the network control training cabinet II6 can realize the basic skills training of S7-200PLC control, the training of basic skills of S7-300PLC control, the training of basic skills of S7-1200PLC control and the training of basic skills of S7-1500PLC control.

为了更好地说明,下面简单介绍一下S7-1500PLC控制基本技能实训使用情况。选择PC计算机I1安装网卡和博途软件,电源操作面板I511,S7-1500PLC操作面板512,伺服电机驱动控制操作面板514, S120变频器操作面板515,数字量I/O操作面板I531,人机界面HMI I532等;组建S7-1500PLC控制基本技能实训平台。学生可根据实训需求灵活选用各元器件及元器件的各接线端子,实现PLC基本应用实训、基于PLC的变频调速控制实训、基于PLC的交流伺服电机位置运动控制实训、PLC、触摸屏与变频器的综合实训。其他单型号、单台PLC控制实训使用情况与S7-1500PLC控制基本技能实训使用情况类似,就不在一一赘述。In order to better explain, the following briefly introduces the use of S7-1500PLC control basic skills training. Select PC computer I1 to install network card and Portal software, power supply operation panel I511, S7-1500 PLC operation panel 512, servo motor drive control operation panel 514, S120 inverter operation panel 515, digital I/O operation panel I531, human-machine interface HMI I532, etc.; set up S7-1500PLC control basic skills training platform. Students can flexibly select each component and each terminal of the component according to the training needs, and realize the basic application training of PLC, the training of frequency conversion speed regulation based on PLC, the training of position motion control of AC servo motor based on PLC, PLC, Comprehensive training of touch screen and inverter. The use of other single model and single PLC control training is similar to the use of S7-1500 PLC control basic skills training, so I will not repeat them one by one.

实施例二Embodiment 2

本实施例为开展多型号、多台PLC Profinet网络控制实训情况。如图1、3、4所示。This embodiment is the situation of carrying out multi-model and multi-PLC Profinet network control training. As shown in Figures 1, 3 and 4.

选择PC计算机I1安装网卡和博途软件,电源操作面板I511, S7-1500PLC操作面板512,S7-1200PLC操作面板I513,电源操作面板II521,S7-1200PLC操作面板II522,电源操作面板III611, S7-300PLC操作面板612,电源操作面板IV621,S7-200PLC操作面板 II,远程I/O Profinet操作面板5232,远程I/O Profinet操作面板 6232,人机界面HMI II集成Profinet接口542,人机界面HMIIV集成Profinet接口,AI模拟量信号仿真面板5231,伺服电机驱动控制操作面板514,步进电机驱动控制操作面板614,S120变频器操作面板515,G120变频器操作面板525,V20变频器操作面板615,M420 变频器操作面板625,基本电气控制面板I524,基本电气控制面板 II624,数字量I/O操作面板I531,数字量I/O操作面板II541,数字量I/O操作面板III631,数字量I/O操作面板IV641。Select PC I1 to install network card and Portal software, power operation panel I511, S7-1500PLC operation panel 512, S7-1200PLC operation panel I513, power supply operation panel II521, S7-1200PLC operation panel II522, power supply operation panel III611, S7-300PLC operation Panel 612, power supply operation panel IV621, S7-200PLC operation panel II, remote I/O Profinet operation panel 5232, remote I/O Profinet operation panel 6232, HMI II integrated Profinet interface 542, human-machine interface HMIIV integrated Profinet interface , AI analog signal simulation panel 5231, servo motor drive control panel 514, stepper motor drive control panel 614, S120 inverter operation panel 515, G120 inverter operation panel 525, V20 inverter operation panel 615, M420 inverter Operation panel 625, basic electrical control panel I524, basic electrical control panel II624, digital I/O operation panel I531, digital I/O operation panel II541, digital I/O operation panel III631, digital I/O operation panel IV641.

利用Profinet网线,连接PC计算机I1,S7-1500PLC操作面板512上CPU1516模块,S7-1200PLC操作面板I513上CPU1214DC/DC/DC 模块、CM1241通讯模块、CSM1277交换机模块,S7-1200PLC操作面板II522上CPU1214AC/DC/RLY模块、CM1241通讯板,S7-300PLC操作面板612上CPU314C模块,S7-200PLC操作面板II上 CPU226AC/DC/RLY模块、以太网通讯模块,远程I/O Profinet操作面板5232,远程I/O Profinet操作面板6232,人机界面HMI II集成Profinet接口542,搭建集人机界面HMI、PLC于一体的Profinet 网络控制实训平台,实现S7-1500PLC与S7-1200PLC Profinet通信实训,实现S7-1500PLC与S7-300PLC Profinet通信实训,实现 S7-300PLC与S7-200PLC Profinet通信实训,基于Profinet网络的远程变频调速控制实训,基于Profinet网络的远程伺服、步进运动控制实训。Use Profinet network cable to connect PC computer I1, CPU1516 module on S7-1500PLC operation panel 512, CPU1214DC/DC/DC module, CM1241 communication module, CSM1277 switch module on S7-1200PLC operation panel I513, CPU1214AC/CSM1277 switch module on S7-1200PLC operation panel II522 DC/RLY module, CM1241 communication board, CPU314C module on S7-300PLC operation panel 612, CPU226AC/DC/RLY module, Ethernet communication module on S7-200PLC operation panel II, remote I/O Profinet operation panel 5232, remote I/ O Profinet operation panel 6232, human-machine interface HMI II integrates Profinet interface 542, builds a Profinet network control training platform integrating human-machine interface HMI and PLC, realizes S7-1500PLC and S7-1200PLC Profinet communication training, realizes S7- 1500PLC and S7-300PLC Profinet communication training, realizing S7-300PLC and S7-200PLC Profinet communication training, remote variable frequency speed control training based on Profinet network, remote servo and stepping motion control training based on Profinet network.

实施例三Embodiment 3

本实施例为开展多型号、多台PLC Profibus-DP网络控制实训情况。如图1、3、4所示。This embodiment is the situation of carrying out multi-model and multi-PLC Profibus-DP network control training. As shown in Figures 1, 3 and 4.

选择PC计算机I1安装网卡和博途软件,电源操作面板I511, S7-1500PLC操作面板512,S7-1200PLC操作面板I513,电源操作面板II521,S7-1200PLC操作面板II522,电源操作面板III611, S7-300PLC操作面板612,S7-200PLC操作面板I613,人机界面HMI I 集成Profibus-DP接口532,人机界面HMIIII集成Profibus-DP接口632,AI模拟量信号仿真面板6231,伺服电机驱动控制操作面板 514,步进电机驱动控制操作面板614,S120变频器操作面板515,G120变频器操作面板525,V20变频器操作面板615,M420变频器操作面板625,基本电气控制面板I524,基本电气控制面板II624,数字量I/O操作面板I531,数字量I/O操作面板II541,数字量I/O 操作面板III631,数字量I/O操作面板IV641。Select PC computer I1 to install network card and Portal software, power operation panel I511, S7-1500PLC operation panel 512, S7-1200PLC operation panel I513, power supply operation panel II521, S7-1200PLC operation panel II522, power supply operation panel III611, S7-300PLC operation Panel 612, S7-200PLC operation panel I613, man-machine interface HMI I integrated Profibus-DP interface 532, man-machine interface HMIIII integrated Profibus-DP interface 632, AI analog signal simulation panel 6231, servo motor drive control operation panel 514, step Input motor drive control operation panel 614, S120 inverter operation panel 515, G120 inverter operation panel 525, V20 inverter operation panel 615, M420 inverter operation panel 625, basic electrical control panel I524, basic electrical control panel II624, digital quantity I/O operation panel I531, digital I/O operation panel II541, digital I/O operation panel III631, digital I/O operation panel IV641.

利用Profibus-DP网线,连接PC计算机I1,S7-1500PLC操作面板512上CPU1516模块,S7-1200PLC操作面板I513上 CPU1214DC/DC/DC模块、CM1243-5 DP主站模块,S7-1200PLC操作面板II522上CPU1214AC/DC/RLY模块、CM1242-5 DP从站模块, S7-300PLC操作面板612上CPU314C模块,S7-200PLC操作面板I上 CPU226DC/DC/DC模块、rofibus-DP通讯模块,人机界面HMI I集成 Profibus-DP接口532,人机界面HMIIII集成Profibus-DP接口632,搭建集人机界面HMI、PLC于一体的ProfiBUS-DP网络控制实训平台,实现S7-1500PLC与S7-300PLC Profibus通信实训,实现S7-1200PLC 与S7-300PLC Profibus通信实训,实现S7-300PLC与S7-200PLC Profibus通信实训,基于Profibus-DP网络的远程变频调速控制实训,基于Profibus-DP网络的远程伺服、步进运动控制实训。Use Profibus-DP network cable to connect PC computer I1, CPU1516 module on S7-1500PLC operation panel 512, CPU1214DC/DC/DC module, CM1243-5 DP master station module on S7-1200PLC operation panel I513, and S7-1200PLC operation panel II522 CPU1214AC/DC/RLY module, CM1242-5 DP slave module, CPU314C module on S7-300PLC operation panel 612, CPU226DC/DC/DC module on S7-200PLC operation panel I, rofibus-DP communication module, human-machine interface HMI I Integrate Profibus-DP interface 532, human-machine interface HMIIII integrates Profibus-DP interface 632, build a ProfiBUS-DP network control training platform integrating human-machine interface HMI and PLC, and realize S7-1500PLC and S7-300PLC Profibus communication training , to achieve S7-1200PLC and S7-300PLC Profibus communication training, to achieve S7-300PLC and S7-200PLC Profibus communication training, based on Profibus-DP network remote variable frequency speed control training, based on Profibus-DP network remote servo, Stepping motion control training.

实施例四Embodiment 4

本实施例为开展多型号、多台PLC Profinet+Profibus-DP混合式网络控制实训情况。如图1、3、4所示。This embodiment is the situation of carrying out multi-model and multi-PLC Profinet+Profibus-DP hybrid network control training. As shown in Figures 1, 3 and 4.

选择电源操作面板I511,S7-1500PLC操作面板512,S7-1200PLC 操作面板I513,电源操作面板IV621,S7-200PLC操作面板II,远程 I/O Profinet操作面板5232,远程I/OProfinet操作面板6232,人机界面HMI II集成Profinet接口542,人机界面HMIIV集成Profinet接口。Select power supply operation panel I511, S7-1500PLC operation panel 512, S7-1200PLC operation panel I513, power supply operation panel IV621, S7-200PLC operation panel II, remote I/O Profinet operation panel 5232, remote I/OProfinet operation panel 6232, people The machine interface HMI II integrates the Profinet interface 542, and the human-machine interface HMIIV integrates the Profinet interface.

利用Profinet网线,连接S7-1500PLC操作面板512上CPU1516 模块,S7-1200PLC操作面板I513上CPU1214DC/DC/DC模块、CM1241 通讯模块、CSM1277交换机模块,S7-200PLC操作面板II上 CPU226AC/DC/RLY模块、以太网通讯模块,远程I/O Profinet操作面板I5232,远程I/O Profinet操作面板II6232,人机界面HMI II 集成Profinet接口542,搭建集人机界面HMI、PLC于一体的Profinet 网络。Use Profinet network cable to connect CPU1516 module on S7-1500PLC operation panel 512, CPU1214DC/DC/DC module, CM1241 communication module, CSM1277 switch module on S7-1200PLC operation panel I513, CPU226AC/DC/RLY module on S7-200PLC operation panel II , Ethernet communication module, remote I/O Profinet operation panel I5232, remote I/O Profinet operation panel II6232, human-machine interface HMI II integrates Profinet interface 542 to build a Profinet network integrating human-machine interface HMI and PLC.

选择电源操作面板II521,S7-1200PLC操作面板II522,电源操作面板III611,S7-300PLC操作面板612,S7-200PLC操作面板I613,人机界面HMI I集成Profibus-DP接口532,人机界面HMIIII集成 Profibus-DP接口632。Select power supply operation panel II521, S7-1200PLC operation panel II522, power supply operation panel III611, S7-300PLC operation panel 612, S7-200PLC operation panel I613, HMI I integrated Profibus-DP interface 532, HMI III integrated Profibus - DP interface 632.

利用Profibus-DP网线,连接S7-300PLC操作面板612上CPU314C 模块,S7-1200PLC操作面板II522上CPU1214AC/DC/RLY模块、CM1242-5 DP从站模块,S7-200PLC操作面板I上CPU226DC/DC/DC 模块、Profibus-DP通讯模块,人机界面HMI I集成Profibus-DP接口532,人机界面HMIIII集成Profibus-DP接口632,搭建集人机界面HMI、PLC于一体的Profibus-DP网络。Use Profibus-DP network cable to connect CPU314C module on S7-300PLC operation panel 612, CPU1214AC/DC/RLY module, CM1242-5 DP slave module on S7-1200PLC operation panel II522, CPU226DC/DC/S7-200PLC operation panel I DC module, Profibus-DP communication module, human-machine interface HMI I integrates Profibus-DP interface 532, human-machine interface HMIIII integrates Profibus-DP interface 632, and builds a Profibus-DP network integrating human-machine interface HMI and PLC.

选择PC计算机I1安装网卡和博途软件,利用Profinet网线,连接PC计算机I1,S7-1500PLC操作面板512上CPU1516模块, S7-300PLC操作面板612上CPU314C模块,搭建Profinet+ Profibus-DP混合式网络控制实训平台,实现多型号、多网络PLC网络通信实训功能。Select PC computer I1 to install network card and Portal software, use Profinet network cable to connect PC computer I1, CPU1516 module on S7-1500PLC operation panel 512, CPU314C module on S7-300PLC operation panel 612, and build Profinet+Profibus-DP hybrid network control training The platform realizes multi-model and multi-network PLC network communication training functions.

本实用新型的“一种PLC网络自动化综合实训装置”,与现有技术相比,本实用新型的有益效果是:Compared with the prior art, "a PLC network automation comprehensive training device" of the present utility model has the following beneficial effects:

1、设备直观:设备均采用直接外露的安装形式,设备可以更加直观的展现在学员面前,缩短了学生从教室到岗位现场的过渡和适应时间。1. Intuitive equipment: The equipment is directly exposed, and the equipment can be displayed in front of the students more intuitively, which shortens the transition and adaptation time of the students from the classroom to the job site.

2、结构灵活:采用积木组合式结构,各操作面板形状规格一致,采用快速挂装装置,可根据实训需求灵活移位组装,系统使用和组合更加灵活。2. Flexible structure: It adopts the modular structure of building blocks, the shape and specifications of each operation panel are the same, and the quick hanging device is adopted, which can be flexibly shifted and assembled according to the needs of training, and the use and combination of the system are more flexible.

3、系统性强:本平台将典型的大型PLC、中型PLC、微型PLC、人机界面HMI、变频器、伺服驱动、步进驱动、电机拖动等工业现场主要设备集于一身,能够真实模拟工业现场的各种控制方式,满足学员PLC网络自动化系统性学习需求,避免了单个电气元件很熟练,但不会多个电气元件相互控制的缺陷。3. Strong systemicity: This platform integrates typical large-scale PLC, medium-sized PLC, micro PLC, human-machine interface HMI, frequency converter, servo drive, stepper drive, motor drag and other major industrial field equipment, and can simulate real Various control methods on the industrial site meet the needs of students for systematic learning of PLC network automation, avoiding the defect that a single electrical component is proficient, but multiple electrical components cannot control each other.

4、贴近现场实际:该设备的实训内容均为工业现场主流技术应用,优选的元器件既包含新主流产品,也包含过去主流产品,贴近当前工厂设备新旧产品更替混用之状况,采用典型三层控制架构模式,能够方便的进行各种中、小型工程项目设计或升级改造设计实训,充分锻炼学员的动手能力和解决问题的综合能力。4. Close to the actual scene: The training content of this equipment is all mainstream technology applications in the industrial scene. The preferred components include both new mainstream products and past mainstream products, which are close to the current situation of replacement and mixing of new and old products in factory equipment. The layer control architecture mode can easily carry out various small and medium-sized engineering project design or upgrade design training, and fully exercise the students' hands-on ability and comprehensive ability to solve problems.

5、保护完善:设有漏电保护、短路保护,接线操作安全防护,使用安全可靠,能确保操作者安全。5. Perfect protection: It is equipped with leakage protection, short circuit protection, wiring operation safety protection, safe and reliable use, and can ensure the safety of the operator.

Claims (10)

1. A PLC network automation comprehensive training device is characterized by comprising a PLC network control training cabinet and a PC computer, wherein a training operation panel is hung on the PLC network control training cabinet, and the PC computer is provided with a network card, a communication card and configuration software; the PLC network control practical training cabinet and the PC computer are constructed with the following components:
the power distribution module is used for providing power and comprises a power supply operation panel configured in the PLC network control practical training cabinet;
the remote monitoring module is used for realizing a human-computer interaction function and comprises a PC computer, a network card, a communication card and configuration software, wherein the network card, the communication card and the configuration software are configured on the PC computer;
the PLC network communication station module comprises a PLC operation panel, a remote operation panel and a human-computer interface HMI, wherein the PLC operation panel, the remote operation panel and the human-computer interface HMI are hung on the PLC network control practical training cabinet; the models and the number of the PLC operation panel, the remote operation panel and the human-computer interface HMI are selectively configured according to practical training requirements to form a profinet network, a profibus-DP network and a profinet + profibus-DP mixed network so as to realize the practical training function of multi-model and multi-network PLC network communication;
the system comprises a variable frequency speed regulation module, a PLC network control practical training cabinet and a plurality of communication devices, wherein the variable frequency speed regulation module comprises a plurality of frequency converter operation panels hung on the PLC network control practical training cabinet and is used for realizing the functions of practical training of wiring, practical training of speed positioning and practical training of multi-speed operation of a single frequency converter of each type, practical training of simultaneous operation and practical training of a plurality of frequency converters and networked communication operation;
the motion control module comprises a servo motor driving control operation panel and a stepping motor driving control operation panel which are hung on the PLC network control practical training cabinet and is used for realizing the practical training of linear displacement positioning control and rotation angle displacement positioning control;
the field control module comprises an AI analog quantity signal simulation panel, a digital quantity I/O operation panel and a three-phase asynchronous motor dragging control operation panel which are hung on the PLC network control practical training cabinet, is used for being combined with each PLC operation panel and used as a PLC network control field equipment level network node or realizing a basic motor dragging control practical training function.
2. The PLC network automation comprehensive practical training device as claimed in claim 1,
the PC computers comprise a PC computer I, PC computer II, a PC computer III and a PC computer IV; the four PC computers are all provided with an i7 processor and a memory above 4G, and are provided with a Siemens communication card and Botu software.
3. The PLC network automation comprehensive practical training device as claimed in claim 2,
the PLC network control practical training cabinet comprises a PLC network control practical training cabinet I and a PLC network control practical training cabinet II; the two cabinets are identical in mechanical structure, both adopt an internal and external double-layer frame type structure and comprise cabinet bodies and installation frames arranged in the cabinet bodies, and the installation frames are used for hanging various practical training operation panels; the cabinet body adopts four sides open structure, including four preceding, back, left and right cabinet doors and preceding, two back installation frames.
4. The PLC network automation comprehensive practical training device as claimed in claim 3,
the PLC network control practical training cabinet I is provided with a practical training operation panel hanging structure which is as follows:
a power supply operation panel I, S7-1500PLC operation panel, an S7-1200PLC operation panel I, a servo motor drive control operation panel and an S120 frequency converter operation panel are hung on the front mounting frame;
a power supply operation panel II, an S7-1200PLC operation panel II, an AI analog quantity signal simulation panel, a remote I/O Profinet operation panel and a basic electric control panel I, G120 frequency converter operation panel are hung on the rear mounting frame;
a digital quantity I/O operation panel I and a human-computer interface HMII integrated with a Profibus-DP interface are arranged on the front cabinet door;
a digital quantity I/O operation panel II and a human-computer interface HMIII integrating a Profinet interface are arranged on the rear cabinet door;
the PLC network control practical training cabinet II is provided with a practical training operation panel hanging structure which comprises the following components in parts by weight:
a power supply operation panel III, an S7-300PLC operation panel, an S7-200PLC operation panel I, a stepping motor drive control operation panel and a V20 frequency converter operation panel are hung on the front mounting frame;
a power supply operation panel IV, an S7-200PLC operation panel II, an AI analog quantity signal simulation panel, a remote I/O Profinet operation panel, a basic electric control panel II and an M420 frequency converter operation panel are hung on the rear mounting frame;
a digital quantity I/O operation panel III and a human-computer interface HMIIII integrated with a Profibus-DP interface are arranged on the front cabinet door;
and a digital I/O operation panel IV and a human-computer interface HMIIV integrating a Profinet interface are arranged on the rear cabinet door.
5. The PLC network automation comprehensive practical training device as claimed in claim 3,
the mechanical structure of the PLC network control practical training cabinet further comprises:
the three-phase five-wire industrial waterproof fixed socket is used for supplying and distributing power to the power supply operation panel of the electrical control cabinet;
the safety protection grounding copper column is arranged on the inner side below the cabinet body;
a three wire system AC220V patch cord to provide power to a PC computer;
the universal moving wheel is arranged at the bottom of the cabinet body;
the mounting frame is provided with V-shaped grooves, the operation panels are consistent in shape and specification, and flanges matched with the V-shaped grooves are arranged at four corners;
one side of an operation panel hung on the installation frame is provided with a cable through hole convenient for wiring of the communication network.
6. The PLC network automation comprehensive practical training device of claim 4,
the PC I, PC, the PC III and the PC IV are respectively used as compiling and debugging operating environments of an S7-1500PLC, an S7-1200PLC, an S7-300PLC and an S7-200PLC, and the operation panels of the training cabinet II are combined and matched through the PLC network control training cabinet I, PLC network control, so that the training of the S7-200PLC control basic skills, the training of the S7-300PLC control basic skills, the training of the S7-1200PLC control basic training skills and the training of the S7-1500PLC control basic skills are realized.
7. The PLC network automation comprehensive practical training device of claim 4,
four PC computers and two PLC network control training cabinets are combined into a multi-model and multi-PLC networking coordination control training device, one or more PC computers are used for operating a WINCC program to serve as a central monitoring center.
8. The PLC network automation comprehensive practical training device of claim 7,
selecting a PC computer I to install a network card and a Bolus software, selecting two power supply operation panels I, S7-1500PLC operation panels, S7-1200PLC operation panel I, a power supply operation panel II, S7-1200PLC operation panel II, a power supply operation panel III, S7-300PLC operation panel, a power supply operation panel IV, S7-200PLC operation panel II, a remote I/O Profinet operation panel I, a remote I/O Profinet operation panel II, a human-computer interface HMIII integrated Profinet interface, a human-computer interface HMIIV integrated Profinet interface, an AI analog quantity signal simulation panel, a servo motor drive control operation panel, a stepping motor drive control operation panel, an S120 frequency converter operation panel, a G120 frequency converter operation panel, a V20 frequency converter operation panel, an M420 frequency converter operation panel, a basic electric control panel I, a basic electric control panel II, a power supply operation panel II, a power, A digital quantity I/O operation panel I, a digital quantity I/O operation panel II, a digital quantity I/O operation panel III and a digital quantity I/O operation panel IV;
a PC (personal computer) I, a CPU1516 module on an S7-1500PLC operation panel, a CPU1214DC/DC/DC module on the S7-1200PLC operation panel I, a CM1241 communication module, a CSM1277 switch module, a CPU1214AC/DC/RLY module on the S7-1200PLC operation panel II, a CM1241 communication board, a CPU314C module on the S7-300PLC operation panel, a CPU226AC/DC/RLY module on the S7-200PLC operation panel II, an Ethernet communication module, a remote I/O Profinet operation panel I, a remote I/O Profinet operation panel II and a human-machine interface HMIII integrated Profinet interface are connected by using a Profinet network cable, a Profinet network control training platform integrating a human-machine interface HMI and a PLC into a whole is built, the communication between the S7-1500PLC and the S7-1200PLC is realized, the communication between the S7-1500 and the S PLC 7-1500 and the S3-300 is realized, the communication between the S3884-1200 and the S68542 is realized, the practical training of remote variable-frequency speed regulation control based on the Profinet network and the practical training of remote servo and stepping motion control based on the Profinet network.
9. The PLC network automation comprehensive practical training device of claim 7,
selecting a PC computer I to install a network card and Bo-Tu software, selecting a power supply operation panel I, S7-1500PLC operation panel, an S7-1200PLC operation panel I, a power supply operation panel II, an S7-1200PLC operation panel II, a power supply operation panel III, an S7-300PLC operation panel, an S7-200PLC operation panel I, a human-computer interface HMII integrated Profibus-DP interface, a human-computer interface HMIIII integrated Profibus-DP interface, an AI analog quantity signal simulation panel, a servo motor drive control operation panel, a stepping motor drive control operation panel, an S120 frequency converter operation panel, a G120 frequency converter operation panel, a V20 frequency converter operation panel, an M420 frequency converter operation panel, a basic electrical control panel I, a basic electrical control panel II, a digital quantity I/O operation panel I, a digital quantity I/O operation panel II, a power supply operation panel I, a power supply operation panel II, a power supply operation panel, A digital I/O operation panel III and a digital I/O operation panel IV;
a Profibus-DP network cable is utilized to connect a PC (personal computer) I, a CPU1516 module on an S7-1500PLC operation panel, a CPU1214DC/DC/DC module on an S7-1200PLC operation panel I, a CM1243-5DP master station module, a CPU1214AC/DC/RLY module on the S7-1200PLC operation panel II, a CM1242-5DP slave station module, a CPU314C module on an S7-300PLC operation panel, a CPU226DC/DC/DC module on the S7-200PLC operation panel I, a Profibus-DP communication module, a Profibus-DP interface integrated with a human-machine interface HMII, a Profibus-DP interface integrated with a human-machine interface HMIIII, a Profibus-DP interface HMI (human machine interface) HMI (human machine interface), a Profibus-DP network control practical training platform integrated with the PLC, the S7-1500PLC and the S2-300 PLC, the Profibus 7-1200 and the Profibus 7-300 are communicated, and the practical training platform is achieved, and the S7-68542 and S68584 communication is achieved, the remote variable-frequency speed regulation control practical training based on the Profibus-DP network and the remote servo and stepping motion control practical training based on the Profibus-DP network.
10. The PLC network automation comprehensive practical training device of claim 7,
selecting a power supply operation panel I, an S7-1500PLC operation panel, an S7-1200PLC operation panel I, a power supply operation panel IV, an S7-200PLC operation panel II, a remote I/O Profinet operation panel I, a remote I/O Profinet operation panel II, a human-computer interface HMIII integrated Profinet interface and a human-computer interface HMIIV integrated Profinet interface;
the method comprises the following steps of connecting a CPU1516 module on an S7-1500PLC operation panel, a CPU1214DC/DC/DC module on an S7-1200PLC operation panel I, a CM1241 communication module and a CSM1277 switch module by using a Profinet network cable, connecting a CPU226AC/DC/RLY module on an S7-200PLC operation panel II, an Ethernet communication module, a remote I/O Profinet operation panel I, a remote I/O Profinet operation panel II and a human-computer interface HMIII integrated Profinet interface, and constructing a Profinet network integrating a human-computer interface HMI and a PLC;
selecting a power supply operation panel II, an S7-1200PLC operation panel II, a power supply operation panel III, an S7-300PLC operation panel, an S7-200PLC operation panel I, a human-computer interface HMII integrated Profibus-DP interface and a human-computer interface HMIIII integrated Profibus-DP interface;
the method comprises the following steps of connecting a CPU314C module on an S7-300PLC operation panel, a CPU1214AC/DC/RLY module and a CM1242-5DP slave station module on an S7-1200PLC operation panel II, a CPU226DC/DC/DC module and a Profibus-DP communication module on an S7-200PLC operation panel I, integrating a Profibus-DP interface with a human-computer interface HMII, integrating a Profibus-DP interface with a human-computer interface HMIIII, and building a Profibus-DP network integrating a human-computer interface HMI and a PLC into a whole by utilizing a Profibus-DP network;
a network card and a routing software are installed on a PC computer I, the PC computer I is connected with a CPU1516 module on an S7-1500PLC operation panel and a CPU314C module on an S7-300PLC operation panel 612 by utilizing a Profinet network cable, a Profinet + Profibus-DP mixed network control practical training platform is built, and the practical training function of multi-model and multi-network PLC network communication is realized.
CN202021020407.8U 2020-06-06 2020-06-06 A PLC network automation comprehensive training device Active CN212208613U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021020407.8U CN212208613U (en) 2020-06-06 2020-06-06 A PLC network automation comprehensive training device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021020407.8U CN212208613U (en) 2020-06-06 2020-06-06 A PLC network automation comprehensive training device

Publications (1)

Publication Number Publication Date
CN212208613U true CN212208613U (en) 2020-12-22

Family

ID=73807977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021020407.8U Active CN212208613U (en) 2020-06-06 2020-06-06 A PLC network automation comprehensive training device

Country Status (1)

Country Link
CN (1) CN212208613U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111627282A (en) * 2020-06-06 2020-09-04 中国人民解放军海军航空大学 PLC network automation comprehensive training device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111627282A (en) * 2020-06-06 2020-09-04 中国人民解放军海军航空大学 PLC network automation comprehensive training device

Similar Documents

Publication Publication Date Title
CN102360046B (en) General test method for motor vehicle electrical product
CN202422528U (en) Movable multifunctional teaching PLC test bench
CN111627282A (en) PLC network automation comprehensive training device
CN104134376A (en) Automatic comprehensive practical training system
CN106873517B (en) Fieldbus control experiment training teaching platform
CN205194194U (en) Emulation numerical control lathe
CN212208613U (en) A PLC network automation comprehensive training device
CN201069618Y (en) PLC simulation teaching device
CN111816039A (en) An electromechanical transmission control system and control method
CN209289290U (en) Light-duty mechanical arm control system based on CANopen
CN104238438A (en) PLC universal platform and design method thereof
CN204496798U (en) A kind of electric automatization actual training device
CN202838763U (en) Automatic control integrated practical training platform
CN203070661U (en) Programmable logic controller (PLC) practical training device
CN204117393U (en) Programmable Logic Controller experimental system
CN203799511U (en) Practical training system
CN111354239A (en) Integrated multi-platform PLC comprehensive simulation body platform
CN212160996U (en) A new comprehensive training platform
CN215770207U (en) Novel PLC teaching course experiment device
CN106547218B (en) Real-time simulation system, simulation system and closed-loop test system at the field level of HVDC transmission
CN201638066U (en) Embedded numerically controlled drill lathe control device
CN108279633A (en) A kind of experimental provision that can be used for a variety of PLC and flexibly switch
CN211826998U (en) A new type of industrial network training platform
CN202075918U (en) Experimental facility for electric equipment maintenance
CN215416307U (en) Field bus training platform based on working process systematization

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant