[go: up one dir, main page]

CN212114056U - A high-voltage transmission line grounding wire for preventing misoperation - Google Patents

A high-voltage transmission line grounding wire for preventing misoperation Download PDF

Info

Publication number
CN212114056U
CN212114056U CN202021199773.4U CN202021199773U CN212114056U CN 212114056 U CN212114056 U CN 212114056U CN 202021199773 U CN202021199773 U CN 202021199773U CN 212114056 U CN212114056 U CN 212114056U
Authority
CN
China
Prior art keywords
wire
clip
grounding
pull
operating rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021199773.4U
Other languages
Chinese (zh)
Inventor
张弘
姚天明
宋凯
李畅
赵峰
周强
赵元勋
何亮
胡灵
张红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Wuhan Power Supply Co of State Grid Hubei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Wuhan Power Supply Co of State Grid Hubei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Wuhan Power Supply Co of State Grid Hubei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN202021199773.4U priority Critical patent/CN212114056U/en
Application granted granted Critical
Publication of CN212114056U publication Critical patent/CN212114056U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本实用新型提供了一种防止误操作的高压输电线路接地线,包括:操作杆、导线夹、接地线夹、软铜线、拉线,所述导线夹设置在所述操作杆的顶部,所述导线夹上设置有导线孔;所述软铜线的一端与所述导线夹相连,另一端与所述接地线夹相连;所述拉线的一端与所述导线夹相连,另一端穿过所述操作杆与所述接地线夹相连,所述拉线张紧时,所述导线孔处于打开状态,所述拉线松弛时,所述导线孔处于关闭状态。本实用新型提供的接地线可保证检修人员的操作顺序,提高作业的安全性,挂接地线时,先接好接地端,才可以挂接导线端;拆卸接地线时,先拆下导线夹,才能拆下接地线夹。

Figure 202021199773

The utility model provides a grounding wire for high-voltage transmission lines that prevents misoperation, comprising: an operating rod, a wire clip, a grounding wire clip, a soft copper wire, and a pull wire, the wire clip is arranged on the top of the operating rod, and the The wire clip is provided with a wire hole; one end of the soft copper wire is connected to the wire clip, and the other end is connected to the ground wire clip; one end of the pull wire is connected to the wire clip, and the other end passes through the wire clip The operating rod is connected with the grounding wire clip, when the pulling wire is tensioned, the wire hole is in an open state, and when the pulling wire is slack, the wire hole is in a closed state. The grounding wire provided by the utility model can ensure the operation sequence of the maintenance personnel and improve the safety of the operation. When hanging the grounding wire, the grounding terminal must be connected first, and then the wire terminal can be connected; to remove the ground clip.

Figure 202021199773

Description

一种防止误操作的高压输电线路接地线A high-voltage transmission line grounding wire for preventing misoperation

技术领域technical field

本实用新型涉及接地线技术领域,具体地涉及一种防止误操作的高压输电线路接地线。The utility model relates to the technical field of grounding wires, in particular to a grounding wire for high-voltage transmission lines that prevents misoperation.

背景技术Background technique

在输电线路停电检修工作中,为了防止电源突然送电及感应电的存在,对检修人员构成威胁,需要在高压设备上加装接地线。接地线在使用过程中,如果先接导线端,可能会因为高压设备上带电或突然来电造成人员触电,所以应严格按照先接接地端,后接导线段的顺序执行;同理,拆除接地线时,应先拆导线端,后拆接地端。目前,尚无很好的防止接地线误操作装置,而检修人员容易疏忽大意,先挂导线端,后接接地端。In the power outage maintenance work of the transmission line, in order to prevent the sudden power transmission of the power supply and the existence of induced electricity, which pose a threat to the maintenance personnel, it is necessary to install a ground wire on the high-voltage equipment. During the use of the ground wire, if the wire end is connected first, it may cause electric shock to the person due to the live on the high-voltage equipment or a sudden power call. Therefore, it should be strictly implemented in the order of connecting the ground terminal first, and then the wire segment. Similarly, remove the ground wire. When , the wire end should be removed first, and then the grounding end should be removed. At present, there is no good device to prevent the misoperation of the ground wire, and the maintenance personnel are easily negligent, and the wire end is hung first, and then the ground terminal is connected.

实用新型内容Utility model content

本实用新型旨在至少解决现有技术中存在的技术问题之一。为此,本实用新型提出一种防止误操作的高压输电线路接地线,包括:The utility model aims to solve at least one of the technical problems existing in the prior art. To this end, the present utility model proposes a high-voltage transmission line grounding wire for preventing misoperation, including:

操作杆(1);operating lever (1);

接地线夹(3);grounding clamp (3);

导线夹(2),所述导线夹(2)设置在所述操作杆(1)的顶部,所述导线夹(2)上设置有导线孔(26);a wire clip (2), the wire clip (2) is arranged on the top of the operating rod (1), and the wire clip (2) is provided with a wire hole (26);

软铜线(4),所述软铜线(4)的一端与所述导线夹(2)相连,另一端与所述接地线夹(3)相连;a soft copper wire (4), one end of the soft copper wire (4) is connected to the wire clip (2), and the other end is connected to the ground wire clip (3);

拉线(5),所述拉线(5)的一端与所述导线夹(2)相连,另一端穿过所述操作杆(1)与所述接地线夹(3)相连,所述拉线(5)张紧时,所述导线孔(26)处于打开状态,所述拉线(5)松弛时,所述导线孔(26)处于关闭状态。A pull wire (5), one end of the pull wire (5) is connected to the wire clip (2), and the other end is connected to the ground wire clamp (3) through the operating rod (1), the pull wire (5) ) when tensioned, the wire hole (26) is in an open state, and when the pulling wire (5) is loosened, the wire hole (26) is in a closed state.

进一步地,所述导线夹(2)包括左半夹体(21)、右半夹体(22)、压缩弹簧,所述左半夹体(21)与右半夹体(22)通过铰接轴(23)铰接相连时形成所述导线孔(26),所述压缩弹簧套设在所述铰接轴(23)上,所述压缩弹簧的一端与所述左半夹体(21)的底部相连,另一端与所述右半夹体(22)的底部相连,所述右半夹体(22)的底部通过螺栓一(6)、螺母一固定在所述操作杆(1)的顶部,所述软铜线(4)的一端与所述右半夹体(22)的上部通过螺钉相连,所述拉线(5)的一端通过螺栓二(7)、螺母二(71)固定在所述左半夹体(21)的底部。Further, the wire clip (2) comprises a left half clip body (21), a right half clip body (22) and a compression spring, and the left half clip body (21) and the right half clip body (22) pass through a hinge shaft (23) The wire hole (26) is formed during hinged connection, the compression spring is sleeved on the hinge shaft (23), and one end of the compression spring is connected to the bottom of the left half-clamp body (21). , the other end is connected to the bottom of the right half-clamp body (22), and the bottom of the right half-clamp body (22) is fixed on the top of the operating rod (1) by a bolt (6) and a nut one, so One end of the soft copper wire (4) is connected with the upper part of the right half-clamp body (22) by screws, and one end of the pull wire (5) is fixed on the left side by two bolts (7) and two nuts (71). Bottom of the half clip body (21).

进一步地,所述拉线(5)包括依次相连的拉线一(51)、迟滞弹簧(53)、拉线二(52),所述迟滞弹簧(53)的刚度大于所述拉线一(51)、拉线二(52)的刚度。Further, the pulling wire (5) comprises a pulling wire one (51), a hysteresis spring (53), and a second pulling wire (52) connected in sequence, and the stiffness of the hysteresis spring (53) is greater than that of the first pulling wire (51), the pulling wire Two (52) stiffness.

本实用新型提供的接地线可保证检修人员的操作顺序,提高作业的安全性,挂接地线时,先接好接地端,才可以挂接导线端;拆卸接地线时,先拆下导线夹,才能拆下接地线夹。The grounding wire provided by the utility model can ensure the operation sequence of the maintenance personnel and improve the safety of the operation. When hanging the grounding wire, the grounding terminal must be connected first, and then the wire terminal can be connected; to remove the ground clip.

附图说明Description of drawings

图1是本实用新型提供的一种防止误操作的高压输电线路接地线的结构示意图;1 is a schematic structural diagram of a high-voltage transmission line grounding wire for preventing misoperation provided by the present invention;

图2是本实用新型提供的导线夹的结构示意图;Fig. 2 is the structural representation of the wire clip provided by the present utility model;

其中,1、操作杆;2、导线夹;21、左半夹体;22、右半夹体;23、铰接轴;24、压缩弹簧的一端;25、压缩弹簧的另一端;26、导线孔;3、接地线夹;4、软铜线;5、拉线;51、拉线一;52、拉线二;53、迟滞弹簧;6、螺栓一;7、螺栓二;71、螺母二;Among them, 1, operating lever; 2, wire clip; 21, left half clip body; 22, right half clip body; 23, hinge shaft; 24, one end of compression spring; 25, the other end of compression spring; 26, wire hole ;3, ground clamp; 4, soft copper wire; 5, pull wire; 51, pull wire one; 52, pull wire two; 53, hysteresis spring; 6, bolt one; 7, bolt two; 71, nut two;

具体实施方式Detailed ways

下面详细描述本实用新型的实施例,所述实施例的示例在附图中示出,其中自始至终相同或类似的标号表示相同或类似的元件或具有相同或类似功能的元件。下面通过参考附图描述的实施例是示例性的,仅用于解释本实用新型,而不能理解为对本实用新型的限制。The following describes in detail the embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein the same or similar reference numerals refer to the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, but should not be construed as a limitation of the present invention.

在本实用新型的描述中,需要理解的是,术语“中心”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In the description of the present invention, it should be understood that the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal" , "top", "bottom", "inside", "outside" and other indicated orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings, only for the convenience of describing the present utility model and simplifying the description, rather than indicating or It is implied that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore should not be construed as a limitation of the present invention.

在本实用新型的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“设置”应做广义理解,例如,可以是固定相连、设置,也可以是可拆卸连接、设置,或一体地连接、设置。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present utility model, it should be noted that, unless otherwise expressly specified and limited, the terms "installation", "connection" and "arrangement" should be understood in a broad sense, for example, it may be fixedly connected, arranged, or It is a detachable connection and arrangement, or an integral connection and arrangement. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood in specific situations.

如图1、图2所示,本实用新型提供了一种防止误操作的高压输电线路接地线,包括:操作杆1、导线夹2、接地线夹3、软铜线4、拉线5,所述导线夹2设置在所述操作杆1的顶部,所述导线夹2上设置有导线孔26;所述软铜线4的一端与所述导线夹2相连,另一端与所述接地线夹3相连;所述拉线5的一端与所述导线夹2相连,另一端穿过所述操作杆1与所述接地线夹3相连,所述拉线5张紧时,所述导线孔26处于打开状态,所述拉线5松弛时,所述导线孔26处于关闭状态。As shown in Figures 1 and 2, the present utility model provides a grounding wire for high-voltage transmission lines that prevents misoperation, including: an operating rod 1, a wire clip 2, a ground wire clip 3, a soft copper wire 4, and a pull wire 5, all of which The wire clip 2 is arranged on the top of the operating rod 1, and the wire clip 2 is provided with a wire hole 26; one end of the soft copper wire 4 is connected to the wire clip 2, and the other end is connected to the ground wire clip 3 is connected; one end of the pull wire 5 is connected to the wire clip 2, and the other end is connected to the ground wire clamp 3 through the operating rod 1. When the pull wire 5 is tensioned, the wire hole 26 is open In the state, when the pulling wire 5 is loose, the wire hole 26 is in a closed state.

进一步地,所述导线夹2包括左半夹体21、右半夹体22、压缩弹簧,所述左半夹体21与右半夹体22通过铰接轴23铰接相连时形成所述导线孔26,所述压缩弹簧套设在所述铰接轴23上,所述压缩弹簧的一端24与所述左半夹体21的底部相连,所述压缩弹簧的另一端25与所述右半夹体22的底部相连,所述右半夹体22的底部通过螺栓一6、螺母一固定在所述操作杆1的顶部,所述软铜线4的一端与所述右半夹体22的上部通过螺钉相连,所述拉线5的一端通过螺栓二7、螺母二71固定在所述左半夹体21的底部。具体地,所述导线孔26位于所述铰接轴23的上方,所述拉线5位于所述铰接轴23的下方,所述软铜线4的一端位于所述铰接轴23的上方。Further, the wire clip 2 includes a left half clip body 21 , a right half clip body 22 and a compression spring, and the wire hole 26 is formed when the left half clip body 21 and the right half clip body 22 are hingedly connected through the hinge shaft 23 . , the compression spring is sleeved on the hinge shaft 23 , one end 24 of the compression spring is connected to the bottom of the left half clip body 21 , and the other end 25 of the compression spring is connected to the right half clip body 22 The bottom of the right half-clamp body 22 is fixed on the top of the operating rod 1 by bolts 6 and nut 1, and one end of the soft copper wire 4 is connected to the upper part of the right half-clamp body 22 by screws Connected to each other, one end of the pull wire 5 is fixed to the bottom of the left half-clamp body 21 by the second bolt 7 and the second nut 71 . Specifically, the wire hole 26 is located above the hinge shaft 23 , the pull wire 5 is located below the hinge shaft 23 , and one end of the soft copper wire 4 is located above the hinge shaft 23 .

进一步地,所述拉线5包括依次相连的拉线一51、迟滞弹簧53、拉线二52,所述迟滞弹簧53的刚度大于所述拉线一51、拉线二52的刚度。Further, the pull wire 5 includes a pull wire one 51 , a hysteresis spring 53 , and a pull wire two 52 connected in sequence. The stiffness of the hysteresis spring 53 is greater than that of the pull wire one 51 and the pull wire two 52 .

本实用新型的工作原理为:The working principle of the utility model is:

接地线没有挂在导线上时,拉线一51、拉线二52处于松弛状态,导线孔26处于关闭状态。When the ground wire is not hung on the wire, the first pull wire 51 and the second pull wire 52 are in a loose state, and the wire hole 26 is in a closed state.

当需要挂接地线时,首先,将接地线夹3固定在杆塔上,然后手持操作杆1并将操作杆1向上移动,使得拉线一51、拉线二52处于张紧状态,此时,导线孔26打开,即可将导线卡入导线孔26中,之后,沿着导线向左或向右移动操作杆1,使得拉线一51、拉线二52处于松弛状态,导线孔26处于关闭状态,如此,即完成了挂接地线的工作。When it is necessary to hang the ground wire, first, fix the ground wire clip 3 on the tower, then hold the operating rod 1 and move the operating rod 1 upward, so that the first pull wire 51 and the second pull wire 52 are in a tensioned state. At this time, the wire hole 26 is opened, the wire can be clipped into the wire hole 26, then, move the operating lever 1 to the left or right along the wire, so that the first pull wire 51 and the second pull wire 52 are in a relaxed state, and the wire hole 26 is in a closed state, so, That is, the work of hanging the ground wire is completed.

当需要拆卸接地线时,向左或向右移动操作杆1,使得拉线一51、拉线二52处于张紧状态,此时导线孔26打开,即可将导线夹2从导线上拆卸下来,之后,将接地线夹3从杆塔上拆卸下来,如此,即完成了拆卸接地线的工作。When it is necessary to remove the ground wire, move the operating lever 1 to the left or right, so that the first pull wire 51 and the second pull wire 52 are in a tensioned state. At this time, the wire hole 26 is opened, and the wire clamp 2 can be removed from the wire, and then , remove the ground wire clip 3 from the tower, so that the work of removing the ground wire is completed.

尽管已经示出和描述了本实用新型的实施例,本领域的普通技术人员可以理解:在不脱离本实用新型的原理和宗旨的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由权利要求及其等同物限定。Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the present invention. Variations, the scope of the present invention is defined by the claims and their equivalents.

Claims (3)

1.一种防止误操作的高压输电线路接地线,其特征在于,包括:1. A high-voltage transmission line ground wire for preventing misoperation, it is characterized in that, comprising: 操作杆(1);operating lever (1); 接地线夹(3);grounding clamp (3); 导线夹(2),所述导线夹(2)设置在所述操作杆(1)的顶部,所述导线夹(2)上设置有导线孔(26);a wire clip (2), the wire clip (2) is arranged on the top of the operating rod (1), and the wire clip (2) is provided with a wire hole (26); 软铜线(4),所述软铜线(4)的一端与所述导线夹(2)相连,另一端与所述接地线夹(3)相连;a soft copper wire (4), one end of the soft copper wire (4) is connected to the wire clip (2), and the other end is connected to the ground wire clip (3); 拉线(5),所述拉线(5)的一端与所述导线夹(2)相连,另一端穿过所述操作杆(1)与所述接地线夹(3)相连,所述拉线(5)张紧时,所述导线孔(26)处于打开状态,所述拉线(5)松弛时,所述导线孔(26)处于关闭状态。A pull wire (5), one end of the pull wire (5) is connected to the wire clip (2), and the other end is connected to the ground wire clamp (3) through the operating rod (1), the pull wire (5) ) when tensioned, the wire hole (26) is in an open state, and when the pulling wire (5) is loosened, the wire hole (26) is in a closed state. 2.根据权利要求1所述的防止误操作的高压输电线路接地线,其特征在于,所述导线夹(2)包括左半夹体(21)、右半夹体(22)、压缩弹簧,所述左半夹体(21)与右半夹体(22)通过铰接轴(23)铰接相连时形成所述导线孔(26),所述压缩弹簧套设在所述铰接轴(23)上,所述压缩弹簧的一端(24)与所述左半夹体(21)的底部相连,另一端(25)与所述右半夹体(22)的底部相连,所述右半夹体(22)的底部通过螺栓一(6)、螺母一固定在所述操作杆(1)的顶部,所述软铜线(4)的一端与所述右半夹体(22)的上部通过螺钉相连,所述拉线(5)的一端通过螺栓二(7)、螺母二(71)固定在所述左半夹体(21)的底部。2. The high-voltage transmission line grounding wire for preventing misoperation according to claim 1, wherein the wire clip (2) comprises a left half clip body (21), a right half clip body (22), and a compression spring, The wire hole (26) is formed when the left half-clamp body (21) and the right half-clamp body (22) are hingedly connected through a hinge shaft (23), and the compression spring is sleeved on the hinge shaft (23) , one end (24) of the compression spring is connected to the bottom of the left half-clamp body (21), and the other end (25) is connected to the bottom of the right half-clamp body (22). The bottom of 22) is fixed on the top of the operating rod (1) by a bolt (6) and a nut, and one end of the soft copper wire (4) is connected with the upper part of the right half-clamp (22) by a screw One end of the pulling wire (5) is fixed on the bottom of the left half-clamp body (21) by two bolts (7) and two nuts (71). 3.根据权利要求2所述的防止误操作的高压输电线路接地线,其特征在于,所述拉线(5)包括依次相连的拉线一(51)、迟滞弹簧(53)、拉线二(52),所述迟滞弹簧(53)的刚度大于所述拉线一(51)、拉线二(52)的刚度。3 . The high-voltage transmission line grounding wire for preventing misoperation according to claim 2 , wherein the pulling wire ( 5 ) comprises a pulling wire one ( 51 ), a hysteresis spring ( 53 ) and a pulling wire two ( 52 ) which are connected in sequence. 4 . , the stiffness of the hysteresis spring (53) is greater than the stiffness of the first pull wire (51) and the second pull wire (52).
CN202021199773.4U 2020-06-25 2020-06-25 A high-voltage transmission line grounding wire for preventing misoperation Expired - Fee Related CN212114056U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021199773.4U CN212114056U (en) 2020-06-25 2020-06-25 A high-voltage transmission line grounding wire for preventing misoperation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021199773.4U CN212114056U (en) 2020-06-25 2020-06-25 A high-voltage transmission line grounding wire for preventing misoperation

Publications (1)

Publication Number Publication Date
CN212114056U true CN212114056U (en) 2020-12-08

Family

ID=73628487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021199773.4U Expired - Fee Related CN212114056U (en) 2020-06-25 2020-06-25 A high-voltage transmission line grounding wire for preventing misoperation

Country Status (1)

Country Link
CN (1) CN212114056U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114577382A (en) * 2022-04-07 2022-06-03 国网江苏省电力有限公司超高压分公司 Overhead line grounding wire sequential assembly and disassembly protection device and use method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114577382A (en) * 2022-04-07 2022-06-03 国网江苏省电力有限公司超高压分公司 Overhead line grounding wire sequential assembly and disassembly protection device and use method
CN114577382B (en) * 2022-04-07 2024-01-23 国网江苏省电力有限公司超高压分公司 Overhead line grounding wire sequential assembling and disassembling protection device and use method

Similar Documents

Publication Publication Date Title
CN110854739B (en) An unmanned aerial vehicle-based electrical inspection and grounding method for overhead transmission lines
CN201490669U (en) Overhead Lightning Line Anti-vibration Hammer Resetter
CN212114056U (en) A high-voltage transmission line grounding wire for preventing misoperation
CN111585068B (en) A ground wire anti-dropping device with double locking function
CN206134957U (en) A quick-rotating and tightening portable grounding device
CN202178408U (en) Straightly-clamping type screw-pressing ground wire clamp for square bus
CN207282757U (en) A kind of outdoor grounding electrical connection
CN105932445B (en) A kind of short circuit earthing clamp with locking anti-loose function
CN102185267B (en) 66KV ground potential hot-line make-and-break bypassing method
CN207504528U (en) A kind of slidingtype of electric power network circuit quickly clears the snow tool
CN210838395U (en) A grounding device for substation equipment externally mounted on an unmanned aerial vehicle
CN105810490B (en) Can charged for replacement contact disconnecting switch and specific purpose tool for replacing contact
CN204991307U (en) Arrester protective frame
CN209822902U (en) Quickly attachable and detachable grounding device
CN203503821U (en) Hard pipe busbar grounding device
CN105185487B (en) A kind of protection of arrester frame
CN206818948U (en) A force unloading device for installing ADSS optical cables on iron towers
CN110653741A (en) Tool for electrically fastening clamp bolt in overhead electrified remote control of power transmission line
CN110571548A (en) A ground clamp
CN205759199U (en) 220kV Twin bundled line electrified operation self-locking backup protection rope
CN209133709U (en) hook grounding device
CN206271910U (en) A ground wire suspension device
CN211405417U (en) Externally hung earthing device for transmission line on unmanned aerial vehicle
CN204858403U (en) A temporary hanging point fixing device for live replacement of V-shaped insulators on transmission lines
CN205406767U (en) Device for hanging ground wire on outdoor busbar of transformer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201208

Termination date: 20210625