CN212127227U - A device for lifting ancient trees - Google Patents
A device for lifting ancient trees Download PDFInfo
- Publication number
- CN212127227U CN212127227U CN201922182728.1U CN201922182728U CN212127227U CN 212127227 U CN212127227 U CN 212127227U CN 201922182728 U CN201922182728 U CN 201922182728U CN 212127227 U CN212127227 U CN 212127227U
- Authority
- CN
- China
- Prior art keywords
- steel ring
- lifting
- fixing
- bolt hole
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及林业辅助设备技术领域,特别涉及一种起吊古树的装置。The utility model relates to the technical field of forestry auxiliary equipment, in particular to a device for lifting ancient trees.
背景技术Background technique
目前,在对林区树苗起吊遇到硬土时,经常要用到吊车进行对树苗的起吊,在起吊过程中需要大量的人力和物力,工作人员工作效率得不到提高,通常人们会选择使用一根绳将树干栓起,然后利用动力装置牵引,使得树木被抬起,这个过程常常会遇到树木的树枝被牵引绳扯断,致使树木死亡;或是树干滑动,导致难以起吊;为改善这一问题,专利申请号为201720307927.9 的中国实用新型专利《林业树苗专用起吊装置》设置了树木枝干保护装置,其能够固定树干,且不会损伤树木枝干,但该树木枝干保护装置无法针对树干的大小进行调解,而单一枝干起吊时也容易晃动,极易造成单一枝干集中受力过重断裂。为改善单线提拉绳对树木进行提升,导致在提升时非常容易产生歪斜,存在提拉不稳定的现象,专利申请号为201710651010.5的中国发明专利《一种大型树木起吊装置》提出了根据需要调节第二驱动杆的长短,两个连接杆的底部均设置有卡定条的设计,有利于驱动马达驱动线轴转动,让卡钩上的树木进行拉伸上升,卡进卡定条的内部进行移动,防止提拉时晃动;但它对所有枝干、树干、根部等无法同时起吊,依然存在倾斜晃动的问题,特别是在树叶流动之时,或某种树皮较薄极易和木质部脱离的树种而造成损伤。At present, when lifting saplings in forest areas and encountering hard soil, cranes are often used to lift saplings, which requires a lot of manpower and material resources during the lifting process, and the work efficiency of the staff cannot be improved. People usually choose to use A rope is used to tie the trunk of the tree, and then the power device is used to pull the tree to lift the tree. In this process, the branches of the tree are often torn off by the traction rope, resulting in the death of the tree; or the trunk slips, making it difficult to lift; in order to improve the For this problem, the Chinese utility model patent "Special Lifting Device for Forestry Saplings" with the patent application number 201720307927.9 is provided with a tree branch protection device, which can fix the tree trunk without damaging the tree branches, but the tree branch protection device cannot. Adjust according to the size of the trunk, and a single branch is easy to shake when it is lifted, which can easily cause the single branch to be over-stressed and broken. In order to improve the lifting of trees by a single-line lifting rope, it is very easy to skew when lifting, and there is a phenomenon of unstable lifting. The Chinese invention patent "A Large Tree Lifting Device" with the patent application number of 201710651010.5 proposes to adjust according to needs. The length of the second driving rod, the bottom of the two connecting rods are provided with the design of the locking bar, which is beneficial to the drive motor to drive the spool to rotate, so that the trees on the hook can be stretched and lifted, and the inside of the locking bar can be moved. , to prevent shaking during lifting; but it cannot lift all branches, trunks, roots, etc. at the same time, and there is still a problem of tilting and shaking, especially when the leaves are flowing, or some kind of bark is thin and easily detached from the xylem damage to trees.
实用新型内容Utility model content
本实用新型的目的是为了解决现有技术中存在的缺点,而提出的一种起吊古树的装置。The purpose of the utility model is to propose a device for lifting ancient trees in order to solve the shortcomings existing in the prior art.
为实现上述目的,本实用新型提供了一种起吊古树的装置,包括吊车本体、平衡装置以及保护装置,所述吊车本体的吊起吊端与所述平衡装置连接,所述平衡装置与保护装置可拆卸式连接,所述保护装置包括箍部和钩部,所述箍部中设有钢环,其特征在于,所述钢环内侧开设有多个用于放置胶垫的钢环槽,所述胶垫上开设有多个咬槽;In order to achieve the above purpose, the present invention provides a device for lifting ancient trees, including a crane body, a balancing device and a protection device. The hoisting end of the crane body is connected to the balancing device, and the balancing device is connected to the protection device. Removable connection, the protection device includes a hoop part and a hook part, a steel ring is arranged in the hoop part, and it is characterized in that a plurality of steel ring grooves for placing rubber pads are opened on the inner side of the steel ring, so The rubber pad is provided with a plurality of bite grooves;
相邻两个钢环槽之间设置栓孔,所述栓孔分为第一栓孔和第二栓孔,所述第一栓孔连通所述钢环内外径两侧,所述第二栓孔开设在垂直于钢环内外径的钢环壁上,与所述第一栓孔相互垂直,所述第一栓孔和第二栓孔单独开设或同时一起开设;A bolt hole is arranged between two adjacent steel ring grooves. The bolt hole is divided into a first bolt hole and a second bolt hole. The first bolt hole communicates with both sides of the inner and outer diameters of the steel ring, and the second bolt hole The holes are opened on the steel ring wall perpendicular to the inner and outer diameters of the steel ring, and are perpendicular to the first bolt holes, and the first bolt holes and the second bolt holes are opened separately or simultaneously;
在所述栓孔中置入调节件可调节保护装置的大小。The size of the protective device can be adjusted by inserting an adjustment piece in the bolt hole.
优选地,上述技术方案中,所述调节件由调节棒和保护棒组成,所述调节棒的一端与保护棒连接,所述调节棒的另一端设置有多个调节孔,所述调节棒的另一端可置入所述第一栓孔伸出钢环外侧后,在伸出的所述调节孔中插入固定柱将第一调节件与钢环连接。Preferably, in the above technical solution, the adjustment member is composed of an adjustment rod and a protection rod, one end of the adjustment rod is connected to the protection rod, and the other end of the adjustment rod is provided with a plurality of adjustment holes. After the other end can be inserted into the first bolt hole and protrude from the outside of the steel ring, a fixing post can be inserted into the extended adjustment hole to connect the first adjustment piece with the steel ring.
优选地,上述技术方案中,所述保护棒朝向所述钢环中心的一侧为圆弧面。Preferably, in the above technical solution, the side of the protection rod facing the center of the steel ring is an arc surface.
优选地,上述技术方案中,所述调节件由限位棒和固定座组成;Preferably, in the above technical solution, the adjusting member is composed of a limit rod and a fixed seat;
其中,所述固定座上开设有第一固定孔,所述第一固定孔对准所述第二栓孔可锁入螺栓或其它锁件将所述固定座与所述钢环固定;Wherein, the fixing seat is provided with a first fixing hole, and the first fixing hole is aligned with the second bolt hole, and a bolt or other locking member can be locked to fix the fixing seat and the steel ring;
所述限位棒的一端设置有限位柱,所述限位棒上开设多个限位孔,所述固定座上设置第二固定孔,所述限位孔对准所述第二固定孔后锁入限位栓来调节所述限位棒伸入所述钢环内径的长度。One end of the limiting rod is provided with a limiting column, a plurality of limiting holes are set on the limiting rod, and a second fixing hole is arranged on the fixing seat, and the limiting hole is aligned with the second fixing hole. Lock the limit bolt to adjust the length of the limit rod extending into the inner diameter of the steel ring.
优选地,上述技术方案中,所述固定座与所述钢环外侧的接触面设为固定槽,所述固定槽朝向所述钢环中心的一侧呈弧面状。Preferably, in the above technical solution, the contact surface between the fixing seat and the outer side of the steel ring is set as a fixing groove, and the side of the fixing groove facing the center of the steel ring is arc-shaped.
优选地,上述技术方案中,所述保护装置的钩部包括套筒、设置在套筒一端的连接端以及第二挂钩,所述套筒、所述连接端以及所述第二挂钩由钢铁一体成型制成;Preferably, in the above technical solution, the hook portion of the protection device includes a sleeve, a connecting end disposed at one end of the sleeve, and a second hook, and the sleeve, the connecting end and the second hook are integrally made of steel. formed;
所述套筒中设置相互垂直的第一套孔和第二套孔,所述第二套孔由套筒的另一端面伸入与所述第一套孔连通,所述第二套孔套入所述箍部的固定部,使固定部上第三栓孔与第一套孔对准,锁入螺栓将所述箍部和所述钩部连接。The sleeve is provided with a first set of holes and a second set of holes that are perpendicular to each other. Insert the fixing part of the hoop part, align the third bolt hole on the fixing part with the first set of holes, and lock the bolt to connect the hoop part and the hook part.
与现有技术相比,本实用新型具有如下有益效果:Compared with the prior art, the utility model has the following beneficial effects:
1、本实用新型能够实现对古树的平稳起吊,而且根据现场需要灵活自由调节保护装置,让保护装置在起吊时对树木完全稳定的卡住,同时有效保护树皮不被吊绳损伤,并让起吊时更加稳定。1. The utility model can realize the stable lifting of ancient trees, and can adjust the protection device flexibly and freely according to the needs of the site, so that the protection device can completely and stably jam the tree when lifting, and at the same time effectively protect the bark from being damaged by the sling, and Make it more stable when lifting.
2、本实用新型中在保护装置和平衡装置的相互作用下可选定重力最优的平衡分布方案,进一步确保起吊的安全及稳定,灵活方便。2. In the utility model, the optimal balance distribution scheme of gravity can be selected under the interaction of the protection device and the balance device, which further ensures the safety and stability of the lifting, and is flexible and convenient.
附图说明Description of drawings
图1是根据本实用新型起吊古树的装置结构示意图;1 is a schematic diagram of the structure of a device for lifting an ancient tree according to the present invention;
图2是根据本实用新型保护装置的第一种结构示意图;Fig. 2 is the first structural schematic diagram of the protection device according to the present invention;
图3是根据本实用新型保护装置的第二种结构示意图;Fig. 3 is the second structure schematic diagram of the protection device according to the present invention;
图4是根据本实用新型胶垫的构示意图;FIG. 4 is a schematic structural diagram of a rubber pad according to the present invention;
图5是根据本实用新型调节件的第一种结构示意图;Fig. 5 is the first structural schematic diagram of the adjusting member according to the present invention;
图6是根据本实用新型保护装置的第三种结构示意图;Fig. 6 is the third structural schematic diagram of the protection device according to the present invention;
图7是根据本实用新型调节件的第二种结构示意图;Fig. 7 is the second structure schematic diagram of the adjusting member according to the present utility model;
图8是根据本实用新型钩部的第二种结构示意图;Fig. 8 is the second structure schematic diagram of the hook portion according to the present invention;
图9是根据本实用新型保护装置的第四种结构示意图。FIG. 9 is a schematic diagram of the fourth structure of the protection device according to the present invention.
主要附图标记说明:Description of main reference signs:
1-吊车本体,2-平衡装置,21-挂钩孔,3-保护装置,31-钢环,32-钢环槽, 33-胶垫,331-咬槽,34-第一栓孔,341-调节棒,342-保护棒,343-调节孔, 35-第二栓孔,36-第三栓孔,37-活动接头,38-第一挂钩,39-固定部,41-限位棒,410-限位孔,411-限位柱,412-限位栓,42-固定座,420-第一固定孔, 421-第二固定孔,422-固定槽,51-套筒,52-第一套孔,53-第二套孔,54-连接端,55-第二挂钩,6-载物平车。1- Crane body, 2- Balance device, 21- Hook hole, 3- Protection device, 31- Steel ring, 32- Steel ring groove, 33- Rubber pad, 331- Biting groove, 34- First bolt hole, 341- Adjustment rod, 342-protection rod, 343-adjustment hole, 35-second bolt hole, 36-third bolt hole, 37-movable joint, 38-first hook, 39-fixed part, 41-limiting rod, 410 -Limiting hole, 411-Limiting post, 412-Limiting bolt, 42-Fixing seat, 420-First fixing hole, 421-Second fixing hole, 422-Fixing groove, 51-Sleeve, 52-First Set of holes, 53-second set of holes, 54-connection end, 55-second hook, 6-carriage flat car.
具体实施方式Detailed ways
下面结合附图,对本实用新型的具体实施方式进行详细描述,但应当理解本实用新型的保护范围并不受具体实施方式的限制。The specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings, but it should be understood that the protection scope of the present invention is not limited by the specific embodiments.
为了使本实用新型所要解决的技术问题、技术方案及有益效果更加清楚明白,以下结合附图及实施例,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施例仅用以解释本实用新型,并不用于限定本实用新型。In order to make the technical problems, technical solutions and beneficial effects to be solved by the present utility model clearer, the present utility model will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
需要说明的是,当元件被称为“固定于”或“设置于”另一个元件,它可以直接在另一个元件上或者间接在该另一个元件上。当一个元件被称为是“连接于”另一个元件,它可以是直接连接到另一个元件或间接连接至该另一个元件上。It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.
在本实用新型的描述中,需要理解的是,术语“中心”、“长度”、“宽度”、“厚度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present invention, it should be understood that the terms "center", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", The orientation or positional relationship indicated by "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the purpose of It is for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operate in a specific orientation, and therefore should not be construed as a limitation of the present invention.
此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本实用新型的描述中,“多个”的含义是两个或两个以上,除非另有明确具体的限定。In addition, the terms "first" and "second" are only used for descriptive purposes, and should not be construed as indicating or implying relative importance or implying the number of indicated technical features. Thus, a feature defined as "first" or "second" may expressly or implicitly include one or more of that feature. In the description of the present invention, "plurality" means two or more, unless otherwise expressly and specifically defined.
在本实用新型的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本实用新型中的具体含义。In the description of the present invention, it should be noted that, unless otherwise expressly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it may be a fixed connection or a connectable connection. Detachable connection, or integral connection; it can be mechanical connection or electrical connection; it can be direct connection or indirect connection through an intermediate medium, and it can be the internal communication of two elements or the interaction relationship between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific situations.
如图1所示,本实用新型的一种起吊古树的装置,其包括吊车本体1、平衡装置2以及保护装置3,吊车本体1的吊绳末端(起吊端)与平衡装置2连接,保护装置3与平衡装置2可拆卸式连接,为方便直接承载起吊后的古树,还可以在吊车本体1的后尾设置载物平车6。吊车本体1的吊绳末端与平衡装置2连接时,其连接位置优选在平衡装置2的重力中心,以便吊车本体1将其吊起时能保持平衡稳定;平衡装置2为圆柱状,也可为方形板状或其它形状,在本实施例中选用的是圆柱状的平衡装置2,该圆柱状的平衡装置2定顶部与吊车本体1的吊绳连接,平衡装置2的下部设置有多个挂钩孔21,挂钩孔21的数量可按需设置,优选设置为6个,均匀分布在平衡装置2的四周。在本实施例中的吊车本体1优选市面可直接购买的吊车,也可以是如专利申请号为201720266481.X的中国实用新型所公开的《一种吊车》,或是其它类似吊车。而保护装置由箍部和钩部构成,保护装置的箍部和钩部可以为一体,也可以拆分。As shown in FIG. 1, a device for lifting ancient trees of the present invention includes a
进一步的,在本实施例中,图2示出的第一种保护装置3的结构,该结构可在201720307927.9的中国实用新型专利《林业树苗专用起吊装置》公开的树木枝干固定装置7的结构上进行改进,增加第一挂钩38,第一挂钩38与保护装置3的钢环31一体成型,钢环31的内测固定粘接的胶垫33上开设有多个咬槽331(具体如图4),咬槽331呈漏斗状向钢环31伸入,但不超过胶垫33厚度的2/3,用于一方面增加与树干、枝干的摩擦面,减少滑动,另一方面当树干或枝干较大时,撑大钢环31由于有咬槽331的存在胶垫33拉伸,咬槽331张大进一步咬合树干、枝干,利于在吊起时稳定平衡树干、枝干并保护树皮不受破坏。进一步的胶垫33可以选用废弃的车轮胎裁制而成,也可以是其它塑胶产品制成。Further, in this embodiment, the structure of the
进一步的,在本实施例中,图3示出的第二种保护装置3的结构,与第一种保护装置3的结构不同的是卡箍式的钢环31内侧开设有多个放置胶垫33 的钢环槽32用于放置胶垫33,为了使得保护装置3可根据树干、枝干的大小而调解内经,在相邻两个钢环槽32之间设置一个第一栓孔34,第一栓孔34 连通钢环31内外径两侧,通过在第一栓孔34中置入第一调节件来适配树干、枝干的大小;更具体的是第一种调节件可采用如图5所示的结构,该调节件外形呈进式T字形,由调节棒341和保护棒342组成,调节棒341的一端与保护棒342连接,调节棒341的另一端设置有多个调节孔343,调节棒341的另一端可置入第一栓孔34伸出钢环31外侧后,在伸出的调节孔343中插入固定柱将第一调节件与钢环3稳固连接,在野外时也可就地选用类似插销的物件插入。进一步优选的保护棒342朝向钢环3中心的一侧(与树干接触的那面)为圆弧面。需要说明的是,使用这一种保护装置3时需要先判断树干、枝干的大小在确定是否要增加调节件,当树干、枝干太小需要增加调节件时,需要先将调节件装入钢环31中在套入树干或枝干,从而进一步通过调节孔343 来调节内径以满足现场需要。Further, in this embodiment, the structure of the second type of
进一步的,在本实施例中,图6示出的第三种保护装置3的结构,与第二种保护装置3的结构不同的是在相邻连个钢环槽32之间设置一个第二栓孔 35,第二栓孔35开设在垂直于钢环31内外径的钢环壁上(第二栓孔35与第一栓孔34相互垂直),而为了调节保护装置3的大小所选用的调节件则是如图7所示的结构,该第二种调节件由限位棒41和固定座42组成,其中限位棒41的一端设置有限位柱411,限位柱411的端面(与树干接触的面)优选采用磨砂面,限位棒41的另一端与固定座42活动连接,具体是通过在限位棒41上开设多个限位孔410,同时固定座42上设置第二固定孔421,限位孔 410对准第二固定孔421后锁入限位栓412来调节限位棒41伸入钢环31内径的长度,从而调节保护装置3的大小以适配树干、枝干的大小。为了使得固定座42能固定安装到钢环31上,固定座42上开设有第一固定孔420,第一固定孔420对准第二栓孔35可锁入螺栓或其它锁件将固定座42与钢环31固定。进一步,为使得固定座42与钢环31外侧的接触更紧密优选为弧面状的固定槽422,具体是朝向所述钢环中心的一侧呈弧面状。而限位棒41和固定座42可采用塑胶制成,也可以采用其它柔性材料制成。用于起吊树干或枝干较为光滑的树木时,限位柱411与钢环31之间可以多置入几个胶垫33,以进一步增加与树干或枝干的接触面,同时增加摩擦抗滑动。而限位棒41也可以用第一种调节件替代。Further, in this embodiment, the structure of the
进一步的,在本实施例中,为了更好的适配和维修更换部件,对图1结构中挂钩部件进行了改进,将保护装置3的箍部和钩部拆分出来,箍部可如图2、图3及图5所示,钩部如图8所示,其包括套筒51、设置在套筒51一端的连接端54以及第二挂钩55,套筒51、连接端54以及第二挂钩55由钢铁一体成型制成,套筒51中设置相互垂直的第一套孔52和第二套孔53,第二套孔53由套筒51的另一端面伸入与第一套孔52连通,第二套孔53套入箍部的固定部39,使得固定部39上的第三栓孔36与第一套孔52相对应,而后锁入螺栓或其它锁件将箍部和钩部稳固连接。Further, in this embodiment, in order to better adapt and maintain and replace parts, the hook part in the structure of FIG. 1 is improved, and the hoop part and the hook part of the
在进一步的,保护装置3还可以是如图9所示的第四种结构,可以通过活动接头37来实现可活动拆分,用于适配当树干超大(大于保护装置3的原设置内径时,通过活动接头37来调大保护装置3,此时挂钩则采用S型的双端挂钩,其一端钩入第三栓孔(或钩住插入第三栓孔的锁件),另一端钩入平衡装置2上的挂钩孔21。该活动接头37可以是铰接或者其它可可将箍部分至少分成两份的连接方式。Further, the
需要所说明的是,无论是如图2、图3、图5及图9的任一种结构第一栓孔和第二栓孔单独开设或同时一起开设。It should be noted that, no matter in any of the structures shown in FIGS. 2 , 3 , 5 and 9 , the first bolt hole and the second bolt hole are opened separately or simultaneously.
需要说明的时,起吊前先根据已经使用的保护装置3的数量(树干、枝干数量),选定重力最优的平衡分布方案,再将挂钩挂入到对应平衡装置2上对应的挂钩孔21,以进一步确保起吊平衡稳定。When it needs to be explained, before lifting, select the optimal balance distribution scheme of gravity according to the number of used protection devices 3 (the number of trunks and branches), and then hang the hooks into the corresponding hook holes on the corresponding balance device 2. 21 to further ensure that the lifting balance is stable.
综上所述,本实用新型能够实现对古树的平稳起吊,而且根据现场需要灵活自由调节保护装置,让保护装置在起吊时对树木完全稳定的卡住,同时有效保护树皮不被吊绳损伤,并让起吊时更加稳定。同时在保护装置和平衡装置的相互作用下可选定重力最优的平衡分布方案,进一步确保起吊的安全及稳定,灵活方便。To sum up, the utility model can realize the stable lifting of ancient trees, and the protection device can be flexibly and freely adjusted according to the needs of the site, so that the protection device can be completely and stably stuck to the tree when lifting, and at the same time effectively protect the bark from the hanging rope. damage and make it more stable when lifting. At the same time, under the interaction of the protection device and the balance device, the optimal balance distribution scheme of gravity can be selected, which further ensures the safety and stability of the lifting, and is flexible and convenient.
在本说明书中未说明的部件型号、结构、形状、连接关系均采用现有技术实现,属于公知常识。The model, structure, shape and connection relationship of the components that are not described in this specification are all realized by the prior art, and belong to common knowledge.
前述对本实用新型的具体示例性实施方案的描述是为了说明和例证的目的。这些描述并非想将本实用新型限定为所公开的精确形式,并且很显然,根据上述教导,可以进行很多改变和变化。对示例性实施例进行选择和描述的目的在于解释本实用新型的特定原理及其实际应用,从而使得本领域的技术人员能够实现并利用本实用新型的各种不同的示例性实施方案以及各种不同的选择和改变。本实用新型的范围意在由权利要求书及其等同形式所限定。The foregoing descriptions of specific exemplary embodiments of the present invention have been presented for purposes of illustration and description. These descriptions are not intended to limit the invention to the precise form disclosed, and obviously many changes and variations are possible in light of the above teachings. The exemplary embodiments were chosen and described for the purpose of explaining certain principles of the invention and its practical applications, to thereby enable those skilled in the art to make and utilize various exemplary embodiments of the invention and various Different choices and changes. The scope of the present invention is intended to be defined by the claims and their equivalents.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922182728.1U CN212127227U (en) | 2019-12-09 | 2019-12-09 | A device for lifting ancient trees |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922182728.1U CN212127227U (en) | 2019-12-09 | 2019-12-09 | A device for lifting ancient trees |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212127227U true CN212127227U (en) | 2020-12-11 |
Family
ID=73668773
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922182728.1U Expired - Fee Related CN212127227U (en) | 2019-12-09 | 2019-12-09 | A device for lifting ancient trees |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212127227U (en) |
-
2019
- 2019-12-09 CN CN201922182728.1U patent/CN212127227U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212127227U (en) | A device for lifting ancient trees | |
CN205622144U (en) | Portable transmission line overhead ground wire elevating gear | |
CN205087867U (en) | Multi -functional haulage equipment of transformer substation that adoption lifting hook lifted by crane | |
KR102007663B1 (en) | Lifting lug apparatus | |
CN109368485B (en) | Balanced hoisting accessory of trees for environmental engineering | |
CN207986495U (en) | A kind of Bridge High-pier main reinforcement hanging apparatus | |
CN206014242U (en) | A kind of aid for lifting insulator | |
CN205346675U (en) | Lorry crane with drilling rod device | |
CN205061426U (en) | Adopt magnetism to hang multi -functional haulage equipment of transformer substation that tong " pan " lifted by crane | |
CN205275095U (en) | Cross bridge type gin pole device | |
US3219215A (en) | Pole handling device | |
CN204022267U (en) | Steel trestle tool special for hoisting | |
CN211338554U (en) | Auxiliary tool for hoisting steel structure construction | |
CN222082206U (en) | A lifting mechanism | |
CN207361608U (en) | A kind of special hanger for board suspending | |
CN217076699U (en) | Hoisting clamp for crane | |
CN219469453U (en) | Anti-drop hook | |
CN215666622U (en) | Prefabricated component hoist of assembly type structure | |
CN216403580U (en) | Brick lifting appliance | |
CN220537300U (en) | Vertical ingot casting lifting tool | |
CN211366694U (en) | Forestry is hoisting accessory for sapling | |
CN211767089U (en) | Steel lifting appliance for forklift | |
CN214611103U (en) | Hoisting tool | |
CN210795489U (en) | Automatic change mechanical hoist | |
CN215160322U (en) | Novel flat hoist that hangs in wheel crane hole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220707 Address after: 530022 No. b-1207, unit B, city impression, No. 52, Changhu Road, Qingxiu District, Nanning City, Guangxi Zhuang Autonomous Region Patentee after: Guangxi woodpecker Plant Protection Technology Co.,Ltd. Address before: No. 206, building 1, Fuhuang commercial and residential community, No. 9, Yulong Erli, Liangqing District, Nanning City, Guangxi Zhuang Autonomous Region 530000 Patentee before: Guangxi Jinhe Mingmu ancient tree protection Co.,Ltd. Patentee before: Nanning Garden Research Institute |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201211 |
|
CF01 | Termination of patent right due to non-payment of annual fee |